BuildingRegulationshadbeeninusebyvariousMunicipalAdministrationsfromaboutthe1940s,andin
1960,thethenWestAfricanBuildingResearchInstitute(WABRI)published,aPartIIIoftheCodedealing
withloads,tobeusedincivilengineeringstructures.
Bytheearly1970stheCodeandBuildingRegulationswereobviouslyoutofdateandtheBuildingand
Road Research Institute (BRRI) of the Council for Scientific and Industrial Research (CSIR) decided to
produceadraftdocument,fordiscussion,modificationanduseasabasisforafinalCodetoaddressthe
redundancyoftheearlierdocuments.
TheeffortwasundertakenbyDr.K.AmonooNeizerandPart3and4oftheDraftCodewaspublishedin
1977,followedbytheParts1,2and5by1988.
Withchangesinlandusepatterns,materialsandconstructionmethodsandlocalgovernmentstructure,
the Ministry of Works and Housing had produce, a document National Building Regulations, 1996
which was gazetted as LI 1630. This document was to improve upon the Building Regulations of the
ColonialtimesandtocomplementtheBRRIDraftBuildingCode.
The present effort is to produce a Draft Building Code which will take in, all the requirements of the
existing building regulations and the BRRI Draft Building Code and be in tune with requirements of a
building code to answer current land use patterns, materials for construction, construction methods,
constructionmanagementpractices,safetyandenergyefficientuseofresources.
This document, the Draft Ghana Building Code (2012) has been compiled under the auspices of the
MinistryofWaterResources,WorksandHousing(MWRWH)withfundingfromtheUNDP,throughthe
NationalDisasterManagementOrganization(NADMO).
ACKNOWLEDGEMENT
ThesupportoftheUnitedNationsDevelopmentProgramme(UNDP),theMWRWH,NADMO,theCSIR
BRRIandDr.K.AmonooNeizeraregratefullyacknowledged.
DRAFTGHANABUILDINGCODE(2012)TECHNCIALCOMMITTEE
Chairman Ing.JohnTettey
MinistryofWaterResources,Works
andHousing(MWRWH)
Organization Representative(s)
1. MWRWH Ing.JohnTettey
Surv.LouisLawerteh
Arch.C.PobeeAbbey
2. CSIRBuilding and Road Research Ing.K.A.SolomonAyeh
Institute(CSIRBRRI) Surv.E.OseiTutu
3. GhanaStandardsAuthority(GSA) Ing.WilliamNimako
Mr.EricAcheampong
4. GhanaInstitutionofGeoScientists Rev.Fr.SamuelWood
5. GhanaInstitutionofSurveyors Surv.G.A.Atieku
6. GhanaInstituteofArchitects Arch.OseiKwameAgyemang
7. GhanaInstitutionofEngineers Ing.SethAttipoeDenya
8. GhanaInstitutionofPlanners Mr.SylvesterAddaPwalia
9. GhanaNationalFireService DavidSamAfful
10. ElectricityCompanyofGhana Arc.TeiOkletey
11. Ministry of Local Government and
RuralDevelopment(MLGRD) Mrs.LevinaOwusu
12. Architectural and Engineering
ServicesLimited(AESL) Arch.EricAnsah
13. National Disaster Management Mr.JosephAnkrah
Organization(NADMO) Mr.P.Y.Amoako
Consultants Ing.K.A.SolomonAyeh
Ing.DrK.AmonooNeizer
GuidetotheUseoftheCode
TheGhanaBuildingCodecontainsregulationswhichcanbeimmediatelyadoptedorenactedforuseby
variousdepartments,metropolitan,municipalanddistrictassemblies,privateandpublicbodies.Itlays
downasetofminimumregulationsdesignedtoprotectthesafetyofthepublicwithregardtostructural
efficiency,firehazardsandhealthaspectsofbuildings.Solongasthesebasicrequirementsaremet,the
choice of materials and methods of design and construction is left to the ingenuity of the building
professionals. The Code achieves the foregoing by covering aspects of administrative regulations;
development control rules and general building requirements; stipulations regarding structural loads
and design; materials; building services; measures to ensure safety of workers and the public during
constructionandrulesforerectionofsignsandoutdoordisplaystructures.
