Sunteți pe pagina 1din 4

5/20/2016 ProjectsOGPTracker>

HiberniaSouthernExtensionProjectCanada,NorthAmerica

FlamedetectedaboardHiberniaplatform

ProjectProfile
Value:US$2,049Million
Location:Jeanned'ArcBasin,offshoreCanada
Reserves:223millionbbl
StartupYear:2013

TheHiberniaprojectincludessixpotentialsubseadevelopmentsthatmaytiebacktotheHiberniagravitybasedplatform.Theactivitiesproposedcouldrununtil2036.
SomeoftheseschemesmaylieoutsideHMDC'sexistingSignificantDiscoveryAreaandsomewillalsorequiregloryholestoavoidicebergimpacts.Eachofthesixdrill
centrescouldcontainupto11injectionorproductionwellsfocusedonatleastonesubseatemplateormanifold.Theworkistobesplitintotwopackages.HiberniaSouth
Eastisoneofsixpossibleexpansions.Itisestimatedtocontainatleast223millionrecoverablebarrelsofoil.Firstproductionisexpectedbytheendof2013.

EPC1:Involvesdesign,fabrication,supplyandinstallationof7km'sofflowlinesandcontrolumbilical'saswellasinstallationofsubseaequipment.
EPC2Coverssixwaterinjectiontrees,apairofthreeslotmanifoldsweighingupto200tonneseach,drillingtemplatesplusassociatedequipment

Operators:

HiberniaManagementandDevelopmentCo.(HMDC)ismadeupofconstituentcompanies:

ExxonMobil
Chevron
SuncorEnergyInc.
MurphyOilCorp.
NalcorEnergy
StatoilASA

ProjectInformation

May17,2016

A fire broke out aboard the Hibernia platform, offshore Canada. The incident involved a flame originating from under the insulation of a high pressure cleaning
unit on the Hibernia Platform. Two workers observed the flame and immediately shut down the high pressure cleaning unit.A portable extinguisher was used
to quickly extinguish the flame.

Feb10,2015

Suncor Energy made progress with its ongoing field developments. The water injection started late last year (in 2014) at the Hibernia South Extension Unit
project, and production should ramp up during the second half of 2015.

Nov20,2014

Wood Group PSN (WGPSN) will continue its provision of engineering, procurement and construction services to the Hibernia platform, offshore Newfoundland
and Labrador, under a new multimillion dollar, fiveyear contract extension from Hibernia Management and Development Company Ltd. (HMDC). Since first oil
in 1997 WGPSN has been the incumbent contractor for these services and the contract is still a cornerstone of WGPSN business in the region. Hibernia
was the first producing field off Canadas East Coast.

May22,2014

http://app.projectsogp.com/viewcomplete.php?id=1657 1/4
5/20/2016 ProjectsOGPTracker>

Projectclassification
Completion date: 2013

STATUS: CATEGORY: ON/OFFSHORE:

UPSTREAM EPC AWARDED PRODUCTION SUBSEA OFFSHORE

Projectoperators

HiberniaManagementandDevelopmentCo(HMDC)
100 New Gower Street, Suite 100
St. Johns NL A1C 6K3
Canada

CONTACT

Telephone:++17097787000
Fax:++17097220022
Web:http://www.hibernia.ca/

ExxonMobilCanadaLtd.
237 4 Ave Sw
Calgary
Calgary T2P 2J7
Canada

CONTACT

http://app.projectsogp.com/viewcomplete.php?id=1657 2/4
5/20/2016 ProjectsOGPTracker>

Projectmaincontractors

KBR(Canada)
3300 76th Ave
Edmonton
Alberta T6P 1J4
Canada

CONTACT

Telephone:++17804681341
Web:http://www.kbr.com

FMCTechnologiesCanada
6703 68 Ave Nw
Edmonton
AB T6B 3E3
Canada

CONTACT

Projectsubcontractors
Nosubcontractorslisted

http://app.projectsogp.com/viewcomplete.php?id=1657 3/4
5/20/2016 ProjectsOGPTracker>

Projectnotes

http://app.projectsogp.com/viewcomplete.php?id=1657 4/4

S-ar putea să vă placă și