1. PROJECT SUMMARY
2. PLOT PLAN
3. PROJECT MILESTONE
5. SCOPE OF WORK
1) Summary 2) Location
Item Description
Contract
EPC Lump Sum Turn Key
Type About 730km
Remark
2. PLOT PLAN
System
46
63. By-Pass Stack
Elec. Building
15.5M
1st Inspection
16.5M
17.5M
GT #1 : 18M / GT #2 : 19M
23M
LAYDOWN AREA
Temporary Facility
Fence
Access (Heavy Equipment)
Batch Plant
Access (Labor)
5. SCOPE OF WORK
Equipment such AHU, Condensing Unit and Bulk Material such as Pipe,
1 R
Cable etc including associated parts, Accessories and consumable parts
6 T.A.B R
8 All permit related with the HVAC, Fire Alarm and Fire Fighting Work R
6. GUIDELINE FOR BIDDING
1) Terms of Payment
No. Description Amount Bond Remark
1 Bid closing date on or before 16:00, November 28, 2016 in Indonesian local time. By E-Mail
1) Commercial Queries
-. Attn. : H.G Kim (seankim@lottenc.com, +62-812-3352-6621)
2) Technical Queries
2 Communication
-. Attn. : M.S Lee (topos412@lottenc.com, +62-812-1899-3195)
-. C.C : H.G Kim (seankim@lottenc.com, +62-812-3352-6621)
M.K Yoon (mkyoon87@lottenc.com, +62-813-3394-7245)