Sunteți pe pagina 1din 86

PRESUPUESTO ANALITICO

Obra Ampliacion y Mejoramiento Integral de los Sistemas de Agua Potable y Alcantarillado del Distrito de San Jose

Sub Gastos Generales


Descripcion Costo Directo
Presupuesto 7%

001 A. SISTEMA INTEGRAL DE AGUA POTABLE 10,429,696.32 730,078.74

002 A. SISTEMA INTEGRAL DE ALCANTARILLADO Y CONSTRUCCION DE 8,382,216.03 586,755.12


PLANTA DE TRATAMIENTO DE AGUAS SERVIDAS.

003 SISTEMA ELECTRICO Y EQUIPAMIENTO 727,052.98 50,893.71

004 REPOSICION DE PAVIMENTOS EN CONSTRUCCION DE SISTEMA 2,941,095.84 205,876.71


DE ALCANTARILLADO
SUB TOTAL 1 22,480,061.17 1,573,604.28

EXPEDIENTE TECNICO (2%)


SUPERVISION (5%)
EXPROPIACION DE TERRENOS
tarillado del Distrito de San Jose - Lambayeque

Fecha : Febrero 2012

Utilidad 5% Sub Total IGV 18% TOTAL

521,484.82 11,681,259.88 2,102,626.78 13,783,886.66

419,110.80 9,388,081.95 1,689,854.75 11,077,936.70

36,352.65 814,299.34 146,573.88 960,873.22

147,054.79 3,294,027.34 592,924.92 3,886,952.26

1,124,003.06 25,177,668.51 4,531,980.33 29,709,648.84

COSTO DE EXPEDIENTE TECNICO 2% 594,192.98


COSTO DE SUPERVISION 5% 1,124,003.08
COSTO DE PAGOS A TERCEROS 220,000.00

TOTAL DEL PRESUPUESTO 31,647,844.90


S10
MUNICIPALIDAD DISTRITAL DE SAN JOSE - LAMBAYEQUE - LAMBAYEQUE
Subpresupuesto 001 SISTEMA
INTEGRAL DE
Item Descripcin AGUA POTABLE Und. Metrado

01 RESERVORIO APOYADO 3000 - 5000 M3


01.01 OBRAS PROVISIONALES
01.01.01 CARTEL DE OBRA CON GIGANTOGRAFIA DE 3.6 X 7.20 M und 1.00
01.01.02 CARTEL DE OBRA CON GIGANTOGRAFIA DE 3.40X2.60M und 1.00
01.01.03 CASETA DE ALMACEN Y GUARDIANIA m2 60.00
01.01.04 FLETE MARITIMO GLB 1.00
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DE TERRENO NORMAL MANUAL m2 255.00
01.02.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 255.00
01.02.03 TRAZO, NIVELES Y REPLANTEO FINAL DE ESTRUCTURAS m2 255.00
01.02.04 REUBICACION DE TUBERIAS EXISTENTES GLB 1.00
01.02.05 PRUEBA DE CALIDAD DEL CONCRETO und 12.00
01.03 DEMOLICIONES
01.03.01 DEMOLICION DE RESERVORIO
01.03.01.01 DEMOLICION DE MUROS DE CONCRETO ARMADO m3 56.59
01.03.01.02 DEMOLICION DE TECHO DE CONCRETO ARMADO m3 21.03
01.03.01.03 DEMOLICION DE LOSA DE CONCRETO ARMADO m3 43.81
01.03.01.04 ELIMINACION DE MATERIAL DE DEMOLICION m3 166.42
01.03.02 DEMOLICION DE CAMARA DE VALVULAS
01.03.02.01 DEMOLICION DE MUROS DE CONCRETO ARMADO m3 5.29
01.03.02.02 DEMOLICION DE LOSA DE CONCRETO ARMADO m3 8.22
01.03.02.03 ELIMINACION DE MATERIAL DE DEMOLICION m3 16.20
01.03.03 DEMOLICION CAJAS DE VALVULAS
01.03.03.01 DEMOLICION DE MUROS DE CONCRETO ARMADO m3 2.16
01.03.03.02 DEMOLICION DE LOSA DE CONCRETO ARMADO m3 1.60
01.03.03.03 ELIMINACION DE MATERIAL DE DEMOLICION m3 4.51
01.04 MOVIMIENTO DE TIERRAS
01.04.01 EXCAVACION CON EXPLOSIVO ESTRICTAMENTE CONTROLADA Y PROTEGIDA CON MALLA DE SOPORTE. m3 1,469.94

01.04.02 EXCAVACION CON MAQUINARIA EN TERRENO DURO m3 178.77


01.04.03 RELLENO CON MATERIAL DE PRESTAMO EN CAPAS DE 0.20M m3 188.78
01.04.04 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 1,957.46
01.05 OBRAS DE CONCRETO SIMPLE
01.05.01 SUB CIMIENTO CONCRETO FC=140 KG/CM2 CEMENTO TIPO V m3 10.56
01.05.02 VEREDAS DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=10CM m2 97.26
01.05.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS CIRCULARES H=0.15M m2 12.72
01.06 CONCRETO ARMADO
01.06.01 ZAPATAS
01.06.01.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V CON MIXER DE 4M3 m3 52.78
01.06.01.02 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 3,226.93
01.06.02 VIGA CIRCULAR
01.06.02.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V CON MIXER DE 4M3 m3 45.24
01.06.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS CIRCULARES m2 150.80
01.06.02.03 ACERO FY=4200 KG/CM2 EN VIGA DE CIMENTACION kg 2,392.24
01.06.03 LOSA DE FONDO DE RESERVORIO
01.06.03.01 CONCRETO FC=245 KG/CM2 CON CEMENTO TIPO V PARA LOSA INC/ADITIVO IMPERMEABILIZANTE m3 106.92

01.06.03.02 ENCOFRADO Y DESENCOFRADO DE PERIMETRO DE LOSA DE RESERVORIO m 79.80


01.06.03.03 ACERO FY=4200 KG/CM2 EN LOSA kg 8,630.06
01.07 REVOQUES Y ENLUCIDOS
01.07.01 RECUBRIMIENTO DE CONCRETO CON IMPERMEABILIZANTE EN FONDO DE RESERVORIO m2 506.71

01.07.02 CURADO CON ADITIVO m2 506.71


01.08 JUNTAS ASFALTICAS
01.08.01 JUNTAS DE DILATACION m 112.14
01.09 TANQUE AQUASTORE MODELO 7824CFWT EXP 38, 3000M3 EXP 5000M3 + ASISTENCIA EN ENSAMBLAJE

01.09.01 TANQUE AQUASTORE MODELO 7824CFWT EXP 38, 3000M3 EXP 5000M3 + ASISTENCIA EN ENSAMBLAJE und 1.00

01.09.02 ARANCEL+MONTAJE+BASE+INDIRECTOS DE TANQUE AQUESTORE MOD 7824CFWT EXP 38, 3,000M3 EXP GLB 1.00
5,000M3
01.09.03 INSTALACION DE ACCESORIOS ADICIONALES PARA LLEGADA, SALIDA Y REBOSE DE AGUA GLB 1.00

01.10 ENSAYOS DE LABORATORIO


01.10.01 PRUEBA DE CALIDAD DEL CONCRETO und 30.00
01.11 CASETA DE VALVULAS
01.11.01 TRABAJOS PRELIMINARES
01.11.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 15.18
01.11.02 MOVIMIENTO DE TIERRAS
01.11.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMENTACION m3 6.36
01.11.02.02 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 7.63
01.11.03 OBRAS DE CONCRETO SIMPLE
01.11.03.01 SOLADO DE CONCRETO FC=140KG/CM2 CEMENTO TIPO V E=10" m2 15.18
01.11.03.02 SOBRECIMIENTOS CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 0.26
01.11.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 5.15
01.11.03.04 FALSO PISO CONCRETO FC=175KG/CM2 m3 0.81
01.11.03.05 VEREDAS DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=10CM m2 3.53
01.11.03.06 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 0.68
01.11.03.07 JUNTAS DE DILATACION m 2.35
01.11.04 OBRAS DE CONCRETO ARMADO
01.11.04.01 CONCRETO FC=175KG/CM2 CEMENTO TIPO V EN ZAPATAS m3 1.28
01.11.04.02 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 36.72
01.11.04.03 CONCRETO FC=210 KG/CM2 EN VIGAS DE CIMENTACION m3 0.62
01.11.04.04 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 10.28
01.11.04.05 ACERO FY=4200 KG/CM2 EN VIGAS DE CIMENTACION kg 175.85
01.11.04.06 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 0.66
01.11.04.07 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 10.60
01.11.04.08 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 129.18
01.11.04.09 VIGAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 1.11
01.11.04.10 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8.73
01.11.04.11 ACERO FY=4200 KG/CM2 EN VIGAS kg 193.73
01.11.04.12 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V EN CAJUELA PARA VALVULAS m3 1.58
01.11.04.13 ENCOFRADO Y DESENCOFRADO EN CAJUELA PARA VALVULAS m2 4.23
01.11.04.14 ACERO FY=4200 KG/CM2 EN CAJUELA PARA VALVULAS kg 141.68
01.11.05 MUROS Y TABIQUES DE ALBAILERIA
01.11.05.01 MURO DE LADRILLO KING KONG TIPO IV, DE SOGA. m2 28.26
01.11.06 LOSA ALIGERADA
01.11.06.01 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 11.48
01.11.06.02 ACERO FY=4200 KG/CM2 EN VIGAS kg 42.55
01.11.06.03 LADRILLO HUECO EN LOSA ALIGERADA (12X30X30 CM) m2 10.80
01.11.06.04 CONCRETO FC=210 KG/CM2, EN LOSA ALIGERADA m2 0.92
01.11.07 REVOQUES Y ENLUCIDOS
01.11.07.01 TARRAJEO EN INTERIORES C:A (1:5) m2 28.90
01.11.07.02 TARRAJEO EN EXTERIORES C:A (1:5) m2 30.48
01.11.07.03 TARRAJEO DE COLUMNAS (INC. ARISTAS) m2 7.20
01.11.07.04 TARRAJEO DE VIGAS (INC ARISTAS) m2 7.50
01.11.07.05 VESTIDURA DE DERRAMES ANCHO=15CM m 22.40
01.11.07.06 TARRAJEO EN CAJUELA MORTERO C:A 1:5 m2 6.58
01.11.07.07 TARRAJEO EN CIELO RASO m2 11.48
01.11.08 PISOS Y PAVIMENTOS
01.11.08.01 PISO DE CONCRETO SIN COLOREAR BRUNADO E=2" CEMENTO TIPO V m2 22.96
01.11.09 VIDRIOS, CRISTALES Y SIMILARES
01.11.09.01 VIDRIO SEMI DOBLE DE 6MM LAMINADO p2 16.68
01.11.10 CARPINTERIA METALICA
01.11.10.01 PUERTA CON PLANCHA ACANALADA DE 1X2.40M und 1.00
01.11.10.02 VENTANA METALICA < y T de 3/4"X1/8" m2 3.10
01.11.10.03 TAPAS METALICAS EN CAJA DE VALVULAS m2 4.37
01.11.11 PINTURA
01.11.11.01 PINTURA EN CIELO RASO m2 11.48
01.11.11.02 PINTURA LATEX DOS MANOS EN COLUMNAS Y VIGAS m2 18.06
01.11.11.03 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 59.38
01.12 EQUIPAMIENTO DE CASETA DE VALVULAS, LINEAS DE INGRESO Y SALIDA
01.12.01 TRABAJOS PRELIMINARES
01.12.01.01 TRAZO NIVELACION Y REPLANTEO DE TUBERIAS DE AGUA POTABLE m 132.99
01.12.02 MOVIMIENTO DE TIERRAS
01.12.02.01 EXCAVACION DE ZANJAS CON MAQUINARIA m 132.99
01.12.02.02 REFINE MANUAL DE ZANJAS EN TERRENO SEMI ROCOSO m 132.99
01.12.02.03 CAMA DE APOYO PARA TUBERIAS MAYORES DE 10" m 132.99
01.12.02.04 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON ARENA FINA A=1.00 H=0.30 CON MAQUINARIA m 132.99
(D=20")
01.12.02.05 RELLENO Y APISONADO DE ZANJAS CON MATERIAL PROPIO m3 43.89
01.12.02.06 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 52.66
01.12.03 TUBERIAS
01.12.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 400MM CL 10 m 16.50
01.12.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 350MM CL 10 m 36.30
01.12.03.03 SUMINISTRO E INSTALACION TUB PVC-ISO C-10 250mm m 14.19
01.12.03.04 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 200 MM C-10 m 21.40
01.12.03.05 TUBERIA DE ACERO CEDULA 40 D=16" (400MM) m 12.97
01.12.03.06 TUBERIA DE ACERO CEDULA 40 D=12" (315MM) m 6.25
01.12.03.07 TUBERIA DE ACERO CEDULA 40 DE 8" (200MM )_x000D_ m 25.38
01.12.03.08 BRIDA PARA SOLDAR DE 12" (315MM)_x000D_ und 7.00
01.12.03.09 BRIDA PARA SOLDAR DE 8" (200MM )_x000D_ und 8.00
01.12.03.10 BRIDA DE ACERO 16" 400MM PARA SOLDAR Y EMPERNAR und 1.00
01.12.04 VALVULAS Y ACCESORIOS DE INGRESO A RESERVORIO
01.12.04.01 SUMINISTRO E INSTALACION DE YEE PVC DE 600MMX400MM_x000D_ und 1.00
01.12.04.02 SUMINISTRO E INSTALACION DE UNION CORREDISA C-10 600MM_x000D_ und 2.00
01.12.04.03 CODO DE FIERRO FUNDIDO BRIDADO DE 90 X 400MM 16"_x000D_ und 2.00
01.12.04.04 CODO DE FIERRO FUNDIDO BRIDADO DE 22.5X400MM 16" und 1.00
01.12.04.05 UNION FLEXIBLE TIPO DRESSER DE 16" (400MM) und 1.00
01.12.04.06 VALVULA DE CONTROL BRIDADA DE 16" (400MM ) und 1.00
01.12.04.07 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC DN 400 MM 14" (CAMPANA BRIDA) und 1.00

01.12.04.08 DADO DE ANCLAJE DE 0.6X0.6X0.6 PARA ACCESORIOS DE 315 MM m3 1.51


01.12.05 VALVULAS Y ACCESORIOS EN SISTEMA DE DESCARGA D=12" (315MM)
01.12.05.01 UNION FLEXIBLE TIPO DRESSER DE 12" (315MM )_x000D_ und 2.00
01.12.05.02 VALVULA DE CONTROL BRIDADA DE 12" (315MM)_x000D_ und 2.00
01.12.05.03 CODO DE FIERRO FUNDIDO BRIDADO 90 X 12" (315MM )_x000D_ und 3.00
01.12.05.04 BRIDA CIEGA PARA TUBO DE 315MM und 1.00
01.12.05.05 BRIDA ROMPE AGUA DE PARA SALIDA DE 12" (315MM) und 2.00
01.12.05.06 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC 12" (315MM )_x000D_ und 1.00
01.12.05.07 DADO DE ANCLAJE DE 0.6X0.6X0.6 PARA ACCESORIOS DE 315 MM m3 0.65
01.12.06 TUBERIA DE LIMPIEZA, REBOSE Y EQUIPAMIENTO
01.12.06.01 SUMINISTRO E INSTALACION DE YEE PVC C-10 200MM und 1.00
01.12.06.02 BRIDA ROMPE AGUA DE PARA SALIDA DE 8" (200 MM) und 1.00
01.12.06.03 VALVULA DE CONTROL PARA TUB ISO 8" (200MM )_x000D_ und 1.00
01.12.06.04 CODO DE FIERRO FUNDIDO BRIDADO 90 X 8" (200MM )_x000D_ und 2.00
01.12.06.05 SUMINISTRO E INSTALACION DE CODO PVC ISO 200MM X90 und 2.00
01.12.06.06 SUMINISTRO Y COLOCACION DE CORREDISA PVC C-10 200 MM_x000D_ und 2.00
01.12.06.07 DADO DE ANCLAJE PARA TUBERIA DE 200MM m3 1.51
01.12.07 CAJA DE VALVULAS
01.12.07.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 3.38
01.12.07.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 4.39
01.12.07.03 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 2.81
01.12.07.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2 27.04
01.12.07.05 ACERO FY=4200 KG/CM2 kg 210.11
01.12.07.06 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 12.40
01.12.08 CAJA DE DECANTACION (LIMPIEZA Y REBOCE)
01.12.08.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 1.49
01.12.08.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 1.86
01.12.08.03 SOLADO DE CONCRETO FC=140KG/CM2 CEMENTO TIPO V E=10" m2 1.49
01.12.08.04 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 0.94
01.12.08.05 ENCOFRADO Y DESENCOFRADO DE MUROS m2 11.11
01.12.08.06 ACERO FY=4200 KG/CM2 kg 44.94
01.12.08.07 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 5.46
01.12.08.08 DADO DE ANCLAJE PARA TUBERIA DE 200MM m3 0.26
01.12.08.09 REJILLA DE FIERRO GALVANIZADO PREFABRICADA und 1.00
01.12.09 VARIOS
01.12.09.01 SUMINISTRO E INSTALACION DE CODO PVC ISO 350 MM X 45 (EQUIP) und 1.00
01.12.09.02 SUMINISTRO E INSTALACION DE CODO PVC ISO 350MM X 22.5 (EQUIP) und 2.00
01.12.09.03 SUMINISTRO E INSTALACION DE TEE PVC DE 350 MM 14" und 1.00
01.12.09.04 SUMINISTRO E INSTALACION DE REDUCCION PVC C-10 DE 350 A 250 und 1.00
01.12.09.05 SUMINISTRO E INSTALACION DE CODO PVC ISO C-10 250MM X 45 und 2.00
01.12.09.06 VALVULA DE CONTROL PARA TUB ISO 10" (250MM )_x000D_ und 1.00
01.12.09.07 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC DN 350 MM 14" und 1.00
01.12.09.08 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC 10" (250MM )_x000D_ und 1.00
01.12.09.09 SUMINISTRO E INSTALACION DE TEE PVC DE 350 MM 14" und 1.00
01.12.09.10 DADO DE ANCLAJE DE 0.6X0.6X0.6 PARA ACCESORIOS DE 315 MM m3 0.96
01.12.09.11 TUBERIA PVC SAL 3" und 5.00
01.12.09.12 CODO PVC SAL DE 3"X90" und 6.00
01.12.09.13 CODO PVC SAL 3"X45 und 1.00
01.12.09.14 YEE PVC SAL DE 3" und 1.00
01.12.09.15 SUMIDERO DE BRONCE DE 3" und 2.00
01.12.10 PRUEBA HIDRAULICA
01.12.10.01 PRUEBA HIDRAULICA EN RESERVORIO DE 3000 M3 m3 3,000.00
01.12.10.02 PRUEBA HIDRAULICA EN TUBERIA D=12" m 132.99
01.12.11 MURO DE CONTENCION
01.12.11.01 EXCAVACION CON EXPLOSIVO ESTRICTAMENTE CONTROLADA Y PROTEGIDA CON MALLA DE SOPORTE. m3 40.04

01.12.11.02 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL SELECCIONADO m3 10.56


01.12.11.03 SOLADO CON CEMENTO MS E=5CM m2 61.60
01.12.11.04 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V CON MIXER DE 4M3 m3 44.00
01.12.11.05 ENCOFRADO Y DESENCOFRADO DE MUROS m2 193.60
01.12.11.06 ACERO FY=4200 KG/CM2 kg 1,583.07
01.12.11.07 BARANDA DE PROTECCION CON TUBO DE FG 3" m 44.00
01.12.12 PINTURA DE PROTECCION DE ACCESORIOS
01.12.12.01 PROTECCION GENERAL DE ACCESORIOS DE METAL CON PINTURA EPOXICA EN TODA LA OBRA (DOS GLB 1.00
MANOS)
02 LINEA DE CONDUCCION DE AGUA POTABLE
02.01 TRABAJOS PROVICIONALES
02.01.01 CASETA DE GUARDIANIA GLB 1.00
02.01.02 ALMACEN DE OBRA GLB 1.00
02.01.03 MOVILIZACION DE MAQUINARIAS HERRAMIENTAS PARA LA OBRA glb 1.00
02.01.04 SEALIZACION DE TRAFICO
02.01.04.01 LETREROS DE DESVIO TRIPLAY 8 MM DE 1.20X0.60 und 8.00
02.01.04.02 EQUIPO DE ILUMINACION NOCTURNA CON ELECTRICIDAD 6 FOCOS INTERMITENTES und 1.00

02.01.04.03 EQUIPO DE ILUMINACION NOCTURNA CON ELECTRICIDAD 3 FOCOS INTERMITENTES und 2.00

02.01.04.04 BLOQUES DE CONCRETO PINTADOS PARA LINDERO DE TRAFICO DE 0.8 X 1.00 M und 30.00

02.02 OBRAS PRELIMINARES


02.02.01 TRAZO Y REPLANTEO PRELIMINAR DE TUBERIAS m 10,800.00
02.02.02 LIMPIEZA DE TERRENO Y DESBROCE m2 740.00
02.02.03 LIMPIEZA DE TERRENO CON ESCOMBROS m2 930.00
02.02.04 TRAZO NIVELACION Y REPLANTEO DE TUBERIAS DE AGUA POTABLE m 10,800.00
02.02.05 PUENTES PEATONALES u 3.00
02.02.06 PROTECCION DE CONEXIONES DOMICILIARIAS DE AGUA u 165.00
02.02.07 PROTECCION DE CONEXIONES DOMICILIARIAS DE DESAGUE u 165.00
02.02.08 RETIRO Y REPOSICION DE CERCO CON POSTE DE MADERA Y ALAMBRE DE PUAS m 449.00

02.02.09 ALINEAMIENTO E IZADO DE POSTES und 1.00


02.03 MOVIMIENTO DE TIERRAS
02.03.01 EXCAVACION EN ROCA FIJA m3 212.40
02.03.02 EXCAVACION DE ZANJAS PARA TUBERIA EN T.N. CON MAQUINARIA HASTA H=1.50 M PROF. m 10,505.00

02.03.03 REFINE MANUAL DE ZANJAS EN TERRENO NORMAL m 10,800.00


02.03.04 CAMA DE APOYO CON ARENILLA PARA TUBERIAS D=10" CON MAQUINARIA m 10,215.00
02.03.05 CAMA DE APOYO PARA TUBERIA CON RIPIO CORRIENTE E=0.2O CON MAQUINARIA m 585.00

02.03.06 RELLENO DE ZANJAS 30CM SOBRE CLAVE DE TUBO D=12" INCLUYE LATERAL m 10,800.00
02.03.07 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO m 9,610.00
02.03.08 RELLENO Y COMPACTACION DE ZANJAS A=0.60 M CON ARENILLA m 1,190.00
02.03.09 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 106.20
02.03.10 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 7,443.15
02.03.11 CONFORMACION DE TERRAPLEN PARA PROTECCION DE TUBERIAS
02.03.11.01 CORTE DE TERRENO NATURAL CON MAQUINARIA m3 351.00
02.03.11.02 CONFORMACION DE SUB RASANTE CON MAQUINARIA PESADA m2 1,755.00
02.03.11.03 RELLENO CON MATERIAL GRANULAR D=2" E=0.30 CM m3 684.45
02.03.11.04 RELLENO CON AFIRMADO CAPAS DE 0.20 M m3 2,737.80
02.03.11.05 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 456.30
02.04 TUBERIAS Y PRUEBA HIDRAULICA
02.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 350MM CL 10 m 3,982.00
02.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 315MM m 6,769.50
02.04.03 PRUEBA HIDRAULICA EN TUBERIA DN 350MM 14" m 4,000.00
02.04.04 PRUEBA HIDRAULICA EN TUBERIA D=12" m 6,800.00
02.05 PASE AEREO PARA TUBERIAS
02.05.01 TRAZO Y REPLANTEO DE ESTRUCTURAS m2 10.00
02.05.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 5.38
02.05.03 SOLADO PARA ZAPATAS CEMENTO MS E=3" C:H 1:12 m2 6.00
02.05.04 CONCRETO PARA ZAPATAS FC=210KG/CM2 CEMENTO TIPO II MS m3 3.58
02.05.05 ACERO FY=4200 KG/CM2 ZAPATAS kg 66.10
02.05.06 CONCRETO FC=210 KG/CM2 EN COLUMNAS m3 1.65
02.05.07 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 98.18
02.05.08 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 19.80
02.05.09 TUBERIA DE ACERO CEDULA 40 D=14" (350MM) m 18.00
02.05.10 TUBERIA DE ACERO CEDULA 40 D=12" (315MM) m 30.50
02.05.11 BRIDA PARA SOLDAR DE 14" (350MM) und 4.00
02.05.12 BRIDA PARA SOLDAR D=12" und 12.00
02.05.13 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC DN 350 MM 14" und 2.00
02.05.14 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC D=12" 315MM und 2.00
02.06 CRUCE DE CANAL DE CONCRETO P= 7+370
02.06.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 2.40
02.06.02 RELLENO CON MATERIAL SELECCIONADO m3 2.40
02.06.03 APUNTALAMIENTO DE CANAL m 3.00
02.07 ACCESORIOS EN LINEA DE CONDUCCION
02.07.01 SUMINISTRO E INSTALACION DE CODO PVC CL-10 350 MM X 90 und 2.00
02.07.02 CODO PVC ISO 350MM X 45 (EQUIP) und 5.00
02.07.03 SUMINISTRO E INSTALACION DE CODO PVC ISO 350MM X 22.5 (EQUIP) und 4.00
02.07.04 CODO PVC CL-10 315 MM X 90 und 7.00
02.07.05 CODO PVC CL-10 315MM X 45 und 9.00
02.07.06 CODO PVC CL-10 315MM X 22.5 und 5.00
02.07.07 TEE PVC 315MM X 200 MM und 1.00
02.07.08 SUMINISTRO E INSTALACION DE TAPON PVC SAP 315MM und 1.00
02.07.09 DADO DE ANCLAJE DE 0.6X0.6X0.6 PARA ACCESORIOS DE 315 MM m3 7.86
02.08 CAJA DE VALVULA DE CONTROL INC/ACCESORIOS
02.08.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 13.50
02.08.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 19.31
02.08.03 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 10.98
02.08.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2 72.00
02.08.05 ACERO FY=4200 KG/CM2 kg 630.34
02.08.06 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 30.00
02.08.07 VALVULA DE CONTROL PARA TUB ISO 14" (350MM) und 3.00
02.08.08 VALVULA DE CONTROL PARA TUB ISO 12" (315MM)_x000D_ und 3.00
02.08.09 TAPA TERMOPLASTICA DE 20X15CM E=1.5" und 6.00
02.09 CAJA DE VALVULA DE AIRE INC/ACCESORIOS
02.09.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 17.01
02.09.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 26.67
02.09.03 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 17.62
02.09.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2 101.86
02.09.05 ACERO FY=4200 KG/CM2 kg 1,171.53
02.09.06 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 41.00
02.09.07 VALVULA DE AIRE DE TRIPLE FUNCION HDUCTIL C/ELASTOMERO 50MM PARA TUB 350 MM 14" und 2.00
INC/ACCESORIOS
02.09.08 VALVULA DE AIRE DE TRIPLE FUNCION HDUCTIL C/ELASTOMERO 50MM PARA TUBO 315 MM 12" INC. und 4.00
ACCESORIOS
02.10 VARIOS
02.10.01 ESCALERA DE FIERRO GALVANIZADO TIPO GATO DE 3/4" L=1.5M und 6.00
02.11 CAJA PARA VALVULA DE PURGA INCL/ACCESORIOS
02.11.01 TRABAJOS PRELIMINARES
02.11.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 8.51
02.11.02 MOVIMIENTO DE TIERRAS
02.11.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 57.83
02.11.02.02 CAMA DE APOYO CON ARENILLA PARA TUBERIAS DE 4" A 8" m 73.00
02.11.02.03 RELLENO SOBRE CLAVE DE TUBO DE ZANJAS CON MAQUINARIA PARA TUBERIAS D>10" m 73.00

02.11.02.04 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO A=1.00 M m3 73.00


