Thisis to certify that Mr. Ronan Ortega, Sr. Electrical Engineer from QIT PowerTech, Doha
Qatar has successfully participated and completed the Factory Acceptance Testing for EPE 11 KV
‘Switchgear Panels built for AUAB Power Plant Project which was held in EPE Switchgear (M) Sdn-
Bhd factory, Nilai - Malaysia from 08-04-2013 to 11-04-2013.
‘The FAT testing & training included;
General operation
Mechanical and Electrical Interlocks
Power Frequency Testing CERTIC!
Insulation testing i
Protection testing
Hardware design
Maintenance and Operation
Documentation structure
KSNK8 855
During the above period, we found him to be well qualified and he showed a lot of interest in his
work. We do not hesitate to recommend and work with him again in future.
‘We wish him all the success in future.
: SUBSCRIBEB AND SNOR'
: BEFORE ME THIS__"ML 24
ene Pate ee rel seat AT CEBU CITY, PHILIPPINES
Lee Tew Giap
{Export Director)
“h CEBU CITY
ING,97-43
2014
4 PROVINGE
U PROVO
PE Switchgear (Mt) Sdn Bhdome
or Jalen Permata 2, Arab Malaysian industrial Park, 71800 Nis, Negeri Sembile, Malays
Tel:605-7908500 Fx 6067098620,PHILIPPINE EMBASSY
DUM STATE OF QATAR
Service no.
Fee Pack QR.
O.R.vo.