Sunteți pe pagina 1din 1

8 7 6 5 4 3 2 1

Process Diagram | General Arrangement Gas outlet Gas outlet


Selcoperm SES (Selcoperm Electrolysis System)

H H

Rectifier Selcoperm Electrolyser Degassing and storage tank Optional storage tank

LS F
Product& Product Line Diluted Gas
Gas Outlet LS
Overflow
LS T
Cell Out Product Temp.
G LS G
Overflow

-
Duty Transfer pump
Power In
+ Fan
Power In L
T
by Customer Connection Temp. Standby Duty Product Level To
L OPTIONAL To Application
Product Level Storage Tank
Electroyzer (Dosing)
F F
Standby

OR
LS LS
F Tank Leakage Tank Leakage
Gas warning system Cell OPTIONAL

To Dosing
Control Cabinet Hydraulic Cabinet Drain Outlet

Acid Acid cleaning station


In-/Outlet Product dosing station

H2 Sensor (98035225) Power In


E T E
by Customer
Water
F Brine Inlet
Water
Power Out
Fan
Power Out Acid Tank Acid Pump Power In Injection point Chlorine
Acid Station Water Inlet OPTIONAL Acid Station measurement
Power Out
Brine Dosing
Pre-Filtration Station
Pressure control LS
D Reversible flow filter Selcoperm Leakage D
Optional:
Backflow preventer

Main Water Inlet


by Customer Brine dosing station

Building ventilation Optional


- Photometer
Cooler Heater Standby - ...
C OPTIONAL C
Power In
Brine Dosing
Station Duty
FS
Brine Main control Legend
BY CUSTOMER Acid
Brine
Gas
Additional Power
Equipment Product / NaOCl
Signal Connection
B B
Soft Water
Ventilation
Water softener Hardness measurement Saturator Core Component Interface
Sensor Type
Discription
Sensors
Additional Equipment
Projekt Version

98560688 00
Werkstoff / Halbzeug / Rohteilmae

Index nderung Datum Name


-
Benennung
00 First draft 04 /02 /20 14 THN
Name
01
02
Adujstments with GWTS
Major changes signal lines
13/05 /20 14 THN
SELCOPERM SES 5-45kg
A 03 Salt pump <10kg outside the SES, see PCS
22 /05 /20 14

28 /07 /20 14
THN/MSL

THN
- Overall Process Diagram - A

Originalformat Mastab Zeichnung Nr.

A2 1: 1 xxxxxx
Erst ellt von Datum Datei... Seite
O:\KONSTRUK TION \DESINFEKT IONST ECHNIK\PRODUKTE \SELCO PERM \SELCO PERM LAR GE - PROJ ECT\SPECIFICATIONEN\PROCESS-DIAGRA M\2014-07-
Till Hensgen 04/02/2014 28-SES_OVERA LLPROCESSDIAGRA M.VSD 1 von 3

8 7 6 5 4 3 2 1

S-ar putea să vă placă și