02.11.03 OBRAS DE CONCRETO SIMPLE
02.11.03.01 CONCRETO FC=175KG/CM2 CEMENTO TIPO V, EN MURETE DE DESCARGA m3 0.26
02.11.04 OBRAS DE CONCRETO ARMADO
02.11.04.01 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 8.77
02.11.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 51.81
02.11.04.03 ACERO FY=4200 KG/CM2 kg 585.76
02.11.05 REVOQUES Y ENLUCIDOS
02.11.05.01 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 20.50
02.11.06 SUMINISTRO E INSTALACION DE TUBERIAS
02.11.06.01 SUMINISTRO E INSTALACION TUB PVC-ISO C-10 110mm m 75.00
02.11.07 VALVULAS Y ACCESORIOS
02.11.07.01 VALVULA DE CONTROL PARA TUB ISO 4" (110MM) und 3.00
02.11.07.02 SUMINISTRO E INSTALACION DE TEE PVC ISO 315 MM und 3.00
02.11.07.03 SUMINISTRO E INSTALACION DE TEE PVC 350MM X 110 MM und 1.00
02.11.07.04 SUMINISTRO E INSTALACION DE REDUCCION PVC ISO DE 315X110MM und 2.00
02.11.08 VARIOS
02.11.08.01 TAPA DE CONCRETO PREFABRICADA DE D=O.60M und 3.00
02.11.08.02 ESCALERA DE FIERRO GALVANIZADO TIPO GATO DE 3/4" L=1.5M und 3.00
02.11.08.03 TAPA DE METAL FORRADO CON FIBRA DE VIDRIO DE 0.60X0.60 M und 3.00
03 RESERVORIO 2 (CISTERNA Volumen 3000 m3)
03.01 OBRAS PROVISIONALES
03.01.01 FLETE MARITIMO GLB 1.00
03.02 TRABAJOS PRELIMINARES
03.02.01 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 572.56
03.03 MOVIMIENTO DE TIERRAS
03.03.01 CORTE DE TERRENO NATURAL CON MAQUINARIA RETROEXCAVADORA m3 245.44
03.03.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 114.79
03.03.03 REFINE Y CONFORMACION DE SUB RASANTE CON EQUIPO LIVIANO m2 572.26
03.03.04 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO A=1.00 M m3 25.89
03.03.05 BASE DE LOSA CON AFIRMADO E=0.60 COMPACTADO EN CAPAS DE E=0.20M m3 335.44
03.03.06 BASE DE AFIRMANDO PARA VEREDAS E=30 CM, COMPACTADA CADA 10 CM m2 24.32
03.03.07 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 466.30
03.04 OBRAS DE CONCRETO SIMPLE
03.04.01 SUB CIMIENTO CONCRETO FC=140 KG/CM2 CEMENTO TIPO V m3 15.08
03.04.02 VEREDAS DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=10CM m2 16.80
03.04.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS CIRCULARES H=0.15M m2 150.80
03.05 CONCRETO ARMADO
03.05.01 ZAPATAS
03.05.01.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V CON MIXER DE 4M3 m3 37.70
03.05.01.02 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 1,090.26
03.05.02 VIGA CIRCULAR
03.05.02.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V CON MIXER DE 4M3 m3 45.24
03.05.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS CIRCULARES m2 150.80
03.05.02.03 ACERO FY=4200 KG/CM2 EN VIGA DE CIMENTACION kg 2,557.37
03.05.03 LOSA DE FONDO DE RESERVORIO
03.05.03.01 CONCRETO FC=245 KG/CM2 CON CEMENTO TIPO V PARA LOSA INC/ADITIVO IMPERMEABILIZANTE m3 100.39

03.05.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA PARA RESERVORIO H=0.30M m 75.40


03.05.03.03 ACERO FY=4200 KG/CM2 EN LOSA kg 7,763.51
03.06 REVOQUES Y ENLUCIDOS
03.06.01 TARRAJEO C/ADITIVO IMPERMEABILIZANTE m2 452.39
03.06.02 CURADO CON ADITIVO m2 452.39
03.07 JUNTAS ASFALTICAS
03.07.01 JUNTAS DE DILATACION m 105.28
03.08 TANQUE ACUASTORE MODELO 7624CFWT 3000M3
03.08.01 TANQUE ACUASTORE MODELO 7624CFWT 3000M3 + ASISTENCIA EN EMSAMBLAJE und 1.00

03.08.02 ARANCEL+MONTAJE+BASE+INDIRECTOS DE TANQUE AQUESTORE MOD 7624CFWT 3000M3 GLB 1.00

03.08.03 INSTALACION DE ACCESORIOS ADICIONALES PARA LLEGADA, SALIDA Y REBOSE DE AGUA GLB 1.00

03.08.04 PRUEBA DE CALIDAD DEL CONCRETO und 16.00


03.09 CASETA DE VALVULAS
03.09.01 TRABAJOS PRELIMINARES
03.09.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 71.40
03.09.02 MOVIMIENTO DE TIERRAS
03.09.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMENTACION m3 77.08
03.09.02.02 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO A=1.00 M m3 6.74
03.09.02.03 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 91.08
03.09.03 OBRAS DE CONCRETO SIMPLE
03.09.03.01 SUB ZAPATAS CONCRETO FC=140 KG/CM2 CON CEMENTO TIPO V H=0.30 M m3 3.28
03.09.03.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 12.00
03.09.03.03 CIMIENTOS CORRIDOS CON CEMENTO V MS C;H 1:10 + 30 / PM m3 13.16
03.09.03.04 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 43.87
03.09.04 OBRAS DE CONCRETO ARMADO
03.09.04.01 CONCRETO FC=175KG/CM2 CEMENTO TIPO V EN ZAPATAS m3 5.00
03.09.04.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 20.00
03.09.04.03 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 110.16
03.09.04.04 SOBRECIMIENTOS CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 8.34
03.09.04.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 66.71
03.09.04.06 ACERO FY=4200 KG/CM2 EN SOBRECIMIENTOS ARMADOS kg 280.92
03.09.04.07 VIGAS DE CIMENTACION CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 1.11
03.09.04.08 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 8.88
03.09.04.09 ACERO FY=4200 KG/CM2 EN VIGAS DE CIMENTACION kg 96.13
03.09.04.10 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 3.23
03.09.04.11 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 25.85
03.09.04.12 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 321.88
03.09.04.13 VIGAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 1.56
03.09.04.14 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 12.44
03.09.04.15 ACERO FY=4200 KG/CM2 EN VIGAS kg 193.94
03.09.04.16 CANALETAS DE DRENAJE CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 0.19
03.09.04.17 ENCOFRADO Y DESENCOFRADO DE CANALETAS DE DRENAJE. m2 1.42
03.09.04.18 ACERO FY=4200 KG/CM2 CANALETAS DE DRENAJE kg 4.70
03.09.05 MUROS Y TABIQUES DE ALBAILERIA
03.09.05.01 MURO DE LADRILLO KING KONG TIPO IV, DE SOGA. m2 47.99
03.09.05.02 MURO DE LADRILLO KING KONG TIPO IV, DE CABEZA. m2 63.69
03.09.06 REVOQUES Y ENLUCIDOS
03.09.06.01 TARRAJEO EN INTERIORES C:A (1:5) m2 111.68
03.09.06.02 TARRAJEO EN EXTERIORES C:A (1:5) m2 111.68
03.09.06.03 TARRAJEO DE COLUMNAS (INC. ARISTAS) m2 25.85
03.09.06.04 TARRAJEO DE VIGAS (INC ARISTAS) m2 12.44
03.09.06.05 VESTIDURA DE DERRAMES ANCHO=15CM m 36.00
03.09.07 PISOS Y PAVIMENTOS
03.09.07.01 LOSA DE CONCRETO FC=210 KG/CM2 CONCRETO TIPO V FROTACHADO E=0.20 m2 63.40

03.09.08 COBERTURAS
03.09.08.01 VIGA DE MADERA DE 5"X10" m 6.80
03.09.08.02 VIGAS DE MADERA DE 4"X6" m 11.30
03.09.08.03 CORREA DE MADERA DE 3X3" m 27.20
03.09.08.04 COBERTURA DE ETERNIT GRAN ONDA 3.05 X 1.10M X 4MM m2 76.86
03.09.08.05 CUMBERA ARTICULADA SUPERIOR GRAN ONDA m 6.80
03.09.08.06 CANALETA DE DRENAJE PLUVIAL (Inc. instalacin) m 13.60
03.09.09 CARPINTERIA DE MADERA
03.09.09.01 PUERTA DE MADERA DE CEDRO MACISA E=48MM INCLUYE MARCO m2 4.50
03.09.09.02 VENTANAS DE MADERA m2 7.35
03.09.10 VIDRIOS, CRISTALES Y SIMILARES
03.09.10.01 VIDRIO SEMI DOBLE DE 6MM LAMINADO p2 79.12
03.09.11 CERRAJERIA
03.09.11.01 CERRADURA PARA PUERTA PRINCIPAL und 1.00
03.09.11.02 CANDADO DE 3" und 1.00
03.09.12 INSTALACIONES SANITARIAS
03.09.12.01 RED DE DRENAJE PLUVIAL
03.09.12.01.01 TUBERIA PVC SAL 3" und 6.23
03.09.12.01.02 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-25 DN200mm x 6.00m m 25.00
03.09.12.01.03 SALIDA DE PVC SAL 3" PARA DRENAJE PLUVIAL und 2.00
03.09.12.01.04 CODO PVC SAL DE 3"X90" und 2.00
03.09.12.01.05 CODO PVC SAL 3"X45 und 4.00
03.09.12.01.06 PRUEBA HIDRAULICA m 19.70
03.09.12.01.07 ABRAZADERA PARA TUBERIA DE 3" und 4.00
03.09.12.01.08 CAJA DE REGISTRO DE DESAGUE 0.30X0.30X0.60 (HASTA 3 CUERPOS) und 1.00
03.09.13 PINTURA
03.09.13.01 PINTURA LATEX DOS MANOS EN COLUMNAS Y VIGAS m2 38.29
03.09.13.02 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 223.36
03.10 EQUIPAMIENTO DE CASETA DE VALVULAS, LINEAS DE INGRESO Y SALIDA DE BYPASS.

03.10.01 TRABAJOS PRELIMINARES


03.10.01.01 TRAZO NIVELACION Y REPLANTEO DE TUBERIAS DE AGUA POTABLE m 164.00
03.10.02 MOVIMIENTO DE TIERRAS
03.10.02.01 EXCAVACION DE ZANJAS EN TERRENO NORMAL A=0.60 H=1.30 m 92.30
03.10.02.02 REFINE MANUAL DE ZANJAS EN TERRENO NORMAL m 92.30
03.10.02.03 CAMA DE APOYO CON ARENILLA PARA TUBERIAS D=10" CON MAQUINARIA m 92.30
03.10.02.04 RELLENO SOBRE CLAVE DE TUBO DE ZANJAS CON MAQUINARIA PARA TUBERIAS D>10" m 92.30

03.10.02.05 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON MATERIAL PROPIO A=0.60 H=0.30 CON m 92.30
MAQUINARIA INC. LATERALES
03.10.02.06 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 44.30
03.10.03 TUBERIAS
03.10.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 315MM C-10 m 56.00
03.10.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 200 MM C-10 m 24.00
03.10.03.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO C-5 200MM m 32.50
03.10.03.04 TUBO DE ACERO CEDULA 40 DE D=14" (350MM) m 11.50
03.10.03.05 TUBERIA DE ACERO CEDULA 40 D=12" (315MM) m 18.50
03.10.03.06 TUBERIA DE ACERO CEDULA 40 DE 10" (250MM )_x000D_ m 8.00
03.10.03.07 TUBERIA DE ACERO CEDULA 40 DE 8" (200MM )_x000D_ m 18.50
03.10.03.08 BRIDA PARA SOLDAR DE 14" (350MM) und 8.00
03.10.03.09 BRIDA PARA SOLDAR DE 12" (315MM)_x000D_ und 21.00
03.10.03.10 BRIDA PARA SOLDAR DE 10" (250MM )_x000D_ und 8.00
03.10.03.11 BRIDA PARA SOLDAR DE 8" (200MM )_x000D_ und 23.00
03.10.03.12 PRUEBA HIDRAULICA EN TUBERIA D=12" m 167.00
03.10.04 VALVULAS Y ACCESORIOS DE INGRESO A RESERVORIO
03.10.04.01 SUMINISTRO E INSTALACION DE TEE PVC ISO 315 MM und 1.00
03.10.04.02 VALVULA DE CONTROL PARA TUB ISO 12" (315MM)_x000D_ und 1.00
03.10.04.03 CODO DE FIERRO FUNDIDO BRIDADO 90 X 12" (315MM )_x000D_ und 3.00
03.10.04.04 UNION FLEXIBLE TIPO DRESSER DE 12" (315MM )_x000D_ und 1.00
03.10.04.05 DADO DE ANCLAJE DE 0.6X0.6X0.6 PARA ACCESORIOS DE 315 MM m3 0.82
03.10.05 VALVULAS Y ACCESORIOS DE BY PASS CON TUBERIA 12" (315MM)
03.10.05.01 VALVULA DE CONTROL PARA TUB ISO 12" (315MM)_x000D_ und 2.00
03.10.05.02 CODO PVC CL-10 315 MM X 90 und 1.00
03.10.05.03 SUMINISTRO E INSTALACION DE TEE PVC ISO 315 MM und 1.00
03.10.05.04 SUMINISTRO E INSTALACION DE TEE PVC ISO 315MMX200MM und 1.00
03.10.05.05 DADO DE ANCLAJE DE 0.6X0.6X0.6 PARA ACCESORIOS DE 315 MM m3 0.36
03.10.06 VALVULAS Y ACCESORIOS DE BY PASS CON TUBERIA 8" (200MM)
03.10.06.01 VALVULA DE CONTROL PARA TUB ISO 8" (200MM )_x000D_ und 1.00
03.10.06.02 CODO DE FIERRO FUNDIDO BRIDADO 90 X 8" (200MM )_x000D_ und 2.00
03.10.06.03 SUMINISTRO E INSTALACION DE TEE PVC ISO 200MM und 1.00
03.10.06.04 DADO DE ANCLAJE PARA TUBERIA DE 200MM m3 0.30
03.10.07 VALVULAS Y ACCESORIOS EN IMPULSION A TANQUE 1
03.10.07.01 CODO DE FIERRO FUNDIDO BRIDADO 90 X14" (350MM ) und 2.00
03.10.07.02 VALVULA DE CONTROL BRIDADA DE 14" (350MM ) und 2.00
03.10.07.03 REDUCCION DE FIERRO FUNDIDO BRIDADO DE 14" (350MM) A 12" (315MM) und 2.00
03.10.07.04 CODO DE FIERRO FUNDIDO BRIDADO 90 X 12" (315MM )_x000D_ und 2.00
03.10.07.05 VALVULA DE CONTROL BRIDADA DE 12" (315MM)_x000D_ und 3.00
03.10.07.06 CODO DE FIERRO FUNDIDO BRIDADO 45 X 12" (315MM )_x000D_ und 4.00
03.10.07.07 TEE DE FIERRO FUNDIDO BRIDADO 12" (315MM )_x000D_ und 3.00
03.10.07.08 VALVULA CHECK BRIDADA DE 12" (315MM) und 2.00
03.10.07.09 BRIDA CIEGA PARA TUBO DE 315MM und 2.00
03.10.07.10 UNION FLEXIBLE TIPO DRESSER DE 12" (315MM )_x000D_ und 3.00
03.10.07.11 MANOMETRO DE 0 A 300 LBS und 2.00
03.10.07.12 DADO DE ANCLAJE DE 0.6X0.6X0.6 PARA ACCESORIOS DE 315 MM m3 1.11
03.10.08 VALVULAS Y ACCESORIOS EN IMPULSION A TANQUE 2
03.10.08.01 CODO DE FIERRO FUNDIDO BRIDADO 90 X 10" (250MM ) und 2.00

03.10.08.02 VALVULA DE CONTROL BRIDADA DE 10" (250MM )_x000D_ und 2.00


03.10.08.03 TEE DE FIERRO FUNDIDO BRIDADO 10" (250MM )_x000D_ und 2.00
03.10.08.04 CODO DE FIERRO FUNDIDO BRIDADO 90 X 8" (200MM )_x000D_ und 2.00
03.10.08.05 VALVULA DE CONTROL BRIDADA DE 8" (200MM )_x000D_ und 2.00
03.10.08.06 VALVULA CHEK PARA TUB ISO DE 8" (200MM) und 2.00
03.10.08.07 CODO DE FIERRO FUNDIDO BRIDADO 45 X 8" (200MM ) und 3.00
03.10.08.08 SUMINISTRO E INSTALACION DE "YEE" BRIDA DE 200X200MM und 1.00
03.10.08.09 UNION FLEXIBLE TIPO DRESSER DE 10" (250MM )_x000D_ und 2.00
03.10.08.10 BRIDA CIEGA PARA TUBO DE 200MM und 2.00
03.10.08.11 REDUCCION DE FIERRO FUNDIDO BRIDADO DE 10"(250MM) A 8" (200MM) und 2.00
03.10.08.12 UNION FLEXIBLE TIPO DRESSER DE 8" (200MM )_x000D_ und 3.00
03.10.08.13 MANOMETRO DE 0 A 300 LBS und 1.00
03.10.08.14 DADO DE ANCLAJE PARA TUBERIA DE 200MM m3 0.80
03.10.09 REBOSE Y LIMPIEZA
03.10.09.01 SUMINISTRO E INSTALACION DE CODO PVC ISO 200MM X90 und 2.00
03.10.09.02 SUMINISTRO E INSTALACION DE CODO PVC ISO 200MMX45 und 1.00
03.10.09.03 VALVULA DE CONTROL PARA TUB ISO 8" (200MM )_x000D_ und 1.00
03.10.09.04 CODO DE FIERRO FUNDIDO BRIDADO 90 X 8" (200MM )_x000D_ und 3.00
03.10.09.05 DADO DE ANCLAJE PARA TUBERIA DE 200MM m3 0.25
03.10.09.06 PUESTA EN MARCHA DEL SISTEMA ELECTRICO Y DE BOMBEO DEL SISTEMA DE AGUA POTABLE GLB 1.00

03.10.10 CAJA DE VALVULAS


03.10.10.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 12.48
03.10.10.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 17.85
03.10.10.03 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 10.68
03.10.10.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2 72.00
03.10.10.05 ACERO FY=4200 KG/CM2 kg 694.18
03.10.10.06 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 31.50
03.10.10.07 TAPA TERMOPLASTICA DE 20X15CM E=1.5" und 6.00
03.10.11 CAJA DE DECANTACION (LIMPIEZA Y REBOCE)
03.10.11.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 1.49
03.10.11.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 1.86
03.10.11.03 SOLADO DE CONCRETO FC=140KG/CM2 CEMENTO TIPO V E=10" m2 1.49
03.10.11.04 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 0.94
03.10.11.05 ENCOFRADO Y DESENCOFRADO DE MUROS m2 11.11
03.10.11.06 ACERO FY=4200 KG/CM2 kg 44.94
03.10.11.07 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 5.46
03.10.11.08 DADO DE ANCLAJE PARA TUBERIA DE 200MM m3 0.26
03.10.11.09 REJILLA DE FIERRO GALVANIZADO PREFABRICADA und 1.00
03.11 ALMACEN Y CASETA DE CLORACION
03.11.01 TRABAJOS PRELIMINARES
03.11.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 30.41
03.11.02 MOVIMIENTO DE TIERRAS
03.11.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMENTACION m3 24.98
03.11.02.02 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO A=1.00 M m3 7.35
03.11.02.03 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 22.92
03.11.03 OBRAS DE CONCRETO SIMPLE
03.11.03.01 SUB ZAPATAS CONCRETO FC=140 KG/CM2 CON CEMENTO TIPO V H=0.30 M m3 2.18
03.11.03.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 7.26
03.11.03.03 CIMIENTOS CORRIDOS CON CEMENTO V MS C;H 1:10 + 30 / PM m3 5.59
03.11.03.04 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 21.30
03.11.04 OBRAS DE CONCRETO ARMADO
03.11.04.01 CONCRETO FC=175KG/CM2 CEMENTO TIPO V EN ZAPATAS m3 3.63
03.11.04.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 12.10
03.11.04.03 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 100.16
03.11.04.04 SOBRECIMIENTOS CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 3.17
03.11.04.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 41.37
03.11.04.06 ACERO FY=4200 KG/CM2 EN SOBRECIMIENTOS ARMADOS kg 161.22
03.11.04.07 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V, EN VIGAS DE CIMENTACION m3 1.25
03.11.04.08 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2 10.00
03.11.04.09 ACERO FY=4200 KG/CM2 EN VIGAS DE CIMENTACION kg 139.52
03.11.04.10 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 4.50
03.11.04.11 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 68.51
03.11.04.12 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 579.90
03.11.04.13 VIGAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 2.37
03.11.04.14 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 33.16
03.11.04.15 ACERO FY=4200 KG/CM2 EN VIGAS kg 400.66
03.11.04.16 LOSA DE MACIZA DE CONCRETO FC=210KG/CM2 CEMENTO TIPO V m2 1.08
03.11.04.17 ENCOFRADO Y DESENCOFRADO DE LOSA DE PAVIMENTO m2 6.24
03.11.04.18 ACERO FY=4200KG/CM2 EN LOSA kg 139.94
03.11.04.19 ESCALERA DE CONCRETO FC=210KG/CM2 CEMENTO TIPO V m3 3.96
03.11.04.20 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 22.53
03.11.04.21 ACERO FY=4200KG/CM2 EN ESCALERA kg 287.76
03.11.05 CISTERNA
03.11.05.01 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 4.36
03.11.05.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 10.80
03.11.05.03 ACERO FY=4200 KG/CM2 kg 170.52
03.11.05.04 TAPA DE METAL FORRADO CON FIBRA DE VIDRIO DE 0.60X0.60 M und 1.00
03.11.05.05 CAJA DE REBOCE
03.11.05.05.01 CAJA DE REBOCE CISTERNA CONCRETO FC=210KG/CM2 CEMENTO TIPO V m3 0.12
03.11.05.05.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 0.99
03.11.05.05.03 REJILLA DE LIMPIEZA und 1.00
03.11.06 MUROS Y TABIQUES DE ALBAILERIA
03.11.06.01 MURO DE LADRILLO KING KONG TIPO IV, DE SOGA. m2 102.77
03.11.07 REVOQUES Y ENLUCIDOS
03.11.07.01 TARRAJEO EN INTERIORES C:A (1:5) m2 102.77
03.11.07.02 TARRAJEO EN EXTERIORES C:A (1:5) m2 102.77
03.11.07.03 TARRAJEO DE COLUMNAS (INC. ARISTAS) m2 67.23
03.11.07.04 TARRAJEO DE VIGAS (INC ARISTAS) m2 29.76
03.11.07.05 VESTIDURA DE DERRAMES ANCHO=15CM m 35.60
03.11.07.06 TARRAJEO CON IMPERMEABILIZANTE C:A 1:3 E=2CM m2 10.80
03.11.08 PISOS Y PAVIMENTOS
03.11.08.01 FALSO PISO DE CONCRETO FC=140 KG/CM2 CEMENTO TIPO V E=10CM m2 20.10
03.11.08.02 PISO DE CONCRETO SIN COLOREAR BRUNADO E=2" CEMENTO TIPO V m2 20.10
03.11.09 COBERTURAS
03.11.09.01 CORREAS DE MADERA DE 3X4" m 8.85
03.11.09.02 CORREA DE MADERA DE 3X3" m 18.70
03.11.09.03 COBERTURA DE ETERNIT GRAN ONDA 3.05 X 1.10M X 4MM m2 33.80
03.11.10 CARPINTERIA DE MADERA
03.11.10.01 PUERTA DE MADERA DE CEDRO MACISA E=48MM INCLUYE MARCO m2 3.15
03.11.10.02 PUERTA CONTRAPLACADA DE 48 MM CON TRIPLAY 4MM INCLUYE MARCO DE CEDRO m2 1.89

03.11.10.03 VENTANAS DE MADERA m2 4.38


03.11.11 VIDRIOS, CRISTALES Y SIMILARES
03.11.11.01 VIDRIO SEMI DOBLE DE 6MM LAMINADO p2 47.41
03.11.11.02 BLOQUES DE VIDRIO und 50.00
03.11.12 CARPINTERIA METALICA
03.11.12.01 PASAMANOS DE FG EN ESCALERAS INC/MOT m 12.00
03.11.13 CERRAJERIA
03.11.13.01 CERRADURA PARA PUERTA PRINCIPAL und 2.00
03.11.14 INSTALACIONES SANITARIAS
03.11.14.01 RED DE AGUA
03.11.14.01.01 CONEXION A LA RED PUBLICA und 1.00
03.11.14.01.02 TUBERIA PVC C-10 D=1/2" m 71.50
03.11.14.01.03 CODO PVC 1/2"X90 und 20.00
03.11.14.01.04 CODO DE FG 1/2"90 und 4.00
03.11.14.01.05 TEE PVC 1/2" und 6.00
03.11.14.01.06 VALVULA COMPUERTA DE 1/2" und 2.00
03.11.14.01.07 VALVULA CHECK HORIZONTAL DE 1/2" und 1.00
03.11.14.01.08 CAJA DE MEDIDOR DE AGUA und 1.00
03.11.15 PINTURA
03.11.15.01 PINTURA LATEX DOS MANOS EN COLUMNAS Y VIGAS m2 96.98
03.11.15.02 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 205.54
03.11.16 EQUIPAMIENTO DE CASETA DE CLORACION
03.11.16.01 TANQUES DE POLIETILENO PARA AGUA DE 1000 LITROS INC ACCESORIOS und 1.00
03.11.16.02 SUMINISTRO E INSTALACION DE DEPOSITO PARA SISTEMA DE CLORACION und 1.00
03.11.16.03 VALVULA COMPUERTA DE 1/2" und 3.00
03.11.16.04 TUBERIA PVC C-10 D=1/2" m 71.50
03.11.16.05 CODO PVC 1/2"X90 und 3.00
03.11.16.06 VALVULA CHECK HORIZONTAL DE 1/2" und 1.00
03.11.16.07 ELECTROBOMBA 1 HP Y ACCESORIOS und 1.00
03.12 CERCO PERIMETRICO Y CASETA DE VIGILANCIA
03.12.01 TRABAJOS PRELIMINARES
03.12.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 140.00
03.12.02 MOVIMIENTO DE TIERRAS
03.12.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMENTACION m3 121.27
03.12.02.02 RELLENO Y APISONADO DE ZANJAS CON MATERIAL PROPIO m3 25.56
03.12.02.03 RELLENO CON AFIRMADO Y COMPACTADO EN CAPAS DE 20 CM CON PLANCHA COMPACT. m3 46.01

03.12.02.04 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 123.94


03.12.02.05 RELLENO AREAS LIBRES DE PATIOS CON MATERIAL GRANULAR m3 18.05
03.12.03 OBRAS DE CONCRETO SIMPLE
03.12.03.01 SUB ZAPATAS CONCRETO FC=140 KG/CM2 CON CEMENTO TIPO V H=0.30 M m3 11.92
03.12.03.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 44.70
03.12.03.03 CIMIENTOS CORRIDOS CON CEMENTO V MS C;H 1:10 + 30 / PM m3 53.86
03.12.03.04 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 180.67
03.12.03.05 LOSA DE CONCRETO FC=210KG/CM2 CEMENTO TIPO V EN RAMPA DE INGRESO m2 13.12

