Documente Academic
Documente Profesional
Documente Cultură
Services
Design of onshore and offshore lifting and
installation of heavy structures and
equipment
Subsea installation design
Seafastening design
Design of special lifting devices
Structural analysis for transportation, lifting
and installation
Design of floating structures, buoys and
mooring Lifting Plan for Heavy Lift
Presentation
2D and 3D drawings
Complete calculation report
Lifting Plan for equipment aboard FPSO
Animated video of operation
Dynamic simulation
Standards
ABNT
IMO / ILO / UM ECE
PETROBRAS
ISO
DNV / NOBEL DENTON
ABS
Lift Plan for crane installation on fixed offshore platform
Services
3D Lifting Plans
Lifting design for onshore and offshore
operations
Design of special rigging devices
Design of non conventional lifting using
frames, skids, strand-jacks etc.
Structural stress analysis for transport,
lifting and installation Lifting and upending of reactor using 3 cranes
2D and 3D drawings
Complete calculation report
Lifting animated video
Standards
ABNT
Stress analysis of a tank during lifting
EN / DIN
IMO/ILO/UM ECE
PETROBRAS
ISO
DNV NOBEL DENTON
Training
TechCon Engineering & Consulting is a worldwide company that provides training for lifting design and
operation using comprehensive teaching and updated standards.
Courses
Lift Planning & Design
Lift Planning & Design for advanced operation
Lift Planning & Operation for offshore platforms
Offshore personnel transfer with basket -
planning and execution Workbook - high quality and easy to understand
Lifting Supervision
Steel structures for lifting purposes
Fleet management
Customized training
Highlights
Structures
Top side
Process modules
Flare towers
Storage tanks
Floating structures
Buoys
Temporary structures
Inspection of offshore structures
Special equipment
Analysis
Stress analysis using finite elements
Vibration analysis and attenuation Pig launcher and receiver for offshore pipeline
Fatigue analysis
Computational fluid dynamics
Standards
ISO 19900
ABNT
Stress analysis for rectangular oil tank for offshore platform
IMO
ASME, AISC
API
CEN (EN)
Vitoria, Espirito Santo, Brazil - Phone: +55 (27) 3235-7271
projetos@techcon.eng.br www.techcon.eng.br
TechCon Engineering & Consulting
Offshore Structures and Lifting Design
Methodology
1. Bollard and base structural inspection
2. Non-destructive tests
3. Non-linear stress analysis by finite
element method
4. Check theoretical strength
5. Design of load test
6. Load test execution Stress analysis by Finite Element Method
7. Non-destructive tests
8. Issue of load capacity certificate
Applications
Bollards of any geometry and capacity
Quick release hooks
Vessel bollards
Hooks, winches and capstans Load test up to 500t on mooring equipment
Large pad eyes
Reels and spools
Load Test
Maximum force of 500 tons
Maximum force applied at any angle to
horizontal and vertical simulating real
mooring forces
Load test in hooks, winches and capstans
Automated real-time monitoring of
forces, stresses, displacements,
deformations and reactions on
structures, ensuring the results and
increasing safety
TechCon Engineering & Consulting is a worldwide company that provides crane and rigging accidents
investigation occurred in any kind of operation, using the state of the art of techniques and standards.
Scope
Offshore cranes
Marine cranes
Harbor cranes
Mobile cranes
Tower cranes
Overhead and goliath cranes Complete accident investigation for any kind of operation
Personnel transfer operations
Heavy transport
Davits and lifeboats
Expert Team of Engineers
Structural
Mechanical
Geotechnical and foundation
Metallurgical and materials Onshore and offshore cranes and lifting devices
Vitoria, ES, Brazil - Phone: +55 (27) 3235-7271 | +55 (27) 9.9277-6120
projetos@techcon.eng.br www.techcon.eng.br
TechCon Engineering & Consulting
Offshore Structures and Lifting Design
Lift plan for offshore crane engine replacement using temporary scaffolding structure on FPSO platform. Field survey,
scaffolding structure design, structural verification of boom crane to support concentrated load, dynamic analysis,
calculation and design of lifting accessories.
