Documente Academic
Documente Profesional
Documente Cultură
2nd stage
1. Installation of Feeder Breakers, ratings as per drawing with corresponding conductor size.
2. Guard House, Staff House 1 and Staff house 2 will be tapped at 200A breaker.
Transformer
3 x 100KVA
3. Canteen and tool room will be tapped at a source near the area, as per actual.
Oil Filled
4. Machine shop, Machine Repair area, Industrial and truck parts and upholstery feeders
can be modified as per actual condition. These feeders can be grouped by area to
E
minimize/lessen circuit breaker and conductor. (example, Machine shop and industrial
2x500mm2
parts feeder can be combined or grouped as one circuit. Machine Repair Area and
Upholstery can be combined or grouped as one circuit)
G
Main breaker
800A
5. To branch out from Production breaker to feeders, feeder tapping is permissible.
3Pole CB
2x500mm2
D
500mm2
Pull Box/Junction box
185mm2
Guard House Staff House 1 Staff House 2 Admin
B
SHEET:
CLIENT PROJECTS: CONTENTS: 01 CAD: SCALE:
REVISION
C ONE Electrical Modification 02
PROJECT MANAGER: DESIGNED:
03 OF SHEET:
APPROVED: DWG. NO.
04
QR-DSN-002 EFFECTIVITY: 01/20/14 LOR/ RFQ:
LOCATION: 05 DATE: