Thermite Welding (Cadwelding)

Procedure Overview
This standard provides the procedures for using thermite welding to attach wire
to pipe.

References
CON 13-01 Wrapping Steel Pipe
CON 13-02 Wrapping Wire-to-Pipe Connections
Review of Thermite Welding on Pipelines, Dr. G.T. Beynon, March 15, 2002
Drawing 99000-E-030-101 Typical Thermite Weld Connection

Equipment
5 mm 57 mm copper sleeves
bonding wire or test leads
thermite weld mold (sized for the pipe being welded to)
#15 (15 gram) cartridges and steel disc
flint gun
crimping pliers
scraper
lino knife
wire brush
file
pipe recoating material

Safety Concerns
Thermite weld process produces very high temperatures and molten
metal. Wear gloves, safety goggles, and a long sleeve shirt or coveralls
when igniting the charge.
Do not inhale the fumes from thermite welding.
Do not thermite weld in combustible atmospheres and ensure the ground
below the thermite weld is free of all hydrocarbons.
Only employees having taken the available training course may thermite
weld.
Other Joining Methods
There are other methods of joining wire to pipe however thermite welding is the
only acceptable welding process for field connection of test lead wires, bond
wires, galvanic anode leads, rectifier negative cables, and plastic distribution
system tracer wires to steel pipe.

Mechanical connections are also acceptable, but only for non-current carrying
lead wires.

Torch brazing or arc welding of field connections is not permitted.

Procedure
1. Prepare the pipe.
o The weld area must be at least 150 mm from other thermite welds
and circumferential or longitudinal pipe welds.
o Remove wrapping or other coating from the pipe in accordance
with CON 13-01 Wrapping Steel Pipe.
o Clean the pipes surface thoroughly with a wire brush and a file
attaining a bright, clean, dry surface free of mill scale and grease.
o Refer to Drawing 99000-E-030-101 Typical Thermite Weld
Connection.
2. Inspect the pipe.
o Visually inspect the weld area to confirm the absence of surface
defects.
o Ultrasonically inspect IP pipelines with an outer diameter greater
than 60.3 mm and all TP pipelines (of any diameter) to confirm
adequate wall thickness (See Table 1) and the absence of
laminations.
o Select and prepare a new weld location if there are surface
defects, inadequate wall thickness or laminations.
3. Determine the maximum line pressure for safe thermite welding.
o Ensure that during thermite welding process the maximum line
pressure will not exceed the value given in Table 1 for the wall
thickness of the line.
Table 1:

Maximum Safe Line Pressures During


Maximum Allowable Gas
Thermite Welding
Pressure
Nominal Pipe Wall Thickness
thermite welding not
less than 2.8 mm (0.109")
permitted
2.8 mm (0.109") 700 kPa (100 psi)
3.2 mm (0.125") 2890 kPa (419 psi)
3.6 mm (0.141") 3450 kPa (500 psi
4.0 mm (0.156") or thicker design pressure

o NOTE: The maximum safe line pressures during thermite welding are
lower than the pressure rating of the gas lines and the manufacturer
ratings for thermite product because of FortisBC (Natural Gas) (FBC
(Gas)) concerns regarding the quality of older piping in the ground.
o If unable to reduce the pressure to less than the maximum
allowable pressure in Table 1, test leads can be attached to the
pipe with a stainless steel clamp. However an alternative means of
attaching current carrying leads such as rectifier negative leads will
have to be determined because below ground mechanical
connections will not be permitted.
4. Prepare and position the wire on the pipe.
o Remove 65 mm of insulation from the wire.
Make sure the bare wire is bright, clean, and dry.
o For #10, 12, or 14 AWG wire:
slide a copper sleeve over the bare wire and crimp it into
place.
o For #6 or #8 AWG wire:
a copper sleeve is not required
place the stripped end over the prepared pipe surface
o Loop the wire around the pipe tieing it off with sufficient slack to
ensure that the finished weld will not be strained and place the
copper sleeve over the prepared pipe surface.
o Where a conductor larger than #6 AWG is required, a multi-strand
conductor must be used and the strands arranged into groups no
larger than #6 AWG. Each group will be attached to the pipe with
a separate charge.
Figure 1: Thermite Weld Connection (top view)

Figure 2: Picture showing the wire positioned on the pipe with crucible on
top. Note the absence of voids between the crucible and the pipe.
5. Position the thermite weld mold.
o Choose the correct crucible for the job.
Crucibles come in different configurations depending on the
size of the wire and the size of the pipe being welded.
o Ensure that the crucible is thoroughly clean and dry.
Wet or damp crucibles produce porous welds.
o Position the thermite weld mold over the copper sleeve or bared
wire on top of the prepared surface.
o Make sure the copper sleeve or wire extends fully into the thermite
weld mold cavity.
There should be no wire insulation in contact with the thermite
weld mold.
o Make sure the thermite weld mold sits flat, flush with the pipe so that
there are no voids between the crucible and the pipe caused by
the curvature of the pipe.
o Insert the metal disc in the bottom of the crucible with the concave
side up.

Figure 3

6. Prepare the charge.


o Dump the entire contents of a #15 cartridge into the crucible.

DANGER: Use only #15 (15 gram) cartridges and only one cartridge
per connection.

o Do not upset the metal disc.


o Make sure the ignition powder, stored in the lower part of the
cartridge, is placed in its entirety on top of the copper oxide and
aluminum powder mixture, allowing a little ignition powder to sit on
the outside edge of the crucible. Do not mix the ignition powder
with the copper oxide and aluminum powder mixture otherwise it
may be difficult to ignite the charge with a spark gun.
o Close the cover of the crucible.
7. Ignite the charge.

DANGER: The thermite weld process produces very high temperatures and
molten metal. Wear gloves, safety goggles, and long sleeves for this
operation.

o Using the handle, hold the thermite weld mold firmly in position on
the pipe.
o Make sure all persons are away from or protected from the flash. Be
prepared for the flash that will result so as to avoid sudden
movements (i.e., flinching). Prior to ignition turn your face away to
avoid any flash danger.
o Ignite the charge with the spark igniter.
Do not use matches.
o If the charge fails to ignite, dump the entire thermite weld charge
and try again. Under no circumstances add another charge to the
first one!
o Hold the thermite weld mold in position for 30 seconds before lifting
it from the pipe. Clean the mold.
o Tap the slag away from the weld and file down any irregularities.
8. Ensure that the weld has achieved a good bond between the wire and
the pipe.
o Examine the copper wire for any burn throughs.
o Test the strength of the bond by gently tugging on the wire lead
noting any give or failure in the wire.
o Tap the thermite weld button gently with a slag hammer. Again
noting any give or failure of the weld to the surface of the pipe.
o If there are burn throughs in the wire, or if there is evidence of give
or connection failure when the wire is gently tugged, or if there is
evidence of the weld giving or failing when the weld button is
tapped with the slag hammer, abandon the weld site and go back
to Step 1 of this procedure, selecting another site at least 150 mm
removed from the abandoned site.
9. Properly coat the thermite weld connection.
o Refer to CON 13-02 Wrapping Wire-to-Pipe Connections.
10. Properly recoat the pipe.
o Refer to CON 13-01 Wrapping Steel Pipe.