Overview
The purpose of writing this document is to brief the fundamental points to be considered for Instrumentation
Construction Engineering.
Detail Engineering:
1. Plant General Layout & Shop Layout is based on the process and equipment data of basic engineering
documents, plant general layout as well as the shop layouts for the various plant units and facilities will be developed.
While developing the layout, site conditions will be kept in view and provision will be made for future expansion.
2. Division List of Supplies The preparation of division list of supplies of PLANT & EQUIPMENT to be obtained
from indigenous and foreign sources.
3. Technical Specification Prepare technical specification and related drawings to invite tenders for supply of plant &
equipment. Also evaluate the tenders and submit technical recommendations for award of contract.
4.0 Architectural, Civil & Structural Designs & Drawings
4.1 Civil Work Prepare working drawings for the following: Main Plant buildings Auxiliary buildings Buildings &
Equipment foundations
4.2 Structural Steel Work Prepare design drawings, for structural steel work in buildings, staging and platforms. Shop
detailed drawings (fabrication drawings) as in customary will be prepared by the fabricators.
5.0 Design & Drawings For Utilities & Services
5.1 Plant Water System Make arrangement for availability of adequate water at one point within the plant boundary.
From this point onwards, design internal plant water distribution system including pumping, treatment & cooling facilities.
Also design a suitable fire fighting system based on fire hydrants.
5.2 Power Supply & Distribution Make arrangements for getting adequate high-tension power at one point within the
plant boundary. From this point design the plant substation power distribution and lighting systems including single line
diagram. Also design a suitable emergency power system, if required.
5.3 Communication and Instrumentation System Prepare schematic drawing and specifications for the supply and
installation of the communication and instrumentation system for the plant.
5.4 Plant air, instrument air, Fuel, Steam & Other Utilities Design the Plant air, instrument air, fuel, steam and other
utility systems and prepare outline drawings and specification.
5.5 Ventilation, Air Conditioning, Extraction System Design the ventilation, air conditioning, dust & fume control
systems and prepare outline drawings and specification.
5.6 Storm Water Drainages & Effluent Disposal Systems For contaminated process water which need treatment before
being discharged into plant drainage, prepare a scheme for treatment according to existing STANDARD and prepare
drawings and specifications.
5.7 Sewerage System Design a sewerage system and prepare drawings and specifications for the construction of the
same.
5.8 Roads, Fences & Gates Design and prepare drawings and specifications for construction of roads, fences and gates
within the plant boundary.
5.9 Material Handling & Storage Design of storage and handling facilities within the plant boundary for raw materials
and finished products and prepare outline drawings and specifications.
5.10 Auxiliary Facilities & Ancillary Buildings Design and prepare drawings for auxiliary facilities like repair &
maintenance shop, central stores, plant laboratory and ancillary buildings such as administrative building, gate house, fire
station, canteen, first aid station, charge rooms, parking lots, shop offices, garages, etc.
6.0 Assistance in Commissioning Render technical assistance during commissioning of the plant and equipment. Also
witness the performance guarantee tests to be conducted by the equipment suppliers and assist for issuing Acceptance
Certificate for taking over the equipment on satisfactory completion of the tests.
7.0 Master Network/Progress Schedule
7.1 Prepare overall project construction schedules including the initial master network. This will be updated and
finalised taking into account the actual placement of order on different parties. Advise for corrective measures to be taken
to maintain the overall time schedule.
7.2 Prepare quarterly progress reports indicating progress of construction and erection of the plant and equipment.
These reports will indicate achievement against targets and spell out actions to be taken in specific areas, if any, to
maintain the time schedule.
8.0 Designer's Supervision means: Interpretation of drawings, Interpretation of specifications and codes of practices,
Variation in design and materials Design modifications due to site condition, Interpretation of test results, preliminary
acceptance and final acceptance tests of the erected plant & equipment.
Available resources are taken note of, as also the resources further needed and they are allocated. Contract
documents are prepared keeping in the mind the role of the participating agencies to avoid ambiguities, duel responsibility
and confusion at a later date.
