F02
space.
Provide fresh air inlet fan as
required.
A competent person will be
positioned outside the
confined space is such a
manner that he will be able to
monitor the activity and status
of the personnel working
inside. He will be the
immediate source of contact of
those personnel in confined
space.
Ensure that one competent
person reserve on site while 1st
person on break (toilet).
In case of emergency,
immediately contact EMAL
Emergency Response Team.
EMERGENCY NO:02-509
2111
Cable Maintain consistent contractor 2 1 2
pulling communication between supervisor
group entrant and attendant by
Communication
3 2 6 using radio phone (walkie
barrier
talkie), signal light, rope or any
other means of
communication
Cable Unknown 4 2 8 The number of persons in the contractor 3 1 3
pulling quantity of confined space should always supervisor
group workers inside be known and signed onto the
the confined confined space permit before
space entry
Positive ventilation to be
provided into the confined
space If required
Cable Personnel shall ensure that contractor 2 1 2
pulling correct handling practices are supervisor
Blocked
group used at all times, i.e. bending
access/exit
the knees and keeping the
routes
back straight.
Fall of materials
Personnel shall ensure that
and/or tools 3 2 6
access routes are kept clear
Fall of personnel
at all times and/or alternative
Back walkways are provided.
injuries/strains Personnel shall ensure that all
tools and equipment are kept
secured at all times.
Cable Read first the MSDS before contractor 2 1 2
pulling Use of zinc spray supervisor
commencing any task.
group during cable 3 2 6
MSDS must be available at the
pulling
work force
Cable Fall from height 3 3 9 Use only wooden or GRP contractor 2 2 4
pulling or from ladder. ladder. supervisor
group Dont leave cut cable
inside the building & top of
panels.
Inspect ladder before
use; assign one man to hold
the ladder on the ground while
in used.
Always climb up and
down facing the ladder.
Don't carry tools or
materials in your hand while
warning signboards
Do not keep unwanted
materials on top of the ladder.
Materials to be removed
should be in safe manner
one by one--, ensure no
materials to be dropped.
Cable Use only wooden or GRP contractor 2 2 4
pulling ladder. supervisor
group Dont leave cut cable
inside the building & top of
panels.
Inspect ladder before
use; assign one man to hold
the ladder on the ground while
Fall from height 3 3 9
in used.
or from ladder. Always climb up and
down facing the ladder.
Don't carry tools or
materials in your hand while
climbing up and down ladder.
All workers involve in working
at height must wear their full
body harness and 100% tie
off.
Cable Using damaged 3 2 6 All workers involve in working contractor 2 1 2
pulling hand tools at height must wear their full supervisor
group body harness and 100% tie off.
Barricade the working area by
using safety cones warning
tape / signboard.
No materials or hand tools to
be stocked on the top of
ladder.
Do not over load or allow
materials to get accumulated
on the working platform.
Cable Supervisor/operatives to contractor 2 1 2
pulling ensure that all hand tools must supervisor
Incompetent
group 3 2 6 be in good condition, no
workers.
homemade hand tools to be
used at site.
Cable Slips, trips and Competent workers to be contractor 2 1 2
pulling fall at the same deployed, supervisor to check supervisor
3 2 6
group level. the competency of the
workers.
5 MARKING AND DRILL Electrician Use of damaged Obtain LOTOV permit. contractor 3 2 6
THE GLAND PLATE. s& Hand tools. 4 3 12 Strictly follow EMAL LOTOV supervisor
Remove the Helpers Using of drill procedure
gland plate from machine. Supervisor to ensure
DB Dust from drill approved PTW is available on
Mark the machine. site prior to commencement
glanding Electrocution. the task.
location Sprains & strains Toolbox talks to be held at
Drill the marked site and documented.
to hands and
area according arms Inspect hand tools before
to the gland use.
size.
Inspect drill machine before
use and ensure dead man
switch.
Ensure proper grounding.
Ensure area to be drill is
clear from any services.
Only competent and
authorized worker for the using
of power tools.
Provide dust mask 3M 8210
or 3M respiratory mask. .
(where ever required)
Only 110 V to be used at
site.
Use of cutting fluid when
drilling to avoid burns, damage
to equipments.
Close unused holes in gland
plate by grommets or PVC
plug.
6 GLANDING, JOINTING Electrician Use of sharp Obtain LOTOV permit. contractor 2 3 6
AND TERMINATION: s& hand tools. 3 4 12 Strictly follow EMAL LOTOV supervisor
Opening of Helpers Competency of procedure
insulation and electrician/cable When doing the termination
cut the cable for jointer. in existing system ensure that
jointing/termina Using damaged power is isolated and no
tion. hand tools/ current in the working place.
Crimp the Torque wrench All hand tools must be in
lugs/ferrules to Use of Heat gun good condition with valid
the cable.
(hot blower), colour code, no homemade
Remove the
electrocution/ hand tools to be used at site,
bolt from the
burns. supervisor to check.
breaker and
Using damaged Torque wrench must be in
tight the cable
lugs with bolts hydraulic good condition with calibrated
to the breaker crimping tool sticker on it. Supervisor to
check.
Supervisor to ensure the
competency of
electrician/cable jointer.
Inspect heat gun before use;
ensure that heat gun is in good
Consequence
insignificant catastrophic
Probability -1 minor-2 moderate-3 major-4 -5 TRA Conducted By (Name & Emp#): TRA Approved By (Name, Emp# &
Signature):
rare-1 1 2 3 4 5 1.
possible-2 2 4 6 8 10 2.
3.
File: 4.
Revision: 1(13-Jun-2013) Page 1 of 1
HS.SAF.34.F02
likely-3 3 6 9 12 15
often-4 4 8 12 16 20
frequent-5 5 10 15 20 25