Sunteți pe pagina 1din 2
August 2013 To whomsoever it may concern Thisis to certify that Mr. Ronan Ortega, Sr. Electrical Engineer from QIT PowerTech, Doha Qatar has successfully participated and completed the Factory Acceptance Testing for EPE 11 KV ‘Switchgear Panels built for AUAB Power Plant Project which was held in EPE Switchgear (M) Sdn- Bhd factory, Nilai - Malaysia from 08-04-2013 to 11-04-2013. ‘The FAT testing & training included; General operation Mechanical and Electrical Interlocks Power Frequency Testing CERTIC! Insulation testing i Protection testing Hardware design Maintenance and Operation Documentation structure KSNK8 855 During the above period, we found him to be well qualified and he showed a lot of interest in his work. We do not hesitate to recommend and work with him again in future. ‘We wish him all the success in future. : SUBSCRIBEB AND SNOR' : BEFORE ME THIS__"ML 24 ene Pate ee rel seat AT CEBU CITY, PHILIPPINES Lee Tew Giap {Export Director) “h CEBU CITY ING,97-43 2014 4 PROVINGE U PROVO PE Switchgear (Mt) Sdn Bhdome or Jalen Permata 2, Arab Malaysian industrial Park, 71800 Nis, Negeri Sembile, Malays Tel:605-7908500 Fx 6067098620, PHILIPPINE EMBASSY DUM STATE OF QATAR Service no. Fee Pack QR. O.R.vo.

S-ar putea să vă placă și