Sunteți pe pagina 1din 24

DuroFelgueraS.A.

General view of the company

Founded in 1858
Listed in the Madrid Stock Exchange since 1905
In cooperation with many significant and internationally reputed companies in
energy generation, mining & material handling, oil & gas, etc
High qualified professionals for the multidiscipline management of big projects
Wide range of references in the international market
Flexibility to operate in the 5 continents
DF specialises in mineral processing and handling projects. The company has its
own technology and is capable of developing all stages of a project, from
engineering to start-up and operation of the installations it constructs under EPC
contracts
Felguera gruas India - FGI is an Indian arm of Duro Felguera (DF), registered
under Indian company act since 2009. FGI Head quartered situated at
Visakhapatnam A.P. India
DF Mining and Handling: EPC contractor

Specialized in turn-key project execution, with strong capacity to integrate activities:


Design
Manufacturing
Supply
Erection
Commissioning
O&M

Mining & Mineral


Processing

Materials
Handling

Oil & Gas


Fuel Storage
BulkMaterialsHandling:EPCSolution

Major Product list :>

Stackers, Re claimers and Stacker cum Reclaimers

Belt conveyor systems for Pipe & Trough type Conveyors

Ship Un loaders Grab Type.

Ship Loaders

Wagon loading and unloading systems.

Mineral beneficiation/Coal washeries plant .

Mobile Hoppers of both Rail Mounted & Tyre Mounted.

Silos and Storage Sheds.

Auxiliary systems such as: Dust Suppression Systems, Weighing Systems, Control
Systems, Illumination, etc.
Application

BulkMaterialHandling

Steel Port power Mineral Cement Refinery Coal

Port
EPC project in India

Location : Gangavaram A.P. Customer : Gangavaram Port Ltd. Commissioned 2008

Turnkey project for Iron Ore handling plant consists of :


Wagon Tripper 24 tips/hr 1Set
Bucket wheel Re claimer 5,400 TPH 1 Set
Stacker 1,500 TPH 1 Set
Ship Loader 5,400 TPH, 200,000 DWT Vessel 1 Set
Belt conveyor system 1,500/5400 TPH 3.5 K.M (Approx.)
Turnkey project for Coal handling plant consists of:
Stacker 4,800 TPH 1 Set
bucket wheel Re-claimer 1,500 TPH 1 Set
bucket wheel Stacker/ Re-claimer 4,800/1,500 TPH 1 Set
Train Loading System 1,500 TPH 1 Set
Grab Ship un loaders of 62T 2 Sets
Belt conveying system of cap. 1500/4800 TPH(approx. length) 9 K.M
EPC project
Repeat inIndia
order in India

Location : Gangavaram A.P. Phase II Customer : Gangavaram Port Ltd. Commissioning (Exp.) 2015

Turnkey project for Coal handling plant - Phase II - consists of (Repeat order)

Belt conveyor system 4800 TPH, - 1 Lot


Stackers 4,800 TPH, - 2 Sets
Re Claimer 3,840 TPH, - 2 Sets
In motion Train Loading System 3,600 TPH, - 1 Set
Ship un loaders 2400 TPH / 2800 TPH - 2 Sets
Dust Suppression system, Civil works - 1 Lot
Integration with existing terminal minimizing downtime interface.
EPC project
Completed in in
project India
India

Location : Kakinada A.P. Customer : Bothra Shiping Commissioned 2013

Turnkey project for Coal handling plant consists of :

Belt conveyor system 2,400 tph - 1 Lot


Stacker/Reclaimer machines 2,400/1,800 tph - 2 Sets
Un loading hoppers - 2 Sets
Train Loading Station 1,800 tph - 1 Set
Dust Suppression System - 1 Lot
EPC project
Repeat orders in India

Location : Kakinada A.P. Customer : Sarath Chaterjee & Co Commissioned 2014

Turnkey project for Fertilizer handling plant consists of :

