SECUNDARIA
TAPONES
DE CEMENTO
INTRODUCCIN
H
TTC @ 2850m.
BC @ 3000m. BC @ 3000m.
CLCULO DEL VOLUMEN DE LECHADA
Volumen Lecha de cemento :
2
V LCH = 3.281 LTC (bbl )
1029 .4
9 .25 2
V LCH = 3.281 150 m (bbl )
1029 .4
Altura de agua V LCH = 41 (bbl )
Caera 9 5/8 x 8.535 @2700m.
BC @ 3000m.
ZF = 5800m
CLCULO DEL VOLUMEN DE LECHADA
1 . Clculo de la altura de cemento ( h1 ) :
V LCH
h1 = (m )
Cap EA + Cap Tgb
41
h1 = (m )
(9 . 25 2
2 . 875 2
) 3 . 281 +
(2 . 441 )
2
3 . 281
1029 . 4 1029 . 4
h 1 = 155 ( m )
DP 5: 2800m V3 =
(9.25
2.8752 2
)
3.281 45 V3 = 11.1 (bbl )
V3
TTC: 2845m 1029.4
V5 =
(
9.252 52 )
3.281 100 V5 = 19.3 (bbl )
h1 1029.4
V6 = 50 - 11.1 - 19.3 V6 = 19.6 (bbl )
BC @ 3000m. V6
h6 = = 129 (m)
Cap6
CLCULO DEL VOLUMEN DE LECHADA
VD
VAB =
(2.441 ) 3.281 45 + (4.276 ) 3.281(2800 2571)
2 2
1029.4 1029.4
Altura de agua: 2571m VAB = 14.2 (bbl)
V6
V3 V4
DP 5: 2800m
TTC: 2845m VDespl =
(4.276 ) 3.281 2571
2
1029.4
h1
VDespl = 150 (bbl)
BC @ 3000m.
PROCEDIMIENTO
Probar lneas de cementacin.
Bombear espaciador / lavador qumico por delante de la lechada.
Mezclar y bombear la lechada de cemento.
Bombear espaciador / lavador qumico por detrs de la lechada.
Desplazar con la cantidad calculada de fluido.
Desplazar 1 2 bbls menos de lo especificado por seguridad.
Abrir retornos hacia tanques de desplazamiento del camin
cementador.
Levantar sondeo tubing por encima del tapn.
Circular con cascara de nuez para limpiar el interior del sondeo.
Sacar herramienta del pozo y esperar frage