Sunteți pe pagina 1din 1

PEMERINTAH KOTA MALANG

DINAS PEKERJAAN UMUM


Jalan Bingkil No. 1 Malang
MALANG KUCECWARA

199 m
10 m KEGIATAN
10 m

A Jalan B
Bak Kontrol

Saluran Tertutup Saluran Tertutup 122

A Jalan B Jalan
PEKERJAAN

LOKASI KEGIATAN

DIRENCANAKAN
80 80
10 15 50 15 10 10 15 50 15 10 CV. TIRTA ADI NUGROHO

Tutup Beton 50.5-50 50.50.5


I 10.25 Jalan
RUMAH Existing Jalan
TOMI MAHENDRA, ST
Team Leader
15

15
Timbunan Biasa Timbunan Biasa DIPERIKSA
50.5-50
50.50.5
CV. TIRTA ADI NUGROHO
Beton K-250 Beton K-250
80

80
120

130

60
Timbunan Pilihan
t = 10 cm I 10.25
Timbunan Pilihan

10
15

t = 10 cm

15
Ir. LAKSONO DJOKO NUGROHO
10

50 Direktur

10
15 50 15
80
JUDUL GAMBAR SKALA
15 50 15
80

KODE GAMBAR NO. LEMBAR JML. LEMBAR

ARS 02 03