BLUE OAK INTERIOR & CONSTRUCTION LTD. Quote
‘To be a leading provider of global interior decoration solutions, high quality
construction services & technical expertise.
Date January 4, 2016
Valid Untit_ | 30 Days
> Quote # BOIC16/01/01
P customer MME Quote(Project Description
COMPLANT
KAMPALA, OFFICE FIT-OUT FOR COMPLANT
UGANDA. LUGOGO HOUSE
Boe UNIT Gn
|SUPPLY AND FIXING OF GYPSUM DRYWALL a
PARTITION READY FOR PAINT sam 456.24] 135,000 21,092,400
1
[SUPPLY AND FIXING OF WOODEN SKIRTING.
2 loom HIGH) iM 130.00] 20,000 2,800,000
[SUPPLY AND APPLYING OF PAINT EMULSION
CReW Wale: ‘SoM 313.00] 10,000 3,130,000
[SUPPLY AND FIXING OF FLUSH DOOR
(200x210) MAHOGANY WOODEN FRAME &
COMPLETE WITH IRONMONGERY (WITHOUT ice 10,00) 00,000 Malas
DOOR CLOSER)
|SUPPLY AND FIXING OF ALUMINIUM PARTITION,
[2400MM HIGH WITH 6MM CLEAR
5 |GLASS/MELAMINE MDF-STANDARD PARTITION saM 23.52 | 240,000 5,844,800
|WITH SILVER/BROWN ANODIZED COLOR
(SECTION SIZE 80x40)
[SUPPLY AND FIXING OF ALUMINIUM SINGLE
DOOR (900x2100) WITH 6MM CLEAR
6 |GLASS/MELAMINE MDF-STANDARD DOOR WITH Pos 2.00 | 900,000 1,800,000
ISILVERIBROWN ANODIZED COLOR (SECTION
ISIZE 80x40)
subtotal |uGx | 42,267,200
MEASUREMENT | Actual measurement shall be final. Discount
[ADDITIONAL WORK | Any changes or adctional work will be charged extra. VAT Rate [% 78.00
TINE SCOPE 30 Days VAT uGx 7,608,096)
(60% Advance [Total UGX 49,875,296]
PAYMENTS | 20% on after 75% of the work. (UGX fourty nine Million Eight Hundred
30% on completion of the work [Seventy Five Thousand Two Hundred
Ninety Six Only.)
‘Above information is not an invoice and only an estimate of services/goods described above.
Payment will be collected in prior to provision of servicesigoods described in this quote.
Please confirm your acceptance of this quote by signing this document,