Aswithotherbuildingcodes,thiscodeisnotintendedtobeatextbookonbuildingdesign;adviceupon
whichshouldbesoughtfromprofessionalsources.
ThepresentCodeisamodificationoftheBRRIDraftBuildingCodeinthefollowingareas:
1) A summary of definitions as contained in various Parts of the Code, with reference to where
suchdefinitionswillbefound.
2) Anewsection(Part4)onDevelopmentControlRulesandGeneralBuildingRequirements.
3) A new section (Part 8) on acceptable materials for use in building in Ghana and standards by
whichtheywillbeassessed.
4) Anewsection(Part9)onBuildingServices.
5) AnewsectiononEnergyEfficiencyandSustainability(Part10),settingouttherequirementsand
recommendations for the energy efficient use of service appliances and other equipment
installedinbuildings.ThecontentsofthissectionareextensivelyexpandedoninPart9.
6) Anewsection(Part11)onHealth,SafetyandtheEnvironment.
ThearrangementofthepresentCodeandBRRIDraftBuildingCodeareshowninTable1.
Table1: Comparisonofcontentsof1988and2012BuildingCodes
BRRIBuildingCode(1988) DraftGhanaBuildingCode(2012)
Part Title Part Title
1 Administration 1 ScopeandDefinition
2 UseandOccupancy 2 Administration
StructuralLoads
3 3 UseandOccupancy
andProcedures
DevelopmentControl,
4 Rulesandgeneral
buildingrequirements
4 Foundations
5 Structuralloadsanddesign
5 HousingandSmallBuildings 6 Foundations
7 Housing,SmallandRuralBuildings
8 MaterialsandStandards
9 BuildingServices
10 EnergyEfficiencyandSustainability
ConstructionalPractices,Safetyand
11
theEnvironment
NumberingSystemofCode
A decimal numbering system has been used throughout the Code. The first number (or the first two
numbersinPart9)indicatesthePartoftheCode.ThesecondnumberindicatesthesectioninthePart,
thethird,thesubsectionandthefourththeArticleinthesubsection.Anarticlemayfurtherbebroken
intosentences(indicatedbynumbersinbrackets)andsentencesfurtherdividedintoclausesandsub
clauses.Theseareillustratedasfollows:
3. Part
3.5 Section
3.5.1 Subsection
3.5.1.6 Article
3.5.1.6(1) Sentence
3.5.1.6(1)(e) Clause
3.5.1.6(1)(e)(i) Subclause
Abbreviations
GSGhanaStandards
GHASGhanaHighwayAuthorityStandards
GBCGhanaBuildingCode
BSBritishStandards
BSENBritishEuropeanStandards
ISIndianStandards
NO. OF PAGES
PART1 SCPOEANDDEFINITIONS21
PART2 ADMINISTRATION 28
PART4 DEVELOPMENTCONTROLRULESANDGENERAL
BUILDINGREQUIREMENTS 82
PART5 STRUCTURALLOADSANDDESIGN 42
PART6 FOUNDATIONS 13
PART7 HOUSINGANDSMALLBUILDINGS 66
PART8 MATERIALSANDSTANDARDS 4
PART10 ENERGYEFFICIENCYANDSUSTAINABILITY 4
PART11 CONSTRUCTIONALPRACTICES,SAFETYANDTHEENVIRONMENT 98
PART1:DEFINITIONS
1.0 SCOPE
1.1ThisCodeorbylawmaybecitedastheGhanaBuildingCode(2012)
1.2ThisCodeappliestothedesign,constructionandoccupancyofnewbuildings,andthealteration,
reconstruction,demolition,removal,relocationandoccupancyofexistingbuildingsandtheservices
withinthesebuildings.
2.0DEFINITIONSOFWORDSANDPHRASES
2.1ThispartliststhetermsappearinginallParts/SectionsoftheGhanaBuildingCode(2012).Theterms
havebeenarrangedinalphabeticalorder.TheParts/Sectionsinwhichthesetermsareappearing,have
beenindicatedagainsttheterms.