03.12.03.06 ENCOFRADO Y DESENCOFRADO DE LOSA DE PAVIMENTO m2 3.13


03.12.03.07 GRADAS DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 0.98
03.12.03.08 ENCOFRADO Y DESENCOFRADO DE GRADAS DE CONCRETO m2 3.13
03.12.03.09 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V PARA MURO DE CONTENCION m3 6.53
03.12.03.10 ENCOFRADO Y DESNCOFRADO DE MURO DE CONTENCION m2 29.48
03.12.04 OBRAS DE CONCRETO ARMADO
03.12.04.01 CONCRETO FC=175KG/CM2 CEMENTO TIPO V EN ZAPATAS m3 19.75
03.12.04.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 74.50
03.12.04.03 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 429.62
03.12.04.04 SOBRECIMIENTOS CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 15.98
03.12.04.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 219.70
03.12.04.06 ACERO FY=4200 KG/CM2 EN SOBRE CIMIENTOS kg 977.48
03.12.04.07 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 10.83
03.12.04.08 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 121.09
03.12.04.09 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 1,066.59
03.12.04.10 VIGAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 6.76
03.12.04.11 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 67.41
03.12.04.12 ACERO FY=4200 KG/CM2 EN VIGAS kg 836.23
03.12.04.13 CAJA DE DECANTACION CONCRETO FC=245KG/CM2 CEMENTO TIPO V m3 0.48
03.12.04.14 ENCOFRADO Y DESNCOFRADO DE CAJA DE DECANTACION m2 2.22
03.12.04.15 ACERO FY=4200 KG/CM2 EN CAJA DE DECANTACION kg 31.06
03.12.04.16 REJILLA DE FIERRO GALVANIZADO PREFABRICADA und 2.00
03.12.04.17 CANALETAS DE DRENAJE CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 0.23
03.12.04.18 ENCOFRADO Y DESENCOFRADO DE CANALETAS DE DRENAJE. m2 1.76
03.12.04.19 ACERO FY=4200 KG/CM2 CANALETAS DE DRENAJE kg 6.27
03.12.05 MUROS Y TABIQUES DE ALBAILERIA
03.12.05.01 MURO DE LADRILLO KING KONG TIPO IV DE SOGA/CARA VISTA m2 303.59
03.12.05.02 MURO DE LADRILLO KING KONG TIPO IV, DE CABEZA. m2 30.94
03.12.06 REVOQUES Y ENLUCIDOS
03.12.06.01 TARRAJEO EN INTERIORES C:A (1:5) m2 58.17
03.12.06.02 TARRAJEO EN EXTERIORES C:A (1:5) m2 19.88
03.12.06.03 TARRAJEO DE COLUMNAS (INC. ARISTAS) m2 121.09
03.12.06.04 TARRAJEO DE VIGAS (INC ARISTAS) m2 67.69
03.12.06.05 VESTIDURA DE DERRAMES ANCHO=15CM m 21.00
03.12.07 PISOS Y PAVIMENTOS
03.12.07.01 LOSA DE CONCRETO FC=210 KG/CM2 CONCRETO TIPO V FROTACHADO m2 100.40
03.12.07.02 FALSO PISO DE CONCRETO FC=140 KG/CM2 CEMENTO TIPO V E=10CM m2 13.40
03.12.07.03 PISO DE CONCRETO SIN COLOREAR BRUNADO E=2" CEMENTO TIPO V m2 13.40
03.12.08 COBERTURAS
03.12.08.01 CORREAS DE MADERA DE 3X4" m 8.60
03.12.08.02 COBERTURA DE ETERNIT GRAN ONDA 3.05 X 1.10M X 4MM m2 19.55
03.12.09 CARPINTERIA DE MADERA
03.12.09.01 PUERTA CONTRAPLACADA DE 48 MM CON TRIPLAY 4MM INCLUYE MARCO DE CEDRO m2 2.57

03.12.09.02 PUERTA CONTRAPLACADA DE 40MM CON TRIPLAY 4MM (INCL VIDRIO) PARA SSHH m2 2.10

03.12.09.03 VENTANAS DE MADERA m2 2.48


03.12.10 VIDRIOS, CRISTALES Y SIMILARES
03.12.10.01 VIDRIO SEMI DOBLE DE 6MM LAMINADO p2 26.64
03.12.11 CARPINTERIA METALICA
03.12.11.01 PUERTA METALICA CON PLANCHA ACANALDA GALVANIZADA DE 2MM DE 3.50X3.55M INC/MONTAJE und 1.00

03.12.12 CERRAJERIA
03.12.12.01 CERRADURA PARA PUERTA PRINCIPAL und 1.00
03.12.12.02 CERRADURA PARA PUERTAS INTERIORES und 1.00
03.12.12.03 CERRADURA PARA PUERTA DE BAO und 1.00
03.12.12.04 CANDADO DE 3" und 3.00
03.12.13 APARATOS SANITARIOS
03.12.13.01 INODORO TANQUE BAJO BLANCO und 1.00
03.12.13.02 LABATORIO DE COLOR BLANCO 1 LLAVE und 1.00
03.12.13.03 LAVATORIO DE GRANITO PARA LAVANDERIA und 1.00
03.12.13.04 DUCHA CROMADA 1 LLAVE INCL. ACCESORIOS und 1.00
03.12.13.05 JABONERA DE LOSA PARA DUCHA und 1.00
03.12.13.06 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und 1.00
03.12.14 INSTALACIONES SANITARIAS
03.12.14.01 RED DE AGUA
03.12.14.01.01 CONEXION A LA RED PUBLICA und 1.00
03.12.14.01.02 TUBERIA PVC C-10 D=1/2" m 17.00
03.12.14.01.03 CODO PVC 1/2"X90 und 7.00
03.12.14.01.04 CODO DE FG 1/2"90 und 4.00
03.12.14.01.05 TEE PVC 1/2" und 3.00
03.12.14.01.06 VALVULA COMPUERTA DE 1/2" und 2.00
03.12.14.01.07 CAJA DE MEDIDOR DE AGUA und 1.00
03.12.14.02 RED DE DESAGUE
03.12.14.02.01 TUBERIA PVC SAL 2" m 6.00
03.12.14.02.02 TUBERIA PVC SAL 4" m 31.62
03.12.14.02.03 SALIDA DE PVC SAL PARA VENTILACION DE 2" und 1.00
03.12.14.02.04 SALIDA DE PVC SAL PARA DESAGUE DE 2" und 4.00
03.12.14.02.05 SALIDA DE PVC SAL 4" und 1.00
03.12.14.02.06 CODO PVC SAL 2"X45 und 2.00
03.12.14.02.07 CODO PVC SAL 4"X45 und 1.00
03.12.14.02.08 TRAMPA "P" DE PVC SAL DESAGUE 2" und 3.00
03.12.14.02.09 SUMIDERO DE BRONCE 2" und 4.00
03.12.14.02.10 REGISTRO DE BRONCE 4" und 1.00
03.12.14.02.11 SOMBREO DE VENTILACION PVC 2" und 1.00
03.12.14.02.12 CAJA DE REGISTRO DE DESAGUE 0.30X0.30X0.60 (HASTA 3 CUERPOS) und 3.00
03.12.14.02.13 PRUEBA HIDRAULICA PARA DESAGUE GLB 1.00
03.12.15 PINTURA
03.12.15.01 PINTURA LATEX DOS MANOS EN COLUMNAS Y VIGAS m2 188.78
03.12.15.02 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 78.04
03.12.15.03 PINTURA EN MUROS EXTERIORES CARAVISTA 2 MANOS INCLUYE BASE_x000D_ m2 303.59
03.12.15.04 PINTURA EN MUROS DE CONTENCION m2 18.09
04 LINEA DE IMPULSION (RESERV2. - TANQUE 1)
04.01 TRABAJOS PROVICIONALES
04.01.01 LETREROS DE DESVIO TRIPLAY 8 MM DE 1.20X0.60 und 1.00
04.01.02 LETRERO DE SEALIZACION TRIPLAY 8MM DE 1.00X0.50M und 1.00
04.01.03 PUENTES PEATONALES u 1.00
04.02 OBRAS PRELIMINARES
04.02.01 TRAZO Y REPLANTEO PRELIMINAR DE TUBERIAS m 569.00
04.03 MOVIMIENTO DE TIERRAS
04.03.01 EXCAVACION DE ZANJAS PARA TUBERIA EN T.N. CON MAQUINARIA HASTA H=1.50 M PROF. m 422.00

04.03.02 EXCAVACION DE ZANJAS EN TERRENO ARENOSO A=0.60 H=1.40 m 147.00


04.03.03 REFINE MANUAL DE ZANJAS EN TERRENO NORMAL m 422.00
04.03.04 REFINE Y NIVELACION DE ZANJAS EX. CON MAQ. EN TERRENO ARENOSO m 147.00
04.03.05 CAMA DE APOYO CON ARENILLA PARA TUBERIAS D=10" A 12" CON MAQUINARIA m 422.00

04.03.06 RELLENO HASTA 30CM SOBRE CLAVE DE TUBO DE ZANJAS A=1M CON MAQUINARIA INCLUYE LATERALES m 422.00

04.03.07 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON MATERIAL PROPIO A=1.00 H=0.30 CON MAQUINARIA m 147.00
(D=10 PROM.) INC. LATERALES
04.03.08 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO m 569.00
04.03.09 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 362.45
04.04 INSTALACIONES SANITARIAS
04.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 315MM m 569.00
04.04.02 PRUEBA HIDRAULICA PARA TUBERIA 12" m 569.00
04.05 ACCESORIOS
04.05.01 SUMINISTRO E INSTALACION DE CODO PVC CL-10 315MM X 90 und 4.00
04.05.02 SUMINISTRO E INSTALACION DE CODO PVC CL-10 315MM X 45 und 2.00
04.05.03 SUMINISTRO E INSTALACION DE CODO PVC CL-10 315MM X 22.5 und 2.00
04.06 OBRAS DE CONCRETO SIMPLE
04.06.01 DADO DE ANCLAJE PARA ACCESORIOS m3 1.63
05 LINEA DE IMPULSION (RESERVORIO2. - TANQUE 2)
05.01 TRABAJOS PROVICIONALES
05.01.01 LETREROS DE DESVIO TRIPLAY 8 MM DE 1.20X0.60 und 3.00
05.01.02 PUENTES PEATONALES u 1.00
05.02 OBRAS PRELIMINARES
05.02.01 TRAZO Y REPLANTEO PRELIMINAR DE TUBERIAS m 282.50
05.03 MOVIMIENTO DE TIERRAS
05.03.01 EXCAVACION DE ZANJAS PARA TUBERIA EN T.N. CON MAQUINARIA HASTA H=1.50 M PROF. m 157.50

05.03.02 EXCAVACION DE ZANJAS EN TERRENO ARENOSO A=0.60 H=1.40 m 125.00


05.03.03 REFINE MANUAL DE ZANJAS EN TERRENO NORMAL m 157.50
05.03.04 REFINE Y NIVELACION DE ZANJAS EX. CON MAQ. EN TERRENO ARENOSO m 125.00
05.03.05 CAMA DE APOYO CON ARENILLA PARA TUBERIAS D=10" A 8" CON MAQUINARIA m 157.50
05.03.06 RELLENO SOBRE CLAVE DE TUBO DE ZANJAS CON MAQUINARIAS PARA TUBERIAS A=1.00 D= 8" INCLUYE m 157.50
LATERALES
05.03.07 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON MATERIAL PROPIO A=1.00 H=0.30 CON MAQUINARIA m 125.00
(D=10 PROM.) INC. LATERALES
05.03.08 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO m 282.50
05.03.09 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 179.95
05.04 INSTALACIONES SANITARIAS
05.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 200MM m 282.50
05.04.02 PUEBA HIDRAULICA EN TUBERIA DE D=10" m 282.50
05.05 ACCESORIOS
05.05.01 SUMINISTRO E INSTALACION DE CODO PVC ISO 200MM X90 und 3.00
05.05.02 SUMINISTRO E INSTALACION DE CODO PVC ISO 200MMX45 und 2.00
05.06 OBRAS DE CONCRETO
05.06.01 DADO DE ANCLAJE PARA ACCESORIOS m3 1.72
06 RESERVORIO ELEVADO 1500 m3
06.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO m2 260.16
06.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 260.16
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION CON RETROEXCAVADORA m3 2,169.58
06.02.02 REFINE DE FONDOS Y TALUDES m2 260.16
06.02.03 RELLENO CON MATERIAL PROPIO EN CAPAS DE 0.20M m3 1,364.07
06.02.04 RELLENO CON MATERIAL DE PRESTAMO EN CAPAS DE 0.20M m3 123.79
06.02.05 RELLENO CON AFIRMADO EN PROTECCION DE TALUD CAPAS DE 0.20M m3 454.85
06.02.06 CAPA BASE DE AFIRMADO E=4" m2 40.42
06.02.07 ENTIBADO SEMICIRCULAR PARA EXCAVACION EN CIMENTACION DE RESERVORIO m2 334.79

06.02.08 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 966.61


06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 SUB ZAPATA DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 312.19
06.03.02 VEREDAS DE CONCRETO FC=175KG/CM2 CEMENTO TIPO II MS E=10CM m2 40.72
06.03.03 SARDINELES DE CONCRETO FC=175KG/CM2 CEMENTO TIPOII MS m3 3.29
06.03.04 JUNTAS DE DILATACION EN VEREDAS m 14.00
06.03.05 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 6.58
06.03.06 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 21.93
06.03.07 SOLADO DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=3" m2 101.36
06.04 OBRAS DE CONCRETO ARMADO
06.04.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V CON MIXER DE 4 M3 EN CIMIENTOS Y VIGAS m3 380.36

06.04.02 CONCRETO FC=280 KG/CM2 CEMENTO TIPO II MS CON MIXER DE 4M3 EN FUSTE m3 202.20

06.04.03 CONCRETO FC=280 KG/CM2 CEMENTO TIPO II MS CON MIXER DE 4M3 EN PUENTE m3 13.04
06.04.04 CONCRETO FC=315 KG/CM2 CEMENTO TIPO II MS CON MIXER DE 4M3 EN CUBA m3 254.24
06.04.05 CONCRETO FC=280 KG/CM2 CEMENTO TIPO II MS CON MIXER DE 4M3 EN TECHO m3 19.70

06.04.06 LOSA DE CONCRETO FC=210KG/CM2 CONCRETO TIPO V_x000D_ m2 101.36


06.04.07 CURADO CON ADITIVO m2 2,473.08
06.04.08 ENCOFRADO Y DESENCOFRADO DE CIMENTACION m2 71.48
06.04.09 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 91.58
06.04.10 ENCOFRADO Y DESENCOFRADO DE FUSTE DE RESERVORIO CON ELEMENTOS METALICOS m2 1,347.99

06.04.11 ENCOFRADO Y DESENCOFRADO DE TABLERO DE PUENTE m2 115.02


06.04.12 ENCOFRADO Y DESENCOFRADO DE FONDO INTERIOR ABOBEDADO DE CUBA m2 219.08
06.04.13 ENCOFRADO Y DESENCOFRADO DE FONDO EXTERIOR DE CUBA EN RESERVORIO ELEVADO m2 109.46

06.04.14 ENCOFRADO Y DESENCOFRADO DE RESERVORIO CON ELEMENTOS METALICOS EN CUBA( INCLUYE m2 791.37
DUCTO)
06.04.15 ENCOFRADO Y DESENCOFRADO DE VERTEDERO RESERVORIO m2 5.18
06.04.16 ENCOFRADO Y DESENCOFRADO DE TECHO DE CUBA RESERVORIO ELEVADO E=8CM INCLUYE m2 296.26
LINTERNA.
06.04.17 ENCOFRADO Y DESENCOFRADO DE LOZA DE PISO E=15CM m2 9.95
06.04.18 ACERO FC=4200 KG/CM2 EN CIMENTACION kg 16,485.01
06.04.19 ACERO FY=4200 KG/CM2 EN RESERVORIO ELEVADO (FUSTE) kg 21,613.65
06.04.20 ACERO FC=4200 KG/CM2 EN PUENTE kg 1,323.44
06.04.21 ACERO FY=4200 KG/CM2 EN RESERVORIO ELEVADO CUBA (INCL MUROS, LINTERNA Y FONDO) kg 36,253.93

06.04.22 ACERO FY= 4200KG/CM2 EN CUPULA DE RESERVORIO kg 385.48


06.04.23 JUNTA DE CONSTRUCCION CON WATER STOP DE 8" m 232.48
06.04.24 LINTERNA EN CUBA und 1.00
06.04.25 BLOQUES DE VIDRIO und 8.00
06.05 REVOQUES ENLUCIDOS Y MOLDURAS
06.05.01 TARRAJEO CON IMPERMEABILIZANTE 1:3 C:A ; E=1CM m2 894.24
06.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:1 ; C:A E=1CM m2 597.98
06.05.03 IMPRIMACION DE CIMENTACION CON EMULSION ASFALTICA m2 525.25
06.06 TUBERIA DE IMPULSION Y EQUIPAMIENTO.
06.06.01 TUBERIA DE ACERO CEDULA 40 D=12" (315MM) m 28.52
06.06.02 CODO DE FIERRO FUNDIDO BRIDADO 90 X 12" (315MM )_x000D_ und 2.00
06.06.03 CODO DE FIERRO FUNDIDO BRIDADO 45 X 12" (315MM )_x000D_ und 3.00
06.06.04 CODO DE FIERRO FUNDIDO BRIDADO 22.5 X12" (315MM ) und 2.00
06.06.05 TEE DE FIERRO FUNDIDO BRIDADO DE 12 " (315MM) A 10(250MM) und 1.00
06.06.06 UNION FLEXIBLE TIPO DRESSER DE 12" (315MM )_x000D_ und 2.00
06.06.07 BRIDA PARA SOLDAR D=12" und 14.00
06.06.08 VALVULA DE CONTROL BRIDADA DE 12" (315MM)_x000D_ und 1.00
06.06.09 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC 12" (315MM )_x000D_ und 1.00
06.07 TUBERIA DE DESCARGA Y EQUIPAMIENTO
06.07.01 TUBERIA DE ACERO CEDULA 40 DE 10" (250MM )_x000D_ m 17.74
06.07.02 CANASTILLA DE SUCCION DE ACERO INOX. 250MM_x000D_ und 1.00
06.07.03 BRIDA ROMPE AGUA DE PARA SALIDA DE 10" (250MM) und 1.00
06.07.04 CODO DE FIERRO FUNDIDO BRIDADO 45 X 10" (250MM ) und 1.00
06.07.05 UNION FLEXIBLE TIPO DRESSER DE 10" (250MM )_x000D_ und 2.00
06.07.06 VALVULA DE CONTROL BRIDADA DE 10" (250MM )_x000D_ und 2.00
06.07.07 CODO DE FIERRO FUNDIDO BRIDADO 90 X 10" (250MM ) und 1.00

06.07.08 TEE DE FIERRO FUNDIDO BRIDADO 10" (250MM )_x000D_ und 1.00
06.07.09 BRIDA PARA SOLDAR DE 10" (250MM )_x000D_ und 11.00
06.07.10 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC 10" (250MM )_x000D_ und 1.00
06.08 TUBERIA DE LIMPIEZA Y REBOCE Y EQUIPAMIENTO.
06.08.01 TUBERIA DE ACERO CEDULA 40 DE 8" (200MM )_x000D_ m 25.38
06.08.02 BRIDA ROMPE AGUA PARA SALIDA DE 8" (200MM) und 1.00
06.08.03 VALVULA DE CONTROL BRIDADA DE 8" (200MM )_x000D_ und 1.00
06.08.04 CODO DE FIERRO FUNDIDO BRIDADO 90 X 8" (200MM )_x000D_ und 4.00
06.08.05 CODO DE FIERRO FUNDIDO BRIDADO 45 X 8" (200MM ) und 3.00
06.08.06 CODO DE FIERRO FUNDIDO BRIDADO 22.5 X8" (200MM ) und 2.00
06.08.07 UNION FLEXIBLE TIPO DRESSER DE 8" (200MM )_x000D_ und 1.00
06.08.08 TEE DE FIERRO FUNDIDO BRIDADO 8" (200MM )_x000D_ und 1.00
06.08.09 BRIDA PARA SOLDAR DE 8" (200MM )_x000D_ und 16.00
06.09 VARIOS
06.09.01 DADO DE 50X50X40CM DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 0.96
06.09.02 TUBERIA PVC SAL DE 3" PARA SUMIDERO EN PISO DE FUSTE DE RESERVORIO und 5.00
06.09.03 CODO PVC SAL DE 3"X90 PARA TRAMPA HIDRAULICA und 6.00
06.09.04 CODO PVC SAL 3"X45 und 1.00
06.09.05 YEE PVC SAL DE 3" und 1.00
06.09.06 SUMIDERO DE BRONCE DE 3" und 2.00
06.09.07 ACCESORIOS DE VENTILACION DE 4" DE TUBERIA GALVANIZADA EN RESERVORIO ELEVADO und 4.00

06.10 CAJA DE DESCARGA EN TUBERIA DE LIMPIEZA


06.10.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 1.49
06.10.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 1.86
06.10.03 SOLADO DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=3" m2 0.94
06.10.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2 11.11
06.10.05 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 0.94
06.10.06 ACERO FY=4200 KG/CM2 kg 44.94
06.10.07 TARRAJEO CON IMPERMEABILIZANTE 1:1 E=1.5CM m2 5.46
06.10.08 DADO DE ANCLAJE PARA SALIDA DE TUBO EN CAJA. und 2.00
06.10.09 REJILLA DE FIERRO GALVANIZADO PREFABRICADA und 1.00
06.11 PRUEBA HIDRAULICA
06.11.01 PRUEBA HIDRAULICA DE RESERVORIO DE 1500 M3 m3 1,500.00
06.11.02 PRUEBA HIDRAULICA EN TUBERIA D=12" m 71.70
06.12 INSTALACIONES ELECTRICAS
06.12.01 TUBO PVC SEL (ELECTRICAS) D=1" (25mm) m 25.00
06.12.02 TUBERIA PVC-SEL 3/4" (ELECT.) m 123.39
06.12.03 CABLE ELECTRICO TW AWG - 4 MM2 m 50.60
06.12.04 CABLE ELECTRICO TW-AG -2.5MM m 256.84
06.12.05 SALIDA PARA CENTRO DE LUZ und 4.00
06.12.06 CAJA DE PASE FG LIV. 4" X 4" X 3" und 6.00
06.12.07 SALIDA PARA CAJA DE PASO DE 6X6X3" und 1.00
06.12.08 TABLERO DE CONTROL und 2.00
06.12.09 LUZ DE SEALIZACION AEREA und 4.00
06.12.10 PROTECCION DE CONDUCTOR DIRECTAMENTE ENTERRADO m 20.50
06.13 ESCALERA DE CONCRETO
06.13.01 SOLADO CON CEMENTO MS E=10" m2 0.23
06.13.02 CONCRETO FC=210KG/CM2 CEM: MS m3 3.68
06.13.03 ENCOFRADO Y DESENCOFRADO DE LOSA DE ESCALERA m2 26.83
06.13.04 ACERO F`Y=4200KG/CM2 kg 320.46
06.14 CARPINTERIA METALICA
06.14.01 PUERTA CON PLANCHA ACANALADA DE 1.20X2.4M und 1.00
06.14.02 VENTANAS CIRCULAR D=0.60 CON PLATINA DE 1 1/2"X1/4" CON MALLA GALVANIZADA DE 2" und 24.00

06.14.03 ESCALERA DE FIERRO GALVANIZADO D=1 1/2" m 12.35


06.14.04 BARANDA DE PROTECCION PARA PUENTE und 2.00
06.14.05 BARANDA DE PROTECCION DE FG EN ESCALERA m 18.19
06.15 PINTURA
06.15.01 PINTURA EN FUSTE DE RESERVORIO CON OLEO MATE HASTA H=4M m2 150.29
06.15.02 PINTURA EN FUSTE DE RESERVORIO CON OLEO MATE HASTA H=8M m2 150.29
06.15.03 PINTURA EN FUSTE DE RESERVORIO CON OLEO MATE HASTA H=12M m2 150.29
06.15.04 PINTURA EN FUSTE DE RESERVORIO CON OLEO MATE HASTA H=16M m2 126.09
06.15.05 PINTURA EN CUBA DE RESERVORIO CON OLEO MATE INC/TECHO m2 859.65
06.16 MURO DE CONTENCION
06.16.01 TRAZO Y REPLANTEO m2 85.79
06.16.02 EXCAVACION CON RETROEXCAVADORA m3 143.29
06.16.03 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 55.00
06.16.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2 160.52
06.16.05 ACERO FY=4200 KG/CM2 kg 2,513.89
06.17 CERCO PERIMETRICO Y CASETA DE VIGILANCIA
06.17.01 TRABAJOS PRELIMINARES
06.17.01.01 LIMPIEZA DE TERRENO m2 134.37
06.17.01.02 TRAZO Y REPLANTEO m2 134.37
06.17.02 MOVIMIENTO DE TIERRAS
06.17.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMENTACION m3 63.03
06.17.02.02 RELLENO Y APISONADO DE ZANJAS CON MATERIAL PROPIO m3 18.46
06.17.02.03 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 57.94
06.17.02.04 RELLENO AREAS LIBRES DE PATIOS CON MATERIAL GRANULAR m3 20.25
06.17.02.05 TERRENO DE CHACRA PARA CULTIVO m3 8.77
06.17.03 OBRAS DE CONCRETO SIMPLE
06.17.03.01 SUB ZAPATAS CONCRETO FC=140 KG/CM2 CON CEMENTO TIPO V H=0.30 M m3 7.95
06.17.03.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 30.90
06.17.03.03 CIMIENTOS CORRIDOS CON CEMENTO V MS C;H 1:10 + 30 / PM m3 31.61
06.17.03.04 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 106.71
06.17.03.05 LOSA DE CONCRETO FC=210KG/CM2 CEMENTO TIPO V EN RAMPA DE INGRESO m2 5.90

06.17.03.06 ENCOFRADO Y DESENCOFRADO DE LOSA DE PAVIMENTO m2 1.62


06.17.03.07 DADO PARA POSTE PRE FABRICADO DE CONCRETO FC=140 KG/CM2 CEMENTO TIPO V m3 2.54

06.17.04 OBRAS DE CONCRETO ARMADO


06.17.04.01 CONCRETO FC=175KG/CM2 CEMENTO TIPO V EN ZAPATAS m3 13.25
06.17.04.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 51.50
06.17.04.03 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 290.09
06.17.04.04 SOBRECIMIENTOS CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 9.53
06.17.04.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 92.93
06.17.04.06 ACERO FY=4200 KG/CM2 EN VIGAS DE CIMENTACION kg 487.17
06.17.04.07 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 5.95
06.17.04.08 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 67.08
06.17.04.09 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 619.92
06.17.04.10 POSTES PRE FABRICADO DE CONCRETO FC=175KG/CM2 PARA CERCO PERIMETRICO und 27.00

06.17.04.11 VIGAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 3.88


06.17.04.12 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 38.44
06.17.04.13 ACERO FY=4200 KG/CM2 EN VIGAS kg 506.58
06.17.05 MUROS Y TABIQUES DE ALBAILERIA
06.17.05.01 MURO DE LADRILLO KING KONG TIPO IV DE SOGA/CARA VISTA m2 181.78
06.17.05.02 MURO DE LADRILLO KING KONG TIPO IV, DE CABEZA. m2 26.42
06.17.06 REVOQUES Y ENLUCIDOS
06.17.06.01 TARRAJEO EN INTERIORES C:A (1:5) m2 38.35
06.17.06.02 TARRAJEO EN EXTERIORES C:A (1:5) m2 38.35
06.17.06.03 TARRAJEO DE COLUMNAS (INC. ARISTAS) m2 67.08
06.17.06.04 TARRAJEO DE VIGAS (INC ARISTAS) m2 38.44
06.17.06.05 VESTIDURA DE DERRAMES ANCHO=15CM m 23.95
06.17.07 PISOS Y PAVIMENTOS
06.17.07.01 LOSA DE CONCRETO FC=210KG/CM2 CEMENTO TIPO V E=20CM m2 10.89
06.17.07.02 FALSO PISO DE CONCRETO FC=140 KG/CM2 CEMENTO TIPO V E=10CM m2 13.40
06.17.07.03 PISO DE CONCRETO SIN COLOREAR, PULIDO, BRUADO E=2" CEMENTO TIPO V m2 13.40

06.17.07.04 VEREDAS DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=10CM m2 6.12


06.17.08 COBERTURAS
06.17.08.01 CORREAS DE MADERA DE 3X4" m 5.20
06.17.08.02 COBERTURA DE ETERNIT GRAN ONDA 3.05 X 1.10M X 4MM m2 19.55
06.17.09 CARPINTERIA DE MADERA
06.17.09.01 PUERTA CONTRAPLACADA DE 48 MM CON TRIPLAY 4MM INCLUYE MARCO DE CEDRO m2 2.52

06.17.09.02 PUERTA CONTRAPLACADA DE 40MM CON TRIPLAY 4MM (INCL VIDRIO) PARA SSHH m2 1.96

06.17.09.03 VENTANAS DE MADERA m2 2.48


06.17.10 CARPINTERIA METALICA
06.17.10.01 PUERTA METALICA CON PLANCHA ACANALDA GALVANIZADA DE 2MM DE 3.50X3.55M INC/MONTAJE und 1.00

