Sunteți pe pagina 1din 8

SL.No.

Function Name

1 Shift Report/Shift Notes, Confirmation

Enhancement in Manufacturing
2
Information System

3 EWM Integration into Manufacturing

4 XSteps for Routing and Production Order

5 Order split

6 Business Package for Production Supervisor


PM

SL.No. Function Name


1 Action log in maintenance task list

2 Inspection round

Work Center Synchronisation between Maint


3 enance order & notification
4 Displying multilevel list of technical objects

QM

SL.No. Function Name


1 Assigning object at item level
2 Sending notification with attachment
Function Details

This business function enables


you to create and process shift notes and shift reports for work centers and hierarchies and utilize enhancements in the area
of production and process order confirmations

This business function enables you to utilize


additional evaluations in material requirements planning. Numerous enhancements for the Order
Information System and in mass processing offer additional options for the analysis of planning data
and the simultaneous processing of large numbers of orders.

Handling complete end to end process with materials

Thisbusiness function enables you to use


execution steps (XSteps) that you previously used
only in production planning for process industries
in discrete manufacturing as well. Execution steps
are modules that you can use to describe the individual
steps in production.

This business function enables you to use the enhanced


functionality for the order split. This functionality enhances
the existing functions for the PP confirmation, the MM goods
movements, and the corresponding CO postings. The enhancements
allow greater flexibility with regard to how the child order can be created
. This ensures greater transparency in the operations and confirmations
of the parent and child order and facilitates a meaningful plan/actual
comparison for parent and child order.

new worksets and iViews facilitate the monitoring and


control of your production
Function Details
Changes to task lists for equipment and functional locations, and changes to general
maintenance task lists are recorded in an action log. This enables you to track who has
made which status or data changes to which fields, and when. Changes to task lists
with change numbers are also recorded in the action log.
Specifying functional location at operation level & linking measuring point to the location.

Synchronisation of work center between Maintenance order & notification


We can display multilevel list for technical objects.

Function Details
We can assign multiple object to a notifiaction at item level.
Sending quality notification with attachment in email.
Advantages/Features

All relevant information for shift can be captured.Shift wise Qty tracking
,i.e Yield,scrap.Subdividing yield,scrap,rework into further field.Automatic generation
of quality notification when scrap is confirmed.

Mass extraction of planning data,Enhancements in the collective


displays of material requirements planning,define material-specific limit values for
important materials in order to identify critical items

Integration of EWM in the area of production.Logistic process will be more


transperent.such integration facilitates better tracking of materials and better
identification of weak points, thereby bringing an overall improvement in the supply
chain or parts thereof.

Exchange of manufacturing relevant data between ERP & independent level


of manufacturing. Creation of a work environment adapted to the worker (e.g.
machine operator) for fast and easy access to different applications and services

The planned costs can be charged proportionally to the child order.


Co- and by-products can be transferred proportionally to the child order
The split quantity can be suggested from planned independent requirements
, WIP batches, or component batches

The new workset Shift Reports enables you to create and process shift reports
The new workset Planning Situation gives the production supervisor an overview
of problems that are already discernible in the planning phase, enabling him or
her to respond accordingly to ensure a smooth production process.you can create maintenance
notifications, maintenance orders, and quality notifications, and carry out a personnel evaluation.
Advantages/Features
Better trackin facility in different parts of maintenance plan

Linking measuring point to the functional location at operation level.

Changing the work center in Notification will change the work center in
related header will be changed or viceversa.
Analysis will be easier.

Advantages/Features
Reducing amount of processing & no. of notification.
Sending quality notification over email.
Disadvantages

Some change management is required


to adapt the change made in CO11N,Co15
Disadvantages

Disadvantages

S-ar putea să vă placă și