2. Work Location : NEW ABB LAYDOWN Engineer, Supervisor, Electricians and Helpers.
(Near to existing GIS building)
Proposed Starting Date :
Yes No Yes No
7. Approvals
The completed Work Method Statement must be submitted at least seven full working days prior to the
commencement of activities.
Where the Work Method Statement indicates the use of Hazardous Substances, a Material Hazard Data
Sheet must be attached.
After the Area Owners approval the Work Method Statement shall be forwarded to EHS department for
approval
The approved Work Method Statement must be attached to the permit(s) to work and all persons involved
in the job instructed in its requirements.
Severity
Probability Low x1 Medium x 2 High x3
Significant Risk = High Risk (6-9) or Medium Risk (3-4) in terms of probability and severity
Tolerable Risk = Risk reduced to an acceptable level = Low Risk (1-2)
Residual Risk = Risk remaining after implementing recommended control actions (usually very minor).
8. Safety Analysis
Identified Hazard(s) Persons Exposed To Precautions and Plan of actions To Be Taken Severity x Probability =
Individual Activities To Associated With Activity Hazard To Remove / Control Hazards Risk
Complete Work. List In
Sequence of Activity Residual Risk
(Use Risk Estimator
Chart)
PREPARATION. Slips, trips and fall at the Emal rep., Engr., Supv. Maintain housekeeping around in the working
1x2=2
same level. Elec, helpers. area.
Emal rep., Engr., Supv. All workers involve in the activity must be
Hot weather. 2x2=4
Elec,helpers aware of heat stress, supervisor to ensure
drinking cold water is available.
Emal rep., Engr., Supv. Wear P.P.E.'s at all times (hard hat, safety
2x2=4
Not using P.P.E.'s Elec, helpers. glass, safety shoes, hand gloves, dust mask,
coverall.
Manual handling hazards Supv. Elec,helpers Supervisor to give tool box talk regarding 1x1=2
proper manual handling.
No approved permit to
CABLE LAYING Engr., Supv., Elec., & 3x1=3
work from emal helpers Supervisor to ensure approved PTW, MS and
(Telephone and power) RA are available on site NO PERMIT NO
WORK.
Ensure that working crew does not enter into
the operational area.
Manual handling hazards Elect & helpers Supervisor to give tool box talk regarding 1x2=2
proper manual handling.
Excavation that is more than 1.2 mtrs depth
shall administer protective system. (Sloping of
Cav-ins and collapses of All workers involved in 1:1 ratio or benching not less than 0.6mtr wide
2x2=4
excavation walls the activity level, shoring, etc.)
Keep spoiled sand and other materials atleast
1mter away from the edge of excavation.
Provide warning signs and barricade the
Emal rep., Engr., Supv.
Fall into the treanch treanch to be provided. 2x1=2
Elec, helpers.
Emal rep., Engr., Supv. Wear P.P.E.'s at all times (hard hat, safety 2x2=4
Not using P.P.E.'s Elec, helpers. glass, safety shoes, hand gloves, dust mask,
coverall.
Supervisor to ensure approved PTW, MS and
RA are available on site NO PERMIT NO
WORK.
Ensure that working crew does not enter into
GLANDING AND
No approved permit to Engr., Supv., Elec., & the operational area.
TERMINATION OF CABLE: 3x1=3
work from emal helpers Complete the pre-work check list on a daily
basis.
Daily toolbox meetings to be conducted on
days activity, which will include TRA for the
activity.
Inspect the hand tools before use, ensure the
1.Opening of insulation Use of sharp hand tools condition is good
and cut the cable for Competency of Use hand glove
termination electrician Supervisor to ensure the competency of
2.Crimp the lugs to the Use damaged tools may electrician.
cable end slip and injure Inspect heat gun before use, it is in good
Elec., & helpers 1x3=3
3.Remove the bolt from electrician or damage condition, provide fire extinguisher.
the breaker and tight the property
cable lugs with bolts to Use of Heat gun (hot
the breaker blower), electricity /
Fire.
Emal rep., Engr., Supv. Wear P.P.E.'s at all times (hard hat, safety 2x2=4
Not using P.P.E.'s Elec, helpers. glass, safety shoes, hand gloves, dust mask,
coverall.
This sheet must be properly completed detailing all of the steps required to complete the job along with the sequence of events and each of the hazards
arising. Failure to properly complete the form will result in non-approval.
(Additional sheets to be used as required)
9. Chemical Analysis (This form to be used as required)
Product Name
Duration of Exposure
Frequency of Exposure
Controls to be implemented