06.17.11 VIDRIOS, CRISTALES Y SIMILARES


06.17.11.01 VIDRIO SEMI DOBLE DE 6MM LAMINADO p2 26.64
06.17.12 CERRAJERIA
06.17.12.01 CERRADURA PARA PUERTA PRINCIPAL und 1.00
06.17.12.02 CERRADURA PARA PUERTAS INTERIORES und 1.00
06.17.12.03 CERRADURA PARA PUERTA DE BAO und 1.00
06.17.12.04 CANDADO DE 3" und 2.00
06.17.13 APARATOS SANITARIOS
06.17.13.01 INODORO TANQUE BAJO BLANCO und 1.00
06.17.13.02 LABATORIO DE COLOR BLANCO 1 LLAVE und 1.00
06.17.13.03 LAVATORIO DE GRANITO PARA LAVANDERIA und 1.00
06.17.13.04 DUCHA CROMADA 1 LLAVE INCL. ACCESORIOS und 1.00
06.17.13.05 JABONERA DE LOSA PARA DUCHA und 1.00
06.17.13.06 PAPELERA DE LOSA Y TOALLERA CON BARRAS PLASTICAS und 1.00
06.17.14 INSTALACIONES SANITARIAS
06.17.14.01 RED DE AGUA
06.17.14.01.01 CONEXION A LA RED PUBLICA und 1.00
06.17.14.01.02 TUBERIA PVC C-10 D=1/2" m 8.00
06.17.14.01.03 CODO PVC 1/2"X90 und 11.00
06.17.14.01.04 CODO DE FG 1/2"90 und 4.00
06.17.14.01.05 TEE PVC 1/2" und 3.00
06.17.14.01.06 VALVULA COMPUERTA DE 1/2" und 3.00
06.17.14.01.07 CAJA DE MEDIDOR DE AGUA und 1.00
06.17.14.02 RED DE DESAGUE
06.17.14.02.01 TUBERIA PVC SAL 2" m 6.00
06.17.14.02.02 TUBERIA PVC SAL 4" m 26.94
06.17.14.02.03 SALIDA DE PVC SAL PARA VENTILACION DE 2" und 1.00
06.17.14.02.04 SALIDA DE PVC SAL PARA DESAGUE DE 2" und 4.00
06.17.14.02.05 SALIDA DE PVC SAL 4" und 1.00
06.17.14.02.06 CODO PVC SAL 2"X45 und 2.00
06.17.14.02.07 TRAMPA "P" DE PVC SAL DESAGUE 2" und 2.00
06.17.14.02.08 SUMIDERO DE BRONCE 2" und 2.00
06.17.14.02.09 REGISTRO DE BRONCE 4" und 2.00
06.17.14.02.10 SOMBREO DE VENTILACION PVC 2" und 1.00
06.17.14.02.11 CAJA DE REGISTRO DE DESAGUE 0.30X0.30X0.60 (HASTA 3 CUERPOS) und 1.00
06.17.14.02.12 PRUEBA HIDRAULICA PARA DESAGUE GLB 1.00
06.17.15 PINTURA
06.17.15.01 PINTURA LATEX DOS MANOS EN CIELO RASO Y VIGAS m2 105.52
06.17.15.02 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 76.70
06.17.15.03 PINTURA EN MUROS EXTERIORES CARAVISTA 2 MANOS INCLUYE BASE_x000D_ m2 187.27
06.17.16 VARIOS
06.17.16.01 ALAMBRE DE PUAS PARA CERCO PERIMETRICO m 383.60
06.17.16.02 SEMBRADO DE PLANTA DE DULANTO PARA CERCO VIVO und 62.00
06.17.16.03 MANGERA DE POLIPROPILENO D=1/2" PARA RIEGO POR GOTEO m 60.00
07 MANTENIMIENTO DE RESERVORIO ELEVADO 500 M3
07.01 MOVIMIENTO DE TIERRAS
07.01.01 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL HASTA h=1.50 M m 27.10
07.01.02 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON MATERIAL PROPIO A=1.00 H=0.30 CON MAQUINARIA m 27.10
(D=10 PROM.) INC. LATERALES
07.01.03 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO HASTA h=1.50 M m 27.10

07.01.04 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL DE PRESTAMO A=0.60 M m3 32.00

07.02 OBRAS DE CONCRETO SIMPLE


07.02.01 LOSA DE CONCRETO FC=175KG/CM2 CEMENTO TIPO II MS m3 0.76
07.02.02 ESCALINATA DE CONCRETO FC=175KG/CM2 CEMENTO TIPO II MS EN ACCESO DE RESERVORIO . m3 0.48

07.02.03 DADO DE ANCLAJE 0.40X0.40X0.4M CONCRETO FC=140KG/CM2 CEMENTO TIPO V m3 1.12

07.03 TUBERIAS Y ACCESORIOS


07.03.01 TUBERIAS DE METAL EN LLEGADA, SALIDA Y CUBA DE RESERVORIO
07.03.01.01 TUBERIA DE ACERO CEDULA 40 DE 10" (250MM )_x000D_ m 2.40
07.03.01.02 TUBERIA DE ACERO CEDULA 40 DE 8" (200MM )_x000D_ m 4.40
07.03.01.03 TUBERIA DE ACERO CEDULA 40 DE 6" (160MM )_x000D_ m 1.00
07.03.01.04 BRIDA PARA SOLDAR DE 10" (250MM )_x000D_ und 4.00
07.03.01.05 BRIDA PARA SOLDAR DE 8" (200MM )_x000D_ und 7.00
07.03.01.06 BRIDA PARA SOLDAR DE 6" (160MM )_x000D_ und 2.00
07.03.01.07 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC 10" (250MM )_x000D_ und 1.00
07.03.01.08 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC 8" (200MM )_x000D_ und 1.00
07.03.01.09 TRANSICION DE FIERRO FUNDIDO BRIDADO A PVC 6" (160MM )_x000D_ und 1.00
07.03.01.10 TRANSICION DE PVC A ASBESTO CEMENTO DE 8" und 1.00
07.03.01.11 TRANSICION DE PVC A ASBESTO CEMENTO DE 10" und 1.00
07.03.02 TUBERIAS DE PVC EN SALIDA Y REBOSE
07.03.02.01 SUMINISTRO E INSTALACION TUB PVC-ISO C-10 250mm m 3.00
07.03.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 200MM m 24.00
07.03.02.03 SUMINISTRO E INSTALACION TUB PVC-ISO 160mm m 3.10
07.04 PINTURA EN EXTERIORES
07.04.01 PINTURA EN FUSTE DE RESERVORIO CON OLEO MATE HASTA H=4M m2 109.33
07.04.02 PINTURA EN FUSTE DE RESERVORIO CON OLEO MATE HASTA H=8M m2 109.33
07.04.03 PINTURA EN FUSTE DE RESERVORIO CON OLEO MATE HASTA H=12M m2 109.33
07.04.04 PINTURA EN FUSTE DE RESERVORIO CON OLEO MATE HASTA H=16M m2 90.84
07.04.05 PINTURA EN CUBA DE RESERVORIO CON OLEO MATE INC/TECHO m2 411.15
07.05 CARPINTERIA METALICA
07.05.01 ARENADO Y PINTURA DE TUBERIAS INSTALADAS m 60.60
07.05.02 VENTANA CIRCULAR D=0.60 CON PLATINA DE 11/2"X1/4" CON MALLA GALVANIZADA DE 2" und 15.00

07.05.03 PUERTA CON PLANCHA ESTRIADA DE FIERRO GALVANIZADO DE 2.10X1.60M CON ARCO SUPERIOR und 1.00

07.05.04 PINTURA EPOXICA EN CARPINTERIA METALICA BARANDAS m2 4.06


07.06 VARIOS
07.06.01 VALVULA DE CONTROL BRIDADA DE 10" (250MM )_x000D_ und 2.00
07.06.02 VALVULA DE CONTROL BRIDADA DE 8" (200MM )_x000D_ und 1.00
07.06.03 VALVULA DE CONTROL BRIDADA DE 6" (160MM )_x000D_ und 1.00
07.06.04 SUMIDERO DE BRONCE DE 3" und 1.00
07.06.05 CODO PVC SAL DE 3"X90" und 3.00
07.06.06 TUBERIA PVC SAL 3" und 2.00
07.06.07 LINTERNA EN CUBA und 1.00
08 REDES DE DISTRIBUCION DE AGUA POTABLE Y CONEXIONES DOMICILIARIAS
08.01 TRABAJOS PROVICIONALES
08.01.01 LETREROS DE DESVIO TRIPLAY 8 MM DE 1.20X0.60 und 18.00
08.01.02 PUENTES PEATONALES u 8.00
08.02 TRABAJOS PRELIMINARES
08.02.01 TRAZO Y REPLANTEO PRELIMINAR DE TUBERIAS m 15,017.15
08.03 MOVIMIENTO DE TIERRAS
08.03.01 EXCAVACION CON MAQUINARIA EN TERRENO ARENOSO H=1.20 A=0.60 m 6,009.05
08.03.02 EXCAVACION DE ZANJAS EN TERRENO NORMAL A=0.60 H=1.30 m 4,686.55
08.03.03 EXCAVACION DE ZANJAS EN TERRENO SATURADO A=0.60 H=1.40 m 4,321.55
08.03.04 REFINE Y NIVELACION DE ZANJAS EX. CON MAQ. EN TERRENO ARENOSO m 6,009.05
08.03.05 REFINE NIVELACION DE FONDOS DE ZANJAS PARA TUBERIA EXC, CON MAQ. EN TERRENO NORMAL m 4,686.55

08.03.06 REFINE, NIVELACION DE FONDOS DE ZANJAS EXC. CON MAQ. EN TERRENO SATURADO m 4,321.55

08.03.07 CAMA DE APOYO CON ARENILLA PARA TUBERIAS D=10" CON MAQUINARIA m 4,686.55
08.03.08 CAMA DE APOYO CON RIPIO CORRIENTE DE 3/4" PARA TUBERIAS DE 4 A 8" m 4,321.55
08.03.09 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON ARENILLA A=0.60 H=0.30 CON MAQUINARIA INCLUYE m 4,686.55
LATERALES
08.03.10 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON RIPIO CORRIENTE T/S A=0.60 H=0.30 CON m 4,321.55
MAQUINARIA INCLUYE LATERALES
08.03.11 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON MATERIAL PROPIO A=0.60 H=0.30 CON MAQUINARIA m 6,009.05
INC. LATERALES
08.03.12 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO m 10,695.60
08.03.13 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 6,115.65
08.04 VARIOS
08.04.01 ENTIBADO DE ZANJAS CON TABLESTACAS DE METAL (ARBED SHEET PILES) DE 0 HASTA 2M m 10,330.60

08.04.02 DRENAJE DE ZANJAS DE H=0 A 2M m 4,321.55


08.05 TUBERIAS Y PRUEBA HIDRAULICA
08.05.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO C-10 90MM m 1,373.70
08.05.02 SUMINISTRO E INSTALACION TUB PVC-ISO C-10 110mm m 10,816.20
08.05.03 SUMINISTRO E INSTALACION TUB PVC-ISO 160mm m 2,405.85
08.05.04 SUMINISTRO E INSTALACION TUB PVC-ISO 200mm m 401.40
08.05.05 SUMINISTRO E INSTALACION TUB PVC-ISO 250mm m 20.00
08.05.06 PRUEBA HIDRULICA EN TUBERIA PVC DN=3" 90MM m 1,373.60
08.05.07 DOBLE PRUEBA HIDRAULICA P/ TUB =110mm PVC m 10,816.20
08.05.08 DOBLE PRUEBA HIDRAULICA P/ TUB =160mm PVC m 2,405.85
08.05.09 DOBLE PRUEBA HIDRAULICA P/ TUB =200mm PVC m 401.40
08.05.10 DOBLE PRUEBA HIDRAULICA P/ TUB =250mm PVC m 20.00
08.06 ACCESORIOS
08.06.01 SUMINISTRO E INSTALACION DE TEE PVC ISO DE 110X90 MM und 7.00
08.06.02 SUMINISTRO E INSTALACION DE TEE PVC ISO DE 160X110MM und 29.00
08.06.03 SUMINISTRO E INSTALACION DE TEE PVC ISO DE 90X90MM und 2.00
08.06.04 SUMINISTRO E INSTALACION DE TEE PVC ISO DE 110X110 MM und 35.00
08.06.05 SUMINISTRO E INSTALACION DE TEE PVC ISO DE 160X160 MM und 10.00
08.06.06 SUMINISTRO E INSTALACION DE TEE PVC ISO DE 250X250 MM und 1.00
08.06.07 SUMINISTRO E INSTALACION DE REDUCCION DE PVC DE 110 A 90MM und 17.00
08.06.08 SUMINISTRO E INSTALACION DE REDUCCION PVC DE 160 A 110 MM und 20.00
08.06.09 SUMINISTRO E INSTALACION DE REDUCCION PVC 200 A 160 MM und 3.00
08.06.10 SUMINISTRO E INSTALACION DE REDUCCION PVC 250 A 200 MM und 3.00
08.06.11 SUMINISTRO E INSTALACION DE TAPON PVC SAP 90MM und 8.00
08.06.12 SUMINISTRO E INSTALACION DE TAPON PVC SAP 110MM und 14.00
08.06.13 SUMINISTRO E INSTALACION DE TAPON PVC SAP 160MM und 4.00
08.06.14 SUMINISTRO E INSTALACION DE CODO PVC ISO 110MM X 90 und 8.00
08.06.15 SUMINISTRO E INSTALACION DE CODO PVC ISO 110MM X 45 und 5.00
08.06.16 SUMINISTRO E INSTALACION DE CODO PVC ISO 110MM X 22.5 und 3.00
08.06.17 SUMINISTRO E INSTALACION DE CODO PVC ISO 160MM X 90 und 2.00
08.06.18 SUMINISTRO E INSTALACION DE CODO PVC ISO 160MMX 45 und 3.00
08.06.19 SUMINISTRO E INSTALACION DE CODO PVC ISO 160MMX 22.5 und 3.00
08.06.20 SUMINISTRO E INSTALACION DE CODO PVC ISO 90MM X 45 und 1.00
08.06.21 SUMINISTRO E INSTALACION DE CODO PVC ISO 90MM X 90 und 2.00
08.06.22 SUMINISTRO E INSTALACION DE CRUZ PVC ISO 110X110MM und 20.00
08.06.23 SUMINISTRO E INSTALACION DE CRUZ PVC ISO 160X160MM und 6.00
08.06.24 SUMINISTRO E INSTALACION DE CRUZ PVC ISO 160X110MM und 8.00
08.06.25 SUMINISTRO E INSTALACION DE CRUZ PVC ISO 200X160MM und 2.00
08.06.26 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO u 8.00
08.06.27 SUMINISTRO E INSERCION DE TEE PVC CL-10 160X110MM und 15.00
08.06.28 SUMINISTRO E INSERCION DE TEE PVC CL-10 200X160MM und 1.00
08.06.29 SUMINISTRO E INSERCION DE TEE PVC ISO DE 90MM und 1.00
08.07 OBRAS DE CONCRETO
08.07.01 DADO DE ANCLAJE PARA ACCESORIO FC=175KG/CM2 m3 14.82
08.07.02 CAJA PARA VALVULAS DE CONTROL INCLUYE ACCESORIOS DE 90 A 110MM
08.07.02.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 191.52
08.07.02.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 273.87
08.07.02.03 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 172.27
08.07.02.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2 1,197.00
08.07.02.05 ACERO FY=4200 KG/CM2 kg 10,769.81
08.07.02.06 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 465.50
08.07.02.07 VALVULA DE CONTROL PARA TUB ISO 3" (90MM) und 19.00
08.07.02.08 VALVULA DE CONTROL PARA TUB ISO 4" (110MM) und 114.00
08.07.02.09 REPOSICION DE VALVULA DE CONTROL DE 4" (110MM) und 12.00
08.07.02.10 TAPA TERMOPLASTICA DE 20X15CM E=1.5" und 133.00
08.07.03 CAJA PARA VALVULAS DE CONTROL INCLUYE ACCESORIOS DE 160 A 200MM
08.07.03.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 109.85
08.07.03.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 157.09
08.07.03.03 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 95.37
08.07.03.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2 650.00
08.07.03.05 ACERO FY=4200 KG/CM2 kg 5,638.36
08.07.03.06 TARRAJEOS EN INTERIORES Y EXTERIORES CEM MS 1.5 m2 260.00
08.07.03.07 VALVULA DE CONTROL PARA TUB ISO 6" (160MM )_x000D_ und 60.00
08.07.03.08 VALVULA DE CONTROL PARA TUB ISO 8" (200MM )_x000D_ und 5.00
08.07.03.09 REPOSICION DE VALVULA DE CONTROL DE 6" (160MM) und 19.00
08.07.03.10 TAPA TERMOPLASTICA DE 20X15CM E=1.5" und 65.00
08.08 CONEXIONES DOMICILIARIAS DE AGUA POTABLE
08.08.01 TRABAJOS PRELIMINARES
08.08.01.01 TRAZO Y REPLANTEO DE CONEXCIONES DOMICILIARIAS m 11,155.15
08.08.02 MOVIMIENTO DE TIERRAS
08.08.02.01 EXCAVACION A MANO ZANJAS P/TUB 1/2" PROF. 1.00 m m 11,155.15
08.08.02.02 REFINE Y CONFORMACION D/FONDO D/ZANJA P/TUB " m 11,155.15
08.08.02.03 CAMA DE APOYO P/TUB ARENILLA e=0.10 a=0.30m m 11,155.15
08.08.02.04 RELLENO Y COMPACTACION ZANJA P/TUB " C/ARENILLA m 11,155.15
08.08.02.05 RELLENO Y COMPACTACION C/MAT PROPIO SELEC P/TUB CONEX DOMIC m 11,155.15
08.08.02.06 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 1,740.20
08.08.03 TUBERIAS Y PRUEBA HIDRAULICA
08.08.03.01 SUMINISTRO E INSTAL. TUB " PVC UF CL-10 (Inc/3%) m 11,155.15
08.08.03.02 PRUEBA HIDRAULICA P/TUBERIA DE PVC 1/2" m 11,155.15
08.08.04 VARIOS
08.08.04.01 SUMINISTRO E INSTALACION DE ABRAZADERA DE 200MM A 1/2" und 57.00
08.08.04.02 SUMINISTRO E INSTALACION DE ABRAZADERA DE 160MM A 1/2" und 357.00
08.08.04.03 SUMINISTRO E INSTALACION D/ABRAZADERA PVC 110mm x" P/TUB u 1,477.00
08.08.04.04 BRAZADERA DE PVC PARA TUBERIA DE 90MM 3" CON REDUCCION A 1/2" und 80.00
08.08.04.05 SUMINISTRO E INSTAL. ACCESORIOS P/CONEX. DOM. 1/2" u 1,971.00
08.08.04.06 SUMINISTRO E INSTAL. D/CAJA PRE-FABRICADA u 1,971.00
08.08.04.07 SUMINISTRO E INSTALACION D/MEDIDOR D/AGUA u 1,971.00
08.08.04.08 INSTALACION PROVICIONAL DEL SERVICIO DE AGUA POTABLE DOMICILIARIO und 930.00
COSTO DIRECTO
GASTOS GENERALES 7%
UTILIDAD 5%

SUB TOTAL
IMPUESTO 18%

PRESUPUESTO TOTAL

SON : DOCE MILLONES NOVECIENTOS VEINTIDOS MIL TRESCIENTOS NOVENTITRES Y 75/100 NUEVOS SOLES
Pgina 1

Precio S/. Parcial S/.

1,764,477.22
58,286.63
2,068.25 2,068.25
1,423.98 1,423.98
35.74 2,144.40
52,650.00 52,650.00
4,970.45
1.00 255.00
1.87 476.85
1.72 438.60
3,500.00 3,500.00
25.00 300.00
15,214.84
13,537.68
64.54 3,652.32
176.00 3,701.28
97.70 4,280.24
11.44 1,903.84
1,329.84
64.54 341.42
97.70 803.09
11.44 185.33
347.32
64.54 139.41
97.70 156.32
11.44 51.59
119,213.57
57.20 84,080.57

18.97 3,391.27
49.52 9,348.39
11.44 22,393.34
12,044.79
374.35 3,953.14
78.62 7,646.58
34.99 445.07
157,737.20
31,348.02
331.65 17,504.49
4.29 13,843.53
33,801.84
331.65 15,003.85
56.60 8,535.28
4.29 10,262.71
92,587.34
502.15 53,689.88

23.49 1,874.50
4.29 37,022.96
19,209.38
28.77 14,578.05

9.14 4,631.33
598.83
5.34 598.83
1,241,017.20

794,901.60 794,901.60

432,615.60 432,615.60

13,500.00 13,500.00

750.00
25.00 750.00
18,312.12
50.40
3.32 50.40
266.45
28.17 179.16
11.44 87.29
1,421.53
34.16 518.55
409.82 106.55
31.89 164.23
409.82 331.95
78.62 277.53
14.96 10.17
5.34 12.55
7,020.51
409.82 524.57
4.29 157.53
395.07 244.94
44.89 461.47
4.29 754.40
395.07 260.75
81.28 861.57
4.29 554.18
395.07 438.53
58.37 509.57
4.29 831.10
395.07 624.21
44.89 189.88
4.29 607.81
1,293.46
45.77 1,293.46
889.64
51.13 586.97
4.29 182.54
5.08 54.86
70.95 65.27
2,658.58
19.09 551.70
26.92 820.52
35.96 258.91
53.16 398.70
11.36 254.46
18.64 122.65
21.92 251.64
883.73
38.49 883.73
172.97
10.37 172.97
2,596.16
384.19 384.19
186.32 577.59
374.00 1,634.38
1,058.69
11.95 137.19
12.95 233.88
11.58 687.62
117,122.21
363.06
2.73 363.06
5,807.66
9.62 1,279.36
2.88 383.01
4.47 594.47
18.18 2,417.76

12.09 530.63
11.44 602.43
23,065.75
284.90 4,700.85
112.41 4,080.48
91.92 1,304.34
92.66 1,982.92
293.69 3,809.16
188.16 1,176.00
115.83 2,939.77
219.32 1,535.24
150.35 1,202.80
334.19 334.19
10,959.34
367.46 367.46
299.69 599.38
935.17 1,870.34
767.46 767.46
1,387.38 1,387.38
4,613.35 4,613.35
820.76 820.76

353.12 533.21
10,902.91
1,297.22 2,594.44
2,526.69 5,053.38
594.74 1,784.22
182.05 182.05
152.19 304.38
754.91 754.91
353.12 229.53
2,322.51
162.20 162.20
105.54 105.54
165.28 165.28
408.63 817.26
141.11 282.22
128.40 256.80
353.12 533.21
4,443.73
3.32 11.22
32.82 144.08
677.15 1,902.79
44.89 1,213.83
4.29 901.37
21.81 270.44
2,262.82
3.32 4.95
32.82 61.05
34.16 50.90
677.15 636.52
44.89 498.73
4.29 192.79
21.81 119.08
353.12 91.81
606.99 606.99
6,665.29
585.73 585.73
637.21 1,274.42
898.46 898.46
117.84 117.84
283.25 566.50
178.38 178.38
820.76 820.76
654.34 654.34
898.46 898.46
353.12 339.00
9.50 47.50
30.06 180.36
24.39 24.39
27.69 27.69
25.73 51.46
8,941.42
2.82 8,460.00
3.62 481.42
37,460.16
57.20 2,290.29

26.35 278.26
18.99 1,169.78
331.65 14,592.60
44.89 8,690.70
4.29 6,791.37
82.89 3,647.16
3,927.56
3,927.56 3,927.56

2,502,073.24
28,264.00
3,600.00 3,600.00
1,800.00 1,800.00
17,600.00 17,600.00
5,264.00
28.00 224.00
1,320.00 1,320.00

360.00 720.00

100.00 3,000.00

58,972.41
0.93 10,044.00
1.13 836.20
6.95 6,463.50
2.73 29,484.00
80.00 240.00
21.26 3,507.90
26.46 4,365.90
8.05 3,614.45

416.46 416.46
523,541.90
43.07 9,148.07
3.97 41,704.85

1.91 20,628.00
3.67 37,489.05
9.82 5,744.70

10.81 116,748.00
6.99 67,173.90
14.38 17,112.20
3.77 400.37
11.44 85,149.64
122,243.12
8.13 2,853.63
3.66 6,423.30
34.26 23,449.26
30.79 84,296.86
11.44 5,220.07
1,736,645.30
112.41 447,616.62
184.24 1,247,212.68
4.30 17,200.00
3.62 24,616.00
21,813.11
8.97 89.70
32.82 176.57
46.25 277.50
456.02 1,632.55
4.29 283.57
344.55 568.51
4.29 421.19
81.28 1,609.34
168.53 3,033.54
188.16 5,738.88
308.31 1,233.24
228.03 2,736.36
820.76 1,641.52
1,185.32 2,370.64
272.61
32.82 78.77
34.99 83.98
36.62 109.86
15,100.63
585.73 1,171.46
585.73 2,928.65
637.21 2,548.84
246.67 1,726.69
246.67 2,220.03
246.67 1,233.35
439.90 439.90
56.19 56.19
353.12 2,775.52
32,729.03
3.32 44.82
32.82 633.75
677.15 7,435.11
44.89 3,232.08
4.29 2,704.16
21.81 654.30
3,152.94 9,458.82
2,768.09 8,304.27
43.62 261.72
60,859.07
3.32 56.47
32.82 875.31
677.15 11,931.38
44.89 4,572.50
4.29 5,025.86
21.81 894.21
6,082.25 12,164.50

6,334.71 25,338.84

1,511.82
251.97 1,511.82
22,363.36
28.25
3.32 28.25
3,685.75
32.82 1,897.98
4.49 327.77
10.81 789.13

9.19 670.87
106.55
409.82 106.55
10,777.27
677.15 5,938.61
44.89 2,325.75
4.29 2,512.91
447.11
21.81 447.11
2,334.75
31.13 2,334.75
2,892.41
288.15 864.45
429.83 1,289.49
495.31 495.31
121.58 243.16
2,091.27
130.28 390.84
251.97 755.91
314.84 944.52
1,790,013.73
52,650.00
52,650.00 52,650.00
1,070.69
1.87 1,070.69
33,156.55
10.01 2,456.85
32.82 3,767.41
7.48 4,280.50
9.19 237.93
49.52 16,610.99
19.26 468.40
11.44 5,334.47
12,242.51
374.35 5,645.20
78.62 1,320.82
34.99 5,276.49
137,178.13
17,180.43
331.65 12,503.21
4.29 4,677.22
34,510.25
331.65 15,003.85
56.60 8,535.28
4.29 10,971.12
85,487.45
502.15 50,410.84

23.49 1,771.15
4.29 33,305.46
15,906.03
26.02 11,771.19
9.14 4,134.84
562.20
5.34 562.20
1,091,893.90
746,660.70 746,660.70

331,333.20 331,333.20

13,500.00 13,500.00

25.00 400.00
67,631.37
237.05
3.32 237.05
3,275.24
28.17 2,171.34
9.19 61.94
11.44 1,041.96
7,011.41
374.35 1,227.87
30.72 368.64
240.12 3,159.98
51.40 2,254.92
19,214.44
409.82 2,049.10
30.72 614.40
4.29 472.59
409.82 3,417.90
44.89 2,994.61
4.29 1,205.15
395.07 438.53
58.37 518.33
4.29 412.40
395.07 1,276.08
81.28 2,101.09
4.29 1,380.87
395.07 616.31
58.37 726.12
4.29 832.00
395.07 75.06
44.89 63.74
4.29 20.16
6,946.50
45.77 2,196.50
74.58 4,750.00
7,138.24
19.09 2,131.97
26.92 3,006.43
35.96 929.57
53.16 661.31
11.36 408.96
7,752.55
122.28 7,752.55

