Table of Contents
Page | 1
Background and Objectives...5
Market and Demand Analysis....7
Technical Analysis..11
Financial Analysis...15
Gantt Chart...17
Network Diagram18
Input and Personnel Requirement....19
Work breakdown Structure.21
Detailed Work Plan Statement...24
Cost Summary......27
Monitoring and Evaluation Framework.28
End Project Scenario...29
Page | 2
Background and Objectives
Problem Statement
The market has a great potential because children of poor families are deprived
of basic quality education. This is mainly due to high fee structure of various
private educational institutions and as for government institutions, they are not
fostering quality in education as compared to private institutions. The school
market belongs to lower class people where income level of the people is hardly
up to 15000 and they cannot pay high fees for education of their children and
they have to compromise with government schools for low quality with low fee
structure. Due to weak financial positions and low income level, parents of
children are in search of a schooling system that can cater comparatively better
and quality education with fee structure acceptable to them.
Goals
Objectives
The construction cost of the school may increase because of the market
dynamics and price volatility
In the start of project the risk of loss may be faced.
To keep the facility fit with the vision and mission of school is very tough
and strenuous exercise. So it will require extraordinary attention and
efforts of the management.
Page | 3
Market and Demand Analysis
Demand Forecasts
There are around about 1000 students per year who need basic education in this
locality Growth rate in primary is 19% and in middle 9% and in high classes it is 5
% per year
Marketing Plan
Opportunities
Strengths
Weaknesses
The project team may not have sufficient interest in this project
Page | 4
Threats
Objectives
To increase the number of students u to 100 with in one year, 300 in two
years, 500 in nest 3 years, 700 in 4th year and 1000 in 5th year
To satisfy the parents that their children are getting better education than
competitors
Marketing strategy
Play ground
Promoting Extra- curricular Activities
Computer Training
Religious Activities
Functions and competition among schools
Talent Grooming
Personality Grooming
Enhancing Leadership abilities
Page | 5
The promotion and advertisement source will be brusher, flyers and newspapers.
This is more economic source and 60% of the budget allocated for promotion will
be spent on this source of advertisement.
Action Plan
Page | 6
Technical Analysis
Manufacturing Process
The building of the institution will be constructed with the typical construction
technique.
Technical Arrangements
Transfer of land
The document of the transfer of land and ownership of that land is given.
Registration
The registration of the land is done.
Soil testing
The soil will be tested whether it is feasible to build a structure for an
educational institute on that land.
NOC
No Objection Certificate will also be acquired.
Drawings
The drawings of the building is completed
Registration
Registration of the school with Board of Secondary Education Rawalpindi
is also done.
Raw Materials
Page | 7
Processed Industrial Materials and Components
After construction the following materials is required for running the school
properly.
Iron
Wood
Oils
Paints
Plastics
Glue
Utilities
These given utilities are required for operating the school in future.
Electric Power
Water
Diesel
Product Mix
The school will be educating the students of low income families. They will be
getting education at such low cost that could be easily afforded by them. So, our
product is educational service at small cost for the low income family.
Capacity
Input Constraints
Investment Cost
Market Condition
Page | 8
Labor situation
Other factors
Dumper
Crusher
Crane
Mixer
Page | 9
Financial Analysis
The funding of project will generated thought shareholders capital and through
debt financing. To total funding that we require is 15 to 20 million for the project.
Where, 20% of the funding of the project will be generated through term loans
taken from the banks in the time of need.
Page | 10
Inputs and Personnel Requirements
Raw Materials
Cement
Bricks
Clay
Sand
Stones
After construction the following materials is required for running the school
properly.
Iron
Wood
Oils
Paints
Plastics
Glue
Utilities
These given utilities are required for operating the school in future.
Electric Power
Water
Diesel
Input Constraints
Page | 11
There are constraints especially in gathering the raw materials because they are
very expensive. Also the utilities are not easily available due to energy crisis
going on in the country.
Personnel Requirement
Page | 12
Work Breakdown Structure
No. Level Description Responsibility Quarterly
Progress
1 Main Goal Provide Program Q1 Q2 Q3 Q4
Education Manager
1.2 Objectives Build School For Project Manager
Low Income
Families
Page | 13
and fixture
Page | 14
Page | 15
Detailed Work Plan Structure
Purchase land
Land is very important to construct the building we have selected the land in
Dhook Hasoo. First of all we have made payment of land to the seller. After
which we have registered the land for the construction of school.
Registration
Prepare drawing
Excavation
Leveling of land
We hire the machinery to level the land and paid labor 10/cft.
Erection of structure
Prepare wall
After completion the main structure of the building we set out the shuttering
for linter.
After setting the shuttering for linter machinery is used to filling it.
Plaster of wall
Page | 16
The next step is to plaster the wall so that they came into the finishing phase.
Install Sidings
Install wiring
When the wall is completed from plaster then the next step is to install the
wiring with the help of electrician.
Install Plumbing
When the electric fitting is over then the next step is put furniture and
complete the wood work.
At the end steel work has to be completed installation of gate and window
should be done.
Hiring of Staff
Page | 17
The project is evaluated at the end
Page | 18
COST SUMMARY
Excavation 13,870
PCC 42,000
Brick work 450,000
Aluminum+ 400,000
glass
Window door 75,000
RCC 200,000
Steel 500,000
reinforcement
Electricity 300,000
Water and gas 100,000
Plaster and 700,000
manual
Page | 19
land and site 3000000
development
building and civil 3200000
works
furniture and 1000000
fixtures
contingency 100000
activities
Total Cost of 15982870
Project
Monitoring and
Evaluation Framework
In our school we plan learning and teaching with a view to enabling each child to
seek Highest level of personal achievement. To ensure that this happens, we
regularly monitor
The actions we have taken, so that we are in a position to make a judgment
about how
Effective these actions have been. This gives us information on which we can
base future Decisions about the development of the school.
Monitoring
Evaluation
Page | 20
Monitoring and evaluation
Monitoring and Evaluation in our school are part of a planned process and
involve a range of different people over the course of the school year.
.
We follow a planned cycle of school self-evaluation. This ensures that all
aspects of the schools performance are systematically and regularly
reviewed as part of an annual cycle.
A timeline for subject leaders outlining monitoring and evaluation is in place. This
is used to inform our whole school monitoring and evaluation.