MATERIAL TRACEABILITY/ FIT UP/ DIMENSIONAL & WELD VISUAL INSPECTION REPORT

Project No: 170011 Doc No: FME-STR-005


Project: METRO RED LINE SOUTH ELEVATED AND AT - GRADE (EZ TRANSOM CONNECTION BATReport No: FME-170011-DWR-S07
Client: QATAR RAIL Assembly No:/ Quantity As Per the following Drawing
Consultant: LOUIS BERGER. (PMC) Assembly Heat No:/Grade: As Per the following Drawing
Contractor: FYAP BS EN ISO 17637:2011/
Specification: BS EN ISO 5817:2014 LEVEL B
Sub Contractor UAAC
TRACEABILITY FIT UP/ DIMENSIONAL PART WELDING PART NDT (%) PART
Sl Material Inspection Report Sketch/Drawing Attached Weld Map attached NDT Request
Remarks
No:
Welder Welding
Mark No: Qty Joint No: Material Grade / Heat no: Fit Up Date Orientation Alignment Dimension Welding Date
ID
WPS No: Position
Process
MT PT UT RT

1 AWN-TBR1 19 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-703 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
2 AWN-TBR2 2 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
3 AWN-TBR3 10 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-559 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
PL 15mm - S355J0+N - 364210-1
4 AWN-TBR4 10 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-559 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
5 AWN-TBR5 5 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
6 AWN-TBR6 5 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA

Comments:

Frijns ME TPI/ SE Contractor Client/ Consultant Rep


Name Chau Minh Ky

Siganature

Date 11.3.2017
MATERIAL TRACEABILITY/ FIT UP/ DIMENSIONAL & WELD VISUAL INSPECTION REPORT

Project No: 170011 Doc No: FME-STR-005


Project: METRO RED LINE SOUTH ELEVATED AND AT - GRADE (EZ TRANSOM CONNECTION BATReport No: FME-170011-DWR-S08
Client: QATAR RAIL Assembly No:/ Quantity As Per the following Drawing
Consultant: LOUIS BERGER. (PMC) Assembly Heat No:/Grade: As Per the following Drawing
Contractor: FYAP BS EN ISO 17637:2011/
Specification: BS EN ISO 5817:2014 LEVEL B
Sub Contractor UAAC
TRACEABILITY FIT UP/ DIMENSIONAL PART WELDING PART NDT (%) PART
Sl Material Inspection Report Sketch/Drawing Attached Weld Map attached NDT Request
Remarks
No:
Welder Welding
Mark No: Qty Joint No: Material Grade / Heat no: Fit Up Date Orientation Alignment Dimension Welding Date
ID
WPS No: Position
Process
MT PT UT RT

1 AWS-TBR1 19 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-703 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
2 AWS-TBR2 2 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
3 AWS-TBR3 10 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-559 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
PL 15mm - S355J0+N - 364210-1
4 AWS-TBR4 10 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-559 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
5 AWS-TBR5 5 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA
6 AWS-TBR6 5 J1-J3 6.3.2017 Acc Acc Acc 11.3.2017 W-704 WPS-FRJ-027 Rev 00 PF MAG 25% NA NA NA

Comments:

Frijns ME TPI/ SE Contractor Client/ Consultant Rep


Name Chau Minh Ky

Siganature

Date 11.3.2017