Quality Assurance

Job Safety Analysis Sheet


PRESSURE TESTING OF PIPES/TUBES/EQUIPMENT
PERSONAL PROTECTIVE EQUIPMENT & TOOLS: Hard Hat, Safety Shoes, Safety Goggles, Hand Gloves, Coverall,
hose, compressor, pressure gauge, spade, gasket etc.
SEQUENCE OF
Yes /
BASIC JOB POTENTIAL HAZARDS PRECAUTIONS
No
STEPS

Non compliance of Safety Refer to Safety Policy.


Policy Conduct Tool Box Talk.

Barricade the area where pressure-test is to be carried


Planning Unauthorized Personnel out.
Post warning notice.
Ensure the equipment / tool to be used for pressure
testing (such as hose, coupling, pressure gauge, spade,
Defective Tools / Equipment
gasket etc) are free from defect and suitable for the
pressure rating of the system.
Ensure the pressure relieving device is set at maximum
Exceeding Maximum Allowable
allowable pressure for weakest portion of the segment
Pressure
to be pressure-tested.
Keep away from the pressurized segment of the system
being pressure-tested.
Monitor the pressure gauge from a safe distance away
Injury to Workers
from the potential source of high pressure jetting (Such
as Flange Joint, Spade, and Coupling etc.)
Ensure the workers are wearing required PPE.
Never increase the test pressure more than the
Damage to Equipment / System maximum allowable pressure for the weakest portion in
the segment or pressure rating of the hose & coupling.
Pressure-testing
Do not leave the pressurized hose unattended when the
Un-attended Pressurized Tool / pressure-test is going on.
Equipment Isolate the equipment from all source of energy when
not in use.
Do not change (exceed / decrease) the duration of
Changing the Duration of
pressure test without permission from Inspection
Hydro-test
Engineer.
Ensure the safe depressurization of air.

Unsafe Depressurization

TPC-FZE (Process Packages) TPC-FZE(PP)/FM/008


ISSUE: 01
Page 1 of 2
Quality Assurance
SEQUENCE OF
Yes /
BASIC JOB POTENTIAL HAZARDS PRECAUTIONS
No
STEPS
Ensure proper wind up & housekeeping at worksite.
The accessories (hoses & compressor) not being used
Windup &
Scattered Material must be disconnected and the hoses are stored properly
Housekeeping
PSV (in case isolated) to be lined up after pressure test
completion.

Additional
Hazards
(Other than
indicated above)

Name: Designation:

JSA Done By
Signature: Date:

TPC-FZE (Process Packages) TPC-FZE(PP)/FM/008