PRESUPUESTO AMPLIACION SUBESTACION SOCABAYA 33/10 KV

RESUMEN GENERAL DE INVERSIONES - ALTERNATIVA 1

AMPLIACION DE PRESUPUESTO
CELDAS DE SALIDA TELECOMUNICA-
TEM DESCRIPCIN CAPACIDAD DE REDES 10KV TOTAL
10 KV CIONES Y SCADA
TRANSFORMACION (S/.)

A SUMINISTROS PRINCIPALES 2,759,534.98 727,927.28 83,408.00 0.00 3,570,870.26

B MONTAJE ELECTROMECANICO #N/A #N/A #N/A #N/A #N/A

C OBRAS CIVILES 83,275.21 0.00 0.00 #N/A #N/A

D TRANSPORTE DE EQUIPOS Y MATERIALES 48,120.00 38,496.00 0.00 0.00 86,616.00

E COSTO DIRECTO #N/A #N/A #N/A #N/A #N/A

F GASTOS GENERALES #N/A #N/A #N/A #N/A #N/A

G UTILIDADES #N/A #N/A #N/A #N/A #N/A

H COSTO TOTAL SIN I.G.V. #N/A #N/A #N/A #N/A #N/A

I I.G.V. #N/A #N/A #N/A #N/A #N/A

COSTO TOTAL DE OBRA (Incluye I.G.V.) #N/A #N/A #N/A #N/A #N/A
ESTUDIO DEFINITIVO (CON IGV) 30,000.19
ESTUDIO DE PREOPERATIVIDAD (CON IGV) 28,349.46
DIA (CON IGV) (**) 0.00
CIRA (CON IGV) (**) 0.00
SERVIDUMBRE (CON IGV) (**) 0.00
SUPERVISION (CON IGV) 316,871.00

COSTO TOTAL DEL PROYECTO S/. #N/A


(**): Estudios no considerados porque la intervencin es dentro del terreno de la S.E. Socabaya
AMPLIACION SUBESTACION SOCABAYA 33/10 kV

SUMINISTRO DE EQUIPOS Y MATERIALES (AMPLIACIONES DE TRANSFORMACION) * TC (US$/S/): 3.208


3.208

Precio Unitario Precio Total


tem Descripcin Unidad Cantidad (S/.) (S/.)

1 AMPLIACIONES DE TRANSFORMACION
A SUMINISTRO DE EQUIPOS Y MATERIALES

1.00 TRANSFORMADOR DE POTENCIA 33/10 KV


Transformador de Potencia 20/25 MVA ONAN/ONAF 33.5 +/-9x1.391% KV/10.4kV, 18 pasos; Inc. Pararrayos (lados 33 y 10
1.01 kV) adosados a la cuba del transformador sobre soportes metlicos, en 10kV con contadores de descargas; Incl. tablero Un 1 1,924,800.00 1,924,800.00
autosoportado de regulacin automtica de tensin, rel de rotura de membrana y lote de repuestos.
Sub-Total 1: 1,924,800.00

2.00 EQUIPAMIENTO CELDA DE 33KV (TIPO CONVENCIONAL INTERIOR)


2.01 Seccionadores de barras tipo vertical, 52 kV, 1250 A Un 2 20,723.68 41,447.36
2.02 Interruptor en SF6 (modelo similar a los existentes, EDF SK 1-1) 52 kV, 1250 A Un 1 79,365.92 79,365.92
2.03 Transformadores de corriente 33 kV, 800-400/5/5/5 A Un 3 22,423.92 67,271.76
2.04 Seccionadores de lnea c/cuchilla de puesta a tierra tipo vertical 52 kV, 1250 A Un 1 25,888.56 25,888.56
2.05 Bushings pasamuros (instalados al exterior de la sala de control, ver foto) Un 3 5,132.80 15,398.40
2.06 Conectores y ferretera Glb 1 24,380.80 24,380.80
Sub-Total 2: 253,752.80

3.00 EQUIPAMIENTO DE MANIOBRA, PROTECCIN Y MEDIDA 10kV


Celda metal clad de barra aislada en aire de entrada de transformador del Item 1.01, en 17,5 kV; 95 kVcr-BIL, 2000 A, 25
3.01 kA, con interruptor de potencia extrable 2000 A; transformador de corriente 1800-1200/5/5/5 A, 2x10 VA 5P20, 10 VA cl 0.2; Un 1 206,980.16 206,980.16
Seccionador de barras 2000A; rel de proteccin multifuncin y medidor multifuncin.
Sub-Total 3: 206,980.16

4.00 CABLES DE ENERGA, CONTROL Y TERMINALES


4.01 Cable de energa N2XSY 15 kV; 1x400mm m 150 311.12 46,667.55
4.02 Cable de energa N2XSY 36 kV; 1x300mm m 281 211.12 59,376.65
4.03 Cables de control, proteccin y medicin Glb 1 30,476.00 30,476.00
4.04 Conjunto de terminales autocontrables para cable de 400mm; 15kV (01 Kit Para 03 fases) Kit 4 2,681.89 10,727.55
0.00 Conjunto de terminales autocontrables para cable de 240mm; 35kV (3unidades) Cjto 0 #DIV/0! 0.00
4.05 Conjunto de terminales autocontrables para cable de 300mm; 35kV. (01 Kit Para 01 fases) Kit 6 2,726.80 16,360.80
Sub-Total 4: 163,608.55

5.00 TABLEROS DE CONTROL, PROTECCIN, MEDICIN Y SERVICIOS AUXILIARES

5.01 Tablero de control, proteccin, medicin de la SE de Potencia 33/10 kV Un 1 189,721.12 189,721.12

Sub-Total 5: 189,721.12 189,721.12

6.00 SISTEMA DE PUESTA A TIERRA

6.01 Bentonita, bolsa de 30 kg blsa 7 47.66 333.63

6.02 Soldadura exotrmica u 7 15.58 109.07

6.03 Varilla de cobre de 5/8"x2,4m con conector u 7 44.00 307.97

6.04 Tapa de registro para puesta a tierra u 1 32.08 32.08

6.05 Sistema de puesta a tierra superficial, conductor de cobre de 70 mm2 (celda 33kV, transformador y equipo complementario) glb 1 13,473.60 13,473.60

Sub-Total 6: 14,256.35

7.00 FERRETERA Y OTROS ACCESORIOS

7.01 Sistema de bandejas y canaletas glb. 1 6,416.00 6,416.00

Sub-Total 7: 6,416.00

TOTAL GENERAL DE SUMINISTROS 2,759,534.98



AMPLIACION SUBESTACION SOCABAYA 33/10 kV (al 11-08-2015 - EL PERUANO)

SUMINISTRO DE EQUIPOS Y MATERIALES (SALIDAS EN 10 KV) * TC (US$/S/): 3.208

PRESUPUESTO REFERENCIAL SIN IGV DE FECHA 11.08.2015

Precio Unitario Precio Total


tem Descripcin Unidad Cantidad (S/.) (S/.)

2 IMPLEMENTACIONES PARA SALIDAS EN 10KV.


A SUMINISTRO DE EQUIPOS Y MATERIALES

1.00 EQUIPAMIENTO DE MANIOBRA, PROTECCIN Y MEDIDA 10kV


Celda metal clad de barra aislada en aire de Acoplamiento, en 17,5 kV; 95 kVcr-BIL, 2000 A, 25 kA, con interruptor de
potencia extrable 2000 A, 25 kA; transformador de corriente 1800-1200/5/5/5 A, 2x10 VA 5P20, 10 VA cl 0.2; Transformador
1.01 Un 1 200,082.96 200,082.96
de Corriente Toroidal 100-50/1A, 5 VA cl 1.0; Seccionador de barras 2000A, 25kA; rel de proteccin multifuncin y medidor
multifuncin.

1.02 Celda metal clad de remonte a barra aislada en aire, en 17,5 kV, con Seccionador de barras 2000A. Un 1 69,004.08 69,004.08

Celda metal clad de barra aislada en aire de Medicin, en 17,5 kV; 95 kVcr-BIL, 25 kA, transformador de tensin
1.03 Un 1 86,263.12 86,263.12
10:3/0.1:3/0.1:3 kV, 20 VA 3P, 20 VA cl 0.2, con fusibles de proteccin de 2 A.