A Part5/Section5.9
Access(Exit)Part2/Section1.2 ApparatusPart9.2/Section2.1
AccesspanelPart9.6/Section2.1 AppliancePart9.2/Section2.1
AccessoryPart9.2/Section2.1 AppliancevalvePart9.7/Section2
AccessoryusePart2/Section1.2 ApproachFunnelPart4/AppendixA
AerodromeReferencePoint(ARP) ApprovedPart2/Section1.2
Part4/AppendixA AtmosphericpressurePart9.3/Section2
AgingPart4/AppendixE AudibleFrequencyRangePart9.4/Section2
AirconditioningPart9.3/Section1.2 AutomaticrescuedevicePart9.5/Section2
AirgapPart9.6/Section2 AuthorityhavingjurisdictionPart1/Sect.1.2
AirvalvePart9.6/Section2 AvailableheadPart9.6/Section2
AlterationPart2/Section1.2 AWeightedSoundPressure,PA
Altitude()Part9.1/Section2.1 Part9.4/Section2
AmbientNoisePart9.4/Section2 AWeightedSoundPressureLevel
Angleofattack/incidence() Part9.4/Section2
Azimuth()Part9.1/Section2.1 Part9.6/Section2.1
Branchventilatingpipe(BVP)
B Part9.6/Section2.1
BackflowPart9.6/Section2.1 Branchwastepipe(BWP)
Backflowpreventiondevice Part9.6/Section2.1
Part9.6/Section2.1 Breadth(b)Part5/Section5.9
BackgroundnoisePart9.4/Section2 BreakinPart9.4/Section2
BackupPart9.6/Section2.1 BreakoutPart9.4/Section2
BalconyPart4/Section2.1 Brightnessratioorcontrast
BalusterPart9.5/Section2 Part9.1/Section2.1
BalustradePart9.5/Section2 BroadbandnoisePart9.4/Section2
BarrelPart9.6/Section2.1 BufferPart9.5/Section2
BasePart9.6/Section2.1 BuildingPart2/Section1.2
BasementorcellarPart4/Section2.1 Buildingdrain,combined
BasementstoreyPart3/Section1.2 Part9.6/Section2.1
BatteryoffixturesPart9.6/Section2.1 Buildingdrain,sanitary
BeddingPart9.6/Section2.1 Part9.6/Section2.1
BenchingPart9.6/Section2.1 Buildingdrain,storm
BottomcarrunbyPart9.5/Section2 Part9.6/Section2.1
Bottomcounterweightrunby Building,heightofPart2/Section1.2
Part9.5/Section2 BuildinglinePart2/Section1.2
BranchPart9.6/Section2.1 BuildingsRelatedIllnesses(BRI)
Branchsoilpipe(BSP) Part9.3/Section2
Part9.6/Section2.1 BuildingsewerPart9.6/Section2.1
Branchsoilwastepipe(BSWP) BuildingsubdrainPart9.6/Section2.1
BuildingtrapPart9.6/Section2.1 ChairPart9.6/Section2.1
BunchedPart9.2/Section2.1 ChannelPart9.6/Section2.1
C ChutePart9.6/Section2.1
CabinPart4/Section2.1 CisternPart9.6/Section2.1
CablePart9.2/Section2.1 CleaningeyePart9.6/Section2.1
Cable,armouredPart9.2/Section2.1 CleardesignskyPart9.1/Section2.1
Cable,flexiblePart9.2/Section2.1 ClearwastewaterPart9.6/Section2.1
Cable,metalsheathedPart9.2/Section2.1 CleatPart9.2/Section2.1
Cable,PVCsheathedinsulated ColourRenderingIndex(CRI)
Part9.2/Section2.1 Part9.1/Section2.1
Cable,weatherproofPart9.2/Section2.1 CollectionchamberPart9.6/Section2.1
Cable,XLPEPart9.2/Section2.1 CommonstairwayPart7/Section7.2.1
CallindicatorPart9.5/Section2 CommunicationpipePart9.6/Section2.1
Candela(c/d)Part9.1/Section2.1 CompartmentPart3/Section1.2
CarbodyworkPart9.5/Section2 Compartmentwallandcompartmentfloor
