Portage Bay Park

Design Commission Review 4: 90% Design Development


January 5, 2017
Existing Site

15th
AV E.
BRO
OKLY
N AV
E.

ST.
A CIFIC
P
ST.
BOAT
Previous Site Plan

POTENTIAL
PARK CONNECTION &
MID-BLOCK CROSSING

BOAT STREET

PICNIC AREA MULTI-USE LAWN


SAKUMA
VIEWPOINT

LAWN TERRACES PLANTED


AREAS
SHORELINE
HABITAT
SHORELINE
BEACH HABITAT

0 25 50 100

Portage Bay Park | Design Commission Review 4 January 5, 2017


Current Site Plan Base Bid
VE Adjustments:
Pavilion & Restroom are an Add Alternate
POTENTIAL PARK
Shorter Pier (Long Pier submitted for Permit)
CONNECTION &
MID-BLOCK CROSSING

BOAT STREET

a PLANTED AREA

c b e
MULTI-USE LAWN
SAKUMA
VIEWPOINT
PLANTED AREA

SHORELINE
HABITAT
d
SHORELINE
BEACH HABITAT

f
a Drop-Off Plaza w/ Entry Signage, Kayak Slide

b Picnic Terrace

c Shade Grove

d Beachfront Lawn Terraces

e Portage Trail and Meadow w/ Entry Signage N

f 0 25 50 100
Deck & Pier

Portage Bay Park | Design Commission Review 4 January 5, 2017


Cost Summary: 65% CD Cost Estimate - $6.9M Estimated Base Bid

Site Prep & Remediation 56% of budget

Site Development 24% of budget ~$19/ SF

General Overhead & Contingencies 20% of budget

Portage Bay Park | Design Commission Review 4 January 5, 2017


Arrivals & Boat Street Experience
Cyclists and
U District
Community

Signage
Trail Entry
Bike Racks

Meadow
Views Hospital
Picnic
Play Visitors
Signage Terrace
Loading/Drop-off Food Trucks Lawn
Waterfront
Students Bike Racks Shade Grove
Trail
& Cars Hand-carried Boat Launch Stone Seating

Portage Bay Park | Design Commission Review 4 January 5, 2017


Future Context: UW Master Plan
West Campus Signicant Pedestrian Path

The West Campus is the most urban of the industry partners and a signicant supply Signicant Open Space
four campus sectors and accommodates a of UW-operated student housing, the West
Active Ground Floor
wide range of uses including student housing, Campus is uniquely positioned to develop as
academic, research, and cultural programs. an innovation district within the broader Existing Building
Given its regional transportation access Seattle region (see page 38 for more detail
Potential Building
from I-5, regional transit services, retail, on academic and research partnerships). The
research in numerous elds, as well as cafes, long-term vision for the West Campus: Gateway

Extends and re-establishes the street Increases development capacity and


grid, and improves connections with the balances dense development with access to

Br
oo
adjacent University District. open space.

kl
yn
Av
Enhances connections

e
nu
e
with Central Campus.

Creates pedestrian-scaled
Connects the campus and development parcels
University District to their and activates street life
waterfronts. with ground oor active
destinations.

PLAZA

Burke-Gi
lman Trai
l

Pacic St
reet

MP US
T CA Reinforces east-west
WE S R E E N
G
connections with
South Campus.
ge
ri d

PORTAGE BAY PAR


yB

K
rsit
i ve

Provides exible building footprints Structures proposed development


Un

and massing to accommodate a range around a proposed multi-use, public


of functions, including academic and open space that functions as the
PORTAGE BAY
research partnerships. heart of the West Campus.

Figure 5. West Campus. Graphics are for Illustrative Purposes Only

Portage Bay Park | Design Commission Review 4 January 5, 2017


Birds-Eye View

Portage Bay Park | Design Commission Review 4 January 5, 2017


ADA Access & Seating

+28
LOADING

+19.88

ACCESSIBLE SEATING AREAS

ADA ACCESS ROUTES

0 25 50 100

Portage Bay Park | Design Commission Review 4 January 5, 2017


Grading Plan

+27.5 +28 +28.5


27.8+ 1.5%
+31
5%
4.5% 5:1 2.5
% 4.
1.5%
19.5+
4:1 25+ 25+ 4.5%
+25
+24.6 3.5 % 4:1
% 1.5 +21.3
+23.2 +23.5
.8
+21.6 18
+20.4 W
+23 OH

