Sunteți pe pagina 1din 390

HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

SANITARY INSTALLATION
1 Install the following sanitary ware
complete with all fixings, fittings, accessories, connections;and piping (drain pipe ,cold water , hot
water and all necessary valves)
all in accordance with the drawings and specifications

1.1 Supply & fix pedestal wash basin including all fittings,mixers,glass shelf,soap dish and towel rail
complete with all related fittings & mirrors including angle valves at all outlets
9,456.00

1.2 Supply & fix undercounter wash basin complete with all related fittings & mirrors including angle
38,473.20
valves at all outlets

Type A - [ 1 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

1.3 Supply & fix Back to wall European water closet concealed with flushing mechanism,shataff and
paper holder complete with all related fittings including angle valves at all outlets 58,119.30

1.4 Supply & fix European water closet set (shattaf and paper holder) complete with all related
12,915.40
fittings including angle valves at all outlets.

1.5 Supply & fix shower set complete with shower mixer,robe hook,grab bar and all related fittings&
25,103.10
including angle valves at all outlets

1.6 Supply & fix Bath tub including mixer complete with rose hook,grab bar and all related fittings&
including angle valves at all outlets 13,824.90

1.7 Supply & fix Kitchen sink double bowl with mixer and complete related fittings
5,093.40

Type A - [ 2 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

DRAINAGE INSTALLATION

1 Supply and install UPVC soil, waste and vent pipework


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
and accessories; all in accordance with the drawings
and specifications

Above ground UPVC pipes and fittings


1.1 82mm dia pipes and fittings 2,838.00

1.2 110mm dia pipes and fittings 3,711.00

under ground UPVC pipes and fittings

Type A - [ 3 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

1.4 160mm dia pipes and fittings 18,010.00

50mm dia pipes and fittings 18,189.60

Above ground UPVC pipes and fittings


2 Supply and install UPVC rain drain pipe
including , caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
Rain drain UPVC all
and accessories; pipes and fittings with the drawings
in accordance
and specifications
2.1 82mm dia pipes and fittings 6,622.00

3 Pipework ancillaries complete; all in accordance with the


drawings and specifications
3.1 Floor Clean Outlets with ss cover 1,091.45

3.2 Floor Traps with ss cover 15,280.30

Type A - [ 4 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

3.3 RAIN WATER OUTLET 7,640.15

Type A - [ 5 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

WATER SUPPLY INSTALLATION

COLD WATER INSTALLATION


1 Supply & fix PPR pipe (External PPR pipe will be PN25 with aluminume layer with rubber
insulation with foster and all the internal PPR will be PN20), with different diameters for hot and
cold water from roof tank to all all toilet, wash, bath, w/c & services.. All as per drawings
including necessary fittings & accessories
1 25mm dia pipes and fittings 5,676.00

1.2 40mm dia pipes and fittings 8,382.60

HOT WATER INSTALLATION

2 Equipment and ancillaries

Type A - [ 6 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

2.1 Electric Water Heater - 50 ltr (horizontal) 8,185.80

2.2 Electric Water Heater -80 ltr (horizontal) 15,462.00

3 Supply and install PVC irrigation pipe


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings,hosebibe
3.1 15mm dia pipes and
and accessories; fittings
all in accordance with the drawings 10,916.25
and specifications
3.2 Bib tap for irrigation 2,037.40

3.3 pex pipe 8,367.70

Type A - [ 7 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

Type A - [ 8 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

EXTERNAL WORK

DRAINAGE INSTALLATION
1 Construction of manholes as per drawings with approved covers al with necessary channels and
traps

1.1 MH 12,733.35

2 Constructions of gully traps as per drawings with approved covers

2.1 GT 6,548.75

Type A - [ 9 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

* Allow for all works necessary for the connections to the


nearest sewer connection including all pipe works, fixings,
fittings, accessories, excavation, backfilling and all other
civil works; all in accordance with the drawings and
specifications

WATER INSTALLATION
3 Equipment and ancillaries, complete; all in accordance with
the drawings and specifications

3.1 300mmx370mm water meter cabinet; including


all necessary valves, fixings, fittings and accessories; 4,547.70
all in accordance with the drawings and specifications

Type A - [ 10 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

3.2 Construct as per drawings 560gals. 3-layer isolated PVC Roof water tank horizontal type
complete with, valves, vent, internal finished ceramic tiles fixed with waterproof glue & inspection
opening with medium duty cover including necessary fittings & accessories. 12,551.60

3.3 Transfer pump set of 2L/S at 19m head (1 duty & 1 standby) in the pump room with power
supplies, float switches, alum box for protection & controls including necessary fittings & 21,828.85
accessories

Type A - [ 11 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

1
Booster pump set of 1.5L/S at 17m head with 100ltr pressure vessel (1 duty & 1 standby) in the
pump room with power supplies, float switches, alum box for protection & controls including
necessary fittings & accessories 21,828.85

Allow for all works necessary for the connections to the


existing local water authority main including all pipeworks,
fixings, fittings, accessories, excavation, backfilling and all
other civil works; all in accordance with the drawings and
specifications.

Generally

Type A - [ 12 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SUNDRIES

Work incidental to the disposal installation


Generally

2 Building in or cutting and pinning brackets or the like


and making good finishings
3 Protective painting and decorative painting

4 Co-ordination with other engineering installations 5,457.20

5 Any works, not included in the above, to complete the


disposal installations, give details

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS 380,891.85

Type A - [ 13 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS
1 Supply and install the air conditioning &ventilation system, complete as specifiedshown and
detailed on Drawings and to theapproval of the Engineer:

EQUIPMENT
1.1 Split ducted unit with capacity of 1.5 TON total load complete as specified with all
accessories and controls with free discharging 1" UPVC condensate pipe completed with
69,124.60
foundation for outdoor unit.

1.2 Ditto, but 2 TON total load . 48,300.00

Type A - [ 14 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

1.3 Ditto, but 2.5TON total load . 72,450.00

1.4 Ditto, but 5.5 TON total load . 80,039.10

1.5 Roof mounted exhaust fan,50 CFM. 5,457.25

1.6 Roof mounted exhaust fan,100 CFM. 2,182.90

1.7 Ditto, but 400 CFM. 1,637.15

1.8 Axial Wall Mounted Fan 100 CFM


2,182.90

DUCT WORK

2 Pre-Insulated ducting for air conditioning, complete with volume splitter dampers, access,panels, 45,476.75
hangers supports flexible duct connection and other accessories, as shown on drawings and
specifications.

Type A - [ 15 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

Type A - [ 16 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS

3 Supply, return, fresh air and exhaust grilles, registers and diffusers for air conditioning and
ventilation system as per specifications:
Supply Air Grilles
3.1 SAG 18 inch x 6 inch. 363.80

3.2 SAG 36 inch x 6 inch. 4,583.95

Return Air Grilles


3.3 RAG 18 inch x 6 inch. 272.85

3.4 RAG 36 inch x 6 inch. 3,438.05

Type A - [ 17 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

Supply Ceiling Diffusers

3.5 SCD 9 inch x 9 inch. 3,929.20


3.6 SCD 12 inch x 12 inch. 1,382.50

Return Ceiling Diffusers


3.7 RCD 9 inch x 9 inch. 2,182.80
3.8 RCD 12 inch x12 inch. 1,055.10
Volume Control Dampers
3.9 VCD 10,477.80
Exhaust Air Diffuser
3.10 EAD 9 inch x 9 inch. 3,783.60
COMB GRILL
3.11 CG 28 inch x 6 inch. 1,091.40
SLSD ( 3 SLOTS) L 2200MM
3.12 SLSD ( 3 SLOTS) 7,640.00

Type A - [ 18 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

3.13 RLSD ( 3 SLOTS) 6,985.20


4 CIVIL WORKS IN CONNECTION WITH A/C AND VENTILATION WORKS

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS HVAC 374,036.90

Type A - [ 19 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION L - ELECTRICAL INSTALLATIONS

Distribution Board
1 Furnishing, Supplying, installing, hooking up and testing the main distribution board. Complete
with Energy meter and all components as specified and as indicated in the drawings.also
including all necessary accessories and ancillary works for preparing low tension panel board
room and all required for complete installation type. SMDB-A 15,825.90
V(A) .According to specs. & load schedule

2 Ditto as above but distribution board type DB-GF According to specs. & load schedule
17,281.15

3 Ditto as above but distribution board type DB-FF . According to specs. & load schedule
10,914.40

Type A - [ 20 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

4 KWHR meters including all cables, fixing, fittings,and accessories: all in accordance with the
drawing and specifications.

4.1 KWHR meters (CALIBRATED) class 2 FEWA approved 8,367.70


Feeders and Sub Feeders
5 Multicore XLPE /PVC/SWA insulated cable :-
Furnishing, Supplying, installing, connecting and testing of conductors PVC insulated,
including terminations, hooking up, cable trays or U.P.V.C conduits and all necessary
accessories and ancillary works required for complete installation as specified and
the drawings.

5.1 4C 70 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 35 sq.mm. Y/G ECC From Metering Panel to the SMDB Panel according to drawing 4,307.60

Type A - [ 21 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

5.2 4C 50 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 25 sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 15,534.75

5.3 4C 35 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 16 sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 13,534.00

Type A - [ 22 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Lighting Outlet

1 Supplying, installing, connecting and testing of wall or ceiling lighting outlets with ceiling rose
including P.V.C conduits , fittings, boxes, sub circuit and main circuits and all necessary and
ancillary works back to panel board as specified and as indicated in the drawings: 58,081.70
Lighting outlets on ceiling or at wall

2 Ditto as above but With Flexible cable in UPVC pipe for all external light in ground and roof .
8,986.25

3 Supplying, installing & connecting the PVC conduit from SMDB to backyard with switching back
box provision for future external garden layout with IP 65 PVC juncton box at appropriate location 1,091.45
.

Type A - [ 23 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

Lighting Fixtures
4 Supply and fix lighting fixtures: including all necessary
fixings, fittings and accessories: complete in
accordance with the drawings and specifications.