CardoorelectriccontactPart9.5/Section2 Part3/Section1.2
CarframePart9.5/Section2 Conductor,aerialPart9.2/Section2.1
CarplatformPart9.5/Section2 Conductor,barePart9.2/Section2.1
CarpetareaPart4/Section2.1 Conductor,earthedPart9.2/Section2.1
CeilingrosePart9.2/Section2.1 Conductor,insulatedPart9.2/Section2.1
CircuitPart9.2/Section2.1 Conductorofacableorcore
CircuitbreakerPart9.2/Section2.1 Part9.2/Section2.1
Circuit,finalsubPart9.2/Section2.1 ConnectionPart9.6/Section2.1
CentralfieldPart9.1/Section2.1 ConnectorPart9.2/Section2.1
CesspoolPart9.6/Section2.1 Connectorboxorjointbox
10
Part9.2/Section2.1 D
Connectorforportableappliances DampsituationPart9.2/Section2.1
Part9.2/Section2.1 DaylightareaPart9.1/Section2.1
ConstructionequipmentPart11/Section4.2.1 DaylightfactorPart9.1/Section2.1
ConsumerPart9.6/Section2.1 DaylightpenetrationPart9.1/Section2.1
ConsumerspipePart9.6/Section2.1 DeadPart9.2/Section2.1
ConsumersterminalsPart9.2/Section2.1 DeadloadsPart5/Section2.1
ControlPart9.5/Section2 DecibelsPart9.4/Section2
ConversionPart2/Section1.2 DeepmanholePart9.6/Section2.1
CookingalcovePart4/Section2.1 DeflectorsheavePart9.5/Section2
Cord,flexiblePart9.2/Section2.1 DensityPart4/Section2.1
CoreofacablePart9.2/Section2.1 Depth(D)Part5/Section5.9
CorrelatedColourTemperature(CCT) DepthofmanholePart9.6/Section2.1
Part9.1/Section2.1 DetachedbuildingPart4/Section2.1
CourtyardPart4/Section2.1 DevelopmentPart2/Section1.2
CounterweightPart9.5/Section2.1 DewpointtemperaturePart9.3/Section2
CoverPart9.6/Section2.1 DiameterPart9.6/Section2.1
CoveredareaPart4/Section2.1 DirectsolarilluminancePart9.1/Section2.1
CrossconnectionPart9.6/Section2.1 DirectearthingsystemPart9.2/Section2.1
CrosstalkPart9.4/Section2 DirecttapPart9.6/Section2.1
CrownoftrapPart9.6/Section2.1 DisabilitiesofIncoordination
Customers/consumersconnection Part4/AppendixE
11
Part/Section2.1 Earthleakagecircuitbreakersystem
DoorPart3/Section1.2,Part9.5/Section2 Part9.2/Section2.1
DoorcloserPart9.5/Section2 EarthquakeloadsPart5/Section2.1
EnthalpyPart9.3/Section2
E
Equivalent continuous Aweighted sound
EarthPart9.2/Section pressurelevel,LAeg.TPart9.4/Section2
Earthcontinuityconductor Equivalentsoundabsorptionareaofaroom
Part9.2/Section2.1 Part9.4/Section2
EarthelectrodePart9.2/Section2.1 EscalatorPart9.5/Section2
EarthfaultPart9.2/Section2.1 EscalatorinstallationsPart9.5/Section2
EarthingleadPart9.2/Section2.1 EscalatorlandingPart9.5/Section2
12
EscalatorlandingzonePart9.5/Section2 FloorAreaRatio(FAR)Part4/Section2
EscalatormachinePart9.5/Section2 FloorholePart11/Section4.2.1
ExitPart4/Section2.1 FloorlevelingswitchPart9.5/Section2
ExposedmetalPart9.2/Section2.1 FlooropeningPart11/Section4.2.1
ExternallynoncombustiblePart3/Section1.2 FloorselectorPart9.5/Section2
ExternalReflectedComponent(ERC) FloorstoppingswitchPart9.5/Section2