Celda metal clad de salidas aislada en aire para cables alimentadores a redes de distribucin primaria; en aire en 17,5 kV; 95
kVcr-BIL, 2000 A, 25 kA, con interruptor de potencia extrable 630 A, 25 kA; transformador de corriente 600-300/5/5 A, 10 VA
1.04 Un 2 186,288.56 372,577.12
5P20, 10 VA cl 0.2; Transformador de Corriente Toroidal 100-50/1A, 5 VA cl 1.0;Seccionador de lneas con cuchilla de puesta a
tierra 630 A; Incluye pararrayos OZn de 10 kV y rel de proteccin multifuncin y medidor multifuncin.

Sub-Total 1: 727,927.28

TOTAL GENERAL DE SUMINISTROS 0.00 727,927.28



AMPLIACION SUBESTACION SOCABAYA 33/10 KV
MONTAJE DE EQUIPOS Y MATERIALES (AMPLIACIONES DE TRANSFORMACION)
PRESUPUESTO REFERENCIAL SIN IGV DE FECHA 11.08.2015

Precio Precio
tem Descripcin Unidad Cantidad Unitario Total
(S/.) (S/.)

1 AMPLIACIONES DE TRANSFORMACION

B MONTAJE ELECTROMECNICO

1.00 TRABAJOS PRELIMINARES

Ingeniera de detalle de las obras electromecnicas (Conexionado, puesta a tierra, coordinacin de las
1.01 Glb 1 #N/A #N/A
###
protecciones, sistema de comunicaciones, etc) necesarias para el correcto desarrollo de la obra.

Sub-Total 1: #N/A

2.00 MONTAJE DE TRANSFORMADOR DE POTENCIA

Transformador de Potencia 20/25 MVA ONAN/ONAF 33.5 +/-9x1.391% KV/10.4kV, 18 pasos; Inc. Pararrayos (lados
33 y 10 kV) adosados a la cuba del transformador sobre soportes metlicos, en 10kV con contadores de
2.01 Un 1 #N/A #N/A
###
descargas; Incl. tablero autosoportado de regulacin automtica de tensin, rel de rotura de membrana y lote
de repuestos.

Sub-Total 2: #N/A
###

3.00 MONTAJE CELDA DE 33KV (TIPO CONVENCIONAL)


3.01 Seccionadores de barras tipo vertical, 52 kV, 1250 A Un 2 #N/A #N/A###
3.02 Interruptor en SF6 (modelo similar a los existentes, EDF SK 1-1) 52 kV, 1250 A Un 1 #N/A #N/A
3.03 Transformadores de corriente 33 kV, 800-400/5/5/5 A Un 3 #N/A #N/A
3.04 Seccionadores de lnea c/cuchilla de puesta a tierra tipo vertical 52 kV, 1250 A Un 1 #N/A #N/A
3.05 Bushings pasamuros (instalados al exterior de la sala de control, ver foto) Un 3 #N/A #N/A
3.06 Conectores y ferretera Un 1 #N/A #N/A
Glb
Sub-Total 3: #N/A
###

4.00 MONTAJE DE EQUIPOS Y MATERIALES 10 KV ###

Celda metal clad de barra aislada en aire de entrada de transformador del Item 1.01, en 17,5 kV; 95 kVcr-BIL,
2000 A, 25 kA, con interruptor de potencia extrable 2000 A; transformador de corriente 1800-1200/5/5/5 A,
4.01 Un 1 #N/A #N/A
###
2x10 VA 5P20, 10 VA cl 0.2; Seccionador de barras 2000A; rel de proteccin multifuncin y medidor
multifuncin.

Sub-Total 4: #N/A
###

5.00 MONTAJE DE CABLES DE ENERGA, CONTROL Y TERMINALES ###


5.01 Cable de energa N2XSY 15 kV; 1x400mm Glb 0.50 #N/A #N/A
###
5.02 Cable de energa N2XSY 36 kV; 1x300mm Glb 0.50 #N/A #N/A
###
5.03 Cables de control, proteccin y medicin Glb 1.00 #N/A #N/A
###
5.04 Conjunto de terminales autocontrables para cable de 400mm; 15kV (01 Kit Para 03 fases) Cjto 4 #N/A #N/A
###
5.05 Conjunto de terminales autocontrables para cable de 300mm; 35kV. (01 Kit Para 01 fases) Cjto 6 #N/A #N/A
###
Sub-Total 5: #N/A

6.00 TABLEROS DE CONTROL, PROTECCIN Y MEDICIN


6.01 Tablero de regulacin automtica Un 1 #N/A #N/A
###
6.02 Tablero de control, proteccin, medicin de la Lnea 33 kV Un 1 #N/A #N/A
###
Sub-Total 6: #N/A

7.00 SISTEMA DE PUESTA A TIERRA


7.01 Sistema de puesta a tierra superficial, conductor de cobre de 70 mm2 Glb 1 #N/A #N/A
###
Sub-Total 7: #N/A

8.00 FERRETERA Y OTROS ACCESORIOS


8.01 Sistema de bandejas y canaletas Glb 1 #N/A #N/A
###
Sub-Total 8: #N/A

9.00 PRUEBAS Y PUESTA EN SERVICIO Y EXPEDIENTE CONFORME A OBRAS


9.01 Pruebas y Puesta en Servicio y Expediente Conforme a Obras Glb 1 #N/A #N/A###
Sub-Total 9: #N/A

10.00 MONITOREO AMBIENTAL


10.01 Monitorio de Aire y de ruidos Glb 1 1,682.05 1,682.05###
Sub-Total 10: 1,682.05

TOTAL MONTAJE DE EQUIPOS Y MATERIALES #N/A###


AMPLIACION SUBESTACION SOCABAYA 33/10 KV
MONTAJE DE EQUIPOS Y MATERIALES (SALIDAS EN 10KV)
PRESUPUESTO REFERENCIAL SIN IGV DE FECHA 11.08.2015

Precio Precio
tem Descripcin Unidad Cantidad Unitario Total
(S/.) (S/.)

2 IMPLEMENTACIONES PARA SALIDAS EN 10KV.

B MONTAJE ELECTROMECNICO

1.00 MONTAJE DE EQUIPOS Y MATERIALES 10 KV ###

Celda metal clad de barra aislada en aire de Acoplamiento, en 17,5 kV; 95 kVcr-BIL, 2000 A, 25 kA, con
interruptor de potencia extrable 2000 A, 25 kA; transformador de corriente 1800-1200/5/5/5 A, 2x10 VA 5P20,
1.02 Un 1 #N/A #N/A
###
10 VA cl 0.2; Transformador de Corriente Toroidal 100-50/1A, 5 VA cl 1.0; Seccionador de barras 2000A, 25kA;
rel de proteccin multifuncin y medidor multifuncin.

1.03 Celda metal clad de remonte a barra aislada en aire, en 17,5 kV, con Seccionador de barras 2000A, 25kA. Un 1 #N/A #N/A
###

Celda metal clad de barra aislada en aire de Medicin, en 17,5 kV; 95 kVcr-BIL, 2000 A, 25 kA, 25 kA,
1.04 Un 1 #N/A #N/A
###
transformador de tensin 10:3/0.1:3/0.1:3 kV, 20 VA 3P, 20 VA cl 0.2, con fusibles de proteccin de 2 A.

Celda metal clad de salidas aislada en aire para cables alimentadores a redes de distribucin primaria; en aire
en 17,5 kV; 95 kVcr-BIL, 2000 A, 25 kA, con interruptor de potencia extrable 630 A, 25 kA; transformador de
1.05 corriente 400-200/5/5 A, 10 VA 5P20, 10 VA cl 0.2; Transformador de Corriente Toroidal 100-50/1A, 5 VA cl Un 2 #N/A #N/A
###
1.0;Seccionador de lneas con cuchilla de puesta a tierra 630 A, 25 kA; Incluye pararrayos OZn de 10 kV y
terminales de cables N2XSY 3x1x120 mm2; rel de proteccin multifuncin y medidor multifuncin.

Sub-Total 1: #N/A
###

TOTAL MONTAJE DE EQUIPOS Y MATERIALES #N/A###


SUBESTACION SOCABAYA 33/10 KV
OBRAS CIVILES

Precio Precio
ITEM. DESCRIPCIN Unidad Cantidad Unitario Total
(S/.) (S/.)