4.1 TYPE A:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2000 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 15,280.30

4.2 TYPE B:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2000 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 19,100.55

4.3 TYPE H:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2000 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR. 12,005.95

Type A - [ 24 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

4.4 TYPE P:280x144x100mm,1464LM LED WALL MOUNTED BULKHEAD IP67 RATED WITH DIE
CAST BODY AND TEMPERED GLASS DIFFUSER WITH DECORATIVE GRILL 6500K. 15,371.20

4.5 TYPES:75mmDIA,116mmDEPTH,7WATTS,600LUMEN,43 DEGREE BEAM ANGLE,CRI


82,UGR 12 LOW GLARE DEEP DRAWN REFLECTOR WITH GLASS DIFFUSER IP65. 16,008.00

Type A - [ 25 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Lighting Switches

Supplying, installing, connecting and testing of lighting switches one way. Conduits fitting, boxes,
sub-circuit, and all necessary accessories and ancillary works back to panel board as specified
and as indicated in the drawing 490.95

2 Ditto as above but One way, Two gang switch (10A-250V) 1,018.50

3 Ditto as above but One way, Three gang switch (10A-250V) 1,800.70

4 Ditto as above but Two way, One gang switch (10A-250V) 709.15

5 Ditto as above but Two way, Two gang switch (10A-250V) 1,222.20

Type A - [ 26 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

Type A - [ 27 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Disconnect Switches outlets & sockets:
1 Supplying, installing, connecting and testing of 3PH Disconnecting isolator 40A/415V for A/C
OUT DOOR UNIT ON ROOF FLOOR including fittings, boxes, wiring and all necessary
accessories and ancillary works as specified and as indicated in the drawing. 13,643.10

2 Ditto as above but Disconnecting isolator 40A/415V FOR swimming pool. 5,457.20

3 Ditto as above but Disconnecting isolator 32A/230V FOR 1Ph A/C Units. 21,828.80

4 Ditto as above but Disconnecting isolator 20A/230V FOR 1Ph pump. 5,457.20

5 Ditto as above but Disconnecting isolator 20A/230V FOR 1Ph motorized gate. 2,728.60

Type A - [ 28 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

6 Supplying, installing, connecting and testing of sockets outlets including PVC conduits. conduit
fittings, boxes and all necessary accessories and ancillary works as specified and as indicated in
the drawings : 31,215.60
1PH Switched Single Socket 13 A/ 230V

7 Ditto as above but 1PH Switched Single Socket outlet 13 A/ 230V weather proof at cartport. 1,273.35

8 Ditto as above but 1PH shaver outlet as per BS EN 61558-2-5. 2,182.90

9 Ditto as above but 13A double Socket outlet for ONT. 2,364.80

10 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as dish washer 1,819.05

11 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as washing machine 1,819.05

12 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as dryer 1,819.05

Type A - [ 29 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

13 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as hot plate 1,819.05

14 Ditto as above but 40A spur outlet with 40A DP switch with factory engrated as hot plate 3,274.35

15 Ditto as above but 20A WH 14,552.40

Type A - [ 30 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Power Outlets
1 Supplying, installing, connecting and testing of 3PH Disconnecting flex. outlet 10A/230V for 1Ph
for Exhaust Fans including boxes, wiring and all necessary accessories and ancillary works as
8,731.60
specified and as indicated in the drawing.

2 20A fused flex outlet for water heater 7,276.40

3 20A fused flex outlet for FCU 10,005.05

Fire Alarm System


4 Supplying ,installing , connecting and testing addressable fire alarm Stand Alone Heat Detector
With sounder and including devices and all necessary accessories and ancillary works as
specified and as indicated in the drawings. 2,728.60

Type A - [ 31 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

Telephone and Data System


5 Telephone outlet with cable CAT6 copper inside P.V.C conduit extended from ONT to TJB to
Telephone outlet complete with plug and socket (RJ- 45) and all accessories acc. to the 12,006.00
specifications and drawings.

6 Ditto as above but RJ-45 double Data outlet. 800.40

7 Ditto as above but E-Vision outlet . 7,203.60


8 Supplying ,installing , connecting the OPTICAL NETWORK UNIT (ONU BOX)
3,274.35

9 Supplying ,installing , connecting of Telephone Janction Box . 1,091.45

Earthing System

Type A - [ 32 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

10 L. V Earthign System
Supplying, installing, connecting and testing complete earthing pit (earth resistance
value less than 1.0 ohm) for SMDB including welding, earthign electrodes, disturbing
bus bar and test link, earth continuity cable to distribution board of and all necessary 4,547.70
accessories and ancillary materials required for complete installation specified and as
indicated in the drawing.

Type A - [ 33 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Intercom
Supplying, installing, connecting and testing of main console unit in the main door , complete
installation as specified and as indicated in the drawing.

2
Supplying, installing, connecting and testing indoor room unit in the ground &first floors, complete
installation as specified and as indicated in the drawing: 7,276.30

3
Supplying, installing, connecting and testing data cables in UPVC pipes from the main console
unit to each indoor room unit complete installation as specified and as indicated in the drawing.

Type A - [ 34 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

Supplying, installing, connecting and testing power Flexable cables in UPVC pipes from the main
console unit to each indoor room unit complete installation as specified and as indicated in the
drawing.

5 T.V SYSTEM 7,203.60


T.V outlet with coxial cable inside P.V.C conduit extended from T.V Junction box each outlet
complete with socket and all accessories acc. to the specifications and drawings.

6 Supplying ,installing , connecting of T.V Janction Box . 2,182.90


FIRE FIGHTING SYSTEM

7 Supply and install fire fighting materials as per drawings, all as specified:

7.1 4.5 kg dry chemical portable fire extinguishers. 909.55

7.2 Ditto but CO2 4.5 kg. 1,091.45


7.3 Ditto but CO2 2.5 kg. 1,273.35

Type A - [ 35 ]
HI Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type A - #

BOQ Contract Amount


Description
Reference (AED)

7.5 fire blanket 909.55


7.5 Civil works in connection with the plumbing and fire fighting system including all sleeves,
opening, etc.

SECTION L - TOTAL ELECTRICAL INSTALLATIONS 426,698.75


TOTAL FOR VILLA A TYPE 1,181,627.50

Type A - [ 36 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

42.00% 3,971.52 5,484.48

42.00% 16,158.74 22,314.46

Type A - [ 37 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

58.00% 33,709.19 24,410.11

46.00% 5,941.08 6,974.32

40.40% 10,141.65 14,961.45

42.00% 5,806.46 8,018.44

42.00% 2,139.23 2,954.17

Type A - [ 38 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

68.00% 1,929.84 908.16

71.00% 2,634.81 1,076.19 1,076.19 Drainage manhole clearance pending

Type A - [ 39 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
52.00% 9,365.20 8,644.80

60.00% 10,913.76 7,275.84 7,275.84 Drainage manhole clearance pending


`

100.00% 6,622.00 -

64.00% 698.53 392.92

65.00% 9,932.20 5,348.11

Type A - [ 40 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

100.00% 7,640.15 -

Type A - [ 41 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

84.00% 4,767.84 908.16

84.00% 7,041.38 1,341.22

Type A - [ 42 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

20.00% 1,637.16 6,548.64

20.00% 3,092.40 12,369.60

38.00% 4,148.18 6,768.08

20.00% 407.48 1,629.92

100.00% 8,367.70 -

Type A - [ 43 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

Type A - [ 44 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

66.00% 8,404.01 4,329.34 4,329.34 Manhole Construction delay

30.00% 1,964.63 4,584.13 4,584.13 Manhole Construction delay

Type A - [ 45 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

41.00% 1,864.56 2,683.14

Type A - [ 46 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

42.00% 5,271.67 7,279.93

18.00% 3,929.19 17,899.66

Type A - [ 47 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

18.00% 3,929.19 17,899.66

Type A - [ 48 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

0.00% - 5,457.20

47.90% 182,429.75

Type A - [ 49 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

74.00% 51,152.20 17,972.40

-
74.00% 35,742.00 12,558.00
-

Type A - [ 50 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
74.00% 53,613.00 18,837.00
-

74.00% 59,228.93 20,810.17


-
43.00% 2,346.62 3,110.63
-
43.00% 938.65 1,244.25
-
43.00% 703.97 933.18
-
43.00% 938.65 1,244.25
-

20.00% 9,095.35 36,381.40

Type A - [ 51 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

Type A - [ 52 ]
HI Electrical Contracting LLC
15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-
-
-
-
41.00% 149.16 214.64
-
45.40% 2,081.11 2,502.84
-
-
35.00% 95.50 177.35
-
39.80% 1,368.34 2,069.71
-

Type A - [ 53 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
49.40% 1,941.02 1,988.18
57.40% 793.56 588.95
-
-
49.40% 1,078.30 1,104.50
61.40% 647.83 407.27
-
20.00% 2,095.56 8,382.24
-
39.00% 1,475.60 2,308.00
-
35.80% 390.72 700.68
-
56.60% 4,324.24 3,315.76

Type A - [ 54 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

56.60% 3,953.62 3,031.58

62.60% 234,153.95

Type A - [ 55 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

74.00% 11,711.17 4,114.73 4,114.73

76.00% 13,133.67 4,147.48 4,147.48

76.00% 8,294.94 2,619.46 2,619.46

Type A - [ 56 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

50.00% 4,183.85 4,183.85 4,183.85

38.00% 1,636.89 2,670.71 2,670.71

Type A - [ 57 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

40.00% 6,213.90 9,320.85 9,320.85

40.60% 5,494.80 8,039.20 8,039.20

Type A - [ 58 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

85.20% 49,485.61 8,596.09

87.00% 7,818.04 1,168.21

54.00% 589.38 502.07

Type A - [ 59 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

29.20% 4,461.85 10,818.45

28.40% 5,424.56 13,675.99

18.00% 2,161.07 9,844.88

Type A - [ 60 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

30.80% 4,734.33 10,636.87

23.60% 3,777.89 12,230.11

Type A - [ 61 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

26.00% 127.65 363.30

36.00% 366.66 651.84


Wall painting pending by ALT

26.00% 468.18 1,332.52

36.00% 255.29 453.86

36.00% 439.99 782.21

Type A - [ 62 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

Type A - [ 63 ]
HI Electrical Contracting LLC Running Bill-13
15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

26.00% 3,547.21 10,095.89

47.00% 2,564.88 2,892.32

47.00% 10,259.54 11,569.26

69.20% 3,776.38 1,680.82

61.20% 1,669.90 1,058.70

Type A - [ 64 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

64.00% 19,977.98 11,237.62

64.00% 814.94 458.41

70.00% 1,528.03 654.87

64.00% 1,513.47 851.33

69.00% 1,255.14 563.91

69.00% 1,255.14 563.91

69.00% 1,255.14 563.91

Type A - [ 65 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
69.00% 1,255.14 563.91

69.00% 2,259.30 1,015.05

69.00% 10,041.16 4,511.24

Type A - [ 66 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

82.00% 7,159.91 1,571.69

82.00% 5,966.65 1,309.75

82.00% 8,204.14 1,800.91

0.00% - 2,728.60

Type A - [ 67 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

55.40% 6,651.32 5,354.68

55.40% 443.42 356.98

55.40% 3,990.79 3,212.81

69.00% 2,259.30 1,015.05

44.00% 480.24 611.21

Type A - [ 68 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

18.00% 818.59 3,729.11

Type A - [ 69 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

31.00% 2,255.65 5,020.65

Type A - [ 70 ]
HI Electrical Contracting LLC 15 Running Bill-13

31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

53.40% 3,846.72 3,356.88

58.00% 1,266.08 916.82

0.00% - 909.55

0.00% - 1,091.45
0.00% - 1,273.35

Type A - [ 71 ]
HI Electrical Contracting LLC Running Bill-13

15
31-Jul-16

pe A - # 5 villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
0.00% - 909.55