Part9.1/Section2.1 FlushingcisternPart9.6/Section2.1
EvaporativeaircoolingPart9.3/Section2 FormationPart9.6/Section2.1
Forcecoefficient(Cf)Part5/Section5.9
F FreefieldlevelPart9.4/Section2
FaadelevelPart9.4/Section2 Frenchdrain/rubbledrain
FeedcisternPart9.6/Section2.1 Part9.6/Section2.1
FiredamperPart9.3/Section2 FrequencyPart9.4/Section2
FireseparationPart4/Section2 FusePart9.2/Section2.1
FireseparationwallPart9.3/Section2 FuseelementPart9.2/Section2.1
FirestopPart3/Section1.2
FiresurvivalcablePart9.2/Section2.1 G
Fitting,lightingPart9.2/Section2.1 GalleryPart4/Section2.1
FittingsPart9.6/Section2.1 Garage,privatePart4/Section2.1
FixtureunitPart9.6/Section2.1 Garage,publicPart4/Section2.1
FixtureunitdrainagePart9.6/Section2.1 GasfitterPart9.7/Section2
FlameproofenclosurePart9.2/Section2.1 GearedmachinePart9.5/Section2
FlameretardantcablePart9.2/Section2.1 GearlessmachinePart9.5/Section2
FloatoperatedvalvePart9.6/Section2.1 GeneralwashingplacePart9.6/Section2.1
FloorPart4/Section2 GeyserPart9.6/Section2.1
13
GlarePart9.1/Section2.1 HighwayauthorityPart9.6/Section2.1
GlobalWarmingPotential(GWP) HoistingbeamPart9.5/Section2
Part9.3/Section2 HorizontalpipePart9.6/Section2.1
GoodsliftPart9.5/Section2 HospitalliftPart9.5/Section2
GroundroughnessPart5/Section5.9 HotwatertankPart9.6/Section2.1
GroundstoreyPart3/Section1.2 HydronicsystemsPart9.3/Section2
GrouphousingPart4/Section2.1
GuardrailingPart11/Section4.2.1 I
GuiderailsPart9.5/Section2 IlluminancePart9.1/Section2.1
GuiderailsfixingPart9.5/Section2 Impactsoundpressurelevel,Li
GuiderailsshoePart9.5/Section2 Part9.4/Section2
GullychamberPart9.6/Section2.1 Imposed(Live)loadsPart5/Section5.2
GullytrapPart9.6/Section2.1 IndoorAirQuality(IAQ)Part9.3/Section2
IndoorambientnoisePart9.4/Section2
H InflammablePart9.2/Section2.1
HabitableroomPart4/Section2.1 Infiltration/exfiltrationPart9.3/Section2
Harmonics(currentandvoltage) InletPart9.6/Section2.1
Part9.2/Section2.1 InsertionLoss(LIL)Part9.4/Section2
HaunchingPart9.6/Section2.1 InspectionchamberPart9.6/Section2.1
Heelrestbend/duckfootbend Installation(electrical),ofbuildings
Part9.6/Section2.1 Part9.2/Section2.1
HearingdisabilitiesPart4/AppendixE InsulatedPart9.2/Section2.1
Heightofbuilding(H)Part3/Section1.2 Insulation,basicPart9.2/Section2.1
Part5/Section5.9 Insulation,doublePart9.2/Section2.1
HighaltitudesPart9.6/Section2.1 Insulation(electrical)Part9.2/Section2.1
14
Insulation,reinforcedPart9.2/Section2.1 LiftPart4/Section2.1
Insulation,supplementary LiftcarPart9.5/Section2
Part9.2/Section2.1 LiftlandingPart9.5/Section2
InterceptorPart9.6/Section2.1 LiftmachinePart9.5/Section2
Interceptormanhole/interceptorchamber LiftpitPart9.5/Section2
Part9.6/Section2.1 LiftwellPart9.5/Section2
InternalReflectedComponent(IRC) LiftwellenclosurePart9.5/Section2
Part9.1/Section2.1 LightOutputRatio(LOR)/Efficiency()
