Contents
Primary SA Secondary SA
DMS
SCADA
Network
Information
System
External
Network
Copyright ABB - 7 -
Data
1MRS755095
Simulation mode
Replaces the pins in the wall and/or
the mimics
Copyright ABB - 25 -
1MRS755095
DMS 600
A modular Software
Main modules
Automatic
Restoration
Restoration Extended load Operations
Reconfiguration
Support modeling Planning
SCADA Interface
Copyright ABB - 26 -
1MRS755095
DMS 600
Customer Information
Customer data can be linked from
other database or imported from text
files or spreadsheets to DMS 600
database
Customers can be queried using
several criteria. The found
customers can be easily located on
network map
Detailed customer data and outage
history are available
A new outage report can be added
manually
Copyright ABB - 27 -
1MRS755095
DMS 600
Extended Data Management
User defined object types
Tool for searching for components in
the network
Criterion can be anything that is in
the network database
Graphical results easy to overview
Data Analysis
Filtering, sorting and statistics with
MS Access
Graphical queries (Theme map)
Copyright ABB - 28 -
1MRS755095
DMS 600
Low Voltage Networks
Network model can include the
whole network down to the LV
network and the end user
Needed LV networks are loaded
from database to workstation
memory
The real-time topology and outages
in LV networks can be updated to
database
With LV network modeling outage
reports can be produced of all
maintenance and fault outages
Copyright ABB - 29 -
1MRS755095
DMS 600
Extended Load Modeling
Improves the load model for a more
accurate presentation.
Profile Editor for creating or editing
the load profiles for energy
consumers.
Possible to create load profiles for
customer segments or even large
customers
Adaptation of loads to
measurements (state estimation),
even to daily changes in the weather
One week forecast for simulation
and operations planning
Copyright ABB - 30 -
1MRS755095
DMS 600
Operations Planning
Create and simulate a switching
sequence in advance
Two way to create a sequence:
Automatic sequence creation
Checking of technical constraints
Learn mode (macro recording)
Simulation of the operation before
actual execution
Plan Management
Saving
Scheduling
Execution Support
Copyright ABB - 31 -
Reporting
1MRS755095
DMS 600
Operations Planning
The tasks in switch orders can be
customized
Checking, approval, work permit
Tight Integration with MS Word to
create documents
MS word templates with modified
content, layout and customer logos
The end user can define and print
customized switch order documents
Customized list of customers
affected by an outage
Copyright ABB - 32 -
1MRS755095
DMS 600
Reconfiguration
Search for optimal network
configuration for loss minimization
Two modes of reconfiguration
All switches
Only remote controlled switches
Two algorithms available
Single trial faster, sometimes local
optimum
Double trial better results
Possibility to freeze open points
Tool for interactive study of
optimization results
Copyright ABB - 33 -
1MRS755095
DMS 600
Fault Location
Detects permanent faults along
feeders, calculates the distance and
displays the fault location on a map.
Coloring of possible faulted lines
Fault location based on
Tripped circuit-breaker
Calculated fault distance (size of
fault current of fault reactance from
relays via SCADA)
Fault indicator data
A fast fault location assists in a rapid
restoration process
Copyright ABB - 34 -
1MRS755095
DMS 600
Fault Isolation & Network Restoration
DMS determines the switching
sequence that is required for
maximum restored power supply
Safe restoration by checking
technical constraints with each
operation
Results in list of operations to be
done
The restoration process can be
made Automatic
Reduces outage times from several
hours to even less than a minute!
Copyright ABB - 35 -
1MRS755095
DMS 600
Outage Reports and Statistics
Collect information about outages
Faults
Reclosing trips
Maintenance outages
Detailed Fault information
Exact fault location
Faulted component
Get statistics of outages in the
network
Whole system (SAIDI, SAIFI, etc.)
For each customer
Copyright ABB - 36 -
1MRS755095
DMS 600
Network Analysis
Calculation in the network
Load flow based on load model
Fault current
Voltage drop
Protection analysis
Detection ability
Short circuit capacity
Selectivity
Result representation using coloring
Ensures an efficient and secure
network operation
Copyright ABB - 37 -
1MRS755095
DMS 600
New requirements for network companies
The society requires information of
distribution quality
Exact information of outage situation
and forecasts
For media, customers and own
organization
The authorities and regulators
require statistics and information
Key figures to evaluate operational
quality and efficiency
New laws
In many countries compensation for
long outages to all customers
Copyright ABB - 38 -
1MRS755095
DMS 600
Outage information in internet/intranet
Information to internal management and
external parties like media
History of the situation is stored to study
the chosen actions
DMS 600 creates automatically
html-document for intra- and internet
MS Word-documents stored for later
studies
Copyright ABB - 39 -
1MRS755095
DMS 600
Outage information by telephone
accurately
NMEA = National Marine Electronics Association
1MRS755095
DMS 600
MicroSCADA SYS 600 & DMS 600
High level of integration
Single data entry
Tools for connecting process objects
and importing station pictures
Tool to create manual switches ads
process objects in MicroSCADA
All remote control done from
MicroSCADA
MicroSCADA process picture
opened automatically
Integrated warnings, alarms and
events
No need to redo what once have
been done in MicroSCADA
Copyright ABB - 42 -
1MRS755095
DMS 600
DMS vs. Traditional
DMS Traditional
Open point management with a click of a Open point data management with pins
mouse and dynamic colouring on the wall
Fault located immediately after the fault Limited information available in fault
happens situations
=> Laborious fault management
=> Long outage times
Operations planned and simulated in Operation planning using experience
advance with efficient tools and intuition
Copyright ABB - 43 -
1MRS755095
DMS 600
Summing up
!
" # " " " "
"
$ " "
"
% &
' " (
) " "
Copyright ABB - 44 -
1MRS755095
DMS 600
Summing up
% (
%
& " !
* "
" "
+ "
"
$ (
$ " "
$ " "
Copyright ABB - 45 -
1MRS755095