55.57% 237,095.92
55.32% 653,679.63 527,947.87 52,361.77

Type A - [ 72 ]
Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

SANITARY INSTALLATION
1 Install the following sanitary ware
complete with all fixings, fittings, accessories, connections;and piping (drain pipe ,cold water , hot
water and all necessary valves)
all in accordance with the drawings and specifications

1.1 Supply & fix pedestal wash basin including all fittings,mixers,glass shelf,soap dish and towel rail
complete with all related fittings & mirrors including angle valves at all outlets
56,736.00

-
1.2 Supply & fix undercounter wash basin complete with all related fittings & mirrors including angle
136,793.60
valves at all outlets

Running Bill-13 Type-B - [ 73 ]


Hi Electrical Contracting LLC
Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

-
1.3 Supply & fix Back to wall European water closet concealed with flushing mechanism,shataff and
paper holder complete with all related fittings including angle valves at all outlets 154,984.80

-
1.4 Supply & fix European water closet set (shattaf and paper holder) complete with all related
51,661.60
fittings including angle valves at all outlets.
-
1.5 Supply & fix shower set complete with shower mixer,robe hook,grab bar and all related fittings&
100,412.40
including angle valves at all outlets
-
1.6 Supply & fix Bath tub including mixer complete with rose hook,grab bar and all related fittings&
including angle valves at all outlets 27,649.80

-
1.7 Supply & fix Kitchen sink double bowl with mixer and complete related fittings
40,747.20

Running Bill-13 Type-B - [ 74 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

DRAINAGE INSTALLATION

1 Supply and install UPVC soil, waste and vent pipework


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
and accessories; all in accordance with the drawings
and specifications

Above ground UPVC pipes and fittings


1.1 82mm dia pipes and fittings 22,704.00

1.2 110mm dia pipes and fittings 14,844.00

50mm dia pipes and fittings 56,505.60

Running Bill-13 Type-B - [ 75 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

under ground UPVC pipes and fittings


1.4 110mm dia pipes and fittings 16,371.00
1.5 160mm dia pipes and fittings 57,632.00

Above ground UPVC pipes and fittings


2 Supply and install UPVC rain drain pipe
including , caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
Rain drain UPVC all
and accessories; pipes and fittings with the drawings
in accordance
and specifications
2.1 82mm dia pipes and fittings 26,488.00

3 Pipework ancillaries complete; all in accordance with the


drawings and specifications
3.1 Floor Clean Outlets with ss cover 4,365.80

Running Bill-13 Type-B - [ 76 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

3.2 Floor Traps with ss cover 56,755.40

3.3 Vent Cowl 13,097.40

3.3 RAIN WATER OUTLET 30,560.60

3.4 Any works, not included in the above, to complete the 4,256.40
Sanitary installations, give details.

Running Bill-13 Type-B - [ 77 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

WATER SUPPLY INSTALLATION

COLD WATER INSTALLATION


1 Supply & fix PPR pipe (External PPR pipe will be PN25 with aluminume layer with rubber
1.1 insulation
20mm dia with foster
pipes and all the internal PPR will be PN20), with different diameters for hot and
and fittings 19,644.00
cold water from roof tank to all all toilet, wash, bath, w/c & services.. All as per drawings
including necessary fittings & accessories
1 25mm dia pipes and fittings 11,352.00

1 40mm dia pipes and fittings 18,628.00

HOT WATER INSTALLATION

2 Equipment and ancillaries

Running Bill-13 Type-B - [ 78 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

2.1 Electric Water Heater - 50 ltr (horizontal) 43,657.60

2.2 Electric Water Heater -80 ltr (horizontal) 61,848.00

3 Supply and install PVC irrigation pipe


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings,hosebibe
3.1 15mm dia pipes and
and accessories; fittings
all in accordance with the drawings 40,754.00
and specifications
3.2 Bib tap for irrigation 8,149.60

3.3 pex pipe 33,470.80

1.5" pvc pipe 9,680.00


1" pvc pipe 11,200.00

Running Bill-13 Type-B - [ 79 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

3/4" pvc pipe 12,950.00

Running Bill-13 Type-B - [ 80 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

EXTERNAL WORK

DRAINAGE INSTALLATION
1 Construction of manholes as per drawings with approved covers al with necessary channels and
traps

1.1 MH 43,657.20

2 Constructions of gully traps as per drawings with approved covers

2.1 GT 20,956.00

Running Bill-13 Type-B - [ 81 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

* Allow for all works necessary for the connections to the


nearest sewer connection including all pipe works, fixings,
fittings, accessories, excavation, backfilling and all other
civil works; all in accordance with the drawings and
specifications

WATER INSTALLATION
3 Equipment and ancillaries, complete; all in accordance with
the drawings and specifications

3.1 300mmx370mm water meter cabinet; including


all necessary valves, fixings, fittings and accessories; 18,190.80
all in accordance with the drawings and specifications

Running Bill-13 Type-B - [ 82 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

3.2 Construct as per drawings 560gals. 3-layer isolated PVC Roof water tank horizontal type
complete with, valves, vent, internal finished ceramic tiles fixed with waterproof glue & inspection
opening with medium duty cover including necessary fittings & accessories. 50,206.40

3.3 Transfer pump set of 2L/S at 19m head (1 duty & 1 standby) in the pump room with power
supplies, float switches, alum box for protection & controls including necessary fittings & 87,315.40
accessories

Running Bill-13 Type-B - [ 83 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

1
Booster pump set of 1.5L/S at 17m head with 100ltr pressure vessel (1 duty & 1 standby) in the
pump room with power supplies, float switches, alum box for protection & controls including
necessary fittings & accessories 87,315.40

Allow for all works necessary for the connections to the


existing local water authority main including all pipeworks,
fixings, fittings, accessories, excavation, backfilling and all
other civil works; all in accordance with the drawings and
specifications.

Generally

Running Bill-13 Type-B - [ 84 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SUNDRIES

Work incidental to the disposal installation


Generally

2 Building in or cutting and pinning brackets or the like


and making good finishings
3 Protective painting and decorative painting

4 Co-ordination with other engineering installations -

5 Any works, not included in the above, to complete the


disposal installations, give details

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS 1,451,540.80

Running Bill-13 Type-B - [ 85 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS
1 Supply and install the air conditioning &ventilation system, complete as specifiedshown and
detailed on Drawings and to theapproval of the Engineer:

EQUIPMENT
1.1 Split ducted unit with capacity of 1.5 TON total load complete as specified with all
accessories and controls with free discharging 1" UPVC condensate pipe completed with
207,373.80
foundation for outdoor unit.

1.2 Ditto, but 2 TON total load . 289,800.00

Running Bill-13 Type-B - [ 86 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

1.3 Ditto, but 2.5TON total load . 96,600.00

1.4 Ditto, but 3TON total load . 213,544.40

1.4 Ditto, but 5.5 TON total load . 160,078.20

1.5 Roof mounted exhaust fan,50 CFM. 17,463.20

1.6 Roof mounted exhaust fan,100 CFM. 8,731.60

1.7 Ditto, but 200 CFM. 5,966.60

1.8 Axial Wall Mounted Fan 100 CFM


8,731.60

Running Bill-13 Type-B - [ 87 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

DUCT WORK

2 Pre-Insulated ducting for air conditioning, complete with volume splitter dampers, access,panels, 167,354.40
hangers supports flexible duct connection and other accessories, as shown on drawings and
specifications.

Running Bill-13 Type-B - [ 88 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS

3 Supply, return, fresh air and exhaust grilles, registers and diffusers for air conditioning and
ventilation system as per specifications:
Supply Air Grilles
3.1 SAG 18 inch x 6 inch. 1,455.20

3.2 SAG 36 inch x 6 inch. 15,716.40

Return Air Grilles


3.3 RAG 18 inch x 6 inch. 1,091.40

3.4 RAG 36 inch x 6 inch. 11,787.60

Running Bill-13 Type-B - [ 89 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

Supply Ceiling Diffusers

3.5 SCD 9 inch x 9 inch. 11,787.60


3.6 SCD 12 inch x 12 inch. 5,530.00

Return Ceiling Diffusers


3.7 RCD 9 inch x 9 inch. 4,365.60
3.8 RCD 12 inch x12 inch. 4,220.40
Volume Control Dampers
3.9 VCD 76,837.20
Exhaust Air Diffuser
3.10 EAD 9 inch x 9 inch. 11,350.80
COMB GRILL
3.11 CG 28 inch x 6 inch. 4,365.60
SLSD ( 3 SLOTS) L 2200MM
3.12 SLSD ( 3 SLOTS) 22,920.00

Running Bill-13 Type-B - [ 90 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

3.13 RLSD ( 3 SLOTS) 20,955.60


4 CIVIL WORKS IN CONNECTION WITH A/C AND VENTILATION WORKS

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS HVAC 1,368,027.20

Running Bill-13 Type-B - [ 91 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

Distribution Board
1 Furnishing, Supplying, installing, hooking up and testing the main distribution board. Complete
with Energy meter and all components as specified and as indicated in the drawings.also
including all necessary accessories and ancillary works for preparing low tension panel board
room and all required for complete installation type. SMDB-A 58,210.20
V(A) .According to specs. & load schedule

2 Ditto as above but distribution board type DB-GF According to specs. & load schedule
63,303.60

3 Ditto as above but distribution board type DB-FF . According to specs. & load schedule
43,657.60

Running Bill-13 Type-B - [ 92 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

4 KWHR meters including all cables, fixing, fittings,and accessories: all in accordance with the
drawing and specifications.

4.1 KWHR meters (CALIBRATED) class 2 FEWA approved 33,470.80


Feeders and Sub Feeders
5 Multicore XLPE /PVC/SWA insulated cable :-
Furnishing, Supplying, installing, connecting and testing of conductors PVC insulated,
including terminations, hooking up, cable trays or U.P.V.C conduits and all necessary
accessories and ancillary works required for complete installation as specified and
the drawings.