InvertPart9.6/Section2.1 Part9.1/Section2.1
LinkedswitchPart9.2/Section2.1
J Live/AlivePart9.2/Section2.1
JunctionpipePart9.6/Section2.1 Live(Imposed)loadsPart5/Section2.1
L Locations,industrialPart9.2/Section2.1
LaggingPart9.6/Section2.1 Locations,nonindustrialPart9.2/Section2.1
LandingcallpushPart9.5/Section2 LoftPart4/Section2.1
LandingdoorPart9.5/Section2 Lumen(lm)Part9.1/Section2.1
LandingzonePart9.5/Section2 LuminancePart9.1/Section2.1
LedgePart4/Section2.1 Luminousflux()Part9.1/Section2.1
Length(l)Part5/Section5.9
LevellingdevicesPart9.5/Section2 M
LevellingzonePart9.5/Section2 Mainsoilpipe(MSP)Part9.6/Section2.1
Part9.6/Section2.1 NotionalwidthPart7/Section7.2.1
Mainwastepipe(MWP)Part9.6/Section2.1
ManholePart9.6/Section2.1 O
ManholechamberPart9.6/Section2.1 Occupancy/UsegroupPart2/Section1.2
MaterialhandlinghoistPart11/Section4.2.1 OccupierPart2/Section1.2
MeridianPart9.1/Section2.1 OctavebandPart9.4/Section2
MezzaninefloorPart4/Section2.1 OffsetPart9.6/Section2.1
MiniaturecircuitbreakerPart9.2/Section2.1 OpencarportPart3/Section1.2
Multipleearthedneutralsystem OpenspacePart4/Section2.1
Part9.2/Section2.1 Openspace,frontPart4/Section2.1
Openspace,rearPart4/Section2.1
N Openspace,sidePart4/Section2.1
NeutralconductorPart9.2/Section2.1 OperationPart9.5/Section2
NoisePart9.4/Section2 OperatingdevicePart9.5/Section2
NoiseExposureForecast(NEF) OperationalconstructionPart2/Section1.2
Part9.4/Section2 OrientationofbuildingsPart9.1/Section2.1
NoiseRating(NR)Part9.4/Section2 OverheadbeamsPart9.5/Section2
NoiseReductionCoefficient(NRC) OverspeedgovernorPart9.5/Section2
Part9.4/Section2 OwnerPart2/Section1.2
NonAmbulatoryDisabilities OzoneDepletionPotential(ODP)
Part4/AppendixE Part9.3/Section2
NonservicelatrinePart9.6/Section2.1 P
NormalizedImpactSoundPressureLevel,Ln ParallelstepPart7/Section7.2.1
Part9.4/Section2 ParapetPart4/Section2.1
NorthandSouthpointsPart9.1/Section2.1 ParkingspacePart4/Section2.1
16
PartitionPart4/Section2.1 PositiveventilationPart9.3/Section2
Percentilelevel,LAN,TPart9.4/Section2 PotablewaterPart9.6/Section2.1
PassengerliftPart9.5/Section2 PremisesPart9.6/Section2.1
PeriodofsupplyPart9.6/Section2.1 PressurecoefficientPart5/Section5.9
PeripheralfieldPart9.1/Section2.1 PressureregulatorPart9.7/Section2
PermitPart2/Section1.2 PrivatestaircasePart7/Section7.2.1
Permittedlimitofunprotectedarea ProtectedshaftPart3/Section1.2
Part3/Section1.2 PsychrometryPart9.3/Section2
PilerigPart11/Section4.2.1 PsychrometricchartPart9.3/Section2
PilotPart9.7/Section2 PuffventilationPart9.6/Section2.1
PinknoisePart9.4/Section2 PuretonePart9.4/Section2
PipesystemPart9.6/Section2.1 PurgePart9.7/Section2
PipeworkPart9.6/Section2.1
PitchlinePart7/Section7.2.1 Q
PlatformPart11/Section4.2.1 QualifiedinstallingagencyPart9.7/Section2
PlenumPart9.3/Section2
PlinthPart4/Section2.1 R
PlinthareaPart4/Section2.1 Ramps,Rampswithgradients