1.00 AMPLIACIONES DE TRANSFORMACION


C OBRAS CIVILES

1.0 OBRAS PRELIMINARES


1.01 MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS glb 1 1690.00 1,690.00
Sub-Total: 1,690.00

2.0 MOVIMIENTO DE TIERRAS


2.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 131 44.55 5,836.68
2.02 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO m3 45 33.60 1,512.01
2.03 ELIMINACIN DE MATERIAL EXCEDENTE m3 123 10.87 1,336.42
Sub-Total: 8,685.11

3.0 CONCRETO
3.01 CONCRETO f'c= 100 kg/cm2 m2 98 34.63 3,393.72
3.02 CONCRETO f'c = 210 kg/cm2 m3 28 323.79 9,066.00
3.03 ENCOFRADO Y DESENCOFRADO RECTO m2 128 74.55 9,542.36
3.04 ACERO DE REFUERZO fy = 4200 kg/cm2 kg 2124 5.82 12,371.65
Sub-Total: 34,373.73

4.0 MISCELNEOS
4.01 SUMIN. E INSTAL. DE RIEL m 20 145.68 2,913.65
4.02 SUMIN. E INSTAL. DE DUCTO DE CONCRETO DE 4 VIAS m 127 199.28 25,308.56
4.03 COLOCACION DE MATERIAL GRAVA m2 2 72.14 144.29
4.04 SUMINISTRO DE TUBO DE FF 8" u 3 119.70 359.10
4.05 ACABADOS VARIOS glb 2 1000.00 2,000.00
4.06 COLOCACION DE PLANCHA ESTRIADA m2 48 111.86 5,369.17
4.07 DESMONTAJE DE MALLA glb 1 112.98 112.98
4.08 INSTALACION DE PUERTA METALICA glb 1 2318.62 2,318.62
Sub-Total: 38,526.37

TOTAL OBRAS CIVILES 83,275.21


PRESUPUESTO DEL TRANSPORTE DE EQUIPOS Y MATERIALES

Seccin : SOCABAYA
Regin : AREQUIPA

D COSTO DE TRANSPORTE DE EQUIPOS Y MATERIALES

CANTIDAD COSTO
Item DESCRIPCION $

1 Transporte de Transformador de Potencia 1 15,000.00


2 Transporte de Equipos Menores 1 12,000.00
COSTO DE TRANSPORTE

Tranformador de Potencia de 20/25MVA - 33/10kV


Equipos Menores: Equipos para celda convencional en 33kV, Celdas en 10 kV., Tableros, Ferreteria, Conductores, Et
OS Y MATERIALES

TC (US$/S/)
3.208

COSTO TOTAL
S/. S/.

48,120.00 48,120.00
38,496.00 38,496.00
COSTO DE TRANSPORTE 86,616.00

V., Tableros, Ferreteria, Conductores, Etc.


SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 1.0 INGENIERA DE DETALLE DE LAS OBRAS ELECTROMECNICAS Y OBRAS CIVILES SEGN DETALLE

1.01 INGENIERA DE DETALLE DE LAS OBRAS ELECTROMECNICAS (CONEXIONADO, PUESTA A TIERRA, COORDINACIN DE LAS PROTECCIONES,
DESCRIPCIN: SISTEMA DE COMUNICACIONES, ETC) NECESARIAS PARA EL CORRECTO DESARROLLO DE LA OBRA.
1-002
RENDIMIENTO : 0.014 Glb/da UNIDAD: Glb
1-004
DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL
MATERIALES #N/A
#N/A EST 1.00 #N/A #N/A 4-001
1-008
MANO DE OBRA #N/A
Ingeniero de coordinacin de protecciones 0.25 h-h 147.33 #N/A #N/A 1-014
Ingeniero especialista en cableado 0.15 h-h 88.40 #N/A #N/A 1-015
Ingeniero de telecomunicaciones 0.15 h-h 88.40 #N/A #N/A 1-016
Dibujante 0.20 h-h 117.86 #N/A #N/A 1-010
1-017
1-010
1-016
1-017
MAQUINARIAS Y EQUIPOS 0.00
1-019

HERRAMIENTAS 0.00

COSTO DIRECTO TOTAL S/. #N/A

SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 2.00 MONTAJE DEL TRANSFORMADOR DE POTENCIA


DESCRIPCIN: 2.01 TRANSFORMADOR DE POTENCIA 33/10 KV 20MVA ONAN 25 MVA ONAF , inc. PARARRAYOS (lados 33 y 10 kV)

RENDIMIENTO : 0.110 Un./da UNIDAD: Un.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 1.00 #N/A #N/A
#N/A Un. 1.00 #N/A #N/A
#N/A Pza. 1.00 #N/A #N/A
#N/A H-E 1.00 #N/A #N/A
#N/A gln 80.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 0.10 h-h 7.30 #N/A #N/A
#N/A 1.00 h-h 72.96 #N/A #N/A
#N/A 2.00 h-h 145.93 #N/A #N/A
#N/A 2.00 h-h 145.93 #N/A #N/A
#N/A 4.00 h-h 291.85 #N/A #N/A
#N/A 1.00 h-h 72.96 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 0.50 h-m 36.48 #N/A #N/A 3-066
#N/A 0.50 h-m 36.48 #N/A #N/A 3-057
#N/A 1.00 h-m 72.96 #N/A #N/A 3-058
#N/A 1.00 h-m 72.96 #N/A #N/A 3-007
#N/A 1.00 h-m 72.96 #N/A #N/A 3-024
#N/A 1.80 h-m 131.33 #N/A #N/A 3-067
#N/A 1.00 h-m 72.96 #N/A #N/A 3-068
#N/A 1.00 h-m 72.96 #N/A #N/A 3-070
#N/A 0.10 h-m 7.30 #N/A #N/A 3-070
#N/A 1.50 h-m 109.44 #N/A #N/A 3-072
#N/A 1.00 h-m 72.96 #N/A #N/A 3-060
#N/A 1.00 h-m 72.96 #N/A #N/A 3-061

HERRAMIENTAS #N/A
#N/A % m-o 5.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A

SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA AMPLIACION DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 2.00 MONTAJE DE EQUIPOS Y MATERIALES 33 kV


DESCRIPCIN: 2.01 SECCIONADOR DE BARRA TIPO VERTICAL 33 KV

RENDIMIENTO : 0.887 Un./da UNIDAD: Un.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 1.00 #N/A #N/A
#N/A Pza. 1.00 #N/A #N/A
#N/A H-E 1.00 #N/A #N/A
#N/A gln 6.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 0.50 h-h 4.51 #N/A #N/A
#N/A 2.00 h-h 18.03 #N/A #N/A
#N/A 2.00 h-h 18.03 #N/A #N/A
#N/A 1.00 h-h 9.02 #N/A #N/A
#N/A 0.50 h-h 4.51 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 1.00 h-m 9.02 #N/A #N/A
#N/A 0.25 h-m 2.25 #N/A #N/A
#N/A 0.10 h-m 0.90 #N/A #N/A
#N/A 0.40 h-m 3.61 #N/A #N/A
#N/A 1.00 h-m 9.02 #N/A #N/A

HERRAMIENTAS #N/A
#N/A % m-o 3.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A

SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA AMPLIACION DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 2.00 MONTAJE DE EQUIPOS Y MATERIALES 33 kV


DESCRIPCIN: 2.02 INTERRUPTOR EN SF6 52 KV

RENDIMIENTO : 0.602 Un./da UNIDAD: Un.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 1.00 #N/A #N/A
#N/A Pza. 1.00 #N/A #N/A
#N/A H-E 0.50 #N/A #N/A
#N/A gln 6.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 0.50 h-h 6.64 #N/A #N/A
#N/A 1.00 h-h 13.28 #N/A #N/A
#N/A 2.00 h-h 26.56 #N/A #N/A
#N/A 0.10 h-h 1.33 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 1.00 h-m 13.28 #N/A #N/A
#N/A 0.20 h-m 2.66 #N/A #N/A
#N/A 0.10 h-m 1.33 #N/A #N/A
#N/A 0.50 h-m 6.64 #N/A #N/A
#N/A 1.00 h-m 13.28 #N/A #N/A

HERRAMIENTAS #N/A
#N/A % m-o 3.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A

SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA AMPLIACION DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 2.00 MONTAJE DE EQUIPOS Y MATERIALES 33 kV


DESCRIPCIN: 2.03 TRANSFORMADORES DE CORRIENTE
RENDIMIENTO : 5.454 Un./da UNIDAD: Un.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 0.50 #N/A #N/A
#N/A Pza. 0.50 #N/A #N/A
#N/A H-E 1.00 #N/A #N/A
#N/A gln 4.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 1.00 h-h 1.47 #N/A #N/A
#N/A 1.00 h-h 1.47 #N/A #N/A
#N/A 1.00 h-h 1.47 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 1.00 h-m 1.47 #N/A #N/A
#N/A 0.10 h-m 0.15 #N/A #N/A
#N/A 0.25 h-m 0.37 #N/A #N/A
#N/A 1.00 h-m 1.47 #N/A #N/A
#N/A 1.00 h-m 1.47 #N/A #N/A

HERRAMIENTAS #N/A
#N/A % m-o 3.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A

SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL


ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA AMPLIACION DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 2.00 MONTAJE DE EQUIPOS Y MATERIALES 33 kV


DESCRIPCIN: 2.04 SECCIONADOR DE LINEA C/CUCHILLA DE PUESTA A TIERRA 33 KV

RENDIMIENTO : 1.551 Un./da UNIDAD: Un.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 1.00 #N/A #N/A
#N/A Pza. 1.00 #N/A #N/A
#N/A H-E 1.00 #N/A #N/A
#N/A gln 4.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 0.25 h-h 1.29 #N/A #N/A
#N/A 1.00 h-h 5.16 #N/A #N/A
#N/A 1.00 h-h 5.16 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 1.00 h-m 5.16 #N/A #N/A
#N/A 0.15 h-m 0.77 #N/A #N/A
#N/A 0.10 h-m 0.52 #N/A #N/A
#N/A 0.40 h-m 2.06 #N/A #N/A
#N/A 1.00 h-m 5.16 #N/A #N/A

HERRAMIENTAS #N/A
Herramientas manuales % m-o 3.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A

SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA AMPLIACION DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 2.00 MONTAJE DE EQUIPOS Y MATERIALES 33 kV


DESCRIPCIN: 2.05 BUSHING 36 KV
2.06 PARARRAYOS DE OXIDO DE ZINC CON CONTADOR DE DESCARGA 36 KV

RENDIMIENTO : 6.645 Un./da UNIDAD: Un.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 0.50 #N/A #N/A
#N/A Pza. 0.50 #N/A #N/A
#N/A H-E 1.00 #N/A #N/A
#N/A gln 8.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 1.00 h-h 1.20 #N/A #N/A
#N/A 2.00 h-h 2.41 #N/A #N/A
#N/A 2.00 h-h 2.41 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 1.00 h-m 1.20 #N/A #N/A
#N/A 0.50 h-m 0.60 #N/A #N/A
#N/A 0.25 h-m 0.30 #N/A #N/A
#N/A 1.00 h-m 1.20 #N/A #N/A
#N/A 1.00 h-m 1.20 #N/A #N/A

HERRAMIENTAS #N/A
#N/A % m-o 3.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A

SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA AMPLIACION DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 5.00 FERRETERA Y OTROS ACCESORIOS


DESCRIPCIN: 5.01 SISTEMA DE BARRAS, CONECTORES, AISLADORES, FERRETERA, BANDEJAS Y CANALETAS

RENDIMIENTO : 0.249 global/da UNIDAD: glb.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 0.25 #N/A #N/A
#N/A Pza. 0.50 #N/A #N/A
#N/A gln 20.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 0.50 h-h 16.07 #N/A #N/A
#N/A 1.00 h-h 32.15 #N/A #N/A
#N/A 1.00 h-h 32.15 #N/A #N/A
#N/A 1.00 h-h 32.15 #N/A #N/A
#N/A 0.25 h-h 8.04 #N/A #N/A
MAQUINARIAS Y EQUIPOS #N/A
#N/A 0.50 h-m 16.07 #N/A #N/A
#N/A 0.10 h-m 3.21 #N/A #N/A
#N/A 0.10 h-m 3.21 #N/A #N/A
#N/A 0.25 h-m 8.04 #N/A #N/A
#N/A 0.25 h-m 8.04 #N/A #N/A

HERRAMIENTAS #N/A
#N/A % m-o 3.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A


SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 3.00 MONTAJE DE EQUIPOS Y MATERIALES 33 kV


DESCRIPCIN: 3.01 CELDA METAL-CLAD DE LLEGADA DE LINEA EN 36 KV
3.02 CELDA METAL-CLAD DE TRANSFORMADOR EN 36 KV
3.03 CELDA METAL-CLAD DE BARRA 17,5 KV
3.04 CELDA METAL-CLAD DE SALIDA (ALIMENTADORES) EN 17,5 KV
3.05 CELDA METAL-CLAD DE SECCIONAMIENTO S.S.A.A.
3.06 CELDA METAL-CLAD DE SECCIONAMIENTO TRANSFORMADOR ZIGZAG
RENDIMIENTO : 0.307 Un./da UNIDAD: Un.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 1.00 #N/A #N/A
#N/A Un. 1.00 #N/A #N/A
#N/A Pza. 1.00 #N/A #N/A
#N/A gln 5.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 0.10 h-h 2.61 #N/A #N/A
#N/A 0.50 h-h 13.03 #N/A #N/A
#N/A 2.00 h-h 52.11 #N/A #N/A
#N/A 2.00 h-h 52.11 #N/A #N/A
#N/A 0.25 h-h 6.51 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 1.00 h-m 26.06 #N/A #N/A 3-057
#N/A 0.25 h-m 6.51 #N/A #N/A 3-058
#N/A 0.50 h-m 13.03 #N/A #N/A 3-007
#N/A 1.00 h-m 26.06 #N/A #N/A 3-060
#N/A 0.50 h-m 13.03 #N/A #N/A 3-061

HERRAMIENTAS #N/A
#N/A % m-o 5.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A

###
SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 4.00 MONTAJE DE CABLES DE ENERGA, CONTROL Y TERMINALES


DESCRIPCIN: 4.01 CABLE DE ENERGA N2XSY 15 KV 1X400 MM2
4.02 CABLE DE ENERGA N2XSY 35 KV 1X300 MM2
4.03 CABLE DE ENERGA N2XSY 35 KV 1X240 MM2

RENDIMIENTO : 0.118 global/da UNIDAD: glb.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 0.10 #N/A #N/A
#N/A Un. 0.25 #N/A #N/A
#N/A Pza. 0.10 #N/A #N/A
#N/A gln 5.00 #N/A #N/A

#N/A
#N/A 0.10 h-h 6.76 #N/A #N/A
#N/A 0.50 h-h 33.82 #N/A #N/A
#N/A 2.00 h-h 135.30 #N/A #N/A
#N/A 3.00 h-h 202.95 #N/A #N/A
#N/A 0.25 h-h 16.91 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 0.25 h-m 16.91 #N/A #N/A 3-057
#N/A 0.10 h-m 6.76 #N/A #N/A 3-058
#N/A 0.10 h-m 6.76 #N/A #N/A 3-007
#N/A 0.10 h-m 6.76 #N/A #N/A 3-040
#N/A 0.25 h-m 16.91 #N/A #N/A 3-060
#N/A 0.25 h-m 16.91 #N/A #N/A 3-061

HERRAMIENTAS #N/A
#N/A % m-o 5.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A

SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA AMPLIACION DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 3.00 MONTAJE DE CABLES DE ENERGA, CONTROL Y TERMINALES


DESCRIPCIN: 3.02 CABLES DE CONTROL, PROTECCIN Y MEDICION

RENDIMIENTO : 0.280 global/da UNIDAD: glb.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 1.00 #N/A #N/A
#N/A Un. 1.00 #N/A #N/A
#N/A Pza. 1.00 #N/A #N/A
#N/A gln 10.00 #N/A #N/A
ANALISIS DE COSTOS UNITARIOS S.E SOCABAYA