5,377.81
86.36 587.25
35.13 396.97
20.04 545.09
38.28 2,942.20
30.00 204.00
51.64 702.30
5,423.84
845.54 3,804.93
220.26 1,618.91
820.47
10.37 820.47
113.96
81.84 81.84
32.12 32.12
1,237.49
1,237.49
9.50 59.19
30.30 757.50
26.76 53.52
30.06 60.12
24.39 97.56
1.17 23.05
22.13 88.52
98.03 98.03
3,082.37
12.95 495.86
11.58 2,586.51
131,734.25

447.72
2.73 447.72
3,183.49
4.85 447.66
1.91 176.29
3.67 338.74
10.81 997.76

7.76 716.25

11.44 506.79
35,448.07
184.24 10,317.44
92.66 2,223.84
57.43 1,866.48
168.53 1,938.10
188.16 3,480.96
124.28 994.24
115.83 2,142.86
308.31 2,466.48
219.32 4,605.72
168.67 1,349.36
150.35 3,458.05
3.62 604.54
6,568.92
429.83 429.83
2,768.09 2,768.09
594.74 1,784.22
1,297.22 1,297.22
353.12 289.56
6,779.70
2,768.09 5,536.18
246.67 246.67
429.83 429.83
439.90 439.90
353.12 127.12
1,396.50
165.28 165.28
408.63 817.26
308.02 308.02
353.12 105.94
36,937.62
1,032.63 2,065.26
3,260.95 6,521.90
1,340.42 2,680.84
594.74 1,189.48
2,526.69 7,580.07
864.98 3,459.92
739.59 2,218.77
2,876.73 5,753.46
182.05 364.10
1,297.22 3,891.66
410.10 820.20
353.12 391.96
20,579.27
489.29 978.58

2,269.48 4,538.96
667.88 1,335.76
408.63 817.26
1,291.70 2,583.40
915.96 1,831.92
578.33 1,734.99
1,041.88 1,041.88
972.38 1,944.76
144.87 289.74
708.55 1,417.10
457.44 1,372.32
410.10 410.10
353.12 282.50
3,112.06
141.11 282.22
150.39 150.39
165.28 165.28
408.63 1,225.89
353.12 88.28
1,200.00 1,200.00

15,018.08
3.32 41.43
32.82 585.84
677.15 7,231.96
44.89 3,232.08
4.29 2,978.03
21.81 687.02
43.62 261.72
2,262.82
3.32 4.95
32.82 61.05
34.16 50.90
677.15 636.52
44.89 498.73
4.29 192.79
21.81 119.08
353.12 91.81
606.99 606.99
82,684.98
100.96
3.32 100.96
1,033.44
28.17 703.69
9.19 67.55
11.44 262.20
3,476.20
374.35 816.08
30.72 223.03
240.12 1,342.27
51.40 1,094.82
27,330.89
409.82 1,487.65
30.72 371.71
4.29 429.69
409.82 1,299.13
44.89 1,857.10
4.29 691.63
395.07 493.84
58.37 583.70
4.29 598.54
395.07 1,777.82
81.28 5,568.49
4.29 2,487.77
395.07 936.32
58.37 1,935.55
4.29 1,718.83
122.28 132.06
39.53 246.67
4.29 600.34
395.07 1,564.48
58.37 1,315.08
4.29 1,234.49
4,683.35
677.15 2,952.37
44.89 484.81
4.29 731.53
314.84 314.84
199.80
395.07 47.41
44.89 44.44
107.95 107.95
4,703.78
45.77 4,703.78
9,431.12
19.09 1,961.88
26.92 2,766.57
35.96 2,417.59
53.16 1,582.04
11.36 404.42
27.65 298.62
2,442.55
83.03 1,668.90
38.49 773.65
1,890.04
25.02 221.43
20.04 374.75
38.28 1,293.86
4,228.64
845.54 2,663.45
317.70 600.45

220.26 964.74
15,927.14
10.37 491.64
308.71 15,435.50
731.64
60.97 731.64
163.68
81.84 163.68
911.34
911.34
96.73 96.73
3.46 247.39
9.73 194.60
13.21 52.84
16.17 97.02
47.23 94.46
38.06 38.06
90.24 90.24
3,636.04
12.95 1,255.89
11.58 2,380.15
1,994.17
450.00 450.00
396.84 396.84
47.23 141.69
3.46 247.39
9.73 29.19
38.06 38.06
691.00 691.00
163,303.12
464.80
3.32 464.80
7,983.25
28.17 3,416.18
12.09 309.02
34.99 1,609.89

11.44 1,417.87
68.16 1,230.29
34,270.26
374.35 4,462.25
30.72 1,373.18
240.12 12,932.86
51.40 9,286.44
122.28 1,604.31

39.53 123.73
409.82 401.62
58.37 182.70
395.07 2,579.81
44.89 1,323.36
63,688.30
409.82 8,093.95
30.72 2,288.64
4.29 1,843.07
409.82 6,548.92
44.89 9,862.33
4.29 4,193.39
395.07 4,278.61
81.28 9,842.20
4.29 4,575.67
395.07 2,670.67
58.37 3,934.72
4.29 3,587.43
677.15 325.03
44.89 99.66
4.29 133.25
606.99 1,213.98
395.07 90.87
44.89 79.01
4.29 26.90
17,626.66
50.46 15,319.15
74.58 2,307.51
9,837.00
19.09 1,110.47
26.92 535.17
35.96 4,354.40
53.16 3,598.40
11.36 238.56
13,905.28
122.28 12,276.91
83.03 1,112.60
38.49 515.77
963.54
25.02 215.17
38.28 748.37
2,310.73
317.70 816.49

451.43 948.00

220.26 546.24
276.26
10.37 276.26
1,744.57
1,744.57 1,744.57

339.38
81.84 81.84
77.34 77.34
83.84 83.84
32.12 96.36
619.04
231.86 231.86
34.75 34.75
162.04 162.04
59.84 59.84
36.39 36.39
94.16 94.16
1,774.25
509.71
96.73 96.73
3.46 58.82
9.73 68.11
13.21 52.84
16.17 48.51
47.23 94.46
90.24 90.24
1,264.54
6.14 36.84
9.82 310.51
20.12 20.12
20.12 80.48
36.02 36.02
12.15 24.30
15.42 15.42
29.68 89.04
27.68 110.72
35.19 35.19
26.48 26.48
98.03 294.09
185.33 185.33
7,499.80
12.95 2,444.70
11.58 903.70
13.15 3,992.21
8.80 159.19
128,781.18
130.00
28.00 28.00
22.00 22.00
80.00 80.00
529.17
0.93 529.17
19,551.29
3.97 1,675.34

9.54 1,402.38
1.91 806.02
1.43 210.21
3.67 1,548.74

10.81 4,561.82

8.32 1,223.04

6.99 3,977.31
11.44 4,146.43
106,021.77
184.24 104,832.56
2.09 1,189.21
1,973.36
246.67 986.68
246.67 493.34
246.67 493.34
575.59
353.12 575.59
39,747.07
164.00
28.00 84.00
80.00 80.00
262.73
0.93 262.73
9,651.28
3.97 625.28

9.54 1,192.50
1.91 300.83
1.43 178.75
3.67 578.03
10.81 1,702.58

8.32 1,040.00

6.99 1,974.68
11.44 2,058.63
28,337.58
92.66 26,176.45
7.65 2,161.13
724.11
141.11 423.33
150.39 300.78
607.37
353.12 607.37
1,621,764.84
1,118.69
0.57 148.29
3.73 970.40
99,531.29
15.81 34,301.06
4.27 1,110.88
4.80 6,547.54
49.52 6,130.08
49.52 22,524.17
8.08 326.59
52.37 17,532.95

11.44 11,058.02
96,680.00
285.12 89,011.61
76.21 3,103.27
385.92 1,269.68
8.74 122.36
14.96 98.44
19.06 417.99
26.21 2,656.65
1,105,831.13
331.65 126,146.39

320.65 64,835.43

320.65 4,181.28
362.48 92,156.92
320.65 6,316.81

122.28 12,394.30
9.14 22,603.95
40.76 2,913.52
49.53 4,535.96
105.36 142,024.23

186.90 21,497.24
88.25 19,333.81
145.53 15,929.71

105.36 83,378.74

65.70 340.33
158.64 46,998.69

19.38 192.83
4.29 70,720.69
6.07 131,194.86
4.29 5,677.56
6.07 220,061.36

10.58 4,078.38
22.74 5,286.60
561.86 561.86
308.71 2,469.68
58,270.24
37.50 33,534.00
37.44 22,388.37
4.47 2,347.87
20,538.78
188.16 5,366.32
594.74 1,189.48
864.98 2,594.94
738.84 1,477.68
841.90 841.90
1,297.22 2,594.44
228.03 3,192.42
2,526.69 2,526.69
754.91 754.91
15,138.40
124.28 2,204.73
1,857.72 1,857.72
140.54 140.54
784.81 784.81
972.38 1,944.76
2,269.48 4,538.96
489.29 489.29

667.88 667.88
168.67 1,855.37
654.34 654.34
12,369.82
115.83 2,939.77
105.54 105.54
1,291.70 1,291.70
408.63 1,634.52
578.33 1,734.99
605.01 1,210.02
457.44 457.44
590.24 590.24
150.35 2,405.60
1,128.23
409.82 393.43
9.50 47.50
30.06 180.36
24.39 24.39
27.69 27.69
25.73 51.46
100.85 403.40

2,206.93
3.32 4.95
32.82 61.05
26.21 24.64
44.89 498.73
677.15 636.52
4.29 192.79
20.86 113.90
33.68 67.36
606.99 606.99
4,939.55
3.12 4,680.00
3.62 259.55
11,774.65
6.25 156.25
28.43 3,507.98
3.28 165.97
2.41 618.98
41.51 166.04
33.01 198.06
26.34 26.34
72.41 144.82
1,642.10 6,568.40
10.82 221.81
4,747.50
149.29 34.34
456.02 1,678.15
51.13 1,371.82
5.19 1,663.19
11,534.45
864.56 864.56
138.76 3,330.24

240.34 2,968.20
1,057.31 2,114.62
124.07 2,256.83
37,792.86
10.40 1,563.02
14.74 2,215.27
19.37 2,911.12
35.19 4,437.11
31.02 26,666.34
42,082.39
1.14 97.80
15.81 2,265.41
395.07 21,728.85
44.89 7,205.74
4.29 10,784.59
96,079.93
229.77
0.57 76.59
1.14 153.18
4,416.99
28.17 1,775.56
12.09 223.18
11.44 662.83
68.16 1,380.24
42.78 375.18
18,985.03
374.35 2,976.08
30.72 949.25
240.12 7,590.19
51.40 5,484.89
122.28 721.45

39.53 64.04
472.10 1,199.13

37,269.87
409.82 5,430.12
30.72 1,582.08
4.29 1,244.49
409.82 3,905.58
44.89 4,171.63
4.29 2,089.96
395.07 2,350.67
81.28 5,452.26
4.29 2,659.46
90.14 2,433.78

395.07 1,532.87
58.37 2,243.74
4.29 2,173.23
11,143.02
50.46 9,172.62
74.58 1,970.40
6,492.22
19.09 732.10
26.92 1,032.38
35.96 2,412.20
53.16 2,043.47
11.36 272.07
3,813.26
156.45 1,703.74
83.03 1,112.60
38.49 515.77

78.62 481.15
878.47
25.02 130.10
38.28 748.37
2,231.64
317.70 800.60

451.43 884.80

220.26 546.24
1,744.57
1,744.57 1,744.57

276.26
10.37 276.26
307.26
81.84 81.84
77.34 77.34
83.84 83.84
32.12 64.24
619.04
231.86 231.86
34.75 34.75
162.04 162.04
59.84 59.84
36.39 36.39
94.16 94.16
1,521.97
564.72
96.73 96.73
3.46 27.68
9.73 107.03
13.21 52.84
16.17 48.51
47.23 141.69
90.24 90.24
957.25
6.14 36.84
9.82 264.55
20.12 20.12
20.12 80.48
36.02 36.02
12.15 24.30
29.68 59.36
27.68 55.36
35.19 70.38
26.48 26.48
98.03 98.03
185.33 185.33
5,213.22
17.65 1,862.43
11.58 888.19
13.15 2,462.60
937.34
1.39 533.20
3.47 215.14
3.15 189.00
50,919.40
1,793.87
20.88 565.85
8.32 225.47

5.88 159.35

26.35 843.20

877.94
369.89 281.12
369.89 177.55

374.35 419.27

7,430.03
4,807.36
124.28 298.27
115.83 509.65
70.89 70.89
168.67 674.68
150.35 1,052.45
115.98 231.96
654.34 654.34
558.48 558.48
470.06 470.06
156.32 156.32
130.26 130.26
2,622.67
91.92 275.76
92.66 2,223.84
39.70 123.07
20,816.80
10.40 1,137.03
14.74 1,611.52
19.37 2,117.72
35.19 3,196.66
31.02 12,753.87
12,790.80
153.88 9,325.13
138.76 2,081.40

721.03 721.03

163.36 663.24
7,209.96
2,269.48 4,538.96
1,291.70 1,291.70
682.53 682.53
25.73 25.73
30.06 90.18
9.50 19.00
561.86 561.86
2,531,919.64
1,144.00
28.00 504.00
80.00 640.00
13,965.95
0.93 13,965.95
469,355.87
4.68 28,122.35
4.85 22,729.77
6.57 28,392.58
1.43 8,592.94
1.91 8,951.31

2.30 9,939.57

3.67 17,199.64
8.89 38,418.58
9.97 46,724.90

15.95 68,928.72

7.76 46,630.23

6.99 74,762.24
11.44 69,963.04
323,188.80
28.44 293,802.26

6.80 29,386.54
499,473.35
9.41 12,926.52
31.13 336,708.31
39.70 95,512.25
57.12 22,927.97
67.31 1,346.20
7.65 10,508.04
1.28 13,844.74
1.94 4,667.35
2.41 967.37
3.23 64.60
28,950.08
59.45 416.15
133.82 3,880.78
45.85 91.70
59.81 2,093.35
139.72 1,397.20
354.84 354.84
30.08 511.36
42.51 850.20
62.28 186.84
87.71 263.13
21.76 174.08
22.76 318.64
26.76 107.04
24.37 194.96
56.48 282.40
30.18 90.54
64.84 129.68
64.84 194.52
64.84 194.52
21.01 21.01
22.70 45.40
44.46 889.20
150.39 902.34
102.68 821.44
283.82 567.64
1,129.64 9,037.12
307.05 4,605.75
282.40 282.40
45.85 45.85
509,668.22
409.82 6,073.53
319,198.47
3.32 635.85
32.82 8,988.41
677.15 116,652.63
44.89 53,733.33
4.29 46,202.48
21.81 10,152.56
2,060.19 39,143.61
288.15 32,849.10
419.92 5,039.04
43.62 5,801.46
184,396.22
3.32 364.70
32.82 5,155.69
677.15 64,579.80
44.89 29,178.50
4.29 24,188.56
21.81 5,670.60
567.43 34,045.80
165.28 826.40
923.73 17,550.87
43.62 2,835.30
686,173.37
17,402.03
1.56 17,402.03
200,398.21
5.43 60,572.46
1.09 12,159.11
2.09 23,314.26
4.71 52,540.76
2.86 31,903.73
11.44 19,907.89
37,035.10
1.95 21,752.54
1.37 15,282.56
431,338.03
43.97 2,506.29
32.47 11,591.79
23.22 34,295.94
21.71 1,736.80
20.88 41,154.48
64.00 126,144.00
102.63 202,283.73
12.50 11,625.00
10,429,696.32
730,078.74
521,484.82
------------------

11,681,259.88
2,102,626.78
------------------

13,783,886.66
S10
MUNICIPALIDAD DISTRITAL DE SAN JOSE - LAMBAYEQUE - LAMBAYEQUE
Subpresupuesto 002 SISTEMA INTEGRAL DE ALCANTARILLADO Y CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS SERVIDAS.

Item Descripcin Und. Metrado

09 REDES DE ALCANTARILLADO
09.01 TRABAJOS PRELIMINARES
09.01.01 TRAZO Y NIVELACION (Inicio de Obra) m 17,279.70
09.01.02 TRAZO Y REPLANTEO( Durante ejecucion ) m 17,279.70
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION DE ZANJAS EN TERRENO NORMAL A=0.60 H=1.30 m 1,537.40
09.02.02 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=0.60 H=0 A 2 M m 1,557.20

09.02.03 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=0.60 H=0 A 2.5 M m 415.50

09.02.04 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=0.60 H=0 A 3 M m 545.00

09.02.05 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=0.60 H=0 A 3.5 M m 390.30

09.02.06 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=1 H=0 A 4 M m 214.50

09.02.07 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=1 H=0 A 4.5 M m 65.00

09.02.08 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=1 H=0 A 5 M m 133.50

09.02.09 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=1 H=0 A 5.5 M m 108.00

09.02.10 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO NORMAL A=1 H=0 A 6 M m 228.00

09.02.11 EXCAVACION CON MAQUINARIA EN TERRENO ARENOSO H=1.20 M m 3,634.00


09.02.12 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO ARENOSO A=1 H=0 A 2 M m 2,367.40

09.02.13 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO ARENOSO A=1 H=0 A 2.5 M m 802.20

09.02.14 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO ARENOSO A=1 H=0 A 3 M m 349.70

09.02.15 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO ARENOSO A=1 H=0 A 3.5 M m 320.00

09.02.16 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO ARENOSO A=1 H=0 A 4 M m 107.10

09.02.17 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO ARENOSO A=1 H=0 A 4.5 M m 78.10

09.02.18 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO ARENOSO A=1 H=0 A 5 M m 51.20

09.02.19 EXCAVACION DE ZANJAS EN TERRENO SATURADO A=0.60 H=1.40 m 1,084.90


09.02.20 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 2 M m 1,052.80

09.02.21 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 2.5 M m 206.50

09.02.22 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 3 M m 201.00

09.02.23 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 3.5 M m 106.30

09.02.24 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 4 M m 240.30

09.02.25 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 4.5 M m 444.00

09.02.26 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 5 M m 505.40

09.02.27 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 5.5 M m 339.60

09.02.28 EXCAVACION DE ZANJAS CON MAQUINARIA EN TERRENO SATURADO A=1 H=0 A 6 M m 194.80

09.02.29 REFINE MANUAL DE ZANJAS EN TERRENO NORMAL TUB D=10" PROMEDIO m 5,194.40
09.02.30 REFINE Y NIVELACIN DE ZANJAS EX. CON MAQ. EN TERRENO ARENOSO D=10 PROM. m 7,709.70

09.02.31 REFINE Y NIVELACION DE ZANJAS EN TERRENO SATURADO D=10" PROMEDIO m 4,375.60


09.02.32 CAMA DE APOYO CON ARENILLA PARA TUBERIAS A=1.00 D=10" PROM. CON MAQUINARIA m 5,194.40

09.02.33 CAMA DE APOYO PARA TUBERIA CON RIPIO CORRIENTE D=3" A=1.00 E=0.20 D=10" PROM. CON m 4,375.60
MAQUINARIA
09.02.34 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON MATERIAL PROPIO A=1.00 H=0.30 CON MAQUINARIA m 7,709.70
(D=10 PROM.) INC. LATERALES
09.02.35 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON ARENA FINA A=1.00 H=0.30 CON MAQUINARIA (D=10 m 5,194.40
PROM.) INC. LATERALES
09.02.36 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON RIPIO CORRIENTE A=1.00 H=0.30 CON MAQUINARIA m 4,375.60
(D=10 PROM.) INC. LATERALES
09.02.37 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO A=1.00 M m3 36,303.44
09.02.38 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 151.70
09.02.39 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 13,734.74
09.03 ENTIBADO DE ZANJAS Y DEPRECION DE NIVEL FREATICO
09.03.01 ENTIBADO DE ZANJAS CON TABLESTACAS DE METAL (ARBED SHEET PILES) DE 0 HASTA 2M und 8,139.10

09.03.02 ENTIBADO DE ZANJAS CON TABLESTACAS DE METAL (ARBED SHEET PILES) DE 0 HASTA 3M m 1,559.40

09.03.03 ENTIBADO DE ZANJAS CON TABLESTACAS DE METAL (ARBED SHEET PILES) DE 0 HASTA 4M m 773.70

09.03.04 ENTIBADO DE ZANJAS CON TABLESTACAS DE METAL (ARBED SHEET PILES) DE 0 HASTA 5M m 1,078.70

09.03.05 ENTIBADO DE ZANJAS CON TABLESTACAS DE METAL (ARBED SHEET PILES) DE 0 HASTA 6M m 534.40

09.03.06 ENTIBADO DE ZANJAS CON MADERA EN TERRENO ESTABLE DE 2 HASTA 3M m 960.50


09.03.07 ENTIBADO DE ZANJAS CON MADERA EN TERRENO ESTABLE DE 2 HASTA 4M m 604.80
09.03.08 ENTIBADO DE ZANJAS CON MADERA EN TERRENO ESTABLE DE 2 HASTA 5M m 198.50
09.03.09 ENTIBADO DE ZANJAS CON MADERA EN TERRENO ESTABLE DE 2 HASTA 6M m 336.00
09.03.10 BOMBEO DE AGUAS SERVIDAS GLB 1.00
09.03.11 DRENAJE DE ZANJAS DE H=0 A 2M m 2,137.70
09.03.12 DRENAJE DE ZANJAS DE H=2 A 6M m 2,237.90
09.04 TUBERIAS
09.04.01 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-25 DN200mm x 6.00m m 14,648.80
09.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4435 S-25 DN 250MM X 6M m 677.00
09.04.03 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-20 DN315mm x 6.00m m 1,210.00
09.04.04 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-20 DN400mm x 6.00m m 739.00
09.04.05 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-20 DN450mm x 6.00m m 4.50
09.04.06 PRUEBA HIDRAULILA EN TUBERIAS DE DESAGUE DN200MM 8" m 14,648.80
09.04.07 PRUEBA HIDRAULICA EN TUBERIA DE DESAGUE DN250MM D=10" m 677.00
09.04.08 PRUEBA HIDRAULICA EN TUBERIA DE DESAGUE DN 315MM 12" m 1,210.00
09.04.09 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGUE DN 400MM 16" m 739.00
09.05 BUZONES
09.05.01 LIMPIEZA DE BUZONES EXISTENTES und 58.00
09.05.02 RESANE Y CONSTRUCCIOND/TECHO P/BUZON EXIST H hasta 2.00m (e=2cm Mortero 1:10 C.MS) und 38.00

09.05.03 RESANE Y CONSTRUCCIOND/TECHO P/BUZON EXIST H hasta 3.00m (e=2cm Mortero 1:10 C.MS) und 13.00

09.05.04 RESANE Y CONSTRUCCIOND/TECHO P/BUZON EXIST H hasta 4.00m (e=2cm Mortero 1:10 C.MS) und 4.00

09.05.05 RESANE Y CONSTRUCCIOND/TECHO P/BUZON EXIST H hasta 5.00m (e=2cm Mortero 1:10 C.MS) und 2.00

09.05.06 RESANE Y CONSTRUCCIOND/TECHO P/BUZON EXIST H hasta 6.00m (e=2cm Mortero 1:10 C.MS) und 1.00

09.05.07 DEMOLICION DE BUZON EXISTENTE und 248.00


09.05.08 BUZON DE CONCRETO FC=245 KG/CM2 HASTA 1.50M und 123.00
09.05.09 BUZON DE CONCRETO FC=245 KG/CM2 DE 1.51M HASTA 2.00 M und 42.00
09.05.10 BUZON DE CONCRETO FC=245 KG/CM2 DE 2.01M HASTA 2.50 M und 14.00
09.05.11 BUZON DE CONCRETO FC=245 KG/CM2 DE 2.51M HASTA 3.00 M und 15.00
09.05.12 BUZON DE CONCRETO FC=245 KG/CM2 DE 3.01M HASTA 3.50 M und 11.00
09.05.13 BUZON DE CONCRETO FC=245 KG/CM2 DE 3.51M HASTA 4.00 M und 12.00
09.05.14 BUZON DE CONCRETO FC=245 KG/CM2 DE 4.01M HASTA 4.50 M und 8.00
09.05.15 BUZON DE CONCRETO FC=245 KG/CM2 DE 4.51M HASTA 5.00 M und 11.00
09.05.16 BUZON DE CONCRETO FC=245 KG/CM2 DE 5.01M HASTA 5.50 M und 7.00
09.05.17 BUZON DE CONCRETO FC=245 KG/CM2 DE 5.51M HASTA 6.00 M und 5.00
09.05.18 EMPALME DE BUZON Y CONSTRUCCION DE DADO DE CONCRETO TIPO V 0.55X0.55X0.55M und 653.00
09.06 VARIOS
09.06.01 PROTECCION DE POSTES DE TENDIDO ELECTRICO Y TELEFONIA und 195.00
10 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
10.01 TRABAJOS PRELIMINARES
10.01.01 TRAZO Y REPLANTEO( Durante ejecucion ) m 11,391.05
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION CON MAQUINARIA EN TERRENO ARENOSO H=1.20 M m 7,126.03
10.02.02 EXCAVACION DE ZANJAS EN TERRENO NORMAL A=0.60 H=1.30 m 1,718.16
10.02.03 EXCAVACION DE ZANJAS EN TERRENO SATURADO A=0.60 H=1.40 m 2,546.86
10.02.04 REFINE MANUAL DE ZANJAS EN TERRENO NORMAL m 1,718.16
10.02.05 REFINE Y NIVELACION DE ZANJAS EX. CON MAQ. EN TERRENO ARENOSO m 7,126.03
10.02.06 REFINE Y NIVELACION DE ZANJAS EN TERRENO SATURADO A=0.60 m 2,546.86
10.02.07 CAMA DE APOYO CON ARENILLA PARA TUBERIAS DE 4" A 8" m 1,718.16
10.02.08 CAMA DE APOYO CON RIPIO CORRIENTE DE 3/4" PARA TUBERIAS DE 4 A 8" m 2,546.86
10.02.09 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO H=0.30 CON MAQUINARIA (D=4 A 8") m 7,126.03

10.02.10 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON RIPIO CORRIENTE A=0.60 H=0.30M CON MAQUINARIA m 2,546.86
INC/LATERALES
10.02.11 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON MATERIAL PROPIO A=0.60 H=0.30 CON MAQUINARIA m 7,126.03
INC. LATERALES
10.02.12 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO m 11,391.05
10.02.13 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 2,028.35
10.03 TUBERIAS
10.03.01 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-25 DN160mm x 6.00m m 11,391.05
10.03.02 DOBLE PRUEBA HIDRAULICA P/ TUBERIA D/160mm m 11,391.05
10.04 VARIOS
10.04.01 SUMINISTRO E INSTAL. CAJA Y TAPA DE REGISTRO ALC. PRE FABRIC u 1,979.00
10.04.02 SUMINISTRO DE ACCESORIOS PARA CONEXIONES DOMICILIARIAS DE DESAGUE DE 6" A 8" und 1,940.00

10.04.03 SUMINISTRO DE ACCESORIOS PARA CONEXIONES DOMICILIARIAS DE DESAGUE DE 6" A 10" und 7.00

10.04.04 SUMINISTRO DE ACCESORIOS PARA CONEXIONES DOMICILIARIAS DE DESAGUE DE 6" A 12" und 32.00

10.04.05 SUMINISTRO DE ACCESORIOS PARA CONEXIONES DOMICILIARIAS DE DESAGUE DE 6" A 16" und 2.00

10.04.06 DADO DE CONCRETO DE 0.55X0.55X0.55 M PARA EMPALME DE CONEXIONES DOMICILIARIAS DE ALC. und 1,940.00
200.MM
10.04.07 DADO DE CONCRETO DE 0.60X0.60X0.60M PARA EMPALME DE CONEXIONES DOMICILIARIAS ALC. 250MM und 7.00

10.04.08 DADO DE CONCRETO DE 0.65X0.65X0.65M PARA EMPALME DE CONEXIONES DOMICILIARIAS ALC. 315MM und 32.00

10.04.09 DADO DE CONCRETO DE 0.80X0.80X080 PARA EMPALME DE CONEXIONES DOMICILIARIAS ALC. 400MM und 2.00

10.04.10 DADO DE ANCLAJE DE 0.4X0.4X0.4 PARA CONEXIONES DOMICILIARIAS und 1,979.00


10.05 MEDIDAS DE MITIGACION EN IMPACTO AMBIENTAL
10.05.01 REUTILIZACION DE MATERIAL DE DESMONTE PARA RELLENOS m3 2,750.00
10.05.02 RIEGO DE AREAS DE TRABAJO Y VIAS DE TRANSPORTE m2 30,000.00
10.05.03 ADECUACION DE PATIO DE MAQUINAS DE 20X20 M, CON ALAMBRE DE PUAS GLB 1.00
10.05.04 AVISO Y SUSPENSION DEL SERVICIO DE DESAGUE DOMICILIARIO und 1.00
10.05.05 CUBRIMIENTO DE TUBERIAS DE CONCRTO SIMPLE NORMALIZADO EXTRAIDAS Y ELIMINADAS m3 400.00

