JOB SAFETY ANALYSIS ( HYDRO JETTING )

Date: Prepared by : Rajesh

Operation / Process : Hydro


Jetting of pipelines

S/No OPERATION SEQUENCE POTENTIAL HAZARDS / RISKS CONTROL MEASURES ACTION BY

1 a. Ensure a valid work permit Client Rep/


b. Refer to Hydro Jetting Supervisor
Procedure
2 Check the drawing & test a. Hydro jetting of a wrong a. Check and ensure that the hydro jetting is Client Rep/
pack / line no identified test pack / line no carried on a correct test pack / line no. Supervisor
accordance with the
requirement
3 To select & prepare all the a. Pipe Fitting / hose burst a. Select the right materials and equipment. Supervisor
hydro jetting equipment & pipe off, injury other
fittings
b. Unauthorized entry of a. Barricade testing area at least 1 meter and Supervisor
personnel display warning sign.
b. Highlight in the VSCC
4 To hydro jet the pipe lines to a. Eyes / body injury a. Wear PPE (Safety goggle / Full face shield, Worker
100 bar (1500 psi) to check Safety Helmet, Safety Boots, Overalls)
leakage( 1st inspection )
b. Personnel hit by a. Display warning signboard/barricade to be at Supervisor
pressurized items least 1 meter to keep other personnel away.

Signature:
Approved by: Signature:
Rev 0 Reviewed by: Page 1 of 3
JOB SAFETY ANALYSIS ( HYDRO JETTING )

c. Failure of pressure gauge a. Use calibrated pressure gauge. Supervisor


b. Watchman to check and ensure not to over
pressurized
d. Nearby Electrical items a. Protect electrical items prior to start up Supervisor
hit by water/pressurized
items

5 Increase to the required a. Leakage and causing a. Line check prior to commencement of hydro Supervisor
pressure ( 6,000 to 10,000 psi ) flooding onto the jetting
by inserting the nozzle into the surrounding b. Standby diaphragm pump to pump out the
piping system (full) water.
c. Ensure containment tray and pump in good
condition.
b. Personnel hit by a. Display warning signboard/barricade to be at Supervisor
pressurized items least 1 meter to keep other personnel away.
b. Install Protective Barrier made of wooden
material to block any pressurized items
coming out at the open end of pipe.
c. Failure of pressure gauge a. Use calibrated pressure gauge. Supervisor
b. Watchman to check and ensure not to over
pressurized
d. Working at heights a. Ensure the Staging had been certified SAFE Worker
TO USE.
b. Wear safety harness
6 Continue hydro jetting till the a. Unauthorized entry of a. Highlight in the VSCC and display warning Supervisor
pipe lines are clear from debris personnel signboard/barricade to be at least 1 meter.
and drain the clear water after

Signature:
Approved by: Signature:
Rev 0 Reviewed by: Page 2 of 3
JOB SAFETY ANALYSIS ( HYDRO JETTING )

collecting the debris through


the filter bags. Finally the used
filter bags will be disposed into
the rubbish bin.
b. Eyes / body injury a. Wear PPE (Boots, safety goggle and/ or Full Worker
face shield, overalls.)
7 Visual inspection on pipelines a. Personnel in contact with a. Highlight in the VSCC and display warning Supervisor
flushing medium signboard / barricade to be at least 1 meter..
b. Eyes / body injury a. Wear PPE (Boots, safety goggle and/ or Full Worker
face shield, overalls.
8 To remove temporary flanges a. Personnel in contact with a. Highlight in the VSCC and display warning Supervisor
from the pipe lines after flushing medium signboard/ barricade to be at least 1 meter..
flushing
b. Eyes / body injury a. Wear PPE (Boots, safety goggle and/ or Full Worker
face shield, overalls.)
c. Working at heights a. Ensure the Staging had been certified SAFE Worker
9 To reinstate the piping system. TO USE.
b. Wear safety harness.
a. Hand injury by improper c. a. Wear hand gloves. Worker
use of tools and material b. Use right tool for the work.
handling
10 House keeping a. Trip and fall a. Run hoses in proper manner Worker
b. Keep all material and tools after work

11 Review local conditions

Abbreviations:
Signature:
Approved by: Signature:
Rev 0 Reviewed by: Page 3 of 3
JOB SAFETY ANALYSIS ( HYDRO JETTING )

1. VSCC Vessel Safety Coordination Committee


2. PPE - Personal Protective Equipment

Signature:
Approved by: Signature:
Rev 0 Reviewed by: Page 4 of 3