Partida 01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb 1,690.00

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.9000 52.50

Subcontratos
Movilizacin y desmovilizacin de equipos glb 1.0000 1,642.75

Partida 02.01 EXCAVACION MANUAL EN MATERIAL SUELTO

Rendimiento m3/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m3 44.55

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD 0.1000 0.0800 52.50
PEON hh 4.0000 3.2000 11.70

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 7.0000 41.64

Partida 02.02 RELLENO CON MATERIAL PROPIO

Rendimiento m3/DIA 35.92 EQ. 35.92 Costo unitario directo por : m3 33.60

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0223 52.50
CAPATAZ EN SUPERFICIE hh 0.1000 0.0223 18.37
PEON EN SUPERFICIE hh 1.0000 0.2227 12.37

Equipos
Camin plataforma 4x2, 122 HP, 8 TON hm 1.0000 0.2227 125.25
Compactadora vibrador tipo plancha 7 HP hm 0.2000 0.0445 21.10
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 5.0000 4.33

Subpartidas
AGUA PARA LA OBRA m3 0.0210 10.00
Partida 02.03 ELIMINACIN DE MATERIAL EXCEDENTE

Rendimiento m3/DIA 350.0000 EQ. 350.0000 Costo unitario directo por : m3 10.87

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0023 52.50
CAPATAZ hh 0.2000 0.0046 18.37
PEON hh 2.0000 0.0457 12.37

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 5.0000 0.77
CAMION VOLQUETE 10 m3 hm 2.0000 0.0457 220.00

Partida 03.01 CONCRETO fc=100 kg/cm2 (solado)

Rendimiento m2/DIA 50.0000 EQ. 50.0000 Costo unitario directo por : m2 34.63

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD 0.1000 0.0160 52.50
CAPATAZ hh 0.1000 0.0160 17.37
OPERARIO hh 1.0000 0.1600 14.92
OFICIAL hh 2.0000 0.3200 12.97
PEON hh 6.0000 0.9600 11.70

Materiales
CEMENTO PORTLAND TIPO I bls 0.3600 17.10
ADITIVO gal 0.0050 35.10
ACEITE MOTOR GASOLINERO MULTIGRADO gal 0.0040 50.20
GASOLINA 84 OCTANOS gal 0.2400 9.82
AGUA m3 0.0200 9.00
AGREGADO m3 0.1300 32.00

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 7.0000 18.89
MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 Pie 3 hm 1.0000 0.1600 7.44
Partida 03.02 Concreto fc=210 para fundaciones

Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3 323.79

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0533 52.50
CAPATAZ hh 0.5000 0.2667 17.37
OPERARIO hh 1.0000 0.5333 14.92
OFICIAL hh 1.0000 0.5333 12.97
PEON hh 10.0000 5.3333 11.70

Materiales
CEMENTO PORTLAND TIPO I bls 10.0000 17.10
ADITIVO gal 0.1230 35.10
ACEITE MOTOR GASOLINERO MULTIGRADO gal 0.0067 50.20
GASOLINA 84 OCTANOS gal 0.5000 9.82
AGUA m3 0.2500 9.00
AGREGADO m3 1.3250 32.00

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 7.0000 84.71
VIBRADOR DE CONCRETO 4 HP 1.50" hm 1 0.5333 5.30
MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 11-13 Pie 3 hm 1 0.5333 9.58

Partida 03.03 ENCOFRADO Y DESENCOFRADO RECTO

Rendimiento m2/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m2 74.55

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0444 52.50
CAPATAZ hh 1.0000 0.4444 17.37
OPERARIO hh 1.0000 0.4444 14.92
OFICIAL hh 2.0000 0.8889 12.97
PEON hh 2.0000 0.8889 11.7

Materiales
ALAMBRE kg 0.3000 4.1500
CLAVOS PARA MADERA kg 0.3000 4.1500
DESMOLDADOR PARA ENCOFRADO gal 0.0500 81.1250
MATERIALES DIVERSOS %MT 8.0000 46.8600
MADERA NACIONAL p2 6.0000 3.6300

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 10.0000 38.6133
Partida 03.04 ACERO DE REFUERZO fy=4200 kg/cm2

Rendimiento kg/DIA 200.0000 EQ. 200.0000 Costo unitario directo por : kg 5.82

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0040 52.50
CAPATAZ hh 0.2000 0.0080 17.37
OPERARIO hh 1.0000 0.0400 14.92
OFICIAL hh 2.0000 0.0800 12.97

Materiales
ALAMBRE kg 0.0900 4.15
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1.0500 3.17

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 7.0000 1.98

Partida 4.01 SUMIN. E INSTAL. DE RIEL DE ACERO

Rendimiento m/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m 145.68

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0800 52.50
OPERARIO EN SUPERFICIE hh 0.5000 0.4000 15.79
OFICIAL EN SUPERFICIE hh 1.0000 0.8000 13.72
PEON EN SUPERFICIE hh 3.0000 2.4000 12.37

Materiales
RIELES DE ACERO DE 60 lbs/yad m 1.0000 82.65
MATERIALES DIVERSOS %MT 10.0000 82.65

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 7.0000 51.18
Partida 4.02 SUMIN. E INSTAL. DE DUCTO DE CONCRETO DE 4 VAS

Rendimiento m/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : m 199.28

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0600 188.00

Sumin. E Instal. De ducto de concreto de 4 vas m 1.0000 188.00

Partida 4.03 COLOCACIN DE MATERIAL GRAVA

Rendimiento m2/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : m2 72.14

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0610 52.50

Colocacin de material grava m 1.0000 68.94

Partida 4.04 SUMINISTRO DE TUBO DE FF D 8"

Rendimiento m/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : m 119.70

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0800 52.50

Colocacin de material grava m 1.0000 115.50

Partida 4.05 ACABADOS VARIOS

Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb 1,000.00

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.


Subcontratos
Instalaciones sanitarias glb 1.0000 1,000.00
Partida 4.06 COLOCACION DE PLANCHA ESTRIADA

Rendimiento m2/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m2 111.86
Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0200 52.50
OPERARIO EN SUPERFICIE hh 1.0000 0.2000 15.79
OFICIAL EN SUPERFICIE hh 1.0000 0.2000 13.72
PEON EN SUPERFICIE hh 2.0000 0.4000 12.37

Materiales
MATERIALES DIVERSOS %MT 20.000 84.15
PLANCHA ESTRIADA DE e=1/4" m2 1.0500 78.38

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 7.0000 11.90

Partida 4.07 DESMONTAJE DE MALLA

Rendimiento m2/DIA 20.0000 EQ. 40.0000 Costo unitario directo por : m2 112.98
Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0400 52.50
OPERARIO EN SUPERFICIE hh 1.0000 0.2000 15.79
OFICIAL EN SUPERFICIE hh 1.0000 0.2000 13.72
PEON EN SUPERFICIE hh 2.0000 0.4000 12.37

Materiales
MATERIALES DIVERSOS %MT 20.000 84.15
PLANCHA ESTRIADA DE e=1/4" m2 1.0500 78.38

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 7.0000 12.95

Partida 4.08 INSTALACION DE PUERTA METALICA

Rendimiento Gbl 1.0000 EQ. 1.0000 Gblm2 2,318.62


Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 1.0000 52.50
OPERARIO EN SUPERFICIE hh 1.0000 1.0000 15.79
OFICIAL EN SUPERFICIE hh 1.0000 2.0000 13.72
PEON EN SUPERFICIE hh 1.0000 5.0000 12.37

Materiales
Angulos %MT 50.000 20.00
Malla Metalica m2 10.0000 15.00
Agregados m3 20.0000 50.00

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCI %MO 7.0000 157.59
Parcial S/.

47.25
47.25

1,642.75
1,642.75

Parcial S/.

4.20
37.44
41.64

2.91
2.91

Parcial S/.

1.17
0.41
2.76
4.33

27.90
0.94
0.22
29.06

0.21
0.21
Parcial S/.

0.12
0.08
0.57
0.77

0.04
10.06
10.10

Parcial S/.

0.84
0.28
2.39
4.15
11.23
18.89

6.16
0.18
0.20
2.36
0.18
4.16
13.23

1.32
1.19
2.51
Parcial S/.

2.80
4.63
7.96
6.92
62.40
84.71

171.00
4.32
0.34
4.91
2.25
42.40
225.21

5.93
2.83
5.11
13.87

Parcial S/.

2.33
7.72
6.63
11.53
10.40
38.6133

1.25
1.25
4.06
3.75
21.78
32.0751

3.86
3.86
Parcial S/.

0.21
0.14
0.60
1.04
1.98

0.37
3.33
3.70

0.14
0.14

Parcial S/.

4.20
6.32
10.98
29.69
51.18

82.65
8.27
90.92

3.58
3.58
Parcial S/.

11.28
11.28

188.00
188.00

Parcial S/.

3.20
3.20

68.94
68.94

Parcial S/.

4.20
4.20

115.50
115.50

Parcial S/.

1,000.00
1,000.00
Parcial S/.

1.05
3.16
2.74
4.95
11.90

16.83
82.29
99.12

0.83
0.83

Parcial S/.

2.10
3.16
2.74
4.95
12.95

16.83
82.29
99.12

0.91
0.91

Parcial S/.

52.50
15.79
27.44
61.86
157.59

1,000.00
150.00
1,000.00
2,150.00

11.03
11.03
METRADO DE OBRAS CIVILES S.E. SOCABAYA

Descripcin UndCant. alto (m) ancho (m) largo (m) parcial

1.0 OBRAS PRELIMINARES


1.01 MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS
glb 1 1.0 1.00
. Y Desmov. (glb)= 1.00
Metrado adoptado
1.00
(glb)=
1.01 DEMOLICION DE BASE DE CONCRETO Y RIELES
m3 1 28.0 28.00
l Demolicion (m3)= 28.00
Metrado adoptado
28.00
(m3)=

2.00 MOVIMIENTO DE TIERRAS


2.01 EXCAVACION MANUAL EN MATERIAL SUELTO

Buzn de cables
Sector Trafo m3 2.0 1.4 1.2 1.2 3.9
Ductos en linea m3 4.0 1.4 1.2 1.2 8.1

Poza de aceite m3 1.0 1.5 0.9 0.9 1.2

Base Transformador
m3 1.0 1.3 4.5 5.0 29.3

zona de riel
m3 1.0 0.4 2.2 3.2 2.8
zona grillete U m3 1.0 0.5 0.5 0.5 0.1

Seccin X-X m3 1.0 1.4 0.4 3.2 1.7

zona de ductos m3 1.0 1.4 1.0 8.08 11.3


m3 1.0 1.4 1.0 5.9 8.2
m3 1.0 1.4 1.0 37.0 51.8
m3 1.0 1.4 1.0 4.2 5.8

e Excavacion (m3)= 124.1


Metrado adoptado (m3)= 131.0
2.02 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO

zona de ductos m3 1.0 1.1 1.0 8.08 8.9


m3 1.0 1.1 1.0 5.9 6.4
m3 1.0 1.1 1.0 37.0 40.7
m3 1.0 1.1 1.0 4.2 4.6
rea
m3 -1.0 0.3 8.08 -2.7
m3 -1.0 0.3 5.9 -2.0
m3 -1.0 0.3 37.0 -12.5
m3 -1.0 0.3 4.2 -1.4

Total Relleno Compact. Con mat. propio (m3)= 42.0


Metrado adoptado (m3)= 45.0

2.03 ELIMINACIN DE MATERIAL EXCEDENTE f. Vol


Exc. Plataforma material suelto m3 1 0.30 131.0 170.3
relleno m3 -1 0.20 45.0 -54.0
de Material Excedente (m3)= 116.3
Metrado adoptado (m3)= 123.0
3.00 CONCRETO
3.01 CONCRETO fc=100 kg/cm2 Solado

Base Transformador
m3 1.0 4.5 5.0 22.5
zona de riel m3 1.0 2.2 3.2 6.9
zona grillete U m3 1.0 0.5 0.5 0.3

Buzon de cables
Sector Trafo m2 2.0 1.2 1.2 2.8
Ductos en linea m2 4.0 1.2 1.2 5.8

Ductos
m2 1.0 1.0 55.1 55.1

oncreto f'c=100 kg/cm2 (m2)= 93.3


Metrado adoptado (m2)= 98.0
3.02 CONCRETO f'c = 210 kg/cm2

Poza de aceite m3 1.0 0.2 0.9 0.9 0.1


m3 2.0 1.6 0.2 0.9 0.4
m3 2.0 1.6 0.2 0.6 0.3

Transformador
Base m3 1.0 0.3 4.5 5.0 7.6
Muros perimetral m3 1.0 0.9 0.3 4.5 1.0
m3 1.0 1.0 0.3 4.5 1.1
m3 1.0 0.3 0.3 4.5 0.3
m3 1.0 0.3 0.3 4.5 0.3
m3 2.0 1.1 0.3 4.5 2.5
Muros internos m3 1.0 0.9 0.4 4.5 1.6
m3 1.0 1.0 0.4 4.5 1.7
m3 1.0 0.2 0.3 4.5 0.2
m3 1.0 0.2 0.3 4.5 0.2
rea
viguetas m3 ### 0.0 4.1 1.9

zona 2 riel transformador


m3 1.0 0.3 2.2 4.5 3.0
m3 -1.0 0.3 1.2 1.3 -0.5

Buzones m3 6.0 0.1 1.2 1.2 0.9


m3 6.0 1.35 0.1 4.8 3.9

Volumen de Concreto fc=210 kg/cm2 (m3)= 26.5


Metrado adoptado (m3)= 28.0
3.03 ENCOFRADO Y DESENCOFRADO RECTO

Buzn de cables
Sector Trafo m2 6.0 1.3 4.8 36.0

Poza de aceite m2 4.0 1.6 0.6 3.8


m2 1.0 0.8 0.8 0.6

Transformador
Muros perimetral m2 1.0 0.9 4.5 4.1
m2 1.0 1.0 4.5 4.3
m2 1.0 0.3 4.5 1.3
m2 1.0 0.3 4.5 1.3
m2 2.0 1.1 4.5 9.9
Muros internos m2 1.0 0.9 4.5 4.1
m2 1.0 1.0 4.5 4.3
m2 1.0 0.2 4.5 0.7
m2 1.0 0.2 4.5 0.7

viguetas m2 ### 0.2 4.1 15.7


m2 ### 0.2 4.1 31.5

zona 2 riel transformador


m2 2.0 0.3 4.5 2.7
m2 1.0 0.3 2.2 0.7

y desencofrado normal (m2)= 121.4


Metrado adoptado (m2)= 128.0
3.04 ACERO DE REFUERZO fy=4200 kg/ L kg/m Peso
Detalle en metrado de acero kg 1 2,110.5 2,110
grillete u galvanizado de 1" kg 1 0.60 4.04 2
anclaje de 2" kg 1 0.70 14.5 10
o de refuerzo (kg)= 2,123
Metrado adoptado (kg)= 2,124.0
4.00 MISCELNEOS
4.01 SUMIN. E INSTAL. DE RIEL
m 2 9.2 18.4
Long. Total (m)= 18.4
Metrado adoptado (m)= 20.0

4.02 SUMIN. E INSTAL. DE DUCTO DE CONCRETO DE 4 VIAS


m 2 8.08 16.2
m 2 5.9 11.7
m 2 37.0 74.0
m 2 4.2 8.3
Long. Total (m)= 110.2
Metrado adoptado (kg)= 127.0
4.03 COLOCACION DE MATERIAL GRAVA
Transf. Potencia
Entre viguetas m2 23 0.1 0.1 4.0 0.8
Total grava (m2)= 0.8
Metrado adoptado (m2)= 1.0

4.04 SUMINISTRO DE TUBO DE FF 8"

m 1 2.7 2.7
Long. Total (m)= 2.7
Metrado adoptado (m)= 3.0

4.05 ACABADOS VARIOS cant


caseta glb 1 1 1.0
antidad Total (u)= 1.0
Metrado adoptado (u)= 2.0

4.06 COLOCACION DE PLANCHA ESTRIADA


caseta m2 1 1 45.2 45.2
tidad Total (m2)= 45.2
Metrado adoptado (m2)= 48.0
METRADO ACERO

Partida N de Elem. 1/4" 8mm 3/8" 1/2" 5/8" 3/4" 1"