5.1 4C 50 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 25 sq.mm. Y/G ECC From Metering Panel to the SMDB Panel according to drawing 14,203.20

Running Bill-13 Type-B - [ 93 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

5.2 4C 35 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 16 sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 33,835.00

5.3 4C 16 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 1- sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 21,390.00

Running Bill-13 Type-B - [ 94 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Lighting Outlet

Supplying, installing, connecting and testing of wall or ceiling lighting outlets with ceiling rose
including P.V.C conduits , fittings, boxes, sub circuit and main circuits and all necessary and
ancillary works back to panel board as specified and as indicated in the drawings: 207,515.20
Lighting outlets on ceiling or at wall

2 Ditto as above but With Flexible cable in UPVC pipe for all external light in ground and roof .
35,945.00

3 Supplying, installing & connecting the PVC conduit from SMDB to backyard with switching back
box provision for future external garden layout with IP 65 PVC juncton box at appropriate location 4,365.80
.

Running Bill-13 Type-B - [ 95 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

Lighting Fixtures
4 Supply and fix lighting fixtures: including all necessary
fixings, fittings and accessories: complete in
accordance with the drawings and specifications.

4.1 TYPE A:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2000 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 69,852.80

4.2 TYPE B:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2000 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 69,125.80

4.3 TYPE H:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2000 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR. 43,658.00

Running Bill-13 Type-B - [ 96 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

4.4 TYPE P:280x144x100mm,1464LM LED WALL MOUNTED BULKHEAD IP67 RATED WITH DIE
CAST BODY AND TEMPERED GLASS DIFFUSER WITH DECORATIVE GRILL 6500K. 61,484.80

4.5 TYPES:75mmDIA,116mmDEPTH,7WATTS,600LUMEN,43 DEGREE BEAM ANGLE,CRI


82,UGR 12 LOW GLARE DEEP DRAWN REFLECTOR WITH GLASS DIFFUSER IP65. 54,427.20

Running Bill-13 Type-B - [ 97 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Lighting Switches

Supplying, installing, connecting and testing of lighting switches one way. Conduits fitting, boxes,
sub-circuit, and all necessary accessories and ancillary works back to panel board as specified
and as indicated in the drawing 2,400.20

2 Ditto as above but One way, Two gang switch (10A-250V) 2,037.00

3 Ditto as above but One way, Three gang switch (10A-250V) 5,893.20

4 Ditto as above but Two way, One gang switch (10A-250V) 2,182.00

Running Bill-13 Type-B - [ 98 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

5 Ditto as above but Two way, Two gang switch (10A-250V) 5,296.20

6 Ditto as above but Two way, Three gang switch (10A-250V) 654.80

Running Bill-13 Type-B - [ 99 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

Running Bill-13 Type-B - [ 100 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Disconnect Switches outlets & sockets:
1 Supplying, installing, connecting and testing of 3PH Disconnecting isolator 40A/415V for A/C
OUT DOOR UNIT ON ROOF FLOOR including fittings, boxes, wiring and all necessary
accessories and ancillary works as specified and as indicated in the drawing. 36,381.60

2 Ditto as above but Disconnecting isolator 40A/415V FOR swimming pool. 21,828.80

3 Ditto as above but Disconnecting isolator 32A/230V FOR 1Ph A/C Units. 87,315.20

4 Ditto as above but Disconnecting isolator 20A/230V FOR 1Ph pump. 21,828.80

5 Ditto as above but Disconnecting isolator 20A/230V FOR 1Ph motorized gate. 10,914.40

Running Bill-13 Type-B - [ 101 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

6 Supplying, installing, connecting and testing of sockets outlets including PVC conduits. conduit
fittings, boxes and all necessary accessories and ancillary works as specified and as indicated in
the drawings : 121,660.80
1PH Switched Single Socket 13 A/ 230V

7 Ditto as above but 1PH Switched Single Socket outlet 13 A/ 230V weather proof at cartport. 5,093.40

8 Ditto as above but 1PH shaver outlet as per BS EN 61558-2-5. 8,731.60

9 Ditto as above but 13A double Socket outlet for ONT. 9,459.20

10 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as dish washer 7,276.20

11 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as washing machine 7,276.20

12 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as dryer 7,276.20

Running Bill-13 Type-B - [ 102 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

13 20 A double pole switch for W/H 58,209.60

Running Bill-13 Type-B - [ 103 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Power Outlets
1 Supplying, installing, connecting and testing of 3PH Disconnecting flex. outlet 10A/230V for 1Ph
for Exhaust Fans including boxes, wiring and all necessary accessories and ancillary works as
30,560.60
specified and as indicated in the drawing.

2 20A fused flex outlet for water heater 29,105.60

3 20A fused flex outlet for FCU 36,382.00

Fire Alarm System


4 Supplying ,installing , connecting and testing addressable fire alarm Stand Alone Heat Detector
With sounder and including devices and all necessary accessories and ancillary works as
specified and as indicated in the drawings. 10,914.40

Running Bill-13 Type-B - [ 104 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

Telephone and Data System


5 Telephone outlet with cable CAT6 copper inside P.V.C conduit extended from ONT to TJB to
Telephone outlet complete with plug and socket (RJ- 45) and all accessories acc. to the 48,024.00
specifications and drawings.

6 Ditto as above but RJ-45 double Data outlet. 3,201.60

7 Ditto as above but E-Vision outlet . 25,612.80


8 Supplying ,installing , connecting the OPTICAL NETWORK UNIT (ONU BOX)
13,097.40

9 Supplying ,installing , connecting of Telephone Janction Box . 4,365.80

Earthing System

Running Bill-13 Type-B - [ 105 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

10 L. V Earthign System
Supplying, installing, connecting and testing complete earthing pit (earth resistance
value less than 1.0 ohm) for SMDB including welding, earthign electrodes, disturbing
bus bar and test link, earth continuity cable to distribution board of and all necessary 18,190.80
accessories and ancillary materials required for complete installation specified and as
indicated in the drawing.

Running Bill-13 Type-B - [ 106 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Intercom
Supplying, installing, connecting and testing of main console unit in the main door , complete
installation as specified and as indicated in the drawing.

2
Supplying, installing, connecting and testing indoor room unit in the ground &first floors, complete
installation as specified and as indicated in the drawing: 29,105.20

3
Supplying, installing, connecting and testing data cables in UPVC pipes from the main console
unit to each indoor room unit complete installation as specified and as indicated in the drawing.

Running Bill-13 Type-B - [ 107 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

Supplying, installing, connecting and testing power Flexable cables in UPVC pipes from the main
console unit to each indoor room unit complete installation as specified and as indicated in the
drawing.

5 T.V SYSTEM 25,612.80


T.V outlet with coxial cable inside P.V.C conduit extended from T.V Junction box each outlet
complete with socket and all accessories acc. to the specifications and drawings.

6 Supplying ,installing , connecting of T.V Janction Box . 8,731.60


FIRE FIGHTING SYSTEM

7 Supply and install fire fighting materials as per drawings, all as specified:

7.1 4.5 kg dry chemical portable fire extinguishers. 3,638.20

7.2 Ditto but CO2 4.5 kg. 4,365.80

Running Bill-13 Type-B - [ 108 ]


Hi Electrical Contracting LLC

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type B - # 20

BOQ Reference Description Contract Amount (AED)

7.3 Ditto but CO2 2.5 kg. 5,093.40


7.5 fire blanket 3,638.20
7.5 Civil works in connection with the plumbing and fire fighting system including all sleeves,
opening, etc.

SECTION L - TOTAL ELECTRICAL INSTALLATIONS 1,535,800.60


TOTAL FOR VILLA B TYPE 4,355,368.60

Running Bill-13 Type-B - [ 109 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

33.00% 18,722.88 38,013.12

51.00% 69,764.74 67,028.86

Running Bill-13 Type-B - [ 110 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-

51.40% 79,662.19 75,322.61

32.50% 16,790.02 34,871.58

30.60% 30,726.19 69,686.21

33.00% 9,124.43 18,525.37

33.00% 13,446.58 27,300.62

Running Bill-13 Type-B - [ 111 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-
-
-

-
-
100.00% 22,704.00 -
-
100.00% 14,844.00 -
-
100.00% 56,505.60 -

Running Bill-13 Type-B - [ 112 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
100.00% 16,371.00 -
50.50% 29,104.16 28,527.84 28,527.84
-
-
-
-
-
-
100.00% 26,488.00 -
-
-
-
80.00% 3,492.64 873.16
-

Running Bill-13 Type-B - [ 113 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
90.00% 51,079.86 5,675.54
-
40.00% 5,238.96 7,858.44
-
100.00% 30,560.60 -
-
0.00% - 4,256.40

Running Bill-13 Type-B - [ 114 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-
-
-
-
-
81.00% 15,911.64 3,732.36
-
81.50% 9,251.88 2,100.12
-
80.00% 14,902.40 3,725.60
-
-
-
-

Running Bill-13 Type-B - [ 115 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
73.00% 31,870.05 11,787.55
-
51.25% 31,697.10 30,150.90
-
-
-
90.00% 36,678.60 4,075.40
-
90.00% 7,334.64 814.96
-
100.00% 33,470.80 -
-
90.00% 8,712.00 968.00
90.00% 10,080.00 1,120.00

Running Bill-13 Type-B - [ 116 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
90.00% 11,655.00 1,295.00

Running Bill-13 Type-B - [ 117 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-
-
-
-

- -
5.00% 2,182.86 41,474.34 41,474.34 Manhole Construction delay
-

-
- -
62.00% 12,992.72 7,963.28 7,963.28 Manhole Construction delay
-

Running Bill-13 Type-B - [ 118 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

-
-

44.25% 8,049.43 10,141.37

- -

Running Bill-13 Type-B - [ 119 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

20.00% 10,041.28 40,165.12 Roof Foundation delay

4.75% 4,147.48 83,167.92

Running Bill-13 Type-B - [ 120 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-

4.75% 4,147.48 83,167.92

-
-

Running Bill-13 Type-B - [ 121 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-
-
-
-
-
-
-
-
0.00% - -
-

-
51.51% 747,751.21

Running Bill-13 Type-B - [ 122 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-

-
-

- -

73.75% 152,938.18 54,435.62

- -
73.75% 213,727.50 76,072.50
- -

Running Bill-13 Type-B - [ 123 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
73.75% 71,242.50 25,357.50
- -
73.75% 157,489.00 56,055.41
-
73.75% 118,057.67 42,020.53
- -
26.50% 4,627.75 12,835.45
- -
26.50% 2,313.87 6,417.73
- -
26.50% 1,581.15 4,385.45
- -
26.50% 2,313.87 6,417.73
- -

Running Bill-13 Type-B - [ 124 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

- -

40.00% 66,941.76 100,412.64


- -
- -

Running Bill-13 Type-B - [ 125 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

- -

- -
- -
- -
- - -
- -
30.60% 445.29 1,009.91
- -
40.10% 6,302.28 9,414.12
- -
- -
23.00% 251.02 840.38
- -
33.45% 3,942.95 7,844.65
- -

Running Bill-13 Type-B - [ 126 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

