IMPORTANT DATE

Synopsis Approval Last Date : 21/5/2012


Project Submission Date : 30/07/2012

IMPORANT INFORMATION

MCA-6th Sem Project Coordinator : Mr.Deepak Mishra


PGDCA-2nd Sem Project Coordinator : Mr.Arun Kumar Maurya
BCA-6th Sem Project Coordinator : Mrs Seema Srivastava And
: Mr.Sanjeev Dwivedi.
SYNOPSIS AND PROJECT GUIDELINES

MCA-6th BCA-6th & PGDCA-2nd


Synopsis Format
1. Introduction Of Project

2. Objective Of The Project

3. Scope Of The Project

4. Project Plan

5. The Existing System

6. Background Of The Organization

7. Current Problems

8. Areas For Improvement

9. Proposed System

10. Input/Output Requirement

11. Hardware And Software Requirement

12. Database Requirement

13. System Design

14. Tables And Fields For Database

15. Database Dictionary

16. E-R Diagram

17. 0 Level DFD

18. 1 Level DFD

19. Security Control

20. Future Scope Of The Project

21. Conclusion

NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133


1
SYNOPSIS AND PROJECT GUIDELINES

22. Reference Or Bibliography

Some Suggested Project Title


1. Bank Transactions Management

2. Hotel Management

3. Gas Agency Management

4. Office Automation

5. Railway Reservation

6. Computerization Course Registration

7. Hostel Management

8. Hospital Management

9. Inventory Management

10. Competitive Examination Database

11. Air Line Reservation

12. Transport Management

13. College Admission

14. Library Management

15. On Line Examination

16. Social Networking Sites

17. E-Shopping System

18. E-Mailing System

Note: Any Relational Database System Can Be Used As Back End.

NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133


2
SYNOPSIS AND PROJECT GUIDELINES

th nd
BCA-6 & PGDCA-2
Project Report Format
1. Title Cover

2. Certificate from organization about your stay (Project Duration) at that place and about

submission of work done under external guide at the place of training.

3. Certificate from your guide about the submission of work done under his/her guidance,

Internal Supervisor.

4. Table of Contents, abstract of the project (abstract of actual work done).

5. A brief overview of the organization (regarding function area, location, division in which

you are working, turnover)

6. Profile of problems assigned.

7. Study of existing system, if any.

8. System requirements

9. Product Definition

10. Problem Statement

11. Function to be Provided

12. Processing Environment: H/W, S/W.

13. Solution Strategy

14. Acceptance Criteria

15. Feasibility Analysis

16. Project Plan

17. Team Structure


NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
3
SYNOPSIS AND PROJECT GUIDELINES

18. Development Schedule

19. Programming Languages And Development Tools

20. System Requirement Specifications

21. Developing / Operating / Maintenance Environments

22. External Interface And Data Flows

23. User display and report format, user command summary

24. High level DFD and data dictionary

25. Functional and performance specifications

26. Design

27. Detailed DFDs and structure diagrams

28. Data structures, database and file specifications

29. Pseudo code

30. Test Plan

31. Functional, Performance, Stress tests etc.

32. Implementation / Conversion Plan

33. Project Legacy

34. Current status of project

35. Remaining areas of concern

36. Technical and managerial lessons learnt

37. Future recommendations

38. Bibliography

39. Source Code

Note: - The above is meant to serve as a guideline for preparation of your project report.

You may add to, modify or omit some of the above-mentioned points depending upon

NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133


4
SYNOPSIS AND PROJECT GUIDELINES

their relevance to your project. You may also consult your internal supervisor for the

same.

Viva of Full syllabus studied under BCA/PGDCA course.

th
MCA-6
Semester
Project Report Format
1. Title Cover

2. Certificate from organization about your stay (Project Duration) at that place and about

submission of work done under external guide at the place of training.

3. Certificate from your guide about the submission of work done under his/her guidance,

Internal Supervisor.

4. Table of Contents, abstract of the project (abstract of actual work done).

5. A brief overview of the organization (regarding function area, location, division in which you

are working, turnover)

6. Profile of problems assigned.

7. Study of existing system, if any.

8. System requirements

a. Function to be Provided
NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133
5
SYNOPSIS AND PROJECT GUIDELINES

b. Product Definition

c. Problem Statement

d. Processing Environment: H/W, S/W.

e. Solution Strategy

f. Acceptance Criteria

9. Feasibility Analysis

10. Project Plan

a. Team Structure

b. Development Schedule

c. Programming Languages And Development Tools

11. System Requirement Specifications

a. Developing / Operating / Maintenance Environments

b. External Interface And Data Flows

c. User display and report format, user command summary

d. High level DFD and data dictionary

e. Functional and performance specifications

12. Design Phase

a. Detailed DFDs and structure diagrams

b. Data structures, database and file specifications

c. Pseudo Code

13. Test Plan

a. Functional, Performance, Stress tests etc.

14. Implementation / Conversion Plan

a. Project Legacy

b. Current status of project

NIPS COLLEGE OF IT & MANAGEMENT,ALLHABAD PH: 0532-3291133


6
SYNOPSIS AND PROJECT GUIDELINES

c. Remaining areas of concern

d. Technical and managerial lessons learnt

e. Future recommendations

15. Bibliography

16. Source Code

Note: - The above is meant to serve as a guideline for preparation of the project report. The

students may add to, modify or omit some of the above-mentioned points depending upon

their relevance to the project and with the consultation of the project guide for the same.

Joint project will be allowed and joint project report will be also being accepted.

In case of Joint Project the team should not consist of more than 3 members. Individual

project will be recognized and the student should highlight their contribution in a joint project

report.

Viva of Full syllabus studied under MCA course.

THE-