Sunteți pe pagina 1din 12

SELECTION OF

MIDDLE EAST
PROJECT REFERENCES

DUBAI Airport Free Zone


East Wing, Office E125
P O Box 54258
Dubai, UAE
tel: +971 4 2995065
fax: +971 4 2994869
www.energy-solutions.com
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

CONTENTS

1. ADNOC DISTRIBUTION LPG PIPELINE PROJECT ................................ 3


2. GASCO GAS NETWORK ................................................................. 4
3. PDO GAS EXPORT PIPELINE ........................................................... 5
4. ADNOC-DISTRIBUTION ................................................................. 6
5. OMAN GAS COMPANY GAS NETWORK .............................................. 7
6. SAUDI ARAMCO MULTI PRODUCTS PIPELINES ............................... 8
7. SAUDI ARAMCO PRODUCTS PIPELINES ......................................... 9
8. SAUDI ARAMCO SALES GAS NETWORK ....................................... 10
9. AL AIN FUJAIRAH GAS PIPELINE ................................................ 11
10. YANBU MEDINA WATER TRANSMISSION SYSTEM ......................... 12

Energy Solutions International 2011 2


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

1. ADNOC DISTRIBUTION LPG PIPELINE PROJECT

CLIENT: ADNOC DISTRIBUTION (previously ADNOC FOD)

CONTRACTOR: Penspen

SCADA SUPPLIER: Honeywell Middle East Ltd.

LOCATION: Abu Dhabi, United Arab Emirates

PIPELINE SYSTEM: The system consists of one pipeline and one pumping
station:

Mussafah to Um Al Nar Terminal

The product transported in the system is LPG

ESI SCOPE: Real-time Pipeline Modelling Software, including:

Leak detection and location


Data reception and sending
Data pre-processing
Real-time dynamic pipeline model:
Shut-in leak detection

STATUS: Installed on site in 1998

Energy Solutions International 2011 3


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

2. GASCO GAS NETWORK

CLIENT: Abu Dhabi Gas Industries (Gasco), subsidiary of


ADNOC

CONTRACTOR: Snamprogetti, Technip/Bechtel

SCADA SUPPLIER: Serck Controls Ltd.

LOCATION: Abu Dhabi, United Arab Emirates

PIPELINE SYSTEM: The system has a daily throughput of 50 million Nm3


and consists of more than 17 pipelines with diameter >
16 and with total length of > 1000 km

ESI SCOPE: Leak Study

Real-time Pipeline Application Software, including:


Data Reception
Data Pre-processing
Real-time hydraulic model
Leak detection
Leak location
Scraper tracking
Composition tracking
Compressor modelling
Training simulator
Dynamic inventory calculation
Look-ahead model
Survival time analysis
Predictive process model

STATUS: Installed on site in 1998, extended in 2000, 2001 and


2002

Energy Solutions International 2011 4


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

3. PDO GAS EXPORT PIPELINE

CLIENT: Petroleum Development OMAN (PDO)

CONTRACTOR: Bechtel

SCADA SUPPLIER: Scomagg

LOCATION: Oman

PIPELINE SYSTEM: This is a single 354 km pipeline, with 11 block valves

The products transported in the system are:

LNG

ESI SCOPE: Leak Study

Real-time Pipeline Modelling, including:

Data reception
Data Pre-processing
Real-time hydraulic model
Leak detection and location
Line inventory calculation
Look-ahead
Dynamic line pack
Survival time analysis

STATUS: Installed on site in 2000, upgraded in 2004 and 2005

Energy Solutions International 2011 5


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

4. ADNOC-DISTRIBUTION

CLIENT: ADNOC DISTRIBUTION (previously ADNOC FOD)

CONTRACTOR: Penspen/Cegelec

SCADA SUPPLIER: Honeywell Middle East

LOCATION: Abu Dhabi, United Arab Emirates

PIPELINE SYSTEM: The system consists of one pipeline and one pumping
station

Umm Al Nar to Mussafah Terminal

The products transported in the system are:

Gas oil
Kerosene
Gasoline - unleaded and leaded

ESI SCOPE: Real-time Pipeline Modelling Software, including:

Leak detection and location


Data reception and sending
Data pre-processing
Real-time dynamic pipeline models:
Shut-in leak detection
Batch modelling

Batch Management System, including:

Batch sending information handling


Batch tracking (using colour for triggers)
Batch scheduling

STATUS: Installed on site in 1998

Energy Solutions International 2011 6


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

5. OMAN GAS COMPANY GAS NETWORK

CLIENT: Oman Gas Company (OGC)

SCADA SUPPLIER: Invensys

LOCATION: Sultanate of Oman

PIPELINE SYSTEM: Covering the existing and new gas network (more than
1000 kms of pipeline) in Oman operated by OGC.