- -
40.10% 4,726.83 7,060.77
50.55% 2,795.42 2,734.59
- -
False ceiling not ready
- -
40.10% 1,750.61 2,614.99
54.35% 2,293.79 1,926.61
- -
40.00% 30,734.88 46,102.32
- -
31.55% 3,581.18 7,769.62
- -
23.95% 1,045.56 3,320.04
- -
48.65% 11,150.58 11,769.42

Running Bill-13 Type-B - [ 127 ]


Hi Electrical Contracting LLC

15 False ceiling not ready


31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

48.65% 10,194.90 10,760.70

- -

63.63% 870,448.53

Running Bill-13 Type-B - [ 128 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-
-

70.50% 41,038.19 17,172.01 17,172.01

75.00% 47,477.70 15,825.90 15,825.90

75.00% 32,743.20 10,914.40 10,914.40

Running Bill-13 Type-B - [ 129 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-

-
40.50% 13,555.67 19,915.13 19,915.13
-

29.00% 4,118.93 10,084.27 10,084.27

Running Bill-13 Type-B - [ 130 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

37.30% 12,620.46 21,214.55 21,214.55

32.00% 6,844.80 14,545.20 14,545.20

-
-

Running Bill-13 Type-B - [ 131 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-

91.00% 188,838.83 18,676.37

72.75% 26,149.99 9,795.01

60.00% 2,619.48 1,746.32

Running Bill-13 Type-B - [ 132 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-

- -

15.50% 10,827.18 59,025.62

4.50% 3,110.66 66,015.14

11.50% 5,020.67 38,637.33

Running Bill-13 Type-B - [ 133 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-

19.70% 12,112.51 49,372.29

12.10% 6,585.69 47,841.51

Running Bill-13 Type-B - [ 134 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-
-

34.50% 828.07 1,572.13

-
53.00% 1,079.61 957.39
-
53.00% 3,123.40 2,769.80
-
53.00% 1,156.46 1,025.54
-

Running Bill-13 Type-B - [ 135 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
53.00% 2,806.99 2,489.21
-
52.00% 340.50 314.30
-
-
-
-
-
-
-
-
-
-
-
-

Running Bill-13 Type-B - [ 136 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-

Running Bill-13 Type-B - [ 137 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-

36.00% 13,097.38 23,284.22

55.00% 12,005.84 9,822.96


-
43.25% 37,763.82 49,551.38
-
56.70% 12,376.93 9,451.87

56.30% 6,144.81 4,769.59


-

Running Bill-13 Type-B - [ 138 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

62.50% 76,038.00 45,622.80

-
64.75% 3,297.98 1,795.42
-
61.25% 5,348.11 3,383.50
-
62.00% 5,864.70 3,594.50
-
72.25% 5,257.05 2,019.15
-
79.75% 5,802.77 1,473.43
-
79.50% 5,784.58 1,491.62
-

Running Bill-13 Type-B - [ 139 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
76.50% 44,530.34 13,679.26

Running Bill-13 Type-B - [ 140 ]


Hi Electrical Contracting LLC 15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-
-

81.00% 24,754.09 5,806.51

-
81.00% 23,575.54 5,530.06
-
70.00% 25,467.40 10,914.60
-
-

0.00% - 10,914.40

Running Bill-13 Type-B - [ 141 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-

53.75% 25,812.90 22,211.10

-
53.00% 1,696.85 1,504.75
-
53.75% 13,766.88 11,845.92

71.00% 9,299.15 3,798.25

80.50% 3,514.47 851.33


-
-

Running Bill-13 Type-B - [ 142 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

7.00% 1,273.36 16,917.44

Running Bill-13 Type-B - [ 143 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
-
-
-

22.75% 6,621.43 22,483.77

Running Bill-13 Type-B - [ 144 ]


Hi Electrical Contracting LLC
15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance

-
55.00% 14,087.04 11,525.76

77.25% 6,745.16 1,986.44

-
0.00% - 3,638.20
-
0.00% - 4,365.80

Running Bill-13 Type-B - [ 145 ]


Hi Electrical Contracting LLC

15
31-Jul-16

e B - # 20 villas

Amount on
Balance
Current Current claimed hold due to
Amount to Remarks
claim % Amount pending civil
Claim
clearance
0.00% - 5,093.40
0.00% - 3,638.20

-
52.93% 812,925.55
55.82% 2,431,125.28 1,924,243.32 187,636.91

Running Bill-13 Type-B - [ 146 ]


Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

SANITARY INSTALLATION
1 Install the following sanitary ware
complete with all fixings, fittings, accessories, connections;and piping (drain pipe ,cold water , hot
water and all necessary valves)
all in accordance with the drawings and specifications

1.1 Supply & fix pedestal wash basin including all fittings,mixers,glass shelf,soap dish and towel rail
complete with all related fittings & mirrors including angle valves at all outlets
43,497.60

-
1.2 Supply & fix undercounter wash basin complete with all related fittings & mirrors including angle
157,312.64
valves at all outlets
-

Type-C - [ 147 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

1.3 Supply & fix Back to wall European water closet concealed with flushing mechanism,shataff and
paper holder complete with all related fittings including angle valves at all outlets 118,821.68

-
1.4 Supply & fix European water closet set (shattaf and paper holder) complete with all related
59,410.84
fittings including angle valves at all outlets.
-
1.5 Supply & fix shower set complete with shower mixer,robe hook,grab bar and all related fittings&
96,228.55
including angle valves at all outlets
-
1.6 Supply & fix Bath tub including mixer complete with rose hook,grab bar and all related fittings&
including angle valves at all outlets 63,594.54

-
1.7 Supply & fix Kitchen sink double bowl with mixer and complete related fittings
23,429.64

Type-C - [ 148 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

DRAINAGE INSTALLATION

1 Supply and install UPVC soil, waste and vent pipework


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
and accessories; all in accordance with the drawings
and
Abovespecifications
ground UPVC pipes and fittings
1.1 82mm dia pipes and fittings 26,109.60

1.2 110mm dia pipes and fittings 28,451.00

50mm dia pipes and fittings 72,799.83


under ground UPVC pipes and fittings
1.4 160mm dia pipes and fittings 57,992.20

Type-C - [ 149 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

Above ground UPVC pipes and fittings


2 Supply and install UPVC rain drain pipe
including , caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
Rain drain UPVC all
and accessories; pipes and fittings with the drawings
in accordance
and specifications
2.1 82mm dia pipes and fittings 30,461.20

3 Pipework ancillaries complete; all in accordance with the


drawings and specifications
3.1 Floor Clean Outlets with ss cover 5,020.67

3.2 Floor Traps with ss cover 55,227.37

3.3 Vent Kowl 5,020.67

3.3 RAIN WATER OUTLET 35,144.69

Type-C - [ 150 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

Type-C - [ 151 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

WATER SUPPLY INSTALLATION

COLD WATER INSTALLATION


1 Supply & fix PPR pipe (External PPR pipe will be PN25 with aluminume layer with rubber
1.1 insulation
20mm dia with foster
pipes and all the internal PPR will be PN23), with different diameters for hot and
and fittings 11,295.30
cold water from roof tank to all all toilet, wash, bath, w/c & services.. All as per drawings
including necessary fittings & accessories
1 25mm dia pipes and fittings 13,054.80

1 40mm dia pipes and fittings 26,777.75

HOT WATER INSTALLATION

2 Equipment and ancillaries

Type-C - [ 152 ]
Hi Electrical Contracting LLC Running Bill-13
Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

2.1 Electric Water Heater - 50 ltr (horizontal) 37,654.68

2.2 Electric Water Heater -80 ltr (horizontal) 56,900.16

3 Supply and install PVC irrigation pipe


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings,hosebibe
3.1 15mm
and dia pipes and
accessories; fittings
all in accordance with the drawings 46,867.10
and specifications
3.2 Bib tap for irrigation 9,372.04

* pex pipe 33,470.98

Type-C - [ 153 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

Type-C - [ 154 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

EXTERNAL WORK

DRAINAGE INSTALLATION
1 Construction of manholes as per drawings with approved covers al with necessary channels and
traps

1.1 MH 41,838.15

2 Constructions of gully traps as per drawings with approved covers

2.1 GT 18,074.55

Type-C - [ 155 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

* Allow for all works necessary for the connections to the


nearest sewer connection including all pipe works, fixings,
fittings, accessories, excavation, backfilling and all other
civil works; all in accordance with the drawings and
specifications

WATER INSTALLATION
3 Equipment and ancillaries, complete; all in accordance with
the drawings and specifications

3.1 300mmx370mm water meter cabinet; including


all necessary valves, fixings, fittings and accessories; 20,919.42
all in accordance with the drawings and specifications

Type-C - [ 156 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

3.2 Construct as per drawings 400gals. 3-layer isolated PVC Roof water tank horizontal type
complete with, valves, vent, internal finished ceramic tiles fixed with waterproof glue & inspection
opening with medium duty cover including necessary fittings & accessories. 38,491.42

3.3 Transfer pump set of 2L/S at 19m head (1 duty & 1 standby) in the pump room with power
supplies, float switches, alum box for protection & controls including necessary fittings & 100,412.71
accessories

Type-C - [ 157 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

1
Booster pump set of 1.5L/S at 17m head with 100ltr pressure vessel (1 duty & 1 standby) in the
pump room with power supplies, float switches, alum box for protection & controls including
necessary fittings & accessories 100,412.71

Allow for all works necessary for the connections to the


existing local water authority main including all pipeworks,
fixings, fittings, accessories, excavation, backfilling and all
other civil works; all in accordance with the drawings and
specifications.

Generally

Type-C - [ 158 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SUNDRIES

Work incidental to the disposal installation


Generally

2 Building in or cutting and pinning brackets or the like


and making good finishings
3 Protective painting and decorative painting

4 Co-ordination with other engineering installations 25,103.12

5 Any works, not included in the above, to complete the


disposal installations, give details

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS 1,459,167.61

Type-C - [ 159 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS
1 Supply and install the air conditioning &ventilation system, complete as specifiedshown and
detailed on Drawings and to theapproval of the Engineer:

EQUIPMENT
1.1 Split ducted unit with capacity of 1.5 TON total load complete as specified with all
accessories and controls with free discharging 1" UPVC condensate pipe completed with
238,479.87
foundation for outdoor unit.

1.2 Ditto, but 2 TON total load . 333,270.00

Type-C - [ 160 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

1.3 Ditto, but 2.5TON total load . 222,180.00

1.4 Ditto, but 3.5TON total load . 122,788.03

1.5 Roof mounted exhaust fan,50 CFM. 15,062.01

1.6 Roof mounted exhaust fan,100 CFM. 10,041.34

1.7 Ditto, but 200 CFM. 6,861.59

1.8 Axial Wall Mounted Fan 100 CFM


10,041.34

DUCT WORK

2 Pre-Insulated ducting for air conditioning, complete with volume splitter dampers, access,panels, 158,986.81
hangers supports flexible duct connection and other accessories, as shown on drawings and
specifications.