21.6+ +23 .8
16
W
OL

Portage Bay Park | Design Commission Review 4 January 5, 2017


Boat Street looking West

Portage Bay Park | Design Commission Review 4 January 5, 2017


Boat Street at Picnic Terrace

Portage Bay Park | Design Commission Review 4 January 5, 2017


Arc Path and Picnic Terrace

Portage Bay Park | Design Commission Review 4 January 5, 2017


Pier

Portage Bay Park | Design Commission Review 4 January 5, 2017


Tree Planting Plan

A B C
_ _ _

PICNIC GROVE

SHADE TREES
IN LAWN

MEADOW

D_

Yellowwood - Spring Fall Red Oak - Spring Fall Paper Birch - Spring Fall

Portage Bay Park | Design Commission Review 4 January 5, 2017


Site Section A-A west side of site

Portage Bay Park | Design Commission Review 4 January 5, 2017


Site Section B-B central site

Portage Bay Park | Design Commission Review 4 January 5, 2017


Site Section C-C east side of site

Portage Bay Park | Design Commission Review 4 January 5, 2017


Site Elevation D-D waterfront

Portage Bay Park | Design Commission Review 4 January 5, 2017


Interpretive Strategy

STONE SEATS

MEADOW

PORTAGE TRAIL
RECLAIMED TIMBER ELEMENTS
PARK SIGNS

0 25 50 100

Portage Bay Park | Design Commission Review 4 January 5, 2017


Interpretive Strategy

Site Narratives: Portage

Map from Aqua Terra Cultural Mohai Map of Native American Village Burke Museum Waterlines Map - Chudups John & Others Cheshiahud carving a canoe
Resources Report Sites and Major Trails 18. sx ZDDGZLW&DUU\D&DQRH

Salish Canoe Profiles Montlake from Roanoke bike


trail, c.1899

Portage Bay Park | Design Commission Review 4 January 5, 2017


Cultivated Meadow along Portage Trail east side of site

Camas

Paintbrush Tufted Hairgrass

ENTRY SIGNAGE

ENVIRONMENTAL &
CULTURAL HISTORY
Lupine Autumn Moor Grass

Portage Bay Park | Design Commission Review 4 January 5, 2017


Portage Trail

Portage Bay Park | Design Commission Review 4 January 5, 2017


Native Shoreline Planting

Kinnikinnik Vine Maple Oregon Box Evergreen Huckleberry

Sitka Sedge Dagger-Leaf Rush Oregon Iris Sweetgale

Portage Bay Park | Design Commission Review 4 January 5, 2017


Material Transitions at Portage Trail
1

1
CONCRETE PAVING

2 FSC HARDWOOD DECKING

2
3
2 FIBERGRATE DECKING

5 3 4

AGGREGATE PATH WITH STONE SLAB PAVERS

GRAVEL BEACH

Portage Bay Park | Design Commission Review 4 January 5, 2017


Material Transitions at Portage Trail

Portage Bay Park | Design Commission Review 4 January 5, 2017


Interpretive Strategy central and west side of site

Site Narratives: Maritime History

Latona Bridge 1917 Lake Union Mills near Fremont, 1914 1919 %R[DQG/XPEHU&RPSDQ\

6HDWWOH0RWRU%RDW&RPSDQ\HWF 6HDWWOH0RWRU%RDW&RPSDQ\ 7KHILUVW6HDWWOH%RDW6KRZZKLFK%U\DQWVHVWDEOLVKHGLQ

Portage Bay Park | Design Commission Review 4 January 5, 2017


Maritime History: Reclaimed Timber

KAYAK SLIDE

ENTRY SIGNAGE

LUMBER MILL, SHIP BUILDING


& MARINA HISTORY

ARCHITECTURAL CANOPY (ADD ALTERNATE)


Portage Bay Park | Design Commission Review 4 January 5, 2017
Maritime History: Reclaimed Timber

ELEVATION

perspective

PERSPECTIVE

Portage Bay Park | Design Commission Review 4 January 5, 2017


Furnishings

MOVABLE TABLES & CHAIRS

STONE SEATS
BENCH
TIMBER SEAT AT CONCRETE SEATWALL

DECK CHAIR

0 25 50 100

Portage Bay Park | Design Commission Review 4 January 5, 2017


Furnishings

Backed Bench Timber Seat

Movable Tables and Chairs Stone Seats Deck Chairs

Portage Bay Park | Design Commission Review 4 January 5, 2017


Lighting

add image

Bollards Pole Lights Portage Trail Curb Light

Portage Bay Park | Design Commission Review 4 January 5, 2017


Lighting



*
*
* **
* **
*
* *

POLE LIGHTING

* BOLLARD LIGHTING

PARKING LOT LIGHTING


PORTAGE TRAIL CURB LIGHTING

INTERPRETIVE IN-GRADE LIGHTING

0 25 50 100

Portage Bay Park | Design Commission Review 4 January 5, 2017


Add Alternate

POTENTIAL
PARK CONNECTION &
MID-BLOCK CROSSING

BOAT STREET

RESTROOM & SHADE


STRUCTURE
SEATING AREA
MULTI-USE LAWN
SAKUMA
VIEWPOINT

PLANTED
LAWN TERRACES AREAS
SHORELINE
HABITAT
SHORELINE
HABITAT
BEACH

0 25 50 100

Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion

Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion






Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion






Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion

Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion

Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion

Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion

GRZQOLJKW

ZDOOPRXQWIL[WXUH

Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion

YHQWLODWLRQVFUHHQ
UHFODLPHGZRRG

JOD]HGFPX VWDLQOHVVVWHHOKLJKOLJKWV

WUDQVOXFHQWJOD]LQJ

KDPPRFN

Portage Bay Park | Design Commission Review 4 January 5, 2017


Architecture - Shade Pavilion

Portage Bay Park | Design Commission Review 4 January 5, 2017


Boat Street looking West

Portage Bay Park | Design Commission Review 4 January 5, 2017


Boat Street at Pavillion

Portage Bay Park | Design Commission Review 4 January 5, 2017


End / Discussion

Portage Bay Park | Design Commission Review 4 January 5, 2017