Two (2) Movable Berth Hoppers


Belt Conveyor System 1,900 tph,
Warehouse storage for un loaded cargo,
Tripper conveyor with reversible cross conveyor,
Six (6) reclaiming hopper with screw type transfer mechanism
Train Loading Station (including Bagging System)
Electrical and control system
Completed
EPC project
Project
in India
in India

Location : Krishnapatnam A.P. Customer : Navayuga Engineering Co. Partly Commissioned 2010 (On hold)

Turnkey project for Coal handling plant of Krishnapatnam Phase I consists of :

Ship Un loader 2000 TPH - 2 Sets


Stacker/Reclaimer (4000 /2500 TPH), - 2 Sets
Belt Conveyor circuit from jetty to yard 4000 TPH - 1 Lot
Train Loading Stattion 3600 TPH, - 2 sets
Electrical and control system - 1 Lot
EPC project in India

Location : Krishnapatnam A.P. Customer : Krishnapatnam port Co. Ltd. Commissioning (Exp.) 2015

Turnkey project for Fertilizer handling plant consists of

Seven (7) Belt conveyors 2000 TPH


Four (4) Transfer towers
One (Tripper)
Four (4) hoppers,
Completed
EPC project
Project
in India
in India

Location : Krishnapatnam A.P. Customer : Navayuga Engineering Co. Commissioning (Exp.) 2015

Turnkey project for Coal handling plant of Krishnapatnam Phase II north consists of :

Belt Conveyor System 4,400 tph for Coal


One (1) Stacker Reclaimer 3,300/1,700 tph
Nine (9) Transfer Towers for coal circuits
Dust Suppression at Coal Stockyard and Belt Conveyor Transfer Points
Magnetic Separators(4) and Metal Detectors (8)
Five (5) Belt Scales , Buffer Silos
Electrical and Control System
EPC project in India

Location : Tuticorin T.N. Customer : ABG LDA Group. Commissioning (Exp.) 2016

Turnkey project for Coal handling plant consists of


Two (2) Stacker Reclaimer 3250 /1,750 TPH - 2 Sets
One (1) Stacker 3,250 TPH - 1 Set
Six (6) Belt Conveyors 2,250 TPH & Eight (8) Belt Conveyors 3,250 TPH - 1 Lot
Transfer Tower - 8 sets
Truck Loading station, including hoppers and weighing, - 4 Sets
Dust Suppression system, Fire Fighting Systems - 1 Lot
Electrical and Control System, SubStation 110 KV - 1 Lot
GlobalEPC
Global EPC projects
project Latest
Latest

COKELOADINGSYSTEMforMIDTAP SOROS Alexandria EGYPT 2000

Ship Unloader - Gijn Port(Musel) COALANDIRONOREHANDLINGANDSTORAGEINTHEMUSELPORTGijn Yard


Asturias SPAIN 2000 Asturias SPAIN 2000
GlobalEPC
Global EPC projects
project Latest
Latest

CHP (800 TPH) for Power Plant - HIDROCANTABRICOGENERACIN,S.A.at -SotoRiberaAsturias SPAIN


2003

COKESHIPLOADINGSYSTEMLongBeach. CEMENTSHIPLOADINGSYSTEMforHOLCIMSPAIN
California US2003
Carboneras Plant Almera Spain 2003
GlobalEPC
Global EPC projects
project Latest
Latest

CIRCULARYARD&HANDLINGSYSTEMFORCOALPETRO&PETROCOKE HOLCIMSPAIN Almera Spain 2004

DIRECTREDUCTIONIRONPLANTINTERMINALPORT
REVAMPINGOFCOKEHANDLINGSYSTEMINAREFINERY PEMEX KOBESTEELLTD. QASCO Mesaieed
REFINACIN MaderoRefinery.Veracruz MEXICO 2005 STATEOFQATAR 2005
GlobalEPC
Global EPC projects
project Latest
Latest