Type-C - [ 161 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

Type-C - [ 162 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS

3 Supply, return, fresh air and exhaust grilles, registers and diffusers for air conditioning and
ventilation system as per specifications:
Supply Air Grilles
3.1 SAG 18 inch x 6 inch. 1,673.48

3.2 SAG 36 inch x 6 inch. 18,073.86

Return Air Grilles


3.3 RAG 18 inch x 6 inch. 1,255.11

3.4 RAG 36 inch x 6 inch. 13,555.74

Type-C - [ 163 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

Supply Ceiling Diffusers

3.5 SCD 9 inch x 9 inch. 11,296.45


3.6 SCD 12 inch x 12 inch. 6,359.50

Return Ceiling Diffusers


3.7 RCD 9 inch x 9 inch. 5,020.44
3.8 RCD 12 inch x12 inch. 4,853.46
Volume Control Dampers
3.9 VCD 88,362.78
Exhaust Air Diffuser
3.10 EAD 9 inch x 9 inch. 13,053.42
COMB GRILL
3.11 CG 28 inch x 6 inch. 5,020.44
SLSD ( 3 SLOTS) L 2230MM
3.12 SLSD ( 3 SLOTS) 26,358.00

Type-C - [ 164 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

3.13 RLSD ( 3 SLOTS) 24,098.94


4 CIVIL WORKS IN CONNECTION WITH A/C AND VENTILATION WORKS

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS HVAC 1,336,692.61

Type-C - [ 165 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

Distribution Board
1 Furnishing, Supplying, installing, hooking up and testing the main distribution board. Complete
with Energy meter and all components as specified and as indicated in the drawings.also
including all necessary accessories and ancillary works for preparing low tension panel board
room and all required for complete installation type. SMDB-A 65,268.25
V(A) .According to specs. & load schedule

2 Ditto as above but distribution board type DB-GF According to specs. & load schedule
71,125.66

3 Ditto as above but distribution board type DB-FF . According to specs. & load schedule
46,022.54

Type-C - [ 166 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

4 KWHR meters including all cables, fixing, fittings,and accessories: all in accordance with the
drawing and specifications.

4.1 KWHR meters (CALIBRATED) class 2 FEWA approved 38,491.42


Feeders and Sub Feeders
5 Multicore XLPE /PVC/SWA insulated cable :-
Furnishing, Supplying, installing, connecting and testing of conductors PVC insulated,
including terminations, hooking up, cable trays or U.P.V.C conduits and all necessary
accessories and ancillary works required for complete installation as specified and
the drawings.

5.1 4C 50 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 25 sq.mm. Y/G ECC From Metering Panel to the SMDB Panel according to drawing 16,333.68

Type-C - [ 167 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

5.2 4C 25 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 16 sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 30,727.08

5.3 4C 16 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 1- sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 26,238.40

Type-C - [ 168 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Lighting Outlet

1 Supplying, installing, connecting and testing of wall or ceiling lighting outlets with ceiling rose
including P.V.C conduits , fittings, boxes, sub circuit and main circuits and all necessary and
ancillary works back to panel board as specified and as indicated in the drawings: 202,327.32
Lighting outlets on ceiling or at wall

2 Ditto as above but With Flexible cable in UPVC pipe for all external light in ground and roof .
38,157.00

3 Supplying, installing & connecting the PVC conduit from SMDB to backyard with switching back
box provision for future external garden layout with IP 65 PVC juncton box at appropriate location 5,020.67
.

Type-C - [ 169 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

Lighting Fixtures
4 Supply and fix lighting fixtures: including all necessary
fixings, fittings and accessories: complete in
accordance with the drawings and specifications.

4.1 TYPE A:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2300 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 70,289.38

4.2 TYPE B:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2300 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 46,023.23

4.3 TYPE H:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,2300 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR. 45,186.03

Type-C - [ 170 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

4.4 TYPE P:280x144x100mm,1464LM LED WALL MOUNTED BULKHEAD IP67 RATED WITH DIE
CAST BODY AND TEMPERED GLASS DIFFUSER WITH DECORATIVE GRILL 6500K. 65,268.48

4.5 TYPES:75mmDIA,116mmDEPTH,7WATTS,600LUMEN,43 DEGREE BEAM ANGLE,CRI


82,UGR 12 LOW GLARE DEEP DRAWN REFLECTOR WITH GLASS DIFFUSER IP65. 57,068.52

Type-C - [ 171 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Lighting Switches

Supplying, installing, connecting and testing of lighting switches one way. Conduits fitting, boxes,
sub-circuit, and all necessary accessories and ancillary works back to panel board as specified
and as indicated in the drawing 2,258.37

2 Ditto as above but One way, Two gang switch (10A-250V) 2,811.06

3 Ditto as above but One way, Three gang switch (10A-250V) 5,271.14

4 Ditto as above but Two way, One gang switch (10A-250V) 2,509.30

5 Ditto as above but Two way, Two gang switch (10A-250V) 5,153.61

Type-C - [ 172 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

6 Ditto as above but Two way, Three gang switch (10A-250V) 753.02

Type-C - [ 173 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Disconnect Switches outlets & sockets:
1 Supplying, installing, connecting and testing of 3PH Disconnecting isolator 40A/415V for A/C
OUT DOOR UNIT ON ROOF FLOOR including fittings, boxes, wiring and all necessary
accessories and ancillary works as specified and as indicated in the drawing. 4,183.70

2 Ditto as above but Disconnecting isolator 40A/415V FOR swimming pool. 25,103.12

3 Ditto as above but Disconnecting isolator 32A/230V FOR 1Ph A/C Units. 87,860.92

4 Ditto as above but Disconnecting isolator 23A/230V FOR 1Ph pump. 25,103.12

5 Ditto as above but Disconnecting isolator 23A/230V FOR 1Ph motorized gate. 12,551.56

Type-C - [ 174 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

6 Supplying, installing, connecting and testing of sockets outlets including PVC conduits. conduit
fittings, boxes and all necessary accessories and ancillary works as specified and as indicated in
the drawings : 125,182.56
1PH Switched Single Socket 13 A/ 230V

7 Ditto as above but 1PH Switched Single Socket outlet 13 A/ 230V weather proof at cartport. 5,857.41

8 Ditto as above but 1PH shaver outlet as per BS EN 61558-2-5. 10,041.34

9 Ditto as above but 13A double Socket outlet for ONT. 5,439.04

10 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as dish washer
8,367.63

11 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as washing machine
8,367.63

Type-C - [ 175 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

12 Ditto as above but 20A spur outlet with 20A DP switch with factory engrated as dryer
8,367.63

13 20 A double pole switch for W/H 58,573.41

Type-C - [ 176 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Power Outlets
1 Supplying, installing, connecting and testing of 3PH Disconnecting flex. outlet 10A/230V for 1Ph
for Exhaust Fans including boxes, wiring and all necessary accessories and ancillary works as
30,124.02
specified and as indicated in the drawing.

2 20A fused flex outlet for water heater 29,287.51

3 20A fused flex outlet for FCU 37,655.37

Fire Alarm System


4 Supplying ,installing , connecting and testing addressable fire alarm Stand Alone Heat Detector
With sounder and including devices and all necessary accessories and ancillary works as
specified and as indicated in the drawings. 12,551.56

Type-C - [ 177 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

Telephone and Data System


5 Telephone outlet with cable CAT6 copper inside P.V.C conduit extended from ONT to TJB to
Telephone outlet complete with plug and socket (RJ- 45) and all accessories acc. to the 47,863.92
specifications and drawings.

6 Ditto as above but RJ-45 double Data outlet. 3,681.84

7 Ditto as above but E-Vision outlet . 22,091.04


8 Supplying ,installing , connecting the OPTICAL NETWORK UNIT (ONU BOX)
15,062.01

9 Supplying ,installing , connecting of Telephone Janction Box . 5,020.67

Earthing System

Type-C - [ 178 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

10 L. V Earthign System
Supplying, installing, connecting and testing complete earthing pit (earth resistance
value less than 1.0 ohm) for SMDB including welding, earthign electrodes, disturbing
bus bar and test link, earth continuity cable to distribution board of and all necessary 20,919.42
accessories and ancillary materials required for complete installation specified and as
indicated in the drawing.

Type-C - [ 179 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Intercom
Supplying, installing, connecting and testing of main console unit in the main door , complete
installation as specified and as indicated in the drawing.

2
Supplying, installing, connecting and testing indoor room unit in the ground &first floors, complete
installation as specified and as indicated in the drawing: 33,470.98

3
Supplying, installing, connecting and testing data cables in UPVC pipes from the main console
unit to each indoor room unit complete installation as specified and as indicated in the drawing.

Type-C - [ 180 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

Supplying, installing, connecting and testing power Flexable cables in UPVC pipes from the main
console unit to each indoor room unit complete installation as specified and as indicated in the
drawing.

5 T.V SYSTEM 22,091.04


T.V outlet with coxial cable inside P.V.C conduit extended from T.V Junction box each outlet
complete with socket and all accessories acc. to the specifications and drawings.

6 Supplying ,installing , connecting of T.V Janction Box . 10,041.34


FIRE FIGHTING SYSTEM

7 Supply and install fire fighting materials as per drawings, all as specified:

7.1 4.5 kg dry chemical portable fire extinguishers. 4,183.93

7.2 Ditto but CO2 4.5 kg. 5,020.67


7.3 Ditto but CO2 2.5 kg. 5,857.41

Type-C - [ 181 ]
Hi Electrical Contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type C - # 23 V

BOQ Reference Description Contract Amount (AED)

7.5 fire blanket 4,183.93


7.5 Civil works in connection with the plumbing and fire fighting system including all sleeves,
opening, etc.

SECTION L - TOTAL ELECTRICAL INSTALLATIONS 1,536,409.89


4,332,270.11

Type-C - [ 182 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

24.96% 10,857.00 32,640.60

21.13% 33,240.16 124,072.48

Type-C - [ 183 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

35.30% 41,944.05 76,877.63

37.39% 22,213.71 37,197.13

23.65% 22,758.05 73,470.50

32.61% 20,738.18 42,856.36

3.91% 916.10 22,513.54

Type-C - [ 184 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-

-
-
95.65% 24,973.83 1,135.77
-
95.65% 27,213.38 1,237.62 1,237.62
-
95.22% 69,320.00 3,479.83
-
55.65% 32,272.66 25,719.54 25,719.54
-

Type-C - [ 185 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-
-
100.00% 30,461.20 -
-
-
-
80.00% 4,016.54 1,004.13
-
76.96% 42,502.98 12,724.39
-
40.00% 2,008.27 3,012.40
-
100.00% 35,144.69 -

