Kaplan bulb turbines

axial
PRATERKRAFTWERK

SCOPE OF SUPPLY: MAIN DATA:


Turbine Type: RT-22,0VK4A
Output: 2502 kW
Head: 8m
Speed: 210 min-1
Year: 2010
Country: Germany
RENDELSTEIN
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: SZ 16,0 / SR6A
Gear Output: 1653 kW
Generator Head: 13,50 m
Hydraulic governor Speed: 305 min-1
Erection and commissioning Year: 2010
Country: Italy
FRTUNA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S 17,0 / MR4
Generator Output: 859 kW
Hydraulic governor Head: 6,47 m
Erection and commissioning Speed: 250 min-1
Year: 2009
Country: Sweden
LERNBO

SCOPE OF SUPPLY: MAIN DATA:


Turbine Type: 2 x S-17,0/SR6A
Generator Output: 2 x 3640 kW
Hydraulic governor Head: 27 m
Erection and commissioning Speed: 428 min-1
Year: 2009
Country: Sweden
GLOVA

SCOPE OF SUPPLY: MAIN DATA:


Turbine Type: S-10,6/SR6A
Generator Output: 1000 kW
Hydraulic governor Head: 19 m
Digital turbine controller Speed: 500 min-1
Erection and commissioning Year: 2009
Country: Turkey
BURENTOBEL

SCOPE OF SUPPLY: MAIN DATA:


Turbine Type: AR16,5/MR3A
Generator Output: 292 kW
Hydraulic governor Head: 3,35 m
Erection and commissioning Speed: 205 min-1
Year: 2008
Country: Switzerland
LUDVIKA

SCOPE OF SUPPLY: MAIN DATA:


Turbine Type: S-21,2/SR6
Generator Output: 3681 kW
Hydraulic governor Head: 17,00 m
Erection and commissioning Speed: 273 min-1
Year: 2007
Country: Sweden
YONGHUNG
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 3 x P-21,2/MR4
Digital turbine controller Output: 3 x 1070 kW
Hydraulic governor Head: 6,92 m
Generators Speed: 188 min-1
Cooling systems Year: 2007
Erection and commissioning Country: South Korea
PIHLAJAMAA

SCOPE OF SUPPLY: MAIN DATA:


Turbine Type: S-11,2/SR6
Generator Output: 512 kW
Hydraulic governor Head: 10,23 m
Electrical equipment Speed: 381 min-1
Erection and commissioning Year: 2006
Country: Finland
KHHRNDLWEHR

LIEFERUMFANG: HAUPTDATEN:
Turbine Type: S-12,5/MR4
Generator Leistung: 664 kW
Hydraulischer Regler Fallhhe: 8,89 m
Montage und Inbetriebnahme Drehzahl: 375 min-1
Jahr: 2005
Land: sterreich
SCHALLAU
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: ART-11.2/MR4
Generator Output: 254 kW
Hydraulic governor Head: 4,75 m
Erection and commissioning Speed: 315 min-1
Year: 2005
Country: Austria
STIFTSWERK

SCOPE OF SUPPLY: MAIN DATA:


Turbine Type: ART-16.5/MR3
Generator Output: 387 kW
Hydraulic governor Head: 3,60 m
Intake structure Speed: 210 min-1
Erection and commissioning Year: 2005
Country: Austria
DORFMHLE
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 2 x S-19,0/MR4
Generators Output: 2 x 1338 kW
Hydraulic governors Head: 7,0 m
Erection and commissioning Speed: 231 min-1
Year: 2003
Country: Austria
WALZWERK
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-16,0/MR4
Hydraulic governor Output: 548 kW
Intake structure Head: 5,16 m
Erection and commissioning Speed: 250 min-1
Year: 2003
Country: Austria
AUWEHR
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 1 x SZ-12,5/MR4
Weir system 1 x SZ-8,5/MR4
Intake structure Output: 918 / 432 kW
Hydraulic governor Head: 11,4 m
Erection and commissioning Speed: 428 / 600 min-1
Year: 2002
Country: Austria
DOPPL
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-6,5/KR52
Erection and commissioning Output: 142 kW
Head: 9,95 m
Speed: 600 min-1
Year: 2002
Country: Austria
ERLENHOLZ
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-9,0/SR6
Generator Output: 449 kW
Digital turbine controller Head: 12,80 m
Hydraulic governor Speed: 500 min-1
Erection and commissioning Year: 2002
Country: Switzerland
KAWAKODA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-10,0/SR6
Hydraulic governor Output: 857 kW
Erection and Commissioning Head: 21 m
Speed: 600 min-1
Year: 2002
Country: Japan
SCHAFLER