PLANTOFPETROLEUMCOKE CEMEX COALUNLOADING&STOCKYARDDEVELOPMENT ENDESA


MEXICO 2005 GENERACIN CaboPriorio Port.ElFerrol SPAIN 2007

SULPHATESTOCKYARDDEVELOPMENT&SHIPLOADINGSYSTEM IRONORE12Mty CONCENTRATIONPLANT PhaseII


CONSIGNACIONESTOROYBETOLAZA Zierbana Port.Bilbao SPAIN 2007 C.V.G.FERROMINERAORINOCO,C.A. CiudadPiar
VENEZUELA 2012
GlobalEPC
Global EPC projects
project Latest
Latest

PETROLEUMCOKEHANDLINGFACILITY REPSOL/ PETROLEUMCOKESTORAGE&HANDLINGFACILITY


PETRONORMuskiz.Vicaya SPAIN 2011 ENDESA C.T.Compostilla II SPAIN 2010

IRONOREHANDLINGFACILITYATPHASEII EMIRATES
SULPHURHANDLINGFACILITIESREPSOLPETRONOR
STEELINDUSTRIE(ESI) AbuDhabi ARABEMIRATES 2010 Muskiz.Vizcaya SPAIN 2011
GlobalEPC
Global EPC projects
project Latest
Latest

IRONOREPROCESSINGPLANTWITHCAPACITYOF4
MTPY SNIMMauritania WESTAFRICA 2010 IRONOXIDEPELLETSHANDLINGINPORTTERMINAL EZZ
(Ongoing) ROLLINGSMILLSCO Sokhna Port.EGYPT 2010 Ongoing

HANDLINGANDSTORAGEOFCOKEINAREFINERY
IRONORESTACKINGSYSTEM CAPMINERA Vallede
YPF ARGENTINA 2013 Huasco CHILE 2013
GlobalEPC
Global EPC projects
project Latest
Latest

COALANDCOKESHIPLOADERKINDER
IRONORE/PELLETFEEDHANDLINGSYSTEM.CERRONEGRO MORGANTERMINALSPasadena.Texas US
NORTEPROJECT CAPMINERA AMEC CHILE 2012(Ongoing)
2012 Ongoing

COALSTACKINGCONVEYORSYSTEM P.T.LAMINDO JAMBICOALTERMINAL PTBARARIASUKSES


Jambi.SumatraSelatan.INDONESIA 2013 ongoing
INTERMULTIKONEastKalimantan INDONESIA2012
ongoing
GlobalEPC
Global EPC projects
project Latest
Latest
Roy Hill Project under construction

ROYHILLIRONOREPROJECT 55MT SAMSUNGC&TCorporationPlbara.AUSTRALIA 2013 ongoing


In addition to all belt conveying system, in excess of 12 Km length,
following equipment are going to be designed, manufactured and
Within the Process Plant, which includes five main parallel process supplied (Process Plant equipment also to be erected):
lines, main equipment is described as follows:
Process Plant site:
Three (3) units of Primary and Secondary Crushing o One (1) Iron Ore Fixed Slewing Stacker 13,700 tph
Modular Facilities o One (1) Fines Ore Traveling / Slewing Stacker 5,600
Five (5) Scrubbers tph
Five (5) Modules of Wet Coarse and Fines Screens o One (1) Lump Ore Traveling / Slewing Stacker 5,600
Three (3) Modules of Tertiary Crushers and Dry / tph
Wet Screens o One (1) Traveling / Slewing Bucket Wheel Reclaimer
Five (5) Modules of Deslime Cyclones 16,700 tph
Five (5) Up Curret-Classifier o One (1) Train Loading Station
Five (5) Modules of First and Second Stage of Spirals Port site:
Five (5) Belt Filters o Two (2) Ore Traveling / Slewing Stacker 14,500 tph
Three (3) Tailings Thickeners o One (1) Car Dumper 12,900 tph
Process Water Dam and Residue Storage Facility o One (1) Traveling / Slewing Bucket Wheel Reclaimer
One (1) Laboratory 16,700 tph
o One (1) Traveling / Slewing Shiploader 12,700 tph