Descripcin Largo
N vecesIguales (2) (3) (4) (5) (6) (7) (8)
OBRAS DE CONCRETO ARMADO
POZA DE ACEITE
ACERO DE REFUERZO fy=4200 KG/CM2
Piso 1.00 10.00 0.80 5 8.0
Paredes 1.00 17.00 5.20 5 88.4
Horizontal 1.00 17.00 2.70 5 45.9
Vertical 1.00 18.00 1.75 5 31.5
LONGITUD (m) 0.00 0.00 0.00 173.80 0.00 0.00 0.00
# Varillas 0.00 0.00 0.00 20.28 0.00 0.00 0.00
(Kg/m) 0.25 0.42 0.56 0.99 1.56 2.24 4.00
(kg) 0.0 0.0 0.0 172.1 0.0 0.0 0.0
(kg) + 5% 0.0 0.0 0.0 180.7 0.0 0.0 0.0
Peso Total : 180.67

Partida N de Elem. 1/4" 8mm 3/8" 1/2" 5/8" 3/4" 1"


Descripcin Largo
N vecesIguales (2) (3) (4) (5) (6) (7) (8)
OBRAS DE CONCRETO ARMADO
BASE DE TRANSFORMADOR
ACERO DE REFUERZO fy=4200 KG/CM2
Losa 1.00 51.00 4.50 5 229.5
1.00 47.00 5.00 5 235.0
Paredes 2.00 41.00 1.60 5 131.2
Vertical 2.00 37.00 1.60 5 118.4
Horizontal 2.00 9.00 4.50 5 81.0
2.00 9.00 5.00 5 90.0
Vigas 2.00 47.00 1.20 5 112.8
2.00 9.00 4.50 5 81.0
Buzones 6.00 48.00 1.00 5 288.0
6.00 40.00 1.20 5 288.0
Piso 6.00 28.00 1.20 5 201.6
LONGITUD (m) 0.00 0.00 0.00 ### 0.00 0.00 0.00
# Varillas 0.00 0.00 0.00 216.59 0.00 0.00 0.00
(Kg/m) 0.25 0.42 0.56 0.99 1.56 2.24 4.00
(kg) 0.0 0.0 0.0 ### 0.0 0.0 0.0
(kg) + 5% 0.0 0.0 0.0 ### 0.0 0.0 0.0
Peso Total : 1,929.83

Poza de Aceite 180.67


Base de Transformador 1,929.83
TOTAL 2,110.50
3. TELECOMUNICACIONES

A. SUMINISTRO DE EQUIPOS Y MATERIALES

Precio Precio
Unitario Unitario
tem Descripcin Unidad Cantidad
(US$) Equipo (US$) Equipo
Nacional Importado

A SUMINISTRO DE EQUIPOS Y MATERIALES

1.00 SISTEMA DE TELECOMUNICACIONES S.E. SOCABAYA


Tablero de telecomunicaciones (incluye equipo de datos, RTU, transductores y
1.01 Un 1 26,000.00
convertidores)
Sub-Total:

TOTAL DE SUMINISTRO EQUIPOS Y MATERIALES

III. TELECOMUNICACIONES

B. MONTAJE DE EQUIPOS Y MATERIALES

tem Descripcin Unidad Cantidad

B MONTAJE DE EQUIPOS Y MATERIALES

1.00 SISTEMA DE TELECOMUNICACIONES S.E. SOCABAYA

Tablero de telecomunicaciones (incluye equipo de datos, RTU, transductores y


1.01 Glb 1
convertidores)

Sub-Total:

TOTAL MONTAJE DE EQUIPOS Y MATERIALES


Precio Total Precio Total Precio Precio
(US$) Equipo (US$) Equipo Total Total
Nacional Importado (US) (S/.)

26,000.00 26,000.00 83,408.00

0.00 26,000.00 26,000.00 83,408.00

0.00 26,000.00 26,000.00 83,408.00

Precio Unit. Precio Total


(S/.) (S/.)

#N/A #N/A

#N/A

#N/A
SOCIEDAD ELCTRICA DEL SUR OESTE S.A. SEAL

ANLISIS DE COSTOS UNITARIOS DE LAS OBRAS ELECTROMECNICAS DE LA S.E. SOCABAYA 33/10 KV

PROYECTO: AMPLIACIN DE LA SUBESTACIN DE TRANSFORMACIN SOCABAYA 33/10 KV, SOCABAYA - AREQUIPA

PARTIDA : 9.00 SISTEMA DE COMUNICACIONES


DESCRIPCIN: 9.01 COMUNICACIONES

RENDIMIENTO : 0.144 global/da UNIDAD: glb.

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL SUB TOTAL


MATERIALES #N/A
#N/A EST 1.00 #N/A #N/A
#N/A Un. 0.25 #N/A #N/A
#N/A Pza. 0.25 #N/A #N/A
#N/A gln 30.00 #N/A #N/A

MANO DE OBRA #N/A


#N/A 0.10 h-h 5.55 #N/A #N/A
#N/A 0.50 h-h 27.76 #N/A #N/A
#N/A 2.00 h-h 111.03 #N/A #N/A
#N/A 2.00 h-h 111.03 #N/A #N/A
#N/A 1.00 h-h 55.52 #N/A #N/A

MAQUINARIAS Y EQUIPOS #N/A


#N/A 0.50 h-m 27.76 #N/A #N/A
#N/A 0.25 h-m 13.88 #N/A #N/A
#N/A 0.25 h-m 13.88 #N/A #N/A
#N/A 0.25 h-m 13.88 #N/A #N/A

HERRAMIENTAS #N/A
Herramientas manuales y equipos de proteccin % m-o 5.00 #N/A #N/A

COSTO DIRECTO TOTAL S/. #N/A


SEAL S.A.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
AMPLIACIN DE LNEAS 10KV

PARTIDA : Levantamiento topogrfico de las lineas de 10kV


1.01
RENDIMIENTO : 3 km/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
Cemento Portland tipo I en bolsa de 42,5 kg kg 1.00 #N/A #N/A
Cemento Portland tipo I en bolsa de 42,5 kg bls 0.66 #N/A #N/A
Cemento Portland tipo I en bolsa de 42,5 kg EST 0.50 #N/A #N/A
Cemento Portland tipo I en bolsa de 42,5 kg gln 0.13 #N/A #N/A

MANO DE OBRA
Especialista de montaje 1.00 h-h 2.67 #N/A #N/A
Especialista de montaje 1.00 h-h 2.67 #N/A #N/A
Especialista de montaje 2.00 h-h 5.33 #N/A #N/A

MAQUINARIAS Y EQUIPOS
Cemento Portland tipo I en bolsa de 42,5 kg 1.00 h-m 2.67 #N/A #N/A
Cemento Portland tipo I en bolsa de 42,5 kg 3.00 h-m 8.00 #N/A #N/A
Cemento Portland tipo I en bolsa de 42,5 kg 1.00 h-m 2.67 #N/A #N/A
Cemento Portland tipo I en bolsa de 42,5 kg % m-o 10.00 #N/A #N/A

COSTO DIRECTO TOTAL S/.

SEAL S.A.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
AMPLIACIN DE LNEAS 10KV

PARTIDA : Replanteo topogrfico de las lineas de 10kV


1.02
RENDIMIENTO : 3 km/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
#N/A kg 1.00 #N/A #N/A
#N/A bls 0.66 #N/A #N/A
#N/A EST 0.50 #N/A #N/A
#N/A gln 0.13 #N/A #N/A

MANO DE OBRA
#N/A 1.00 h-h 2.67 #N/A #N/A
#N/A 1.00 h-h 2.67 #N/A #N/A
#N/A 2.00 h-h 5.33 #N/A #N/A

MAQUINARIAS Y EQUIPOS
#N/A 1.00 h-m 2.67 #N/A #N/A
#N/A 3.00 h-m 8.00 #N/A #N/A
#N/A 1.00 h-m 2.67 #N/A #N/A
#N/A % m-o 10.00 #N/A #N/A

COSTO DIRECTO TOTAL S/.