Lift Plan to replace spooler of winch for risers without using crane on FPSO platform. Lift plan to load out cargo to supply
vessel. Field survey, interference checking, verification of topside structure to support chain hoist and design of lifting
accessories.
Lift plan for lift, moving and handling hoses for offload of tanks, using temporary structures. Lift plan for submerged pump
in FPSO platform.
Lift plan for lifeboat and skid rescue using drillship crane. Scope: Lifting design, inspection of lifting equipment and
accessories and supervision of offshore operation.
Lift plan for telescopic crane on barge to lift formwork for the construction of bridge protection pier in Tiete River (Brazil).
Lifting design, structural check of the deck of the barge and structural strengthening design of barge deck.
Lift plan for davit of rescue boat replacement on FPSO platform. Lift plan for onshore & offshore lifting, field survey,
structural inspection, design verification of the temporary structure, inspection of lifting accessories, field supervision of
operations onshore and offshore.
Onsh
shore & Offshore Lift Plans
Consulting for construction of port facility using crawler crane on barge. Design of cranes for offshore
offsho and onshore lifting,
barges, tugs, marine operations, road transportation,
transp loadout and lifting of piles and precas
precast concrete pile caps.
Interference assessment with laser and budgetudget of lifting operation. Temporary floating breakwater
ater to protect barge during
loadout. Port of Tubarao, Vitoria, Brazil.
Vitoria,
ia, Esp
Espirito Santo, Brazil - Phone: +55 (27) 3235-7271
projetos
ojetos@techcon.eng.br www.techcon.eng.br
TechCon Engineering & Consulting
Offshore Structures and Lifting Design
Lift plan for boiler drum replacement aboard FPSO. Site survey, design of lifting devices, temporary structures, spreader
bar, seafastening and bumpers design, definition of metocean parameters. FPSO at Campos Basin.
Design verification and consulting for lifting and replacing lifeboats, winches, davits and accessories without use of cranes,
FPSO platform. Lifting done with strand jacks.
Lift plan for lifting turbine and compressor on offshore FPSO. Site survey, calculation and detailing of wire rope and web
slings, adjustable spreader bar, temporary supports.
Lift plan for electrical transformers. Lift plan for lifting transformers in narrow space with interferences.
Onsh
shore & Offshore Lift Plans
Lift plan for assembly of storage tank rings and domus roof. Structural verification and stres
stress analysis using finite
elements. Road transport study.
Lift plan for precast columns, roof beams and crane runway beams for shipyard construction.
n. De
Design of lifting pins and
spreader bar. Check lateral stability of prestress
stressed concrete beams of 32 meters.
Vitoria,
ia, Esp
Espirito Santo, Brazil - Phone: +55 (27) 3235-7271
projetos
ojetos@techcon.eng.br www.techcon.eng.br
TechCon Engineering & Consulting
Offshore Structures and Lifting Design
Consulting and 3rd party review of lift Lift plan for erection of steel bridge Lift plan for heavy blocks in
plan for metering module and skid. 3D with telescopic crane on barge. shipbuilding using goliath crane.
simulation of lifting operation on FPSO
using pedestal crane.
Simulation of lifting operation for Stress analysis using finite element of Structural desing of Scaffold for
stacks upending. eye pad for lifting offshore skid. removal of equipment without use of
crane on FPSO platform.
Structural design of spreader bar to Structural design of double floating Lif plan for duct of boiler stack of
install subsea jumpers. Length of 42 spreader bar for air coolers. Photo: Veracel Celulose without the use of
meters and 50 tonnes test load. Unio Engenharia. cranes. Photo: Imetame.
Spreader bars positioned on offshore
barge for transport to site.
Design of various lifting devices and Lifting design of temporary platforms Stress analysis using finite element of
temporary platforms for assembly of for maintenance of digester with 65 spreader bar with maximum work load
gasometer. Consulting in steel meters tall. of 80 tons.
structures for erecting of dome roof of
gasometer. Photo: Uniao Engenharia.
http://techcon.eng.br/en/icamentos/
Published Papers