PlugPart9.1/Section2.1 Part4/AppendixE
PlumbingPart9.6/Section2.1
Ratedload(lift)Part9.5/Section2
PlumbingsystemPart9.6/Section2.1
Ratedload(escalator)Part9.5/Section2
Point(inwiring)Part9.1/Section2.1
Ratedspeed(lift)Part9.5/Section2
PorchPart4/Section2.1
Ratedspeed(escalator)Part9.5/Section2
Positionand/ordirectionindicator
Ratinglevel,LAr,TrPart9.4/Section2
Part9.5/Section2
RecirculatedairPart9.3/Section2
17
ReflectedglarePart9.1/Section2.1 SanctionedplanPart2/Section1.2
Reflectionfactor(Reflectance) SanitaryappliancesPart9.6/Section2.1
Part9.1/Section2.1 ScaffoldPart11/Section4.2.1
RefrigerantPart9.3/Section2 SemiAmbulatoryDisabilities
RelativehumidityPart9.3/Section2 Part4/AppendixE
RelevantboundaryPart3/Section1.2 SemidetachedbuildingPart4/Section2.1
RiserPart9.7/Section2 SeparatingwallPart3/Section1.2
Residualcurrentcircuitbreaker ServicePart9.2/Section2.1
Part9.2/Section2.1 ServicelatrinePart9.6/Section2.1
ResidualheadPart9.6/Section2.1 ServiceliftPart9.5/Section2
RetiringcamPart9.5/Section2 ServicepipePart9.6/Section2.1
RopingmultiplePart9.5/Section2 ServiceroadPart2/Section1.2
ReturnairPart9.3/Section2 Serviceshutoffvalve(isolationvalve)
RevealPart9.1/Section2.1 Part9.7/Section2
Reverberationtime,TPart9.4/Section2 SetbacklinePart2/Section1.2
RoadPart2/Section1.2 SewerPart9.6/Section2.1
RoadlinePart2/Section1.2 ShadefactorPart9.3/Section2
RoomheightPart2/Section1.2 SheavePart9.5/Section2
RoomIndex(kr)Part9.1/Section2.1 SickBuildingSyndrome(SBS)
Rowhousing/rowtypebuilding Part9.3/Section2
Part4/Section2.1 SightDisabilitiesPart4/AppendixE
SitePart2/Section1.2
S Site,cornerPart4/Section2.1
SaddlePart9.6/Section2.1 Site,depthofPart4/Section2.1
SafetygearPart9.5/Section2 Site,doublefrontagePart4/Section2.1
18
Site,interiorortandemPart4/Section2.1 StandardizedImpactSoundPressureLevel,LnT
SkyComponent(SC)Part9.1/Section2.1 Part9.4/Section2
SlackropeswitchPart9.5/Section2 StandardizedLevelDifference,DnT
Slophopper(slopsink)Part9.6/Section2.1 Part9.4/Section2
SmokedamperPart9.3/Section2 StaticpressurePart9.3/Section2
SoakawayPart9.6/Section2.1 StopcockPart9.6/Section2.1
SocketoutletPart9.2/Section2.1 StoptapPart9.6/Section2.1
Soffit(crown)Part9.6/Section2.1 StoragetankPart9.6/Section2.1
SoilappliancesPart9.6/Section2.1 StoreyPart4/Section2.1
SoilpipePart9.6/Section2.1 Storey,topmostPart4/Section2.1
SoilwastePart9.6/Section2.1 StreetPart2/Section1.2
SolarloadPart9.1/Section2.1 StreetlevelorgradePart2/Section1.2
SoundPart9.4/Section2 StreetlinePart2/Section1.2
SoundExposureLevel,LAEPart9.4/Section2 StructurebornenoisePart9.4/Section2
SoundpowerPart9.4/Section2 SubsoilwaterPart9.6/Section2.1
SoundPowerLevel,LWPart9.4/Section2 SubsoilwaterdrainPart9.6/Section2.1
Soundpressure,pPart9.4/Section2 SullagePart9.6/Section2.1
SoundPressureLevel,LPPart9.4/Section2 SupplyairPart9.3/Section2