10.05.06 FUMIGACION PERIODICA CONTRA LA MALARIA GLB 1.00


10.05.07 VACUNAS Y CONTROL PERIODICO DE MALARIA Y OTROS GLB 1.00
10.05.08 INSTALACION DE BAOS QUIMICOS und 12.00
10.05.09 CHARLAS PREVENTIVAS DE EDUCACION SANITARIA Y OPERACION Y MANTENIMIETO GLB 1.00

10.05.10 MONITOREO DE AGUA, AIRE, SUELO, SONIDO, ETC GLB 1.00


10.05.11 EVALUACION ARQUEOLOGICA GLB 1.00
10.06 CAPACITACIONES
10.06.01 CAPACITACION EN EDUCACION SANITARIA mes 10.00
11 MANTENIMIENTO DE CAMARA DE BOMBEO Y CONSTRUCCION DE CERCO PERIMETRICO

11.01 CAMARA DE REJAS


11.01.01 TRABAJOS PRELIMINARES
11.01.02 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 39.81
11.01.03 MOVIMIENTO DE TIERRAS
11.01.03.01 EXCAVACION MANUAL DENTRO DE ELEMENTOS DE CONCRETO TIPO CAISON - INCLUYE WINCHE m3 34.61

11.01.03.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 24.46


11.01.03.03 RELLENO Y APISONADO DE ZANJAS CON MATERIAL PROPIO m3 12.03
11.01.03.04 CONFORMACION Y COMPACTACION BASE DE PISOS CON AFIRMANDO E=0.20 M m2 9.54

11.01.03.05 RELLENO DE POZO PERCOLADOR CON MATERIAL GRANUNAR D=2" PROM. m3 2.59
11.01.03.06 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 76.79
11.01.03.07 DEPRESION DE NIVEL FREATICO CON BOMBEO h 48.00
11.01.04 OBRAS DE CONCRETO SIMPLE
11.01.04.01 SOLADO DE CONCRETO FC=140KG/CM2 CEMENTO TIPO V E=10" m2 2.56
11.01.04.02 CIMIENTOS CORRIDOS CON CEMENTO V MS C;H 1:10 + 30 / PM m3 2.71
11.01.04.03 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 9.36
11.01.04.04 CONCRETO FC=210KG/CM2 CEMENTO TIPO V EN SOBRECIMIENTOS m3 0.50
11.01.04.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 6.60
11.01.04.06 CONCRETO FC=210KG/CM2 CEMENTO TIPO V EN SARDINELES m3 2.57
11.01.04.07 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 22.80
11.01.05 OBRAS DE CONCRETO ARMADO
11.01.05.01 CONCRETO FC=210KG/CM2 CEMENTO TIPO V EN ZAPATAS m3 5.12
11.01.05.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 6.40
11.01.05.03 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 30.60
11.01.05.04 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 1.11
11.01.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 14.98
11.01.05.06 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 122.57
11.01.06 CAISON CAMARA DE REJAS
11.01.06.01 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V EN CAISON m3 8.56
11.01.06.02 ENCOFRADO Y DESENCOFRADO DE CAISON m2 79.73
11.01.06.03 ACERO FY=4200 KG/CM2 EN CAISON kg 441.11
11.01.07 TECHO Y COVERTURAS
11.01.07.01 VIGA DE MADERA DE 4X4" m 13.00
11.01.07.02 CORREA DE MADERA DE 3X3" m 18.00
11.01.07.03 COBERTURA DE ETERNIT GRAN ONDA 2.44X1.10X4MM m2 19.50
11.01.08 MUROS Y TABIQUES DE ALBAILERIA
11.01.08.01 MURO DE LADRILLO KING KONG TIPO IV, DE SOGA. m2 19.98
11.01.09 REVOQUES Y ENLUCIDOS
11.01.09.01 TARRAJEO EN EXTERIORES C:A (1:5) m2 42.40
11.01.09.02 TARRAJEO DE COLUMNAS (INC. ARISTAS) m2 11.04
11.01.10 PISOS Y PAVIMENTOS
11.01.10.01 PISO DE PATIO DE MANIOBRAS CONCRETO FC=210 KG/CM2 CONCRETO TIPO V FROTACHADO E=0.15 m2 30.39

11.01.11 CARPINTERIA DE MADERA


11.01.11.01 PUERTA CONTRAPLACADA DE 48 MM CON TRIPLAY 4MM INCLUYE MARCO DE CEDRO m2 1.89

11.01.11.02 VENTANA BATIENTE DE MADERA m2 0.54


11.01.12 PINTURA
11.01.12.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 53.44
11.01.13 VARIOS
11.01.13.01 CANASTILLA METALICA PARA CAMARA DE REJAS und 1.00
11.01.13.02 TECLE DE 1000 KG (CON TRATAMIENTO EPOXICO und 1.00
11.01.13.03 TUBERIA DE FG 3" PARA BARRA FIJA DE TECLE m 2.80
11.02 MANTENIMIENTO DE CAMARA DE BOMBEO
11.02.01 TRABAJOS PRELIMINARES
11.02.01.01 CORTE DE LOSA ARMADA PARA ACONDICIONAMIENTO DE EQUIPOS m2 3.45
11.02.01.02 DEMOLICION DE LOSA DE TECHO DE CONCRETO m2 2.88
11.02.01.03 DEMOLICION DE MUROS DE LADRILLO m2 41.00
11.02.01.04 DEMOLICION DE MURO CAISON P/BY-PASS DE COMUNICACION DE CAMARAS m2 2.88
11.02.01.05 DEMOLICION DE MURO CAISON PARA VENTILACION m2 2.88
11.02.01.06 LIMPIEZA Y HABILITACION DE CAMARA HUMEDA und 1.00
11.02.01.07 LIMPIEZA Y HABILITACION DE CAMARA SECA und 1.00
11.02.01.08 DESMONTAJE DE TECHO DE CALAMINA GRAN ONDA CON VIGAS DE MADERA m2 40.60
11.02.01.09 ESCARIFICADO DE TARRAJEO EXISTENTE CAMARA DE BOM m2 387.00
11.02.01.10 ESCARIFICADO DE FONDO DE CAMARA DE BOMBEO m2 50.27
11.02.01.11 DESMONTAJE DE PUERTAS Y VENTANAS und 3.00
11.02.02 OBRAS DE CONCRETO ARMADO
11.02.02.01 SOBRECIMIENTO ARMADO
11.02.02.01.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 0.89
11.02.02.01.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 11.85
11.02.02.01.03 ACERO FY=4200 KG/CM2 kg 16.46
11.02.02.02 DUCTO PARA IZAJE DE ELECTROBOMBAS
11.02.02.02.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 0.52
11.02.02.02.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 3.28
11.02.02.02.03 ACERO FY=4200 KG/CM2 kg 51.20
11.02.02.03 TAPA DE CONCRETO ARMADO
11.02.02.03.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 0.91
11.02.02.03.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 8.58
11.02.02.03.03 ACERO FY=4200 KG/CM2 kg 112.45
11.02.03 MUROS Y TABIQUES DE ALBAILERIA
11.02.03.01 MURO DE LADRILLO KING KONG TIPO IV, DE SOGA. m2 63.51
11.02.04 REVOQUES Y ENLUCIDOS
11.02.04.01 TARRAJEO EN EXTERIORES E INTERIORES (MORTERO 1:5) m2 222.20
11.02.04.02 TARRAJEO DE CIELO RAZO C:A 1:5 INCLUYE VIGAS EMPOTRADAS m2 65.60
11.02.04.03 TARRAJEO EN INTERIOR CAISON CON IMPERMEABILIZANTE C:A 1:3 E=2CM m2 388.40
11.02.05 TECHO Y COVERTURAS
11.02.05.01 VIGAS DE MADERA DE 4"X6" m 16.00
11.02.05.02 CORREAS DE MADERA DE 3X4" m 22.00
11.02.05.03 COBERTURA DE ETERNIT GRAN ONDA 2.44X1.10X4MM m2 22.13
11.02.05.04 CANALETA DE DRENAJE PLUVIAL (Inc. instalacin) m 8.50
11.02.06 PINTURA
11.02.06.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 190.00
11.02.06.02 PINTURA LATEX DOS MANOS EN CIELO RASO Y VIGAS m2 65.60
11.02.07 CARPINTERIA DE MADERA
11.02.07.01 PUERTA DE MADERA DE CEDRO MACISA E=48MM INCLUYE MARCO m2 2.10
11.02.07.02 VENTANAS DE MADERA m2 5.85
11.02.08 VIDRIOS, CRISTALES Y SIMILARES
11.02.08.01 VIDRIO SEMI DOBLE DE 6MM LAMINADO p2 50.35
11.02.09 CERRAJERIA
11.02.09.01 CERRADURA PARA PUERTA PRINCIPAL und 1.00
11.02.10 VARIOS
11.02.10.01 PUERTA DE FIBRA DE VIDRIO DE 1MX1M und 2.00
11.02.10.02 MARCO Y MALLA DE FIERRO GALVANIZADO PARA DUCTO DE VENTILACION DE 1.20X60 und 2.00

11.03 CASETA DE VALVULAS DE CAMARA DE BOMBEO


11.03.01 TRABAJOS PRELIMINARES
11.03.02 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 19.45
11.03.03 MOVIMIENTO DE TIERRAS
11.03.03.01 EXCAVACION CON RETROEXCAVADORA m3 29.18
11.03.03.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 7.34
11.03.03.03 CONFORMACION DE SUB RASANTE CON EQUIPO LIVIANO m2 19.45
11.03.03.04 RELLENO CON MATERIAL DE PRESTAMO EN CAPAS DE 0.20M m3 29.18
11.03.03.05 RELLENO CON MATERIAL PROPIO EN CAPAS DE 0.20M m3 2.67
11.03.03.06 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 47.47
11.03.04 OBRAS DE CONCRETO SIMPLE
11.03.04.01 CIMIENTOS CORRIDOS CON CEMENTO V MS C;H 1:10 + 30 / PM m3 3.67
11.03.04.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 13.34
11.03.05 OBRAS DE CONCRETO ARMADO
11.03.05.01 SOBRECIMIENTO CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 1.30
11.03.05.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 17.34
11.03.05.03 ACERO FY=4200 KG/CM2 EN SOBRECIMIENTOS kg 434.63
11.03.05.04 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 2.21
11.03.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 31.71
11.03.05.06 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 200.47
11.03.06 MUROS Y TABIQUES DE ALBAILERIA
11.03.06.01 MURO DE LADRILLO KING KONG TIPO IV, DE SOGA. m2 34.86
11.03.06.02 TARRAJEO EN EXTERIORES E INTERIORES (MORTERO 1:5) m2 73.64
11.03.07 COBERTURAS
11.03.07.01 VIGAS DE MADERA DE 4"X6" m 6.69
11.03.07.02 CORREAS DE MADERA DE 3X4" m 5.91
11.03.07.03 COBERTURA DE ETERNIT GRAN ONDA 2.44X1.10X4MM m2 17.59
11.03.07.04 CANALETA DE DRENAJE PLUVIAL (Inc. instalacin) m 5.91
11.03.08 PISOS Y PAVIMENTOS
11.03.08.01 PISO DE CONCRETO PULIDO SIN COLOREAR E=10CM CEM. TIPO II MS m2 18.77
11.03.09 PINTURA
11.03.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 73.64
11.03.10 CARPINTERIA DE MADERA
11.03.10.01 PUERTA DE MADERA DE CEDRO MACISA E=48MM INCLUYE MARCO m2 3.60
11.03.11 CERRAJERIA
11.03.11.01 CERRADURA PARA PUERTA PRINCIPAL und 1.00
11.03.12 VARIOS
11.03.12.01 SUMINISTRO DE TECLE 2TN und 1.00
11.03.12.02 BARRA PARA TECLE TUBO FG 3" CON SOPORTES PARA DESPLAZAMIENTO und 1.00
11.04 EQUIPAMIENTO Y ACCESORIOS DE CONTROL DE CASETA DE VALVULAS CAISION

11.04.01 TRABAJOS PRELIMINARES


11.04.01.01 TRAZO Y REPLANTEO PRELIMINAR DE TUBERIAS m 45.00
11.04.02 TUBERIA DE ACERO
11.04.02.01 TUBERIA DE ACERO CEDULA 40 DE 8" (200MM )_x000D_ m 39.00
11.04.02.02 BRIDA PARA SOLDAR DE 8" (200MM )_x000D_ und 30.00
11.04.02.03 TUBERIA DE ACERO CEDULA 40 D=16" (400MM) m 6.00
11.04.02.04 BRIDA DE ACERO 16" 400MM PARA SOLDAR Y EMPERNAR und 5.00
11.04.02.05 PRUEBA HIDRAULICA EN TUBERIA D=12" m 45.00
11.04.03 VALVULAS Y ACCESORIOS
11.04.03.01 VALVULA DE CONTROL BRIDADA DE 8" (200MM )_x000D_ und 3.00
11.04.03.02 VALVULA CHEK BRIDADA DE 8" (200MM) und 3.00
11.04.03.03 UNION FLEXIBLE TIPO DRESSER DE 8" (200MM )_x000D_ und 3.00
11.04.03.04 CODO DE FIERRO FUNDIDO BRIDADO 90 X 8" (200MM )_x000D_ und 7.00
11.04.03.05 TEE DE FIERRO FUNDIDO BRIDADO 16" (400MM ) A 8" (200) und 1.00
11.04.03.06 TEE DE FIERRO FUNDIDO BRIDADO 12" (310MM ) A 8" (200) und 1.00
11.04.03.07 REDUCCION DE FIERRO FUNDIDO BRIDADO DE 16"(400MM) A 12" (315MM) und 1.00
11.04.03.08 REDUCCION DE FIERRO FUNDIDO BRIDADO DE 12" (315MM) A 10" (250MM) und 1.00
11.04.03.09 TEE DE FIERRO FUNDIDO BRIDADO DE 10" (250MM ) A 8" (200) und 1.00
11.04.03.10 REDUCCION DE FIERRO FUNDIDO BRIDADO DE 10"(250MM) A 8" (200MM) und 1.00
11.04.03.11 CODO DE FIERRO FUNDIDO BRIDADO 45 X16" (400MM ) und 2.00
11.04.03.12 UNION FLEXIBLE TIPO DRESSER DE 16" (400MM) und 1.00
11.04.03.13 PUESTA EN MARCHA DEL SISTEMA ELECTRICO Y DE BOMBEO DE LA CAMARA DE REUNION GLB 1.00

11.04.03.14 MANOMETRO DE 0 A 300 LBS und 3.00


11.05 CERCO PERIMETRICO Y CASETA DE VIGILANCIA
11.05.01 TRABAJOS PRELIMINARES
11.05.01.01 LIMPIEZA DE TERRENO m2 140.00
11.05.01.02 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 140.00
11.05.02 MOVIMIENTO DE TIERRAS
11.05.02.01 CORTE DE TERRENO CON MAQUINARIA PARA EXPLANACION. m3 130.99
11.05.02.02 EXCAVACION MANUAL DE ZANJAS PARA CIMENTACION m3 128.75
11.05.02.03 RELLENO Y APISONADO DE ZANJAS CON MATERIAL PROPIO m3 25.88
11.05.02.04 RELLENO Y COMPACTACION A NIVEL DE RASANTE DE TERRENO m3 348.34
11.05.02.05 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 304.05
11.05.02.06 RELLENO AREAS LIBRES DE PATIOS CON MATERIAL GRANULAR m3 19.15
11.05.02.07 TERRENO DE CHACRA PARA CULTIVO m3 168.00
11.05.03 OBRAS DE CONCRETO SIMPLE
11.05.03.01 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 48.60
11.05.03.02 SUB ZAPATAS CONCRETO FC=140 KG/CM2 CON CEMENTO TIPO V H=0.30 M m3 12.90
11.05.03.03 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 189.73
11.05.03.04 CIMIENTOS CORRIDOS CON CEMENTO V MS C;H 1:10 + 30 / PM m3 55.95
11.05.03.05 LOSA DE CONCRETO FC=210KG/CM2 CEMENTO TIPO V EN RAMPA DE INGRESO m2 5.80

11.05.03.06 ENCOFRADO Y DESENCOFRADO DE SARDINELES m2 61.80


11.05.03.07 SARDINELES DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V H=50 m3 6.95
11.05.04 OBRAS DE CONCRETO ARMADO
11.05.04.01 CONCRETO FC=175KG/CM2 CEMENTO TIPO V EN ZAPATAS m3 21.50
11.05.04.02 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 81.00
11.05.04.03 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 467.57
11.05.04.04 SOBRECIMIENTOS CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 16.19
11.05.04.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 158.64
11.05.04.06 ACERO FY=4200 KG/CM2 EN VIGAS DE CIMENTACION kg 813.39
11.05.04.07 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 10.62
11.05.04.08 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 108.87
11.05.04.09 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 1,085.42
11.05.04.10 VIGAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 6.59
11.05.04.11 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 66.14
11.05.04.12 ACERO FY=4200 KG/CM2 EN VIGAS kg 852.08
11.05.05 MUROS Y TABIQUES DE ALBAILERIA
11.05.05.01 MURO DE LADRILLO KING KONG TIPO IV DE SOGA/CARA VISTA m2 310.05
11.05.05.02 MURO DE LADRILLO KING KONG TIPO IV, DE CABEZA. m2 27.91
11.05.06 REVOQUES Y ENLUCIDOS
11.05.06.01 TARRAJEO EN INTERIORES C:A (1:5) m2 81.27
11.05.06.02 TARRAJEO EN EXTERIORES C:A (1:5) m2 15.77
11.05.06.03 TARRAJEO DE COLUMNAS (INC. ARISTAS) m2 108.87
11.05.06.04 TARRAJEO DE VIGAS (INC ARISTAS) m2 63.86
11.05.06.05 VESTIDURA DE DERRAMES ANCHO=15CM m 21.00
11.05.07 PISOS Y PAVIMENTOS
11.05.07.01 LOSA DE CONCRETO FC=210KG/CM2 CEMENTO TIPO V E=20CM m2 66.50
11.05.07.02 FALSO PISO DE CONCRETO FC=140 KG/CM2 CEMENTO TIPO V E=10CM m2 19.50
11.05.07.03 PISO DE CONCRETO SIN COLOREAR, PULIDO, BRUADO E=2" CEMENTO TIPO V m2 19.50

11.05.07.04 VEREDAS DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=10CM m2 48.95


11.05.08 COBERTURAS
11.05.08.01 CORREAS DE MADERA DE 3X4" m 7.20
11.05.08.02 COBERTURA DE ETERNIT GRAN ONDA 3.05 X 1.10M X 4MM m2 27.60
11.05.09 CARPINTERIA DE MADERA
11.05.09.01 PUERTA CONTRAPLACADA DE 48 MM CON TRIPLAY 4MM INCLUYE MARCO DE CEDRO m2 2.52

11.05.09.02 PUERTA CONTRAPLACADA DE 40MM CON TRIPLAY 4MM (INCL VIDRIO) PARA SSHH m2 3.92

11.05.09.03 VENTANAS DE MADERA m2 2.48


11.05.10 CARPINTERIA METALICA
11.05.10.01 PUERTA METALICA CON PLANCHA ACANALDA GALVANIZADA DE 2MM DE 3.50X3.55M INC/MONTAJE und 1.00

11.05.11 VIDRIOS, CRISTALES Y SIMILARES


11.05.11.01 VIDRIO SEMI DOBLE DE 6MM LAMINADO p2 26.64
11.05.12 CERRAJERIA
11.05.12.01 CERRADURA PARA PUERTA PRINCIPAL und 1.00
11.05.12.02 CERRADURA PARA PUERTAS INTERIORES und 2.00
11.05.12.03 CERRADURA PARA PUERTA DE BAO und 1.00
11.05.12.04 CANDADO DE 3" und 3.00
11.05.13 APARATOS SANITARIOS
11.05.13.01 INODORO TANQUE BAJO BLANCO und 1.00
11.05.13.02 LABATORIO DE COLOR BLANCO 1 LLAVE und 1.00
11.05.13.03 LAVATORIO DE GRANITO PARA LAVANDERIA und 1.00
11.05.13.04 DUCHA CROMADA 1 LLAVE INCL. ACCESORIOS und 1.00
11.05.13.05 JABONERA DE LOSA PARA DUCHA und 1.00
11.05.13.06 PAPELERA DE LOSA Y TOALLERA CON BARRAS PLASTICAS und 1.00
11.05.14 INSTALACIONES SANITARIAS
11.05.14.01 RED DE AGUA
11.05.14.01.01 CONEXION A LA RED PUBLICA und 1.00
11.05.14.01.02 TUBERIA PVC C-10 D=1/2" m 13.50
11.05.14.01.03 CODO PVC 1/2"X90 und 6.00
11.05.14.01.04 CODO DE FG 1/2"90 und 4.00
11.05.14.01.05 TEE PVC 1/2" und 3.00
11.05.14.01.06 VALVULA COMPUERTA DE 1/2" und 2.00
11.05.14.01.07 CAJA DE MEDIDOR DE AGUA und 1.00
11.05.14.02 RED DE DESAGUE
11.05.14.02.01 TUBERIA PVC SAL 2" m 5.00
11.05.14.02.02 TUBERIA PVC SAL 4" m 18.25
11.05.14.02.03 SALIDA DE PVC SAL PARA VENTILACION DE 2" und 1.00
11.05.14.02.04 SALIDA DE PVC SAL PARA DESAGUE DE 2" und 4.00
11.05.14.02.05 SALIDA DE PVC SAL 4" und 2.00
11.05.14.02.06 YEE PVC SAL 4"X2" und 3.00
11.05.14.02.07 TEE PVC SAL 4" und 1.00
11.05.14.02.08 TEE PVC SAL 4X2" und 1.00
11.05.14.02.09 CODO PVC SAL 2"X45 und 2.00
11.05.14.02.10 TRAMPA "P" DE PVC SAL DESAGUE 2" und 2.00
11.05.14.02.11 SUMIDERO DE BRONCE 2" und 2.00
11.05.14.02.12 REGISTRO DE BRONCE 4" und 1.00
11.05.14.02.13 CAJA DE REGISTRO DE DESAGUE 0.30X0.30X0.60 (HASTA 3 CUERPOS) und 1.00
11.05.14.02.14 PRUEBA HIDRAULICA PARA DESAGUE GLB 1.00
11.05.15 PINTURA
11.05.15.01 PINTURA LATEX DOS MANOS EN CIELO RASO Y VIGAS m2 172.74
11.05.15.02 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS INC. BASE m2 97.04
11.05.15.03 PINTURA EN MUROS EXTERIORES CARAVISTA 2 MANOS INCLUYE BASE_x000D_ m2 301.21
11.05.15.04 PINTURA ESMALTE DOS MANOS EN SARDINELES m2 33.99
11.05.16 VARIOS
11.05.16.01 SEMBRADO DE PLANTAS HORNAMENTALES und 37.00
12 LINEA DE IMPULSION
12.01 TRABAJOS PROVICIONALES
12.01.01 LETREROS DE DESVIO TRIPLAY 8 MM DE 1.20X0.60 und 3.00
12.02 OBRAS PRELIMINARES
12.02.01 TRAZO Y REPLANTEO PRELIMINAR DE TUBERIAS m 1,660.00
12.03 MOVIMIENTO DE TIERRAS
12.03.01 EXCAVACION CON MAQUINARIA EN TERRENO CON ESCOMBROS A=0.60 H=1.40 m 300.00
12.03.02 EXCAVACION DE ZANJAS EN TERRENO ARENOSO A=0.60 H=1.40 m 854.00
12.03.03 EXCAVACION DE ZANJAS EN TERRENO SATURADO A=0.60 H=1.40 m 506.00
12.03.04 REFINE Y NIVELACION DE ZANJAS EX. CON MAQ. EN TERRENO ARENOSO m 1,154.00
12.03.05 REFINE Y NIVELACION DE ZANJAS EN TERRENO SATURADO m 506.00
12.03.06 CAMA DE APOYO CON ARENILLA PARA TUBERIAS D=10" A 12" CON MAQUINARIA m 1,154.00

12.03.07 CAMA DE APOYO PARA TUBERIA CON RIPIO CORRIENTE E=0.20M CON MAQUINARIA EN TERRENO m 506.00
SATURADO
12.03.08 RELLENO SOBRE CLAVE DE TUBO DE ZANJAS CON MAQUINARIAS PARA TUBERIAS D=12" INCLUYE m 1,154.00
LATERALES
12.03.09 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON RIPIO CORRIENTE A=0.60 H=0.30 CON MAQUINARIA m 506.00
(D=10 PROM.)
12.03.10 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO m 1,154.00
12.03.11 RELLENO Y COMPACTACION DE ZANJAS A=0.60 M CON ARENILLA m 506.00
12.03.12 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 1,333.83
12.04 INSTALACIONES SANITARIAS
12.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-ISO 400MM CL 10 m 1,660.00
12.04.02 PRUEBA HIDRAULICA EN TUBERIA DN 400MM 16" und 1,660.00
12.05 ACCESORIOS
12.05.01 SUMINISTRO E INSTALACION DE CODO PVC CL-10 400 MM X 45 und 8.00
12.05.02 SUMINISTRO E INSTALACION DE CODO PVC CL-10 400 MM X 22.5 und 5.00
12.05.03 DADO DE ANCLAJE PARA ACCESORIOS m3 3.76
12.06 VARIOS
12.06.01 DRENAJE DE ZANJAS DE H=0 A 2M m 506.00
12.06.02 ENTIBADO DE ZANJAS CON TABLESTACAS DE METAL (ARBED SHEET PILES) DE 0 HASTA 2M m 500.00

12.06.03 EMBALSE DE DREN PARA REALIZACION DE TRABAJOS DE INSTALACION DE TUBERIA GLB 1.00

13 LAGUNA DE ESTABILIZACION
13.01 TRABAJOS PRELIMINARES
13.01.01 CASETA DE ALMACEN Y GUARDIANIA CON TRIPLAY Y PARANTES DE MADERA TORNILLO APROX 25M2 + m2 25.00
CALAMINA
13.01.02 TRAZO Y REPLANTEO Y CONTROL TOPOGRAFICO DE ESTRUCTURAS m2 42,900.00
13.02 MOVIMIENTO DE TIERRAS
13.02.01 CORTE DE TERRENO SATURADO CON MAQUINARIA m3 16,432.38
13.02.02 CONFORMACION Y MEJORAMIENTO DE FONDO DE LAGUNA CON MATERIAL GRANULAR 4" PROM. m2 27,372.74

13.02.03 CONFORMACION MASIVA DE DIQUE CON AFIRMANDO m3 31,710.23


13.02.04 CONFORMACION DE LECHO DE LAGUNA CON AFIRMADO H=0.20M_x000D_ m2 4,011.21
13.02.05 CONFORMACION DE CAPA IMPERMEABILIZANTE DE ARCILLA EN FONDO DE LAGUNA E=0.10 m2 2,041.56

13.02.06 REFINE FINAL DE TALUDES m2 13,312.18


13.02.07 NIVELACION DE CORONA DE DIQUE m2 11.60
13.02.08 EXCAVACION DE ZANJAS PARA SUJECION DE GEOMEMBRANA A=0.60 F=0.4 H=0.80 m 267.96