Type-C - [ 186 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-

Type-C - [ 187 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-
-
-
43.26% 4,886.35 6,408.95
-
43.26% 5,647.51 7,407.29
-
43.26% 11,584.05 15,193.70
-
-
-
-

Type-C - [ 188 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
44.35% 16,699.85 20,954.83
-
46.39% 26,395.98 30,504.18
-
-
-
90.00% 42,180.39 4,686.71
-
90.00% 8,434.84 937.20
-
100.00% 33,470.98 -
-
-
-
-

Type-C - [ 189 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-

Type-C - [ 190 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-
-

-
16.52% 6,911.66 34,926.49 34,926.49 Manhole Construction delay
- -

-
-
15.65% 2,828.67 15,245.88 15,245.88 Manhole Construction delay
- -

Type-C - [ 191 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

33.91% 7,093.78 13,825.64

Type-C - [ 192 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

16.96% 6,528.14 31,963.28

- -

3.91% 3,926.14 96,486.57

Type-C - [ 193 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

3.91% 3,926.14 96,486.57

-
-

Type-C - [ 194 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-
-
-
-
-
-
0.00% - 25,103.12
-

-
41.19% 601,095.28

Type-C - [ 195 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

63.48% 151,387.02 87,092.85

- -
63.48% 211,559.80 121,710.20
- -

Type-C - [ 196 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
63.48% 141,039.86 81,140.14
- -
63.48% 77,945.84 44,842.19
- -
12.61% 1,899.32 13,162.69
- - -
12.61% 1,266.21 8,775.13
- -
12.61% 865.25 5,996.34
- -
12.61% 1,266.21 8,775.13
- -

- -

19.57% 31,113.72 127,873.09


- -

Type-C - [ 197 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
- -

Type-C - [ 198 ]
Hi Electrical Contracting LLC
15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

- -

- -
- -
- -
- -
- -
13.22% 221.23 1,452.25
- -
3.48% 628.97 17,444.89
- -
- -
13.22% 165.93 1,089.18
- -
3.48% 471.74 13,084.00
- -

Type-C - [ 199 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
- -
39.83% 4,499.38 6,797.07
50.35% 3,202.01 3,157.49
- -
- -
39.83% 1,999.64 3,020.80
54.17% 2,629.12 2,224.34
- -
19.57% 17,292.60 71,070.18
- -
13.91% 1,815.73 11,237.69
- -
23.57% 1,183.32 3,837.12
- -
5.52% 1,454.96 24,903.04

Type-C - [ 200 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
5.52% 1,330.26 22,768.68

- - -

49.02% 655,238.12 -

Type-C - [ 201 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
- -
-

63.48% 41,432.29 23,835.96 23,835.96

73.04% 51,950.18 19,175.48 19,175.48

72.17% 33,214.47 12,808.07 12,808.07

Type-C - [ 202 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
28.91% 11,127.87 27,363.55 27,363.55
-

49.57% 8,096.61 8,237.07 8,237.07

Type-C - [ 203 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

18.26% 5,610.76 25,116.32 25,116.32

18.26% 4,791.13 21,447.27 21,447.27

-
-

Type-C - [ 204 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

56.78% 114,881.45 87,445.87

50.78% 19,376.12 18,780.88

26.09% 1,309.89 3,710.78

Type-C - [ 205 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-

3.65% 2,565.56 67,723.82

2.17% 998.70 45,024.53

10.00% 4,518.60 40,667.43

Type-C - [ 206 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

17.48% 11,408.93 53,859.55

- -

9.83% 5,609.84 51,458.68

Type-C - [ 207 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
- -
-
- -

54.78% 1,237.14 1,021.23

-
61.30% 1,723.18 1,087.88
-
61.30% 3,231.21 2,039.93
-
54.78% 1,374.59 1,134.71
-
61.30% 3,159.16 1,994.45

Type-C - [ 208 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
61.30% 461.60 291.42
-
-
-
-
-
-
-
-
-
-
-
-
-

Type-C - [ 209 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

21.30% 891.13 3,292.57

17.39% 4,365.43 20,737.69


-
29.57% 25,980.47 61,880.45
-
43.48% 10,914.84 14,188.28

45.22% 5,675.82 6,875.74


-

Type-C - [ 210 ]
Hi Electrical Contracting LLC Running Bill-13
15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

26.09% 32,660.13 92,522.43

-
27.39% 1,604.34 4,253.07
-
38.70% 3,886.00 6,155.34
-
33.04% 1,797.06 3,641.98
-

56.30% 4,710.98 3,656.65

56.09% 4,693.40 3,674.23

Type-C - [ 211 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
56.09% 4,693.40 3,674.23

-
58.26% 34,124.87 24,448.54

Type-C - [ 212 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-

54.78% 16,501.94 13,622.08

-
54.78% 16,043.70 13,243.81
-
46.52% 17,517.28 20,138.09
-
-

0.00% - 12,551.56

Type-C - [ 213 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

32.17% 15,397.82 32,466.10

-
30.00% 1,104.55 2,577.29
-
30.43% 6,722.30 15,368.74

54.35% 8,186.20 6,875.81

47.39% 2,379.30 2,641.37


-
-

Type-C - [ 214 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

6.09% 1,273.99 19,645.43

Type-C - [ 215 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-

22.39% 7,494.15 25,976.83

Type-C - [ 216 ]
Hi Electrical Contracting LLC 15 Running Bill-13

31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
39.13% 8,644.22 13,446.82

46.52% 4,671.23 5,370.11

-
0.00% - 4,183.93
-
0.00% - 5,020.67
0.00% - 5,857.41

Type-C - [ 217 ]
Hi Electrical Contracting LLC Running Bill-13

15
31-Jul-16
.

e C - # 23 Villas
Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
0.00% - 4,183.93

-
17.94% 275,657.52
35.36% 1,531,990.91 2,505,922.86 215,113.25

Type-C - [ 218 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

SANITARY INSTALLATION
1 Install the following sanitary ware
complete with all fixings, fittings, accessories, connections;and piping (drain pipe ,cold water , hot
water and all necessary valves)
all in accordance with the drawings and specifications

1.1 Supply & fix pedestal wash basin including all fittings,mixers,glass shelf,soap dish and towel rail
complete with all related fittings & mirrors including angle valves at all outlets
57,681.60

-
1.2 Supply & fix undercounter wash basin complete with all related fittings & mirrors including angle
260,762.80
valves at all outlets

Type-D - [ 219 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

-
1.3 Supply & fix Back to wall European water closet concealed with flushing mechanism,shataff and
paper holder complete with all related fittings including angle valves at all outlets 315,135.76

-
1.4 Supply & fix European water closet set (shattaf and paper holder) complete with all related
78,783.94
fittings including angle valves at all outlets.
-
1.5 Supply & fix shower set complete with shower mixer,robe hook,grab bar and all related fittings&
153,128.91
including angle valves at all outlets

1.6 Supply & fix Bath tub including mixer complete with rose hook,grab bar and all related fittings&
including angle valves at all outlets 168,663.78

-
1.7 Supply & fix Kitchen sink double bowl with mixer and complete related fittings
62,139.48

Type-D - [ 220 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

DRAINAGE INSTALLATION

1 Supply and install UPVC soil, waste and vent pipework


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
and accessories; all in accordance with the drawings
and specifications

Above ground UPVC pipes and fittings


1.1 82mm dia pipes and fittings 80,788.40

1.2 110mm dia pipes and fittings 60,365.60

50mm dia pipes and fittings 148,894.90

Type-D - [ 221 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

under ground UPVC pipes and fittings


1.4 160mm dia pipes and fittings 43,944.40

Above ground UPVC pipes and fittings


2 Supply and install UPVC rain drain pipe
including , caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
Rain drain UPVC all
and accessories; pipes and fittings with the drawings
in accordance
and specifications
2.1 82mm dia pipes and fittings 80,788.40

3 Pipework ancillaries complete; all in accordance with the


drawings and specifications

3.1 Floor Clean Outlets with ss cover 13,315.69

3.2 Floor Traps with ss cover 119,841.21

Type-D - [ 222 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

3.3 Vent Kowl 39,947.07

3.3 RAIN WATER OUTLET 79,894.14

3.4 Any works, not included in the above, to complete the 6,447.70
Sanitary installations, give details.

Type-D - [ 223 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

WATER SUPPLY INSTALLATION

COLD WATER INSTALLATION


1 Supply & fix PPR pipe (External PPR pipe will be PN25 with aluminume layer with rubber
1.1 insulation
20mm dia with foster
pipes and all the internal PPR will be PN61), with different diameters for hot and
and fittings 49,928.50
cold water from roof tank to all all toilet, wash, bath, w/c & services.. All as per drawings
including necessary fittings & accessories
1 25mm dia pipes and fittings 69,247.20

1 40mm dia pipes and fittings 71,019.25

HOT WATER INSTALLATION

2 Equipment and ancillaries

Type-D - [ 224 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

2.2 Electric Water Heater -80 ltr (horizontal) 150,909.12

3 Supply and install PVC irrigation pipe


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings,hosebibe
3.1 15mm dia pipes and
and accessories; fittings
all in accordance with the drawings 71,028.40
and specifications
3.2 Bib tap for irrigation 24,856.28

* Any works, not included in the above, to complete 62,139.48


water installation, give details
1/2 pex

Type-D - [ 225 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

Type-D - [ 226 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

EXTERNAL WORK

DRAINAGE INSTALLATION
1 Construction of manholes as per drawings with approved covers al with necessary channels and
traps

1.1 MH 44,384.82

2 Constructions of gully traps as per drawings with approved covers

2.1 GT 47,936.85

Type-D - [ 227 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

* Allow for all works necessary for the connections to the


nearest sewer connection including all pipe works, fixings,
fittings, accessories, excavation, backfilling and all other
civil works; all in accordance with the drawings and
specifications

WATER INSTALLATION
3 Equipment and ancillaries, complete; all in accordance with
the drawings and specifications

3.1 300mmx370mm water meter cabinet; including


all necessary valves, fixings, fittings and accessories; 55,481.94
all in accordance with the drawings and specifications

Type-D - [ 228 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

3.2 Construct as per drawings 275gals. 3-layer isolated PVC Roof water tank horizontal type
complete with, valves, vent, internal finished ceramic tiles fixed with waterproof glue & inspection
opening with medium duty cover including necessary fittings & accessories. 79,893.53

3.3 Transfer pump set of 2L/S at 19m head (1 duty & 1 standby) in the pump room with power
supplies, float switches, alum box for protection & controls including necessary fittings & 266,311.97
accessories

Type-D - [ 229 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

1
Booster pump set of 1.5L/S at 17m head with 100ltr pressure vessel (1 duty & 1 standby) in the
pump room with power supplies, float switches, alum box for protection & controls including
necessary fittings & accessories 266,311.97

Allow for all works necessary for the connections to the


existing local water authority main including all pipeworks,
fixings, fittings, accessories, excavation, backfilling and all
other civil works; all in accordance with the drawings and
specifications.