SoundreceiverPart9.4/Section2 Supplyandreturnairgrillsanddiffusers
SoundreductionIndex,RPart9.4/Section2 Part9.3/Section2
SoundsourcePart9.4/Section2 SupplypipePart9.6/Section2.1
SpectrumPart9.4/Section2 SupportsPart9.6/Section2.1
SpeechInterferenceLevel(SIL) SurfacewaterPart9.6/Section2.1
Part9.4/Section2 SurfacewaterdrainPart9.6/Section2.1
StaircoverPart4/Section2.1 SuspensionropesPart9.5/Section2
19
SwitchPart9.2/Section2.1 TransientsoundPart9.4/Section2
SwitchboardPart9.2/Section2.1 TransitionalAreaPart4/AppendixA
SwitchdisconnectorsPart9.2/Section2.1 TrapPart9.6/Section2.1
SwitchdisconnectorfusePart9.2/Section2.1 TravelPart9.5/Section2
SwitchgearPart9.2/Section2.1 U
SystemsofdrainagePart9.6/Section2.1 UnprotectedareaPart3/Section1.2
UnsafebuildingPart2/Section1.2
T UsablewallspacePart9.2/Section2.1
TaperedstepsPart7/Section7.2.1 UtilizationFactor(CoefficientoUtilization)()
TerminalslowdownswitchPart9.5/Section2 Part9.1/Section2.1
Terminalstoppingswitchnormal
Part9.5/Section2 V
Terminalstoppingdevicefinal Ventstack/VentpipePart9.6/Section2.1
Partb9.5/Section2 VentsystemPart9.6/Section2.1
ThermaltransmittancePart9.3/Section2 VerandahPart4/Section2.1
ThermalenergystoragePart9.3/Section2 VerticalpipePart9.6/Section2.1
ThirdoctavebandPart9.4/Section2 VibrationisolationPart9.4/Section2
ThresholdofhearingPart9.4/Section2 VisualfieldPart9.1/Section2.1
ToabutPart4/Section2.1 VolumetoPlotAreaRatio(VPR)
ToeboardPart11/Section4.2.1 Part4/Section2.1
ToerectPart2/Section1.2 Voltage,ExtraHigh(EHT)Part9.2/Section2.1
Topography(orography)Part5/Section5.9 Voltage,ExtraLow(ELV)Part9.2/Section2.1
TotalheadroomPart9.5/Section2 Voltage,High(HT,HV)Part9.2/Section2.1
TowerlikestructuresPart4/Section2.1 Voltage,Low(LV)Part9.2/Section2.1
TradeeffluentPart9.6/Section2.1 Voltage,Medium(MV)Part9.2/Section2.1
20
WeightedStandardizedImpactSoundPressure
Level,LnT,wPart9.4/Section2
W
WeightedStandardizedLevelDifference,DnT,w
Walk,WalksPart4/AppendixE
Part9.4/Section2
WallholePart11/Section4.2.1
Weighted Normalized Impact Sound Pressure
WallopeningPart11/Section4.2.1 Level,Ln,wPart9.4/Section2
WarningpipePart9.6/Section2.1 WetbulbtemperaturePart9.3/Section2
WashoutvalvePart9.6/Section2.1 WhitenoisePart9.4/Section2
WasteappliancePart9.6/Section2.1 Width(w)Part5/Section5.9
WastepipePart9.6/Section2.1 WindloadsPart5/Section2.1
Wastewater(sullage)Part9.6/Section2.1 WindowPart4/Section2.1
Watercloset(WC)Part4/Section2.1 WorkingplanePart9.1/Section2.1
WaterconditioningPart9.3/Section2
WaterhardnessPart9.3/Section2
Watermain(streetmain)Part9.6/Section2.1
WateroutletPart9.6/Section2.1
WatersealPart9.6/Section2.1
WatersupplysystemPart9.6/Section2.1
WaterworksPart9.6/Section2.1
WavelengthPart9.4/Section2
WeatherproofPart9.2/Section2.1
WeightedLevelDifference,DW
Part9.4/Section2
WeightedSoundReductionIndex,RW
Part9.4/Section2
21