SCOPE OF SUPPLY: MAIN DATA:


Turbine Type: ART-11,2/R3
Generator Output: 184 kW
Hydraulic governor Head: 3,20 m
Erection and commissioning Speed: 304 min-1
Year: 2001
Country: Austria
LAUFENAUER
SCOPE OF SUPPLY: MAIN DATA:
Kaplan A-type turbines Type: 2 x AR-19,0/SR3
with belt drive Output: 2 x 326 kW
Head: 2,24 m
Speed: 163 min-1
Year: 2000
Country: Germany
KERSCHBAUM
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: AR-10,6/SR4
Digital turbine controller Output: 152 kW
Hydraulic governor Head: 3,75 m
Trash rack cleaning machine Speed: 320 min-1
Erection and commissioning Year: 1999
Country: Austria
GUNZESRIED
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-9,0/SR6
Governor Output: 366 kW
Steel structure Head: 10,30 m
Trash rack cleaning machine Speed: 500 min-1
Automation Year: 1998
Erection and Commissioning Country: Germany
GLANZER
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: S-10,6/SR6
Governor Output: 569 kW
Steel structure Head: 11,50 m
Trash rack cleaning machine Speed: 428 min-1
Automation Year: 1996
Erection and commissioning Country: Austria
BOHRWERK
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: SR-10,6/SR4
Hydraulic governor Output: 448 kW
Erection and commissioning Head: 8,38 m
Speed: 500 min-1
Year: 1994
Country: Austria
Kaplan turbines
vertical
AUSLAUFTURBINE
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-14,5/SK4B
Gear Output: 384 kW
Generator Head: 5,7 m
Hydraulic governor Speed: 220 min-1
Erection and commissioning Year: 2009
Country: Austria
VILLA DALME
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-18,0/SK4A
Generator Output: 1020 kW
Hydraulic governor Head: 7,2 m
Intake gate Speed: 231 min-1
Electrical equipment Year: 2007
Erection and commissioning Country: Italy
ST. AEGYD
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-7,4/KR4
Belt drive Output: 50 kW
Generator Head: 3,5 m
Hydraulic governor Speed: 400 min-1
Steel structure Year: 2006
Erection and commissioning Country: Austria
MHLTALWEHR
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-19,0/SK4a
Gear Output: 630 kW
Generator Head: 4,9 m
Hydraulic governor Speed: 175 min-1
Erection and commissioning Year: 2005
Country: Austria
LOFERBACH
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-11,5/KR4
Intake gate Output: 197 kW
Hydraulic governor Head: 4,9 m
Speed: 285 min-1
Year: 2003
Country: Austria
GENIVOLTA
SCOPE OF SUPPLY: MAIN DATA:
Turbine Type: VK-22,4/SK4
Speed increaser Output: 1561 kW
Hydraulic governor Head: 6,9 m
Erection and commissioning Speed: 175 min-1
Year: 2002
Country: Italy
CIRISA
SCOPE OF SUPPLY: MAIN DATA:
Turbines Type: 1 x VK -10,0/SK4
Generators 1 x FSV-6,0/75
Electrical equipment Output: 787 / 236 kW
Hydraulic governor Head: 17 m
Erection and commissioning Speed: 600 / 500 min-1
Year: 2002
Country: Latvia
PETZOLD
SCOPE OF SUPPLY: MAIN DATA:
Main and weir turbine Type: VK-15,3/SK4
Trash rack cleaning machine FFV-9,0/250
Digital turbine controller Output: 376 / 82 kW
Hydraulic governor Head: 4,4 / 4,7 m
Steel structure Speed: 220 / 169 min-1
Erection and commissioning Year: 1999
Country: Austria
ALZARA
SCOPE OF SUPPLY: MAIN DATA:
Cooling water energy- Type: 6 x HK-10,0/K6
recovery turbine Output: 6 x 457 kW
6 x Kaplan spiral case turbines Head: 14,5 m
Hydraulic governor Speed: 425 min-1
Year: 1997
Country: Syria