Sunteți pe pagina 1din 5

CALCULATION SHEET

FIRE WATER DEMAND

JOB NO. : INL/SPJ/02/2016


FIRE ZONE : Fire Zone 3 (FZ-3)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17

1. LAB 1ST FLOOR


Sprinkler Quantity per Area
A. Part A (Ruang Analisa Khusus)
Floor Area : 14 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 12.1 m2
Sprinkler quantity (minimum) : 2
Sprinkler quantity / branch line : 1
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter

B. Part B (Ruang Laboratorium)


Floor Area : 72 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 12.1 m2
Sprinkler quantity (minimum) : 6
Sprinkler quantity / branch line : 3
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter

A
1.83 m 1.34 m

1.34 m 1.5 m

2.25 m
2.3 m 3.4 m 2.3 m

2.25 m

B 2.25 m

2.25 m

Minimum Flow & Pressure per Sprinkler


A. Part A (Ruang Analisa Khusus)
Sprinkler distance along the wall (maximum) (S) : 1.83 m
Sprinkler distance across the room (maximum) (L) : 1.5 m
Protection area of coverage per sprinkler (As) : 10.98 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 45.02 L/min
K-Factor : 80.6 L/min/bar1/2
CALCULATION SHEET
FIRE WATER DEMAND

JOB NO. : INL/SPJ/02/2016


FIRE ZONE : Fire Zone 3 (FZ-3)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17

Minimum sprinkler pressure : 0.5 bar


Minimum pressure required (P) : 0.3 bar
Sprinkler Quantity : 2
Total Flow : 90 L/min

B. Part B (Ruang Laboratorium)


Sprinkler distance along the wall (maximum) (S) : 2.25 m
Sprinkler distance across the room (maximum) (L) : 3.4 m
Protection area of coverage per sprinkler (As) : 30.6 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 125.46 L/min
1/2
K-Factor : 80.6 L/min/bar
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 2.4 bar
Sprinkler Quantity : 6
Total Flow : 753 L/min

2. LAB 2ND FLOOR


Sprinkler Quantity per Area
A. Part A (Gudang Bahan Kimia)
Floor Area : 24 m2
Sprinkler spacing (maximum) : 3.7 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 9.3 m2
Sprinkler quantity (minimum) : 3
Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 1.85 meter
Distance from Sprinkler to wall (Minimum) : 0.1 meter

B. Part B (Ruang Kepala Grup & Adm Lab)


Floor Area : 24 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 2
Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter

C. Part C (Ruang Tunggu + Tangga)


C1
Floor Area : 26 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 2
Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter

C2
Floor Area : 29 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
CALCULATION SHEET
FIRE WATER DEMAND

JOB NO. : INL/SPJ/02/2016


FIRE ZONE : Fire Zone 3 (FZ-3)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17

Sprinkler quantity (minimum) : 2


Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter

2m 2.3 m

2m 2m

2.3 m 3.4 m 2.3 m

C 2.3 m

2m
2m

2m
B
2m
A

Minimum Flow & Pressure per Sprinkler


A. Part A (Gudang Bahan Kimia)
Sprinkler distance along the wall (maximum) (S) : 2 m
Sprinkler distance across the room (maximum) (L) : 2 m
Protection area of coverage per sprinkler (As) : 16 m2
Density / Application Rate : 8.55 L/min/m2
Minimum Flow per Sprinkler (Q) : 136.8 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 2.9 bar
Sprinkler Quantity : 2
Total Flow : 274 L/min

B. Part B (Ruang Kepala Grup & Adm Lab)


Sprinkler distance along the wall (maximum) (S) : 2 m
Sprinkler distance across the room (maximum) (L) : 2 m
Protection area of coverage per sprinkler (As) : 16 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 65.6 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.7 bar
Sprinkler Quantity : 2
Total Flow : 131 L/min
CALCULATION SHEET
FIRE WATER DEMAND

JOB NO. : INL/SPJ/02/2016


FIRE ZONE : Fire Zone 3 (FZ-3)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17

C. Part C (Ruang Tunggu + Tangga)


C1
Sprinkler distance along the wall (maximum) (S) : 2.3 m
Sprinkler distance across the room (maximum) (L) : 3.4 m
Protection area of coverage per sprinkler (As) : 31.28 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 128.248 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 2.5 bar
Sprinkler Quantity : 2
Total Flow : 256 L/min

C2
Sprinkler distance along the wall (maximum) (S) : 1.83 m
Sprinkler distance across the room (maximum) (L) : 2 m
Protection area of coverage per sprinkler (As) : 14.64 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 60.024 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.6 bar
Sprinkler Quantity : 2
Total Flow : 120 L/min

Total Overall Flow : 781.3 L/min

3. HYDRANT / MONITOR / HYDRANT BOX


Available hydrant, hydrant box or monitor:
Tag Equipment
WH-06 Pillar Hydrant (Outside of the building) : 946.4 L/min/hose NFPA 14 Section 7.10.1.1.1

4. SUMMARY
Scenario 1: Lab 1st Floor on fire
Sprinkler system Lab 1st floor : 0 L/min
Pillar Hydrant WH-06 : 946 L/min
Total Fire Water Requirement 946.353 L/min

Scenario 2: Lab 2nd Floor on fire


Sprinkler system Lab 2nd floor : 781 L/min
Pillar Hydrant WH-06 : 946 L/min
Total Fire Water Requirement 1728 L/min

Sprinkler Nozzle Head Quantity


Lab 1st Floor : 8
Lab 2nd Floor : 8
CALCULATION SHEET
FIRE WATER DEMAND

JOB NO. : INL/SPJ/02/2016


FIRE ZONE : Fire Zone 3 (FZ-3)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17

S-ar putea să vă placă și