13.02.09 RELLENO DE ZANJA CON MATERIAL PROPIO C/MAQUINARIA m 267.96


13.02.10 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 21,362.09
13.02.11 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 21,362.09
13.03 IMPERMEABILIZACIN CON GEOMEMBRANA
13.03.01 IMPERMEABILIZACION DE TALUD DE DIQUES CON GEOMEMBRANA m2 11,890.49
13.03.02 IMPERMEABILIZACION DE FONDO DE LAGUNA CON GEOMEMBRANA m2 20,536.12
13.04 CAMARA DE REJAS Y CANAL DE INGRESO
13.04.01 TRABAJOS PRELIMINARES
13.04.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 13.50
13.04.02 MOVIMIENTO DE TIERRAS
13.04.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO DURO m3 5.35
13.04.02.02 ACARREO DE MATERIAL EXCEDENTE HASTA PROM 30M m3 6.96
13.04.03 OBRAS DE CONCRETO SIMPLE
13.04.03.01 SOLADO DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=3" m2 10.92
13.04.04 OBRAS DE CONCRETO ARMADO
13.04.04.01 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 5.38
13.04.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 39.62
13.04.04.03 ACERO FY=4200 KG/CM2 kg 236.40
13.04.05 REVOQUES Y ENLUCIDOS
13.04.05.01 TARRAJEO CON IMPERMEABILIZANTE 1:1 E=1.5 CM m2 19.66
13.04.05.02 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 19.96
13.04.05.03 TARRAJEO EN FONDO DE CAJA CON IMPERMEABILIZANTE 1:1 E=1.5 CM m2 3.44
13.04.06 OTROS
13.04.06.01 REJILLA DESMONTABLE DE ACERO INOXIDABLE und 1.00
13.04.06.02 REJILLA CON BARRA DE ACERO INOXIDABLE DE D=3/8" und 1.00
13.04.06.03 JUNTAS DE DILATACION CON RELLENO ELASTOMERICO m 10.00
13.05 DISPOSITIVO DE INGRESO
13.05.01 TRABAJOS PRELIMINARES
13.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 144.63
13.05.02 MOVIMIENTO DE TIERRAS
13.05.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO DURO m3 97.95
13.05.02.02 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 24.91
13.05.02.03 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 127.34
13.05.03 OBRAS DE CONCRETO SIMPLE
13.05.03.01 SOLADO DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=3" m2 165.88
13.05.04 OBRAS DE CONCRETO ARMADO
13.05.04.01 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 38.69
13.05.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 553.10
13.05.04.03 ACERO FY=4200 KG/CM2 kg 2,890.58
13.05.05 REVOQUES Y ENLUCIDOS
13.05.05.01 TARRAJEO CON IMPERMEABILIZANTE 1:1 E=1.5 CM m2 207.06
13.05.05.02 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 129.04
13.05.05.03 TARRAJEO EN FONDO DE CAJA CON IMPERMEABILIZANTE 1:1 E=1.5 CM m2 56.16
13.05.06 TUBERIAS Y ACCESORIOS
13.05.06.01 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-25 DN200mm x 6.00m m 70.00
13.05.06.02 PARTIDOR PLANCHA DE PVC und 8.00
13.06 CAJA DE DISTRIBUCION DE CAUDALES 1 Y 2
13.06.01 TRABAJOS PRELIMINARES
13.06.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 6.89
13.06.02 MOVIMIENTO DE TIERRAS
13.06.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO DURO m3 5.83
13.06.02.02 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 7.58
13.06.03 OBRAS DE CONCRETO SIMPLE
13.06.03.01 SOLADO DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=3" m2 6.89
13.06.04 OBRAS DE CONCRETO ARMADO
13.06.04.01 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 2.66
13.06.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 18.94
13.06.04.03 ACERO FY=4200 KG/CM2 kg 189.57
13.06.05 REVOQUES Y ENLUCIDOS
13.06.05.01 TARRAJEO CON IMPERMEABILIZANTE 1:1 E=1.5 CM m2 14.54
13.06.05.02 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 12.06
13.06.05.03 TARRAJEO EN FONDO DE CAJA CON IMPERMEABILIZANTE 1:1 E=1.5 CM m2 4.64
13.06.06 VARIOS
13.06.06.01 ATAGIA TERMOPLASTICA DE 0.30X0.40M E=1.5CM und 3.00
13.06.06.02 JUNTAS DE DILATACION CON RELLENO ELASTOMERICO m 18.10
13.06.06.03 COMPUERTA TERMOPLASTICA DE 0.30X0.50M INC/CANALETA GUIA TERMOPLASTICA und 7.00

13.07 REDES, BY-PASS Y EVACUACION


13.07.01 TRABAJOS PRELIMINARES
13.07.01.01 TRAZO Y REPLANTEO DE TUBERIAS DE DESAGUE m 417.70
13.07.02 MOVIMIENTO DE TIERRAS
13.07.02.01 EXCAVACION DE ZANJAS EN TERRENO NORMAL A=0.60 H=1.30 m 417.70
13.07.02.02 REFINE MANUAL DE ZANJAS EN TERRENO NORMAL TUB D=10" PROMEDIO m 417.70
13.07.02.03 CAMA DE APOYO CON ARENILLA PARA TUBERIA A=0.60 H=0.10 PROMEDIO 10" CON MAQUINARIA m 417.70

13.07.02.04 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON ARENA FINA A=1.00 H=0.30 CON MAQUINARIA (D=10 m 417.70
PROM.) INC. LATERALES
13.07.02.05 RELLENO Y COMPACTACION DE ZANJAS CON MATERIAL PROPIO m 417.70
13.07.02.06 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 195.48
13.07.03 SUMINISTRO E INSTALACION DE TUBERIAS
13.07.03.01 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-20 DN315mm x 6.00m m 417.70
13.07.03.02 PRUEBA HIDRAULICA EN TUBERIA DE DESAGUE DN 315MM 12" m 417.70
13.07.04 BUZONES
13.07.04.01 BUZON DE CONCRETO FC=245 KG/CM2 HASTA 1.50M und 7.00
13.07.04.02 EMPALME DE BUZON Y CONSTRUCCION DE DADO DE CONCRETO TIPO V 0.55X0.55X0.55M und 17.00

13.08 DISPOSITIVO DE SALIDA


13.08.01 TRABAJOS PRELIMINARES
13.08.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 18.00
13.08.02 MOVIMIENTO DE TIERRAS
13.08.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO DURO m3 14.14
13.08.02.02 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 18.39
13.08.03 OBRAS DE CONCRETO SIMPLE
13.08.03.01 SOLADO DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V E=3" m2 14.21
13.08.04 OBRAS DE CONCRETO ARMADO
13.08.04.01 CONCRETO FC=245 KG/CM2 CEMENTO TIPO V m3 8.01
13.08.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 74.10
13.08.04.03 ACERO FY=4200 KG/CM2 kg 616.90
13.08.05 REVOQUES Y ENLUCIDOS
13.08.05.01 TARRAJEO CON IMPERMEABILIZANTE 1:1 E=1.5 CM m2 33.20
13.08.05.02 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2 8.66
13.08.05.03 TARRAJEO EN FONDO DE CAJA CON IMPERMEABILIZANTE 1:1 E=1.5 CM m2 7.00
13.08.06 ACCESORIOS
13.08.06.01 ATAGIA TERMOPLASTICA DE 0.30X0.40M E=1.5CM und 4.00
13.09 CANAL DE DRENAJE EXTERIOR
13.09.01 TRABAJOS PRELIMINARES
13.09.02 TRAZO, NIVELACION, REPLANTEO Y CONTROL TOPOGRAFICO. m 890.00
13.09.03 MOVIMIENTO DE TIERRAS
13.09.03.01 EXCAVACION CON RETROEXCAVADORA m3 320.40
13.09.03.02 EXCAVACION MANUAL PARA ESTRUCTURAS EN TERRENO NORMAL m3 4.49
13.09.03.03 REFINE DE FONDOS Y TALUDES m2 39.00
13.09.03.04 CAMA DE APOYO PARA TUBERIA DE 500 MM CON ARENILLA m3 39.00
13.09.03.05 RELLENO DE ZANJAS SOBRE CLAVE DE TUBO CON ARENA FINA A=1.00 H=0.30 CON MAQUINARIA m 38.00
(D=20")
13.09.03.06 RELLENO CON AFIRMANDO HASTA HASTA NIVEL DE RASANTE m3 38.00
13.09.04 TUBERIAS
13.09.04.01 SUMINISTRO E INSTALACION D/TUB PVC- ISO 4435 S-20 DN 500mm x 6.00m m 38.00
13.09.05 VARIOS
13.09.05.01 CAMA DE APOYO DE HORMIGON PARA ASENTADO DE ROCA EN ALETAS DE PROTECCION DE m2 4.80
ALCANTARILLA
13.09.05.02 ASENTADO DE MAMPUESTO PARA PROTECCION DE ENTRADA Y SALIDA DE ALCANTARILLA DE DRENAJE m2 13.59

13.10 CERCO PERIMETRICO


13.10.01 TRAZO, NIVELACION Y REPLANTEO DE CERCO PERIMETRICO
13.10.01.01 TRAZO, NIVELACION, REPLANTEO Y CONTROL TOPOGRAFICO. m 850.00
13.10.02 OBRAS PRELIMINARES
13.10.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 46.71
13.10.02.02 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 14.69
13.10.02.03 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 23.21
13.10.03 OBRAS DE CONCRETO SIMPLE
13.10.03.01 SUB ZAPATA DE CONCRETO FC=175KG/CM2 CEMENTO TIPO V m3 13.39
13.10.03.02 DADO DE CONCRETO FC=175KG/CM2 PARA POSTE PREFABRICADO m3 17.86
13.10.03.03 POSTES PRE FABRICADO DE CONCRETO FC=210KG/CM2 PARA CERCO PERIMETRICO und 279.00

13.10.04 OBRAS DE CONCRETO ARMADO


13.10.04.01 CONCRETO FC=210 KG/CM2 CEMENTO TIPO V EN ZAPATAS m3 1.00
13.10.04.02 ACERO FY=4200 KG/CM2 EN ZAPATAS kg 18.36
13.10.04.03 ENCOFRADO Y DESENCOFRADO DE ZAPATAS m2 4.00
13.10.04.04 COLUMNAS CONCRETO FC=210 KG/CM2 CEMENTO TIPO V m3 0.38
13.10.04.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS CARAVISTA m2 6.00
13.10.04.06 ACERO FY=4200 KG/CM2 EN COLUMNAS kg 42.82
13.10.05 VARIOS
13.10.05.01 ALAMBRE DE PUAS PARA CERCO PERIMETRICO m 5,950.00
13.10.05.02 PUERTA METALICA EN CERCO PERIMETRICO m2 7.50
14 FLETE
14.01 FLETE TERRESTRE GLB 1.00
15 ENSAYOS DE LABORATORIO
15.01 DISEO DE MEZCLAS und 5.00
15.02 ENSAYO DE RESISTENCIA DEL CONCRETO A LA COMPRESION und 90.00
15.03 ENSAYO DE CBR und 2.00
15.04 ENSAYO DE CONTROL DE COMPACTACION und 52.00
16 PLACA RECORDATORIA
16.01 PLACA DE BRONCE PARA INAUGURACION und 1.00
17 LIMPIEZA GENERAL DE OBRA
17.01 LIMPIEZA DE OBRA GLB 1.00
COSTO DIRECTO
GASTOS GENERALES 7%
UTILIDAD 5%

SUB TOTAL
IMPUESTO 18%

PRESUPUESTO TOTAL
SON : DIEZ MILLONES TRESCIENTOS OCHENTICINCO MIL QUINIENTOS SESENTICINCO Y 66/100 NUEVOS SOLES
Pgina 1

RVIDAS.

Precio S/. Parcial S/.

2,891,626.89
54,776.65
1.25 21,599.63
1.92 33,177.02
1,041,369.11
4.85 7,456.39
5.24 8,159.73

5.96 2,476.38

6.95 3,787.75

8.34 3,255.10

12.41 2,661.95

15.16 985.40

18.70 2,496.45

19.55 2,111.40

38.86 8,860.08

4.68 17,007.12
8.75 20,714.75

10.00 8,022.00

11.70 4,091.49

14.10 4,512.00

17.85 1,911.74

24.42 1,907.20

38.86 1,989.63

6.57 7,127.79
12.41 13,065.25

14.10 2,911.65

16.42 3,300.42

19.62 2,085.61

24.42 5,868.13

32.42 14,394.48

48.46 24,491.68

55.34 18,793.46

64.50 12,564.60

1.91 9,921.30
1.43 11,024.87

2.30 10,063.88
4.82 25,037.01

10.40 45,506.24

8.32 64,144.70

14.74 76,565.46

23.03 100,770.07

9.19 333,628.61
3.77 571.91
11.44 157,125.43
522,761.54
28.55 232,371.31

29.60 46,158.24

36.96 28,595.95

44.44 47,937.43

51.93 27,751.39

28.69 27,556.75
41.33 24,996.38
61.59 12,225.62
71.88 24,151.68
25,000.00 25,000.00
6.80 14,536.36
5.13 11,480.43
711,429.78
30.30 443,858.64
71.16 48,175.32
66.36 80,295.60
135.50 100,134.50
192.20 864.90
2.19 32,080.87
1.74 1,177.98
2.09 2,528.90
3.13 2,313.07
523,102.96
15.31 887.98
543.29 20,645.02

572.82 7,446.66

602.98 2,411.92

638.50 1,277.00

681.33 681.33

45.13 11,192.24
1,412.95 173,792.85
1,287.84 54,089.28
1,472.02 20,608.28
2,062.65 30,939.75
2,287.98 25,167.78
2,523.92 30,287.04
2,776.89 22,215.12
3,006.23 33,068.53
3,186.24 22,303.68
3,670.84 18,354.20
73.10 47,734.30
38,186.85
195.83 38,186.85
1,356,393.83
17,428.31
1.53 17,428.31
377,794.40
4.68 33,349.82
4.85 8,333.08
6.57 16,732.87
1.91 3,281.69
1.43 10,190.22
2.26 5,755.90
4.49 7,714.54
8.89 22,641.59
9.97 71,046.52

15.95 40,622.42

7.76 55,297.99

6.99 79,623.44
11.44 23,204.32
206,405.83
16.59 188,977.52
1.53 17,428.31
632,171.19
86.72 171,618.88
75.54 146,547.60

75.54 528.78

131.81 4,217.92

145.81 291.62

100.27 194,523.80

108.32 758.24

127.78 4,088.96

246.56 493.12

55.13 109,102.27
97,594.10
3.24 8,910.00
0.46 13,800.00
400.00 400.00
44.10 44.10
2.70 1,080.00

6,000.00 6,000.00
4,000.00 4,000.00
680.00 8,160.00
200.00 200.00

10,000.00 10,000.00
45,000.00 45,000.00
25,000.00
2,500.00 25,000.00
332,111.90

34,865.64

3.32 132.17
3,844.15
16.67 576.95

32.82 802.78
12.09 145.44
8.20 78.23

36.52 94.59
11.44 878.48
26.41 1,267.68
3,077.19
34.16 87.45
240.12 650.73
51.40 481.10
395.07 197.54
31.89 210.47
395.07 1,015.33
19.06 434.57
4,532.57
395.07 2,022.76
30.72 196.61
4.29 131.27
395.07 438.53
81.28 1,217.57
4.29 525.83
11,284.58
677.15 5,796.40
45.10 3,595.82
4.29 1,892.36
1,381.16
30.27 393.51
20.04 360.72
32.15 626.93
914.48
45.77 914.48
1,538.41
26.92 1,141.41
35.96 397.00
3,716.09
122.28 3,716.09

719.39
317.70 600.45

220.26 118.94
618.84
11.58 618.84
3,106.61
1,761.37 1,761.37
1,200.00 1,200.00
51.87 145.24
49,145.53
15,788.72
167.74 578.70
56.54 162.84
24.53 1,005.73
217.01 624.99
217.01 624.99
5,207.48 5,207.48
1,106.41 1,106.41
7.78 315.87
13.96 5,402.52
13.96 701.77
19.14 57.42
2,599.53
800.12
395.07 351.61
31.89 377.90
4.29 70.61
572.33
395.07 205.44
44.89 147.24
4.29 219.65
1,227.08
395.07 359.51
44.89 385.16
4.29 482.41
2,906.85
45.77 2,906.85
17,186.91
18.64 4,141.81
35.15 2,305.84
27.65 10,739.26
2,262.94
35.13 562.08
25.02 550.44
32.15 711.48
51.64 438.94
3,358.04
11.58 2,200.20
17.65 1,157.84
3,064.15
845.54 1,775.63
220.26 1,288.52
522.13
10.37 522.13
81.84
81.84 81.84
1,374.42
416.36 832.72
270.85 541.70

24,048.21

3.32 64.57
2,848.60
15.81 461.34
32.82 240.90
7.48 145.49
49.52 1,444.99
4.80 12.82
11.44 543.06
1,566.92
240.12 881.24
51.40 685.68
7,241.63
395.07 513.59
31.89 552.97
4.29 1,864.56
395.07 873.10
81.28 2,577.39
4.29 860.02
2,968.19
45.77 1,595.54
18.64 1,372.65
1,253.60
35.13 235.02
25.02 147.87
32.15 565.52
51.64 305.19
1,276.17
67.99 1,276.17
852.75
11.58 852.75
3,043.94
845.54 3,043.94
81.84
81.84 81.84
2,850.00
2,400.00 2,400.00
450.00 450.00
34,121.83

41.85
0.93 41.85
12,623.86
115.83 4,517.37
150.35 4,510.50
293.69 1,762.14
334.19 1,670.95
3.62 162.90
21,456.12
1,291.70 3,875.10
950.26 2,850.78
457.44 1,372.32
408.63 2,860.41
950.93 950.93
917.92 917.92
786.94 786.94
495.53 495.53
802.58 802.58
708.55 708.55
858.69 1,717.38
1,387.38 1,387.38
1,500.00 1,500.00

410.10 1,230.30
189,930.69
544.60
0.57 79.80
3.32 464.80
35,231.16
15.81 2,070.95
28.17 3,626.89
12.09 312.89
49.52 17,249.80
11.44 3,478.33
68.16 1,305.26
42.78 7,187.04
34,244.32
30.72 1,492.99
374.35 4,829.12
51.40 9,752.12
240.12 13,434.71
122.28 709.22

19.06 1,177.91
409.82 2,848.25
58,371.67
409.82 8,811.13
30.72 2,488.32
4.29 2,005.88
409.82 6,634.99
44.89 7,121.35
4.29 3,489.44
395.07 4,195.64
81.28 8,848.95
4.29 4,656.45
395.07 2,603.51
58.37 3,860.59
4.29 3,655.42
17,726.65
50.46 15,645.12
74.58 2,081.53
9,524.30
19.09 1,551.44
26.92 424.53
35.96 3,914.97
53.16 3,394.80
11.36 238.56
16,622.03
156.45 10,403.93
83.03 1,619.09
38.49 750.56

78.62 3,848.45
1,236.67
25.02 180.14
38.28 1,056.53
3,116.45
317.70 800.60

451.43 1,769.61

220.26 546.24
1,744.57
1,744.57 1,744.57

276.26
10.37 276.26
416.72
81.84 81.84
77.34 154.68
83.84 83.84
32.12 96.36
619.04
231.86 231.86
34.75 34.75
162.04 162.04
59.84 59.84
36.39 36.39
94.16 94.16
1,424.57
487.87
96.73 96.73
3.46 46.71
9.73 58.38
13.21 52.84
16.17 48.51
47.23 94.46
90.24 90.24
936.70
6.14 30.70
9.82 179.22
20.12 20.12
20.12 80.48
36.02 72.04
17.84 53.52
20.42 20.42
22.63 22.63
12.15 24.30
29.68 59.36
27.68 55.36
35.19 35.19
98.03 98.03
185.33 185.33
8,363.26
17.65 3,048.86
11.58 1,123.72
13.15 3,960.91
6.76 229.77
468.42
12.66 468.42
587,879.69
84.00
28.00 84.00
1,543.80
0.93 1,543.80
78,596.90
13.20 3,960.00
9.54 8,147.16
6.57 3,324.42
1.43 1,650.22
2.30 1,163.80
3.67 4,235.18

9.82 4,968.92

10.81 12,474.74

15.95 8,070.70

6.99 8,066.46
14.38 7,276.28
11.44 15,259.02
481,665.60
284.90 472,934.00
5.26 8,731.60
7,128.59
427.17 3,417.36
476.70 2,383.50
353.12 1,327.73
18,860.80
6.80 3,440.80
28.44 14,220.00

1,200.00 1,200.00

3,204,942.72
62,382.25
110.05 2,751.25

1.39 59,631.00
2,132,604.38
8.13 133,595.25
19.48 533,220.98

30.38 963,356.79
10.81 43,361.18
8.33 17,006.19

8.47 112,754.16
9.52 110.43
9.62 2,577.78

6.36 1,704.23
3.77 80,535.08
11.44 244,382.31
761,506.82
23.75 282,399.14
23.33 479,107.68
9,698.92
44.82
3.32 44.82
540.47
76.59 409.76
18.78 130.71
286.21
26.21 286.21
6,435.77
677.15 3,643.07
44.89 1,778.54
4.29 1,014.16
1,065.15
22.91 450.41
26.85 535.93
22.91 78.81
1,326.50
941.14 941.14
161.76 161.76
22.36 223.60
88,720.33
480.17
3.32 480.17
8,162.66
76.59 7,501.99
7.25 180.60
3.77 480.07
4,347.71
26.21 4,347.71
63,428.18
677.15 26,198.93
44.89 24,828.66
4.29 12,400.59
9,495.09
22.91 4,743.74
26.85 3,464.72
22.91 1,286.63
2,806.52
30.30 2,121.00
85.69 685.52
9,030.12
22.87
3.32 22.87
475.10
76.59 446.52
3.77 28.58
180.59
26.21 180.59
3,464.70
677.15 1,801.22
44.89 850.22
4.29 813.26
763.22
22.91 333.11
26.85 323.81
22.91 106.30
4,123.64
341.68 1,025.04
22.36 404.72
384.84 2,693.88

54,697.09
801.98
1.92 801.98
14,170.20
4.85 2,025.85
1.91 797.81
3.67 1,532.96

14.74 6,156.90

6.99 2,919.72
3.77 736.96
28,591.56
66.36 27,718.57
2.09 872.99
11,133.35
1,412.95 9,890.65
73.10 1,242.70

15,501.55
59.76
3.32 59.76
1,152.31
76.59 1,082.98
3.77 69.33
372.44
26.21 372.44
11,396.82
677.15 5,423.97
44.89 3,326.35
4.29 2,646.50
1,153.50
22.91 760.61
26.85 232.52
22.91 160.37
1,366.72
341.68 1,366.72
18,415.28

1.75 1,557.50
7,880.92
15.81 5,065.52
28.17 126.48
4.27 166.53
12.87 501.93
18.18 690.84

34.99 1,329.62
8,298.44
218.38 8,298.44
678.42
18.97 91.06

43.22 587.36

52,385.98
1,487.50
1.75 1,487.50
1,727.02
32.82 1,533.02
7.25 106.50
3.77 87.50
37,522.18
285.12 3,817.76
409.82 7,319.39
94.57 26,385.03

1,438.98
395.07 395.07
4.29 78.76
30.72 122.88
395.07 150.13
84.74 508.44
4.29 183.70
10,210.30
1.39 8,270.50
258.64 1,939.80
1.00
1.00 1.00
4,960.00
150.00 750.00
25.00 2,250.00
200.00 400.00
30.00 1,560.00
800.00
800.00 800.00
3,500.00
3,500.00 3,500.00
8,382,216.03
586,755.12
419,110.80
------------------

9,388,081.95
1,689,854.75
------------------

11,077,936.70
S10
MUNICIPALIDAD DISTRITAL DE SAN JOSE - LAMBAYEQUE - LAMBAYEQUE
Subpresupuesto 003 SISTEMA ELECTRICO Y EQUIPAMIENTO

Item Descripcin Und. Metrado

18 SISTEMA DE UTILIZACION EN MEDIA TENSION10 KV TRIFASICO.


18.01 TRABAJOS PRELIMINARES
18.01.01 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS. m2 3.00
18.02 INSTALACIN DE POSTES C.A.C 13
18.02.01 EXECAVACION DE HUECO PARA IZAR POSTE m3 3.00
18.02.02 TRANSPORTE DE POSTE DE 13 M DE ALMACEN A PUNTO DE IZAJE und 3.00
18.02.03 MONTAJE DE POSTE DE C.A.C 13M CON ACC CONCRETO und 3.00
18.02.04 SOLADO CON CEMENTO MS E=10" m2 3.00
18.02.05 CIMENTACION DE POSTE 13M und 3.00
18.02.06 MONTAJE DE ACC. CONCRETO EN TRAFOMIX Y SAM und 2.00
18.03 INSTALACION DE RETENIDA M.T
18.03.01 EXCAVACION MANUAL DE HOYO PARA RETENIDA EN TERRENO NORMAL. m3 2.00
18.03.02 INSTALACION DE RETENIDA TIPO CONTRAPUNTA und 2.00
18.03.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 2.00
18.04 INSTALACION DE ARMADOS
18.04.01 INSTALACION DE ARMADO TIPO VANO FLOJO und 1.00
18.04.02 INSTALACION DE ARMADO TIPO TRAFORMIX und 1.00
18.04.03 INSTALACION DE ARMADO TIPO SAM und 1.00
18.05 INSTALACION DE CONDUCTOR DE COBRE
18.05.01 INSTALACION DE CONDUCTOR DE Cu, T.DURO, 35MM2 KM 0.18
18.06 INSTALACION DE SISTEMA PUESTA A TIERRA
18.06.01 EXCAVACION MANUAL DE HOYO PARA INSTALACION DE VARILLA PUESTA A TIERRA. m3 12.00

18.06.02 INSTALACION DE PUESTA A TIERRA Y TRATAMIENTO CON BENTONITA und 6.00


18.06.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 12.00
18.07 INSTALACION DE TRANSFORMADOR, TRAFOMIX Y TABLERO DE DISTRIBUCION
18.07.01 INSTALACION DE TRAFOMIX TMEA-22, 10/0.22KV und 1.00
18.07.02 INSTALACION DE TRANSFORMADOR 100KVA, NIVELACION Y CONEXIONADO und 1.00
18.07.03 INSTALACION DE TABLERO DE DISTRIBUCION P TRAFO 100KVA Y CONEXIONADO. und 1.00

18.08 INSTALACION EQUIPO DE PROTECCION


18.08.01 INSTALACION DE CUT OUT, 36KV, 100A, 150KV BIL und 6.00
18.09 INSTALACION SISTEMA DE MEDICION
18.09.01 INSTALACION DEL SISTEMA DE MEDICION, INCLUYE MEDIDOR 3 ? CJT 1.00
18.10 PRUEBAS ELECTRICAS Y CONEXIONADO EN CALIENTE
18.10.01 PRUEBAS ELECTRICAS Y CONEXIONADO EN CALIENTE GLB 1.00
19 INSTALACIONES ELECTRICAS SALA DE MAQUINAS E INTERIORES Y EXTERIORES CAMARA DE BOMBEO

19.01 INSTALACIONES ELECTRICAS INTERIORES/EXTERIORES


19.01.01 SUMINISTRO E INSTALACION DE SALIDAS
19.01.01.01 SUMINISTRO E INSTAL. DE SALIDA INTERRUPTOR SIMPLE EMPOTRADO CON ELECTRODUCTO PVC-SAP und 4.00
5/8" CAJA RECTANGULAR FeGo
19.01.01.02 SUMINISTRO E INSTAL. DE SALIDA INTERRUPTOR SIMPLE EMPOTRADO CON ELECTRODUCTO PVC-SAP und 7.00
3/4" CAJA RECTANGULAR FeGo
19.01.02 SUMINISTRO E INSTALACION DE ARTEFACTO DE ILUMINACION
19.01.02.01 SUMINISTRO E INSTALACION DE EQUIPO FLUORESCENTE TUBULAR 2X40W, C/PROT. ACRILICO, INC. und 2.00
CABLE TW N 14 AWG
19.01.02.02 SUMINISTRO E INSTALACION DE EQUIPO FLUORESCENTE TUBULAR 40W, C/PROT. ACRILICO, INC. und 2.00
CABLE TW N14 AWG
19.01.02.03 SUMINISTRO E INSTALACION DE LAMPARAS DE VAPOR Na, 50W , C/CABLE NLT 2x2.5mm2, CONDUCTOR und 12.00
THW N 12 AWG
19.01.03 SUMINISTRO E INSTALACION DE TABLERO DE DISTRIBUCION EN BT
19.01.03.01 SUMINISTRO E INSTALACION DE TABLERO TERMOMAGNETICO DE 12 POLOS C/ 01 IT 2x20A Y 03 IT DE CJT 1.00
2x16A
19.01.03.02 SUMINISTRO E INSTALACION DE TABLERO TERMOMAGNETICO DE 10 POLOS C/ 01 IT 2x20A Y 02 IT DE CJT 1.00
2x16A
19.01.04 PRUEBAS ELECTRICAS
19.01.04.01 PRUEBAS ELECTRICAS Y CONEXIONADO EN CALIENTE GLB 1.00
19.02 INSTALACIONES ELECTRICAS SALA DE MAQUINAS
19.02.01 SUMINISTRO E INSTALACION DE CABLE SUBTERRANEO
19.02.01.01 SUMINISTRO E INSTALACION DE CABLE SUB TERRANEO NYY-1KV DE 3-1X35 + 1X25MM2 m 60.00