SEAL S.A.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
AMPLIACIN DE LNEAS 10KV

PARTIDA : ARMADO S1
2.01
RENDIMIENTO : 16 Un/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
#N/A EST 0.50 #N/A #N/A

MANO DE OBRA
#N/A 1.00 h-h 0.50 #N/A #N/A
#N/A 1.00 h-h 0.50 #N/A #N/A
#N/A 2.00 h-h 1.00 #N/A #N/A
#N/A 4.00 h-h 2.00 #N/A #N/A

MAQUINARIAS Y EQUIPOS
#N/A 1.00 h-m 0.50 #N/A #N/A
#N/A 0.50 h-m 0.25 #N/A #N/A
#N/A 1.00 h-m 0.50 #N/A #N/A
#N/A 2.00 h-m 1.00 #N/A #N/A
#N/A 1.00 h-m 0.50 #N/A #N/A
#N/A 1.00 h-m 0.50 #N/A #N/A
#N/A % m-o 10.00 #N/A #N/A

COSTO DIRECTO TOTAL S/.

SEAL S.A.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO: AMPLIACIN DE LNEAS 10KV

PARTIDA : ARMADO A1
2.02
RENDIMIENTO : 9.5 Un/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
#N/A EST 0.50 #N/A #N/A

MANO DE OBRA
#N/A 1.00 h-h 0.84 #N/A #N/A
#N/A 1.00 h-h 0.84 #N/A #N/A
#N/A 2.00 h-h 1.69 #N/A #N/A
#N/A 4.00 h-h 3.37 #N/A #N/A
MAQUINARIAS Y EQUIPOS
#N/A 1.00 h-m 0.84 #N/A #N/A
#N/A 0.50 h-m 0.42 #N/A #N/A
#N/A 1.00 h-m 0.84 #N/A #N/A
#N/A 2.00 h-m 1.69 #N/A #N/A
#N/A 1.00 h-m 0.84 #N/A #N/A
#N/A 1.00 h-m 0.84 #N/A #N/A
#N/A % m-o 10.00 #N/A #N/A

COSTO DIRECTO TOTAL S/.

SEAL S.A.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO: AMPLIACIN DE LNEAS 10KV

PARTIDA : ARMADO R1
2.03
RENDIMIENTO : 9.25 Un/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
#N/A EST 0.50 #N/A #N/A

MANO DE OBRA
#N/A 1.00 h-h 0.87 #N/A #N/A
#N/A 1.00 h-h 0.87 #N/A #N/A
#N/A 2.00 h-h 1.73 #N/A #N/A
#N/A 4.00 h-h 3.46 #N/A #N/A

MAQUINARIAS Y EQUIPOS
#N/A 1.00 h-m 0.87 #N/A #N/A
#N/A 0.50 h-m 0.43 #N/A #N/A
#N/A 1.00 h-m 0.87 #N/A #N/A
#N/A 2.00 h-m 1.73 #N/A #N/A
#N/A 1.00 h-m 0.87 #N/A #N/A
#N/A 1.00 h-m 0.87 #N/A #N/A
#N/A % m-o 10.00 #N/A #N/A

COSTO DIRECTO TOTAL S/.


SEAL S.A.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
AMPLIACIN DE LNEAS 10KV

PARTIDA : ARMADO SEC


2.04
RENDIMIENTO : 8 Un/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
#N/A EST 0.50 #N/A #N/A

MANO DE OBRA
#N/A 0.10 h-h 0.10 #N/A #N/A
#N/A 1.00 h-h 1.00 #N/A #N/A
#N/A 2.00 h-h 2.00 #N/A #N/A
#N/A 4.00 h-h 4.00 #N/A #N/A

MAQUINARIAS Y EQUIPOS
#N/A 1.00 h-m 1.00 #N/A #N/A
#N/A 0.50 h-m 0.50 #N/A #N/A
#N/A 1.00 h-m 1.00 #N/A #N/A
#N/A 2.00 h-m 2.00 #N/A #N/A
#N/A 1.00 h-m 1.00 #N/A #N/A
#N/A 1.00 h-m 1.00 #N/A #N/A
#N/A % m-o 10.00 #N/A #N/A

COSTO DIRECTO TOTAL S/.

SEAL S.A.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
AMPLIACIN DE LNEAS 10KV

PARTIDA : INSTALACION DE CONDUCTOR DESNUDO 120 mm2 AAAC


3.01
RENDIMIENTO : 3.65 Km/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
#N/A EST 1.00 #N/A #N/A

MANO DE OBRA
#N/A 1.00 h-h 2.19 #N/A #N/A
#N/A 8.00 h-h 17.55 #N/A #N/A
#N/A 6.00 h-h 13.16 #N/A #N/A
#N/A 10.00 h-h 21.94 #N/A #N/A
#N/A 1.00 h-h 2.19 #N/A #N/A

MAQUINARIAS Y EQUIPOS
#N/A 1.00 h-m 2.19 #N/A #N/A
#N/A 0.75 h-m 1.65 #N/A #N/A
#N/A 1.00 h-m 2.19 #N/A #N/A
#N/A 0.50 h-m 1.10 #N/A #N/A
#N/A 1.00 h-m 2.19 #N/A #N/A
#N/A 1.00 h-m 2.19 #N/A #N/A
#N/A 0.50 h-m 1.10 #N/A #N/A
#N/A 1.00 h-m 2.19 #N/A #N/A
RANSMISION

km

SUB TOTAL
#N/A

#N/A

#N/A

#N/A

RANSMISION

km

SUB TOTAL
#N/A

#N/A

#N/A
#N/A

RANSMISION

Un.

SUB TOTAL
#N/A

#N/A

#N/A

#N/A

RANSMISION

Un.

SUB TOTAL
#N/A

#N/A
#N/A

#N/A

RANSMISION

Un.

SUB TOTAL
#N/A

#N/A

#N/A

#N/A
RANSMISION

Un.

SUB TOTAL
#N/A

#N/A

#N/A

#N/A

RANSMISION

Km

SUB TOTAL
#N/A

#N/A

#N/A
Unidad p.u. (US$) p.u. (S/.)
Capataz h-h 7.98 22.35
Oficial h-h 5.2 14.57
Operario h-h 6.14 17.19
Pen h-h 4.69 13.12
Tcnico Elctricista I h-h 9
Tcnico Elctricista II h-h 8
Tcnico Elctricista III h-h 6.5
Ingeniero Elctricista h-h 19
Equipos
Equipo de tratamiento de aceite h-m 121.329
Equipos de Medicion h-m 26.442
Equipos de pruebas y puesta en servicio h-m 35.256
Montacargas 3Tn h-m 40.287 86.49
Montacargas 5 Tn h-m 51.298 111.09
Montacargas 7,5Tn h-m 62.972 137.19
Caja de herramientas h-m 2.847
Gra 20 Tn h-m 95.472 213.41
Camin gra de 6 Tn h-m 43.446 112.9596
Camin plataforma 4x2, 122 HP, 8 Tn h-m 49.907
Camin Plataforma de 8 Tn h-m 49.907
Camioneta 4x4, doble cabina h-m 34.632 77.41
Materiales 0
Riel 60 lbs/yd m 121.641
Soldadura cellocord kg 5.291
Electrobomba de 1/2 HP u
Unidad p.u. (US$) p.u. (S/.)
Capataz h-h 6.78
Oficial h-h 6.15 12.06
Operario h-h 5.44 13.62
Pen h-h 4.39 10.89
Tcnico Elctricista I h-h 8.78
Tcnico Elctricista II h-h 7.02
Tcnico Elctricista III h-h 6.15
Ingeniero Elctricista h-h 14.04
Equipos
Equipo de tratamiento de aceite h-m 121.329
Equipos de Medicion h-m 26.442
Equipos de pruebas y puesta en servicio h-m 35.256
Montacargas 3Tn h-m 40.287 90.06
Montacargas 5 Tn h-m 51.298 114.66
Montacargas 7,5Tn h-m 62.972 140.76
Caja de herramientas h-m 2.847
Gra 20 Tn h-m 95.472 213.41
Camin gra de 6 Tn h-m 43.446
Camin plataforma 4x2, 122 HP, 8 Tn h-m 49.907
Camin Plataforma de 8 Tn h-m 49.907
Camioneta 4x4, doble cabina h-m 34.632 77.41
Materiales 0
Riel 60 lbs/yd m 121.641
Soldadura cellocord kg 5.291
Electrobomba de 1/2 HP u