SUPPLIES ESTIMATE

The following were going to be the supplies that are needed to this

proposed business operation and the estimated price for the following

equipment:

Description Initial

estimated amount for monthly supply

Mouse P 3,

000

AVRs P 5,

000

Webcams P 5,

000

Keyboards P 6,

000

Flash drives P 4,

000

Headsets P 5,

000

Computer cables (e.g. UTP, USB, and HDMI) P 4, 500


Icct Colleges Foundation Inc
College of Engineering
V.v Soliven Ave. II, Cainta, Rizal

Total cost for peripherals P

32, 500

IFix It Computer repair and accessories can manage the waste disposal

and cleanliness properly through the following equipments:

Cleaning materials

Price

Broom & Dust pan (replace every 6 months) P 150

Trash cans P 200

Mop - (replace every 6 months) P 250

Air freshener P 175

Powdered soap 2Kg (good for 6 months) P 160

Total cost for cleaning materials P

935

Utilities

Price
Icct Colleges Foundation Inc
College of Engineering
V.v Soliven Ave. II, Cainta, Rizal

Electricity P 2, 000

Water P 120

Uniforms P 2, 000

Total cost for utilities

P 4, 120

Chapter II

BUILDING ESTIMATE

This chapter will show the estimated design of the proposed project. The
following figures will show how this business, the IFix It was planned to build.

A. Floor Plan
Icct Colleges Foundation Inc
College of Engineering
V.v Soliven Ave. II, Cainta, Rizal

B. Front Side Elevation

C. Left Side Elevation

D. Right Side Elevation


Icct Colleges Foundation Inc
College of Engineering
V.v Soliven Ave. II, Cainta, Rizal

E. Rear Side Elevation

F. Septic Tank Plan


Icct Colleges Foundation Inc
College of Engineering
V.v Soliven Ave. II, Cainta, Rizal

G. Perspective View
Icct Colleges Foundation Inc
College of Engineering
V.v Soliven Ave. II, Cainta, Rizal

Chapter VI

CASH FLOW