NO NAME START COMPLETE DWG END REMARKS

1 Conservator Tank
2 Hawker Cart
3 Motorcycle Trailer
4 Hybrid (AV3)
5 Buffalo Cart 1/4/2016 4/4/2016 EN. AZAHAH
6 Split Drawing H2SK 1/4/2016 1/4/2016 EN. HISYAM
Cut-Off Jig (AISB) 3/2016 16/5/2016 (EN. AZAHAH)
Improvements and
modifications.
Fabrication done.
Delivered.
7 Modenas Welding Jig 15/4/201 9/5/2016 (EN. AZAHAH)
(OSI) 6
8 Sub-Frame (OSI) 15/4/201 22/4/2016 22/4/2016 (EN. HARMAN) The
6 real dimensions
need to be re-
updated.
9 Conservator Tank 15/4/201 19/4/2014 18/4/2016 (EN. HARMAN)
Version 2 (AM SGB) 4

10 Lifting Device (AM 11/5/201 13/5/2016 (EN. HARMAN)


SGB) 6 Drawing sent.
11 Roller Line Conveyor 11/5/201 18/5/2016 (EN. HARMAN)
(AM SGB) 6 Drawing sent.
12 A-Frame (AM SGB) 26/5/201 3/6/2016 (EN. HARMAN)
6 Fabrication done.
Delivered.
13 Engine Oil Filler Tank 26/5/201 11/6/2016 (EN. HARMAN)
1L 6 Fabrication done.
(Jeff) Delivered.
14 Engine Oil Filler Tank 3/6/2016 18/6/2016 (EN. HARMAN)
0.5L Fabrication done.
(Jeff) Delivered.
15 Modenas Welding Jig 27/5/201 13/6/2016 (EN. AZAHAH)
Version 2 (OSI) 6 Drawing sent.
16 Extension Shaft (AM 8/6/2016 20/6/2016 (EN. HARMAN)
SGB) Fabrication done.
Delivered.
17 Flange (AM SGB) 8/6/2016 20/6/2016 (EN. HARMAN)
Fabrication done.
Delivered.
18 Plate for Transformer 8/6/2016 9/6/2016 13/7/2016 (EN. HARMAN)
(AM SGB) Drawing sent.
19 Reducer Adapter (AM 14/6/201 14/6/2016 12/7/2016 (EN. HARMAN)
SGB) 6 Drawing sent.
20 Puncher (AM SGB) 15/6/201 16/6/2016 7/2016 (EN. HARMAN)
6 Delivered.
21 Electronic Box Casing 21/6/201 23/6/2016 (EN. AZAHAH)
(Dr. Ahmad) 6 Getting quotation
from Ah Weng
22 MBC Catcher 13/7/201 13/7/2016 5/8/2016 (EN. AZAHAH)
Modification (FGV) 6 Delivered.
23 MBC Catcher Version 2 13/7/201 14/7/2016 (EN. AZAHAH)
(FGV) 6 Drawing sent.
24 Cover Plate (AMSGB) 13/7/201 14/7/2016 18/7/2016 (EN. HARMAN) Sent
6 to fabrication at
DFC. Delivered.
25 Conservator Tank 30/6/201 13/7/2016 - (EN. HARMAN)
Version 3 (AM SGB) 6 Drawing sent.
26 Mixer/Stirrer 26/7/201 12/8/2016 6/9/2016 (EN. HARMAN)
6 Drawing still waiting
to be confirmed
according to the AC
motor. Delivered.
27 Workbench with vise (A 29/7/201 1/8/2016 30/8/2016 (EN. HARMAN)
HAK) 6 Drawing sent.
28 Mobile Aerial Platform 10/8/201 - 30/12/2016 (EN. AZAHAH) Got
(MALIFT) 6 drawing from Malift.
Quoted by Zamri.
Start fabricating on
Oct 2016. Finished
and delivered at the
end of Dec 2016.
29 Hybrid Prime Mover 11/8/201 1/9/2016 - (EN. AZAHAH)
(MPOB) 6 Drawing in progress.
Meeting with MPOB
person.
30 Cabin Interior Design 11/8/201 15/8/2016 - (EN. HARMAN)
6 Drawing in progress.
Drawing sent.
31 Wheel Extender 11/8/201 15/8/2016 9/9/2016 (EN. AZAHAH)
(MPOB) 6 Drawing in progress.
Redraw. Drawing
sent. Fabrication in
process. Delivered.
32 Adjustment Table (OSI) 18/8/201 23/8/2016 10/10/2016 (EN. HADI) Drawing
6 in progress. Drawing
Sent. Got CAD data
from CTRM.
Delivered.
33 Electronic Box Casing 8/2016 19/9/2016 - (EN. AZAHAH)
redraw (Dr. Ahmad) Drawing in progress.
Waiting for Dr.
Ahmad approval.
34 Hybrid Prime Mover 7/9/2016 19/9/2016 - (EN. AZAHAH)
Interior Parts (MPOB) Drawing in progress.
Waiting to be
fabricated. In
fabrication process.
35 Tire Bracket (FGV) 9/9/2016 17/9/2016 23/9/2016 (EN. AZAHAH)
Drawing sent to
DFC. Finished
fabrication.
Delivered.
36 J-IP_047_6000 Jig 26/9/201 28/9/2016 10/10/2016 (EN. HISYAM)
Modification 6 Drawing sent to En.
Hisyam. Fabrication
process. Delivered.
37 Tire Bracket 2.0 (FGV) 27/9/201 29/9/2016 10/10/2016 (EN. AZAHAH)
6 Drawing sent to
DFC. Delivered.
38 Bottle Holder (UPHA) 5/10/201 17/10/2016 10/2016 (EN. HARMAN) Sent
6 drawing to Harman.
Material has been
ordered. Delivered.
39 Pipe Rack (AHAK) 14/10/20 18/10/2016 12/2016 (EN. HARMAN)
16 Drawing sent.
Finished and
delivered.
40 Bolt Plug (AM SGB) 26/10/20 26/10/2016 - (EN. HARMAN)
16 Drawing sent.
41 Heavy Duty Rack 6/1/2017 9/1/2017 7/2/2017 (EN. HARMAN)
(SGBMY) Drawing has been
released. In
progress. Finished
and delivered.
42 Gauge (AISB) 9/1/2017 10/1/2017 2/2017 (EN. HISYAM)
Confirming the
dimensions. In
progress. Finished
and delivered.
43 Roller Line Conveyor 12/1/201 16/1/2017 (EN. HARMAN)
(SGB) - redraw 7 Drawing sent.
Fabricated by DFC.
In progress-
fabricated by
production team.
44 Roller A-Stand 10/2/201 15/2/2017 (EN. HARMAN)
7 Concept design in
progress. Drawing
sent.
45 Car Trailer (POS) 18/2/201 26/2/2017 (EN. AZAHAH)
7 Drawing sent. Need
to redraw.
46 Towing Hook 24/2/201 24/2/2017
(PRASARANA) 7
47 Rotating Car Trailer 24/2/201 (EN. AZAHAH)
(POS) 7
48 Pipe Hanger (SGB) 24/2/201 27/2/2017 (EN. HARMAN)
7
49 Square Conservator 24/2/201 (EN. HARMAN)
Tank (SGB) 7