In case of small building projects, where the owner is the promoter, he arranges the finance himself and engages the
contractors or suppliers, without going into the complexities of preparation of tender documents. But he also gets a detailed
design from his consultant and fixes his terms, conditions and rate with his contractors and suppliers.
Engineering is the activities where all the details study is being carried out such as preparation of instrument
datasheets and all the construction details.
Construction Layout:
Layout is a systematic arrangement of an instrument items installation in Oil & Gas field as well as Refineries and
Petrochemical complex. Types of Layouts are categories as follows.
Construction Layouts: To prepare construction layout for Overall Instrument Cable tray trench routing basic input
information required is overall plot plan where one can see or marked detail of all equipment, skids and packages are
installed. With this one can start planning for instrumentation construction work like preparation of cable trench tray
routing layout, JB location and Instrument location plans.
Other, deliverable of Instrumentation design departments related to construction activities are as follows.
1. Hook Diagrams.
a. Pneumatic Hook-ups
b. Process Hook-ups
2. Cable schedule
3. Wiring Diagrams
4. Material MTO.
5.
Details sections are explain in the subsequent article as follows.
1. Overall Tray /Trench Layouts:
In this type of layout documents, entire cable tray /trench routing are shown for cable laying.
Interconnections between control room to field are shown by this layout. Refer following fig for reference of such
layout drawings.
The tray /trench routing, elevation and type of cable tray, size of tray and all detail section are generally shown
as minimum.
Types of Hook-Ups:
1. Pneumatic Hookups.
Pneumatic hook up means it is independent of process connection. This is basically a tubing/piping work.
2. Process Hookups:
Process hook ups means instruments are installed directly on process line.
Cable Schedule:
b 300mm W x 50 mm H (SS316) M - - 86 - - - 86
c 450mm W x 60 mm H(SS316) M - - 90 - - - 90
2 160 dia. PVC Conduit for direct buried M 370 160 - 50 30 30 640
112
TYPE 3(IS )-5P X 1.5 mm² M - 284 208 336 - 1948
0
208
TYPE 3 (IS)-10P X 2.5 mm² M - - - - 1040 3120
0
b Non IS Cables
208
TYPE 4(NIS)-1P X 1.5 mm² M - 32 - - - 2112
0
Panel earth to electrical earthgrid: 6sqmm M 400 400 400 400 400 400 2400
Instrument earthing: 4sqmm M 770 140 220 120 140 100 1490
Instrument Junction boxes - (Refer General Instrument specification for Packaged equipement:1806-
5
5018-3 clause 5.5)
5.1. a JB-IS (SS304 , IP 65) Note 3
Instrument Cable Glands (SS316, complete with shroud) for IS JBs - (Refer General Instrument
5.1. c
specification for Packaged equipement:1806-5018-3 clause 5.3)
Cable gland (M20S) NOS 82 0 4 22 12 - 120
ST- ST- ST- ST- 72-SBV- Rema
Sr.nos. Description of items Unit ST-S Total
T1 T2 B W1 31 rks
Cable gland (M20) NOS 16 26 4 - - 14 60
Instrument Cable Glands (SS316, complete with shroud) for Non IS JBs - (Refer General Instrument
5.2.c
specification for Packaged equipement:1806-5018-3 clause 5.3)
Cable gland (M20S) NOS 42 - 12 12 - - 66
MTO -HOOK-UPS (Refer Inst. Process hook -up diagrams (Typical) : 1806-5022 & Inst. Pneumatic hook -
6
up diagrams (Typical) :1806-5029 )
a Tubes
b Tube fittings
1/2"NPT(M) X 1/2"OD Male
NOS 35 6 1 15 2 2 61
Connector(SS316L)
1/4"Plug(SS316L) NOS 11 6 1 7 2 2 29
c Others
Note 1.Instrument cable tray heights are considerd as : Upto 100 mmW tray 20mm H, upto 400 mmW 50mmH & above
400mmW 60mmH
Note 2. Earthing cable sizes and lengths are assumed.
Dattatray K. Nikam
GUIDELINE FOR INSTRUMENT LAYOUT Design Engineer ( Instrument)