Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
1 11 1 143 143 25
2 T1 B1 12 1 143 143 25
B2
3 13a 1 30 30 25
BAR BENDING SH
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
B2
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
4 13b 1 30 30 25
5 13c 1 30 30 25
13d 1 30 30 25
BAR BENDING SH
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
T2
6 14a 1 30 30 25
7 14b 2 30 60 25
8 14c 1 30 30 25
BAR BENDING SH
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
10 16 2 20 40 32
BAR BENDING SH
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
C7-
11 17 2 17 34 32
N14 ,M14
12 18 2 17 34 32
13 19 2 21 42 8
BAR BENDING SH
C7-
Bar Schedule Ref : BBS - 32 Rev - 0 Date 8/25/2014
N14 ,M14
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
14 20 2 42 84 8
15 21 2 21 42 8
16 22 2 21 42 8
BAR BENDING SH
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
C7-
17 23 2 17 34 32
L14,K14
18 24 2 17 34 32
19 25 2 30 60 8
BAR BENDING SH
C7-
CONSTRUCTION OF DHOFAR MUNICIPALITY MAIN BUILDING
L14,K14
Location Foundation Part-2 Drawing Title
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
20 26 2 60 120 8
C7-
BAR BENDING SH
L14,K14
Bar Schedule Ref : BBS - 32 Rev - 0 Date 8/25/2014
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
21 27 2 30 60 8
22 28 2 30 60 8
Total weight in Kg
Deduction in Kg
BAR BENDING SH
Subject Footing CF8 with C7 4 Nos Grid K14&N14(Without plinth Beam) Ref. Drawing No:
NO OF NO OF
SI. No: Shape Member Bar mark Total Qty Bar Dia
Footing Bars
Net Weight in Kg
DING SHCHEDULE
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
27577.398
Kg 866.475
DING SHCHEDULE
Dimensions (m)
Actual Shape Unit Weight
Actual Weight (Kg)
Length (m) Code (Kg/m)
A B C D E
n Kg 26710.923
TEEJAN TRADIN
CUTTIN
MEMBER SHAPE DIA OF BAR
A
FOOTING
25 105
25 103
8 292
8 292
COLUMN
32 45
25 45
8 72
8 26
CUTTIN
MEMBER SHAPE DIA OF BAR
A
72 72 72 14 305 0.394
72 26 72 41 213 0.394
CUTTING LENGTH NO OF TOTAL UNIT
B C BARS LENGH WEIGHT(KG)
Sheet:
Rev: 0
Checked By:
WEIGHT KG Remark
327.18
323.08
24.00
22.64
21.56
100.80
42.67
87.25
WEIGHT KG Remark
949.18