CLAVE DESCRIPCION UNIDAD

TRAZ -01 TRAZO Y NIVELACION DE TERRENO PLANO POR MEDIOS M2


MANUALES PARA DESPLANTE DE ESTRUCTURAS
ESTABLECIENDO EJES AUXILIARES Y REFERENCIAS.

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A


EXC-01 1.08 M., DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, m3
HERRAMIENTA Y EQUIPO NECESARIO.

EJE TRAMO LONGITUD ANCHO ALTO PIEZAS TOTAL


1y2 A-B 7.5 1.5 1.08 2 24.3
AyB 1-2 4.5 1.5 1.08 2 14.58

TOTAL 38.88
CANTIDAD

36

38

CROQUIS
CLAVE DESCRIPCION UNIDAD
PLANTILLA DE 5 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA
F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO,
CIM-02 MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. M2

EJE TRAMO LONGITUD ANCHO ALTO PIEZAS


1y2 A-B 7.5 1.5 0 2
AyB 1-2 4.5 1.5 0 2

TOTAL
UNIDAD CANTIDAD

M2 36

TOTAL CROQUIS
22.5
13.5

36
CLAVE DESCRIPCION UNIDAD
Acero de refuerzo-Dala de cimentacion con 6
CIM-03 varillas #3 y estribos #2 @ 20 cm Kg

EJE TRAMO LONGITUD Diametro Peso (kg) PIEZAS TOTAL


1y2 A-B 7.5 #3 (3/8) 0.56 6 25.2
AyB 1-2 4.5 #3 (3/8) 0.56 6 15.12

TOTAL 40.32
CANTIDAD

40.32

CROQUIS
CLAVE DESCRIPCION UNIDAD

Dala de cimentacion con seccion de 20x20


CIM-04 m3
cm concreto f'c= 200 kg/cm2

EJE TRAMO LONGITUD ANCHO ALTO PIEZAS TOTAL


1y2 A-B 6.2 0.2 0.2 2 0.496
AyB 1-2 5.8 0.2 0.2 2 0.464

TOTAL 0.96
CANTIDAD

0.96

CROQUIS
CLAVE DESCRIPCION UNIDAD

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA


DE CONCRETO F'C=200 KG/CM2. DE 65 CM. DE
CIM-05 m3
ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 67.2
KG. DE ACERO DE #3 X M3. DE CONCRETO

EJE TRAMO LONGITUD ANCHO ALTO PIEZAS TOTAL


Zapata
1y2 A-B 7.5 1.5 0.2 2 4.5
AyB 1-2 4.5 1.5 0.2 2 2.7
Dala
1y2 A-B 6.2 0.2 0.2 2 0.496
AyB 1-2 5.8 0.2 0.2 2 0.464

TOTAL 8.16
CANTIDAD

8.16

CROQUIS
CLAVE DESCRIPCION UNIDAD
CIM-06 Kg
Acero de refuerzo-Zapata de varillas #3 @ 20
EJE TRAMO LONGITUD Diametro Peso (kg) PIEZAS TOTAL
Zapata
1 - 1' A-B 7.5 #3 (3/8) 0.56 8 33.60
2 - 2' A' - B' 7.5 #3 (3/8) 0.56 8 33.60
A - A' 1 - .2 7.5 #3 (3/8) 0.56 8 33.60
B - B' 1' - 2' 7.5 #3 (3/8) 0.56 8 33.60
1 - 1' A-B 1.5 #3 (3/8) 0.56 23 19.32
2 - 2' A' - B' 1.5 #3 (3/8) 0.56 23 19.32
A - A' 1 - .2 1.5 #3 (3/8) 0.56 23 19.32
B - B' 1' - 2' 1.5 #3 (3/8) 0.56 23 19.32
Dala de cimentacion
1 - 1' A-B 6.2 #3 (3/8) 0.56 4 13.888
2 - 2' A' - B' 6.2 #3 (3/8) 0.56 4 13.888
A - A' 1 - .2 6.2 #3 (3/8) 0.56 4 13.888
B - B' 1' - 2' 6.2 #3 (3/8) 0.56 4 13.888
Estribos
1 - 1' A-B 1.2 #2 (1/4) 0.25 30 9
2 - 2' A' - B' 1.2 #2 (1/4) 0.25 30 9
A - A' 1 - .2 1.2 #2 (1/4) 0.25 30 9
B - B' 1' - 2' 1.2 #2 (1/4) 0.25 30 9
Castilos
1y2 A-B 1.8 #3 (3/8) 0.56 3 3.024
AyB 1-2 1.8 #3 (3/8) 0.56 3 3.024
1y2 A-B 1.8 #3 (3/8) 0.56 1 1.008
AyB 1-2 1.8 #3 (3/8) 0.56 1 1.008
Estribos
0.8 #2 (1/4) 0.25 4 0.8
0.8 #2 (1/4) 0.25 4 0.8
0.8 #2 (1/4) 0.25 4 0.8
0.8 #2 (1/4) 0.25 4 0.8
0.8 #2 (1/4) 0.25 4 0.8
0.8 #2 (1/4) 0.25 4 0.8
0.8 #2 (1/4) 0.25 4 0.8
0.8 #2 (1/4) 0.25 4 0.8

Total 317.70
CANTIDAD
317.70
CROQUIS
CLAVE DESCRIPCION UNIDAD CAN

CIM-07 Murete de cimentacion de 20 cm de espesor m2 14.


con block de 20x20x40cm, y 1 varrilla de #3
a @ 1m
EJE TRAMO LONGITUD ANCHO ALTO PIEZAS TOTAL
1 A-B 5.6 0.63 3.528
2 A-B 5.6 0.63 3.528
a 1-2 5.6 0.63 3.528
b 1-2 5.6 0.63 3.528

TOTAL 14.112
7.5
7.5
CANTIDAD

14.112

CROQUIS
CLAVE DESCRIPCION UNIDAD
IMPER-01 M2
EJE TRAMO LONGITUD ANCHO ALTO PIEZAS TOTAL
AYB 1Y2 7.5 7.5 56.25
1Y2 AYB 4.5 4.5 20.25
36

48 0.88 42.24

TOTAL 78.24
CANTIDAD
78.24
CROQUIS
CLAVE DESCRIPCION UNIDAD C
Relleno de material inerente compactado con
un equipo mecanico en capas de 20 cm de
CIM-09 espesor , con abundamieto del 30 % m3 1

EJE TRAMO LONGITUD ANCHO ALTO PIEZAS TOTAL


1-2 A-B 7.50 1.30 0.63 2.00 12.29

A-B 1-2 4.50 1.30 0.63 2.00 7.37

TOTAL 19.66
CANTIDAD

19.656

CROQUIS