The transported product is natural gas

ESI SCOPE: Leak Sensitivity Study


Duel Redundant Unix based Operating System
Real-time Pipeline Modelling Software, including:

Data Reception
Data Pre-processing
Real-time dynamic model
Inventory calculation
Instrument analysis
Leak detection and location
Predictive process modelling

STATUS: Installed on site in 2003 - 2004

Energy Solutions International 2011 7


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

6. SAUDI ARAMCO MULTI PRODUCTS PIPELINES

CLIENT: Saudi Aramco

SCADA SUPPLIER: Neles Automation, previously Valmet

LOCATION: Saudi Arabia

PIPELINE SYSTEM: The project consists of three pipeline systems

The products transported in the system are:

Kerosene
Gasoline
Diesel

ESI SCOPE: Real-time Pipeline Modelling Software including:

Data Reception
Data Pre-processing
Real-time dynamic model
Leak detection
Leak location
Training simulator
Pipeline inventory calculations
Look-ahead analysis
Predictive process simulator
Batch tracking
Batch scheduling

STATUS: Installed on site in 1997, upgraded in 2001

Energy Solutions International 2011 8


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

7. SAUDI ARAMCO PRODUCTS PIPELINES

CLIENT: Saudi Aramco

SCADA SUPPLIER: Neles Automation, previously Valmet

LOCATION: Saudi Arabia

PIPELINE SYSTEM: The project consists of seven pipeline systems

The products transported in the systems are:

Butane
Propane
NGL

ESI SCOPE: Real-time Pipeline Modelling Software including:

Data Reception
Data Pre-processing
Real-time dynamic model
Leak detection
Leak location
Training simulator
Pipeline inventory calculations
Look-ahead analysis
Predictive process simulator

STATUS: Installed on site in 1998

Energy Solutions International 2011 9


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

8. SAUDI ARAMCO SALES GAS NETWORK

CLIENT: Saudi Aramco

SCADA SUPPLIER: Neles Automation, formerly Valmet

LOCATION: Saudi Arabia

PIPELINE SYSTEM: The system comprises a number of import/export


pipelines associated with the gas network in Saudi
Arabia

ESI SCOPE: Real-time Pipeline Modelling Software, including:

Data Reception
Data Pre-processing
Real-time dynamic model
Leak detection
Leak location
Composition tracking
Pipeline inventory calculations
Look-ahead analysis
Predictive process simulator
Load forecaster

STATUS: Installed on site in 1994

Energy Solutions International 2011 10


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

9. AL AIN FUJAIRAH GAS PIPELINE

CLIENT: Dolphin Energy Limited (DEL)

CONTRACTOR: Dodsal

SCADA SUPPLIER: Servelec

LOCATION: United Arab Emirates

PIPELINE SYSTEM: The system comprises a single pipeline from Al Ain to


Fujairah, with a spur towards the Oman border.

The product transported is Natural gas

ESI SCOPE: Leak sensitivity study

Real-time Pipeline Modelling Software, including:

Data Reception
Data Pre-processing
Real-time dynamic model
Leak detection
Leak location
Scraper tracking

STATUS: Installed on site in 2004

Energy Solutions International 2011 11


Project Refs/Middle East/2011/WJ
ENERGY SOLUTIONS MIDDLE EAST PROJECT REFERENCES

10. YANBU MEDINA WATER TRANSMISSION SYSTEM

CLIENT: SWCC

CONTRACTOR: Saudi Techint

SCADA SUPPLIER: Honeywell Turki Arabia Limited

LOCATION: Saudi Arabia

PIPELINE SYSTEM: This is a 300km transmission system with three


pump stations, additionally two branch lines are gravity
fed from storage tanks

The products transported in the pipelines are:

Desalinated Water

ESI SCOPE: Leak Sensitivity Study

Dual redundant Real-time Pipeline Modelling Software,


including:

Data Reception
Data Pre-processing
Real-time dynamic model
Inventory calculation
Instrument analysis
Leak detection and location
Pump optimisation
Pump modelling
Pump scheduling
Predictive process modelling
Training simulator

STATUS: Installed on site in 1999, extended in 2001 and 2003

Energy Solutions International 2011 12


Project Refs/Middle East/2011/WJ

S-ar putea să vă placă și