19.02.02 SUMINISTRO E INSTALACION DE ELECTROBOMBAS 60HP, 30HP


19.02.02.01 SUMINISTRO E INSTALACION DE MOTOR ELECTRICO 380V, TRIFASICO 60HZ, 60HP Y ACCESORIOS DE und 2.00
FIJACION Y ACOPLE A BOMBA HIDRAULICA
19.02.02.02 SUMINISTRO E INSTALACION DE MOTOR ELECTRICO 380V, TRIFASICO 60HZ, 30HP Y ACCESORIOS DE und 2.00
FIJACION Y ACOPLE A BOMBA HIDRAULICA
19.02.02.03 SUMINISTRO E INSTALACION DE BOMBA HIDRAULICA 12" PARA MOTOR DE 60HP, ACC, DE FIJACION Y und 2.00
ACOPLE.
19.02.02.04 SUMINISTRO E INSTALACION DE BOMBA HIDRAULICA 8" PARA MOTOR DE 60HP, ACC, DE FIJACION Y und 2.00
ACOPLE.
19.02.03 SUMINISTRO E INSTALACION DE TABLERO DE DISTRIBUCION BT Y ARRANCADORES PARA MOTORES DE
60HP, 30 HP
19.02.03.01 SUMINISTRO E INSTALACION DE ARRANCADOR PARA MOTOR DE 380V, TRIFASICO, 60HZ, 60HP und 2.00

19.02.03.02 SUMINISTRO E INSTALACION DE ARRANCADOR PARA MOTOR DE 380V, TRIFASICO, 60HZ, 30HP und 2.00

19.02.03.03 SUMINISTRO E INSTALACION DE TABLERO GENERAL DE DISTRIBUCION BT, CON 01 IT DE 3X125A Y 02IT CJT 1.00
DE 3X90A CON EQUIP.
19.02.03.04 SUMINISTRO E INSTALACION DE TABLERO CON IT DE 3X200A und 1.00
19.02.03.05 SUMINISTRO E INSTALACION DE TABLERO CON IT DE 3X150A und 1.00
19.02.04 PRUEBAS ELECTRICAS
19.02.04.01 PRUEBAS ELECTRICAS Y CONEXIONADO EN CALIENTE GLB 1.00
20 INSTALACIONES ELECTRICAS SALA DE MAQUINAS E INTERIORES Y EXTERIORES CAMARA DE BOMBEO DE
DESAGUE
20.01 INSTALACIONES ELECTRICAS INTERIORES Y EXTERIORES EN CAMARA DE DESAGUE

20.01.01 SUMINISTRO E INSTALACION DE SALIDAS


20.01.01.01 SUMINISTRO E INSTAL. DE SALIDA INTERRUPTOR SIMPLE EMPOTRADO CON ELECTRODUCTO PVC-SAP und 9.00
5/8" CAJA RECTANGULAR FeGo
20.01.01.02 SUMINISTRO E INSTAL. DE SALIDA INTERRUPTOR SIMPLE EMPOTRADO CON ELECTRODUCTO PVC-SAP und 11.00
3/4" CAJA RECTANGULAR FeGo
20.01.02 SUMINISTRO E INSTALACION DE ARTEFACTO DE ILUMINACION
20.01.02.01 SUMINISTRO E INSTALACION DE EQUIPO FLUORESCENTE TUBULAR 2X40W, C/PROT. ACRILICO, INC. und 1.00
CABLE TW N 14 AWG
20.01.02.02 SUMINISTRO E INSTALACION DE EQUIPO FLUORESCENTE TUBULAR 40W, C/PROT. ACRILICO, INC. und 10.00
CABLE TW N14 AWG
20.01.02.03 SUMINISTRO E INSTALACION DE LAMPARAS DE VAPOR Na, 50W , C/CABLE NLT 2x2.5mm2, CONDUCTOR und 4.00
THW N 12 AWG
20.01.03 SUMINISTRO E INSTALACION DE TABLERO DE DISTRIBUCION EN BT
20.01.03.01 SUMINISTRO E INSTALACION DE TABLERO TERMOMAGNETICO DE 8 POLOS C/ 01 IT 2x20A Y 03 IT DE CJT 1.00
2x16A
20.01.03.02 SUMINISTRO E INSTALACION DE TABLERO TERMOMAGNETICO DE 6 POLOS C/ 01 IT 2x20A Y 03 IT DE CJT 3.00
2x16A
20.01.04 PRUEBAS ELECTRICAS
20.01.04.01 PRUEBAS ELECTRICAS Y CONEXIONADO EN CALIENTE GLB 1.00
20.02 INSTALACIONES ELECTRICAS INTERIORES Y EXTERIORES EN CAMARA DE DESAGUE

20.02.01 SUMINISTRO E INSTALACION DE CABLE SUBTERRANEO


20.02.01.01 SUMINISTRO E INSTALACION DE CABLE SUBTERRANEO NYY - 1KV DE 3-1X25 + 1X16MM2 m 40.00

20.02.02 SUMINISTRO E INSTALACION DE ELECTROBOMBA SUMERGIBLE DE 20HP, 380V, TRIFASICA

20.02.02.01 ELECTROBOMBA SUMERGIBLE MOD. S1.80.100.200.4.54H.C.271.G.N.D NP96781596 und 3.00

20.02.02.02 SENSORES DE HUMEDAD DI EN LA CAMARA DE LA JUNTA MECANICA Y CAMARA DE ACEITE und 3.00

20.02.02.03 CONTROL DE TEMPERATURA CON SONDAS TERMICAS EN EL ESTATOR + THERMISTOR IN WINDINGS und 3.00

20.02.02.04 SENSORES DE TEMPERATURA EN LOS RODAMIENTOS_x000D_ und 3.00


20.02.02.05 KIT AUTOCOUPLING DN 200 PN 10G NP 96641489_x000D_ und 3.00
20.02.02.06 SISTEMA ELECTRONICO PARA MONITOREO DE LOS SENSORES DEL MOTOR IO 111 (NP 96575362) und 3.00

20.02.03 SUMINISTRO E INSTALACION DE TABLERO GENERAL Y TABLERO DE CONTROL PARA ELECTROBOMBAS


DE 20HP
20.02.03.01 TABLERO AUTOSOPORTADO METALICO DE 1000 X 800 X 600 IP 55_x000D_ und 3.00
20.02.03.02 INTERRUPTOR TERMOMAGNETICO PRINCIPAL DE 3X100 A_x000D_ und 3.00
20.02.03.03 INTERRUPTOR DE MANDO DE 2X6 AMP _x000D_ und 3.00
20.02.03.04 VARIADOR DE FRECUENCIA MODELO CUE DE 22.5KW EN 380 VAC. IP20_x000D_ und 3.00
20.02.03.05 DISPLAY PARA MONTAJE FRONTAL EN PUERTA DE TABLERO_x000D_ und 3.00
20.02.03.06 PULSADORES DE MARCHA_x000D_ und 3.00
20.02.03.07 PULSADORES DE PARADA_x000D_ und 3.00
20.02.03.08 TRANSFORMADOR DE CORRIENTE DE 0 A 100 AMP_x000D_ und 6.00
20.02.03.09 MONTAJE DEL SISTEMA ELECTRICO EN CAMARA DE BOMBEO INC/TODO ACCESORIO DE CONEXION GLB 1.00

20.02.04 GRUPO ELECTROGENO 40KW


20.02.04.01 GRUPO ELECTROGENO DE 40KW 380V 60HZ ENCAPSULADO CON TABLERO DE CONTROL Y CJT 1.00
ACCESORIOS DE CONEXION
20.02.05 SISTEMA PUESTA A TIERRA
20.02.05.01 SISTEMA DE PUESTA A TIERRA PARA BAJA TENSION CJT 2.00
COSTO DIRECTO
GASTOS GENERALES 7%
UTILIDAD 5%

SUB TOTAL
IMPUESTO 18%

PRESUPUESTO TOTAL

SON : NOVECIENTOS MIL OCHOCIENTOS DIECIOCHO Y 64/100 NUEVOS SOLES


Pgina 1

Precio S/. Parcial S/.

91,861.70
26.91
8.97 26.91
9,316.82
32.84 98.52
58.16 174.48
1,644.42 4,933.26
149.29 447.87
352.09 1,056.27
1,303.21 2,606.42
1,089.86
30.48 60.96
507.20 1,014.40
7.25 14.50
2,253.66
271.62 271.62
1,185.72 1,185.72
796.32 796.32
467.22
2,595.67 467.22
25,113.72
30.48 365.76

4,110.16 24,660.96
7.25 87.00
30,514.09
15,610.36 15,610.36
13,176.11 13,176.11
1,727.62 1,727.62

17,633.46
2,938.91 17,633.46
3,945.96
3,945.96 3,945.96
1,500.00
1,500.00 1,500.00
141,682.18

9,773.94
2,099.69
163.18 652.72

206.71 1,446.97

4,459.52
128.87 257.74

128.87 257.74

328.67 3,944.04

1,684.82
1,334.91 1,334.91

349.91 349.91
1,529.91
1,529.91 1,529.91
131,908.24
8,139.00
135.65 8,139.00

109,434.96
9,715.62 19,431.24

6,590.62 13,181.24

19,759.62 39,519.24

18,651.62 37,303.24

12,804.37

2,165.91 4,331.82

1,903.91 3,807.82

2,364.91 2,364.91

1,200.91 1,200.91
1,098.91 1,098.91
1,529.91
1,529.91 1,529.91
493,509.10

10,737.23

3,742.43
163.18 1,468.62

206.71 2,273.81

2,732.25
128.87 128.87

128.87 1,288.70

328.67 1,314.68

2,732.64
719.91 719.91

670.91 2,012.73

1,529.91
1,529.91 1,529.91
482,771.87

3,273.60
81.84 3,273.60

235,755.84

48,600.00 145,800.00

6,200.00 18,600.00

4,980.00 14,940.00

4,750.00 14,250.00
12,165.28 36,495.84
1,890.00 5,670.00

194,322.00
987.00 2,961.00
3,511.00 10,533.00
231.00 693.00
2,569.00 7,707.00
358.00 1,074.00
1,250.00 3,750.00
1,268.00 3,804.00
2,300.00 13,800.00
150,000.00 150,000.00

47,840.63
47,840.63 47,840.63

1,579.80
789.90 1,579.80
727,052.98
50,893.71
36,352.65
------------------

814,299.34
146,573.88
------------------

960,873.22
S10
MUNICIPALIDAD DISTRITAL DE SAN JOSE - LAMBAYEQUE - LAMBAYEQUE
Subpresupuesto 004 REPOSICION DE PAVIMENTOS EN CONSTRUCCION DE SISTEMA DE ALCANTARILLADO

Item Descripcin Und. Metrado

21 REPOSICION DE PAVIMENTO FLEXIBLE EN LINEA DE CONDUCCION


21.01 CORTE DE VIA ASFALTADA
21.01.01 TRABAJOS PRELIMINARES
21.01.01.01 CORTE GIA DE CARPETA ASFALTICA m 490.00
21.01.02 MOVIMIENTO DE TIERRAS
21.01.02.01 REPOSICION DE SUB BASE m3 118.00
21.01.02.02 REPOSICION DE BASE m3 88.50
21.01.03 REPOSICION DE CARPETA ASFALTICA EN CALIENTE E=3"
21.01.03.01 MEZCLA ASFALTICA EN CALIENTE m3 26.55
21.01.03.02 TRANSPORTE DE MEZCLA ASFALTICA A OBRA m3 26.55
21.01.03.03 IMPRIMACION m2 295.00
21.01.03.04 COLOCACION DE ASFALTO E=3" m2 295.00
21.01.04 VARIOS
21.01.04.01 ESTUDIOS DE COMPOSICION DE CARPETA ASFALTICA EXISTENTE und 1.00
22 REPOSICION DE PAVIMENTO FLEXIBLE EN LINEA DE IMPULSION A TANQUE 2
22.01 CORTE DE VIA ASFALTADA
22.01.01 TRABAJOS PRELIMINARES
22.01.01.01 CORTE GIA DE CARPETA ASFALTICA m 16.00
22.01.02 MOVIMIENTO DE TIERRAS
22.01.02.01 REPOSICION DE SUB BASE m3 9.60
22.01.02.02 REPOSICION DE BASE m3 7.20
22.01.03 REPOSICION DE CARPETA ASFALTICA EN CALIENTE E=3"
22.01.03.01 MEZCLA ASFALTICA EN CALIENTE m3 1.80
22.01.03.02 TRANSPORTE DE MEZCLA ASFALTICA A OBRA m3 1.80
22.01.03.03 IMPRIMACION m2 24.00
22.01.03.04 COLOCACION DE ASFALTO E=3" m2 24.00
23 REPOSICION DE PAVIMENTO EN REDES DE AGUA Y DESAGUE
23.01 CORTE Y REPOSICION DE PAVIMENTO FLEXIBLE
23.01.01 TRABAJOS PRELIMINARES
23.01.01.01 TRAZO Y REPLANTEO m2 2,572.31
23.01.01.02 CORTE GIA DE CARPETA ASFALTICA m 7,418.38
23.01.02 MOVIMIENTO DE TIERRAS
23.01.02.01 CORTE DE TERRENO NATURAL CON MAQUINARIA m3 12,619.08
23.01.02.02 CONFORMACION DE SUB RASANTE CON MAQUINARIA PESADA m2 22,943.78
23.01.02.03 SUB BASE CON MATERIAL DE PRESTAMO m3 7,698.90
23.01.02.04 BASE DE AFIRMADO E=20CM m2 5,132.60
23.01.02.05 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 18,349.05
23.01.03 REPOSICION DE CARPETA ASFALTICA EN CALIENTE E=3"
23.01.03.01 MEZCLA ASFALTICA EN CALIENTE m3 2,311.09
23.01.03.02 TRANSPORTE DE MEZCLA ASFALTICA A OBRA m3 2,311.09
23.01.03.03 IMPRIMACION m2 25,663.01
23.01.03.04 COLOCACION DE ASFALTO E=3" m2 25,663.01
23.02 REPOSICION DE PAVIMENTO RIGIDO
23.02.01 TRAZO, NIVELACION Y REPLANTEO
23.02.01.01 TRAZO NIVELACION Y REPLANTEO DE ESTRUCTURAS m2 4,376.81
23.02.02 MOVIMIENTO DE TIERRAS
23.02.02.01 DEMOLICION DE LOSA DE CONCRETO E=20CM, m2 4,376.81
23.02.02.02 CORTE DE TERRENO NATURAL CON MAQUINARIA m3 1,313.04
23.02.02.03 CONFORMACION DE SUB RASANTE CON MAQUINARIA PESADA m2 4,376.81
23.02.02.04 BASE DE AFIRMADO DE 0.30M m2 1,313.04
23.02.02.05 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 1,706.96
23.02.03 OBRAS DE CONCRETO
23.02.03.01 CONCRETO FC=210KG/CM2, E=22.5CM EN LOSA m2 1,092.77
23.02.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE PAVIMENTO m2 806.43
23.02.03.03 ACERO FY= 4200 KG/CM2 EN PASADORES INCLUYE TUB DE ENCAPSULAMIENTO kg 3,651.01

23.02.04 VARIOS
23.02.04.01 JIBAS DE CONCRETO FC=210KG/CM2 CEMENTO TIPO V m3 7.69
23.02.04.02 JUNTAS DE DILATACION m 3,491.43
24 REPOSICION DE VEREDAS
24.01 TRABAJOS PRELIMINARES
24.01.01 DEMOLICION DE VEREDAS DE E=10CM, INCLUYE SARDINEL m2 5,703.61
24.01.02 TRAZO Y REPLANTEO DE ESTRUCTURAS m2 5,508.19
24.02 MOVIMIENTO DE TIERRAS
24.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 1,101.64
24.02.02 BASE AFIRMANDO DE H=0.20 M m2 5,503.61
24.02.03 ELIMINACION DE MATERIAL EXEDENTE C/MAQ. DIST. PROMED 50M m3 1,086.80
24.02.04 ELIMINACION DE MATERIAL EXEDENTE D=3KM m3 2,173.60
24.03 OBRAS DE CONCRETO SIMPLE
24.03.01 CONCRETO FC=175KG/CM2 CEMENTO TIPO V EN VEREDAS m3 937.33
24.03.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 5,691.12
24.04 JUNTAS DE DILATACION
24.04.01 JUNTAS DE DILATACION m 300.00
25 PINTURA
25.01 PINTADO DE MARCAS CONTINUAS m 2,967.33
25.02 PINTADO DE MARCAS DISCONTINUAS m 1,483.68
25.03 PINTADO DE SIMBOLOS Y LETRAS m2 943.20
25.04 PINTADO DE VIAS (SARDINELES) m2 2,917.06
COSTO DIRECTO
GASTOS GENERALES 7%
UTILIDAD 5%

SUB TOTAL
IMPUESTO 18%

PRESUPUESTO TOTAL

SON : TRES MILLONES SEISCIENTOS CUARENTICUATRO MIL DIECISIETE Y 74/100 NUEVOS SOLES
Pgina 1

Precio S/. Parcial S/.

31,629.25
31,629.25
1,200.50
2.45 1,200.50
14,049.97
103.79 12,247.22
20.37 1,802.75
16,248.78
390.00 10,354.50
16.34 433.83
8.82 2,601.90
9.69 2,858.55
130.00
130.00 130.00
2,357.89
2,357.89
39.20
2.45 39.20
1,143.04
103.79 996.38
20.37 146.66
1,175.65
390.00 702.00
16.34 29.41
8.82 211.68
9.69 232.56
2,221,452.47
1,932,887.78
21,107.46
1.14 2,932.43
2.45 18,175.03
497,669.69
8.13 102,593.12
3.66 83,974.23
7.11 54,739.18
9.05 46,450.03
11.44 209,913.13
1,414,110.63
390.00 901,325.10
16.34 37,763.21
8.82 226,347.75
9.69 248,674.57
288,564.69
14,531.01
3.32 14,531.01
103,317.19
7.48 32,738.54
8.13 10,675.02
3.66 16,019.12
18.55 24,356.89
11.44 19,527.62
149,034.16
89.87 98,207.24
39.53 31,878.18
5.19 18,948.74

21,682.33
395.07 3,038.09
5.34 18,644.24
626,453.45
45,327.07
5.61 31,997.25
2.42 13,329.82
110,248.64
32.82 36,155.82
8.20 45,129.60
3.77 4,097.24
11.44 24,865.98
469,275.74
409.82 384,136.58
14.96 85,139.16
1,602.00
5.34 1,602.00
59,202.78
5.46 16,201.62
4.42 6,557.87
9.69 9,139.61
9.36 27,303.68
2,941,095.84
205,876.71
147,054.79
------------------

3,294,027.34
592,924.92
------------------

3,886,952.26
S10

Gastos generales
Presupuesto 1004019 AMPLIACIN Y MEJORAMIENTO INTEGRAL DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE
LAMBAYEQUE - LAMBAYEQUE
Fecha 2/2/2012
Moneda 01 NUEVOS SOLES

GASTOS VARIABLES

PERSONAL PROFESIONAL Y AUXILIAR


Cdigo Descripcin Unidad Cantidad

01003 RESIDENTE PRINCIPAL mes 18.00


01004 RESIDENTE EN MOVIMIENTO DE TIERRAS mes 12.00
01005 RESIDENTE ESTRUCTURAL ESPECIALISTA EN mes 10.00
TRABAJOS DE CONRETO.

01006 ADMINISTRADOR DE OBRA mes 18.00


01007 SECRETARIA mes 18.00
01008 ASISTENTE-METRADOR-DIBUJANTE mes 18.00
01009 PLANILLERO mes 18.00
01010 ASISTENTE DE RESIDENTE DE OBRA mes 18.00
01011 INGENIERO SANITARIO mes 14.00
01012 INGENIERO ESPECIALISTA EN MECANICA DE SUELOS mes 9.00
Y PAVIMENTACION
01014 ING| ESPECIALISTA EN DESARROLLO DE PROYECTOS mes 14.00
DE IMPACTO AMBIENTAL
01016 ING MECANICO ELECTRICO mes 4.00
01017 TECNICO EN ELECTRICIDAD mes 6.00
01018 ARQUEOLOGO und 9.00

Subtotal

PERSONAL TECNICO
Cdigo Descripcin Unidad Personas %Particip. Tiempo

02001 Maestro General mes 1.00 100.00 18.00


02003 Almacenero mes 1.00 100.00 18.00
02004 Ayudante de Almacen mes 2.00 100.00 17.00
02006 Guardianes mes 4.00 100.00 14.00
02009 Choferes mes 1.00 100.00 18.00
02010 Laboratorista mes 1.00 50.00 12.00
02011 Mestro especialista en trabajos de saneamiento mes 3.00 100.00 14.00

02012 Maestro especialista en trabajos de pavimentacin mes 1.00 100.00 14.00

Subtotal

ALQUILER DE EQUIPO MENOR


Cdigo Descripcin Unidad Cantidad Tiempo

03001 Camioneta Cabina simple 2 tn. und 1.00 18.00


03002 Radio Trasmisor und 24.00 18.00
03005 Laboratorio und 1.00 18.00
03006 Camion de baranda und 1.00 12.00
03007 Camioneta 4x4 doble cabina mes 1.00 18.00

Subtotal

HOSPEDAJE Y SERVICIOS
Cdigo Descripcin Unidad Cantidad

04001 Alimentacion diaria mes 18.00


04002 Consumo de agua potable mes 18.00
04003 Consumo de energia electrica mes 18.00
04004 Telefono mes 18.00
04007 Hospedaje mes 18.00

Subtotal

MOBILIARIO
Cdigo Descripcin Cantidad %Deprec. Vida util

05001 Escritorios con sillas 4.00 10.00 10.00


05002 Tableros y bancos de dibujo 2.00 10.00 10.00
05003 Mesa de reuniones con sillas 1.00 10.00 10.00
05004 Pizarra acrilica 1.00 2.00 5.00
05005 Pizzarra de avances e informacion 2.00 2.00 5.00
05006 Dispensadores de agua 4.00 50.00 1.00
05007 Computador personal e impresora 4.00 40.00 4.00

Subtotal

GASTOS FINANCIEROS Y SEGUROS


Cdigo Descripcin Unidad Cantidad

11001 Carta fianza por el adelanto Unidad 2.00

11002 Carta Fianza por validez de oferta Unidad 1.00


11003 Carta Fianza por fiel cumplimiento Unidad 1.00
11004 Seguro contra todo riesgo Unidad 1.00

Subtotal

GASTOS FIJOS

VARIOS
Cdigo Descripcin Unidad

08001 Costo de la propuesta est


08002 Visitas al lugar est
08004 Planos de replanteo est
08005 Segundos originales est
08007 Gastos notariales est
08008 Compra de bases est
08009 Traslado de personal y equipo est

Subtotal

Total gastos generales

Fecha :
Pgina 1
:

LLADO DEL DISTRITO DE SAN JOS -

1,566,204.29

Precio Parcial

12,000.00 216,000.00
9,000.00 108,000.00
9,000.00 90,000.00

4,000.00 72,000.00
1,200.00 21,600.00
2,400.00 43,200.00
1,800.00 32,400.00
3,500.00 63,000.00
9,000.00 126,000.00
6,000.00 54,000.00

6,000.00 84,000.00

8,000.00 32,000.00
2,800.00 16,800.00
6,000.00 54,000.00

1,013,000.00

Sueldo/Jornal Parcial

3,000.00 54,000.00
1,800.00 32,400.00
1,000.00 34,000.00
900.00 50,400.00
1,500.00 27,000.00
2,500.00 15,000.00
2,500.00 105,000.00

2,500.00 35,000.00

352,800.00

Costo Parcial

180.00 3,240.00
25.00 10,800.00
362.41 6,523.29
700.00 8,400.00
3,800.00 68,400.00

97,363.29

Precio Parcial

350.00 6,300.00
50.00 900.00
150.00 2,700.00
350.00 6,300.00
750.00 13,500.00

29,700.00
Precio Parcial

450.00 1,800.00
550.00 1,100.00
850.00 850.00
70.00 7.00
70.00 14.00
25.00 50.00
1,300.00 8,320.00

12,141.00

Precio Parcial

13,500.00 27,000.00

14,500.00 14,500.00
13,200.00 13,200.00
6,500.00 6,500.00

61,200.00

7,400.00

Parcial

2,500.00
500.00
3,000.00
300.00
650.00
150.00
300.00

7,400.00

1,573,604.29
S10

Gastos de Supervisin
Presupuesto 1004019 AMPLIACIN Y MEJORAMIENTO INTEGRAL DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE
LAMBAYEQUE - LAMBAYEQUE
Fecha 2/2/2012
Moneda 01 NUEVOS SOLES

GASTOS VARIABLES

PERSONAL PROFESIONAL Y AUXILIAR


Cdigo Descripcin Unidad Cantidad

01007 SECRETARIA mes 18.00


01008 ASISTENTE-METRADOR-DIBUJANTE mes 18.00
01011 INGENIERO SANITARIO mes 18.00
01012 INGENIERO ESPECIALISTA EN MECANICA DE SUELOS Y mes 16.00
PAVIMENTACION
01013 INGENIERO JEFE DE PROYECTO mes 18.00
01014 ING| ESPECIALISTA EN DESARROLLO DE PROYECTOS DE mes 12.00
IMPACTO AMBIENTAL
01015 ASISTENTE EN INGENIERIA DE COSTOS mes 18.00
01016 ING MECANICO ELECTRICO mes 10.00
01018 ARQUEOLOGO und 8.00
01019 INGENIERO ESPECIALISTA EN ESTRUCTURAS mes 16.00

Subtotal

PERSONAL TECNICO
Cdigo Descripcin Unidad Personas Tiempo

02007 Topografo mes 2.00 100.00 14.00


02008 Ayudantes de topografa mes 2.00 100.00 14.00
02009 Choferes mes 1.00 100.00 18.00

Subtotal

ALQUILER DE EQUIPO MENOR


Cdigo Descripcin Unidad Cantidad Tiempo

03007 Camioneta 4x4 doble cabina mes 1.00 18.00

Subtotal

HOSPEDAJE Y SERVICIOS
Cdigo Descripcin Unidad Cantidad

04003 Consumo de energia electrica mes 18.00


04004 Telefono mes 18.00

Subtotal

MOBILIARIO
Cdigo Descripcin Cantidad %Deprec. Vida util

05001 Escritorios con sillas 2.00 20.00 5.00


05005 Pizzarra de avances e informacion 1.00 30.00 2.00
05006 Dispensadores de agua 1.00 80.00 1.00
05007 Computador personal e impresora 3.00 30.00 4.00

Subtotal

Total gastos
generales
Fecha :
Pgina 1
:

TARILLADO DEL DISTRITO DE SAN JOS -

1,124,003.08

Precio Parcial

1,200.00 21,600.00
2,400.00 43,200.00
10,000.00 180,000.00
8,000.00 64,000.00

15,000.00 270,000.00
8,000.00 48,000.00

3,500.00 63,000.00
8,000.00 40,000.00
8,000.00 32,000.00
10,000.00 160,000.00

921,800.00

Sueldo/Jornal Parcial

2,800.00 78,400.00
950.00 26,600.00
1,800.00 32,400.00

137,400.00

Costo Parcial

3,200.00 57,600.00

57,600.00

Precio Parcial

49.06 883.08
40.00 720.00

1,603.08

Precio Parcial

450.00 900.00
120.00 72.00
25.00 20.00
1,280.00 4,608.00

5,600.00

1,124,003.08
12/04/2012 10:50:17 AM