Generally

Type-D - [ 230 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SUNDRIES

Work incidental to the disposal installation


Generally

2 Building in or cutting and pinning brackets or the like


and making good finishings
3 Protective painting and decorative painting

4 Co-ordination with other engineering installations 66,577.84

5 Any works, not included in the above, to complete the


disposal installations, give details

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS 3,096,550.93

Type-D - [ 231 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS
1 Supply and install the air conditioning &ventilation system, complete as specifiedshown and
detailed on Drawings and to theapproval of the Engineer:

EQUIPMENT
1.1 Split ducted unit with capacity of 1.5 TON total load complete as specified with all
accessories and controls with free discharging 1" UPVC condensate pipe completed with
210,830.03
foundation for outdoor unit.

1.2 Ditto, but 2.5 TON total load . 589,260.00

Type-D - [ 232 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

1.3 Ditto, but 4 TON total load . 399,467.65

1.4 Ditto, but 5 TON total load . 399,467.65

1.5 Decorative Split unit 1 Ton 133,155.68

1.6 Roof mounted exhaust fan,50 CFM. 39,947.07

1.7 Ditto, but 100 CFM. 26,631.38

1.8 Ditto, but 150 CFM.


18,198.13

1.8 Ditto, but 200 CFM.


18,198.13
DUCT WORK

Type-D - [ 233 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

2 Pre-Insulated ducting for air conditioning, complete with volume splitter dampers, access,panels, 266,311.97
hangers supports flexible duct connection and other accessories, as shown on drawings and
specifications.

Type-D - [ 234 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS

3 Supply, return, fresh air and exhaust grilles, registers and diffusers for air conditioning and
ventilation system as per specifications:
Supply Air Grilles
3.1 SAG 18 inch x 6 inch. 4,438.36

3.2 SAG 24 inch x 6 inch. 13,315.08

3.2 SAG 36 inch x 6 inch. 15,978.34


Return Air Grilles
3.3 RAG 18 inch x 6 inch. 3,328.77

3.2 SAG 24 inch x 6 inch. 11,095.90

Type-D - [ 235 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

3.4 RAG 36 inch x 6 inch. 11,984.06

Supply Ceiling Diffusers

3.5 SCD 9 inch x 9 inch. 35,952.18

Return Ceiling Diffusers


3.7 RCD 9 inch x 9 inch. 17,753.44

Volume Control Dampers


3.9 VCD 170,438.88
Exhaust Air Diffuser
3.10 EAD 9 inch x 9 inch. 34,619.94
COMB GRILL

Type-D - [ 236 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

3.11 CG 10 inch x 6 inch. 6,657.54

3.11 CG 24 inch x 6 inch. 5,547.95

3.11 CG 28 inch x 6 inch. 33,287.70


SLSD ( 3 SLOTS) L 2610MM
3.12 SLSD ( 3 SLOTS) 46,604.00
3.13 RLSD ( 3 SLOTS) 42,609.72
4 CIVIL WORKS IN CONNECTION WITH A/C AND VENTILATION WORKS

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS HVAC 2,555,079.55

Type-D - [ 237 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

Distribution Board
1 Furnishing, Supplying, installing, hooking up and testing the main distribution board. Complete
with Energy meter and all components as specified and as indicated in the drawings.also
including all necessary accessories and ancillary works for preparing low tension panel board
room and all required for complete installation type. SMDB-A 162,006.24
V(A) .According to specs. & load schedule

2 Ditto as above but distribution board type DB-GF According to specs. & load schedule
173,102.75

3 Ditto as above but distribution board type DB-FF . According to specs. & load schedule
122,059.78

Type-D - [ 238 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

4 KWHR meters including all cables, fixing, fittings,and accessories: all in accordance with the
drawing and specifications.

4.1 KWHR meters (CALIBRATED) class 2 FEWA approved 79,893.53


Feeders and Sub Feeders
5 Multicore XLPE /PVC/SWA insulated cable :-
Furnishing, Supplying, installing, connecting and testing of conductors PVC insulated,
including terminations, hooking up, cable trays or U.P.V.C conduits and all necessary
accessories and ancillary works required for complete installation as specified and
the drawings.

5.1 4C 50 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 25 sq.mm. Y/G ECC From Metering Panel to the SMDB Panel according to drawing 43,319.76

Type-D - [ 239 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

5.2 4C 25 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 16 sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 54,329.04

5.3 4C 16 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 1- sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 50,016.95

Type-D - [ 240 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Lighting Outlet

1 Supplying, installing, connecting and testing of wall or ceiling lighting outlets with ceiling rose
including P.V.C conduits , fittings, boxes, sub circuit and main circuits and all necessary and
ancillary works back to panel board as specified and as indicated in the drawings: 371,497.32
Lighting outlets on ceiling or at wall

2 Ditto as above but With Flexible cable in UPVC pipe for all external light in ground and roof .
84,332.50

3 Supplying, installing & connecting the PVC conduit from SMDB to backyard with switching back
box provision for future external garden layout with IP 65 PVC juncton box at appropriate location 13,315.69
.

Type-D - [ 241 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

Lighting Fixtures
4 Supply and fix lighting fixtures: including all necessary
fixings, fittings and accessories: complete in
accordance with the drawings and specifications.

4.1 TYPE A:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,6100 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 106,525.52

4.2 TYPE B:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,6100 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 188,640.67

4.3 TYPE H:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,6100 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR. 66,578.45

Type-D - [ 242 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

4.4 TYPE P:280x144x100mm,1464LM LED WALL MOUNTED BULKHEAD IP67 RATED WITH DIE
CAST BODY AND TEMPERED GLASS DIFFUSER WITH DECORATIVE GRILL 6500K. 144,252.80

4.5 TYPES:75mmDIA,116mmDEPTH,7WATTS,600LUMEN,43 DEGREE BEAM ANGLE,CRI


82,UGR 12 LOW GLARE DEEP DRAWN REFLECTOR WITH GLASS DIFFUSER IP65. 78,119.04

Type-D - [ 243 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Lighting Switches

Supplying, installing, connecting and testing of lighting switches one way. Conduits fitting, boxes,
sub-circuit, and all necessary accessories and ancillary works back to panel board as specified
and as indicated in the drawing 7,986.12

2 Ditto as above but One way, Two gang switch (10A-250V) 4,970.28

3 Ditto as above but One way, Three gang switch (10A-250V) 9,985.70

4 Ditto as above but Two way, One gang switch (10A-250V) 4,658.57

Type-D - [ 244 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

5 Ditto as above but Two way, Two gang switch (10A-250V) 6,212.85

6 Ditto as above but Two way, Three gang switch (10A-250V) 1,997.14

Type-D - [ 245 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Disconnect Switches outlets & sockets:
1 Supplying, installing, connecting and testing of 3PH Disconnecting isolator 40A/415V for A/C
OUT DOOR UNIT ON ROOF FLOOR including fittings, boxes, wiring and all necessary
accessories and ancillary works as specified and as indicated in the drawing. 88,770.86

2 Ditto as above but Disconnecting isolator 40A/415V FOR swimming pool. 66,577.84

3 Ditto as above but Disconnecting isolator 32A/610V FOR 1Ph A/C Units. 133,155.68

4 Ditto as above but Disconnecting isolator 61A/610V FOR 1Ph pump. 66,577.84

5 Ditto as above but Disconnecting isolator 61A/610V FOR 1Ph motorized gate. 33,288.92

Type-D - [ 246 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

6 Supplying, installing, connecting and testing of sockets outlets including PVC conduits. conduit
fittings, boxes and all necessary accessories and ancillary works as specified and as indicated in
the drawings : 253,886.88
1PH Switched Single Socket 13 A/ 610V

7 Ditto as above but 1PH Switched Single Socket outlet 13 A/ 610V weather proof at cartport. 15,534.87

8 Ditto as above but 1PH shaver outlet as per BS EN 61558-2-5. 26,631.38

9 Ditto as above but 13A double Socket outlet for ONT. 14,425.28

10 Ditto as above but 20A spur outlet with 61A DP switch with factory engrated as dish washer
22,192.41

11 Ditto as above but20A spur outlet with 61A DP switch with factory engrated as washing machine
22,192.41

Type-D - [ 247 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

12 Ditto as above but20A spur outlet with 61A DP switch with factory engrated as dryer
22,192.41

13 20 A double pole switch for W/H 88,769.64

Type-D - [ 248 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Power Outlets
1 Supplying, installing, connecting and testing of 3PH Disconnecting flex. outlet 10A/610V for 1Ph
for Exhaust Fans including boxes, wiring and all necessary accessories and ancillary works as
79,894.14
specified and as indicated in the drawing.

2 20A fused flex outlet for water heater 44,386.04

3 20A fused flex outlet for FCU 77,675.57

Fire Alarm System


4 Supplying ,installing , connecting and testing addressable fire alarm Stand Alone Heat Detector
With sounder and including devices and all necessary accessories and ancillary works as
specified and as indicated in the drawings. 33,288.92

Type-D - [ 249 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

Telephone and Data System


5 Telephone outlet with cable CAT6 copper inside P.V.C conduit extended from ONT to TJB to
Telephone outlet complete with plug and socket (RJ- 45) and all accessories acc. to the
78,119.04
specifications and drawings.

6 Ditto as above but RJ-45 double Data outlet. 9,764.88

7 Ditto as above but E-Vision outlet . 48,824.40


8 Supplying ,installing , connecting the OPTICAL NETWORK UNIT (ONU BOX)
39,947.07

9 Supplying ,installing , connecting of Telephone Janction Box . 13,315.69

Earthing System

Type-D - [ 250 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

10 L. V Earthign System
Supplying, installing, connecting and testing complete earthing pit (earth resistance
value less than 1.0 ohm) for SMDB including welding, earthign electrodes, disturbing
bus bar and test link, earth continuity cable to distribution board of and all necessary 55,481.94
accessories and ancillary materials required for complete installation specified and as
indicated in the drawing.

Type-D - [ 251 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Intercom
Supplying, installing, connecting and testing of main console unit in the main door , complete
installation as specified and as indicated in the drawing.

2
Supplying, installing, connecting and testing indoor room unit in the ground &first floors, complete
installation as specified and as indicated in the drawing: 88,770.86

3
Supplying, installing, connecting and testing data cables in UPVC pipes from the main console
unit to each indoor room unit complete installation as specified and as indicated in the drawing.

Type-D - [ 252 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

Supplying, installing, connecting and testing power Flexable cables in UPVC pipes from the main
console unit to each indoor room unit complete installation as specified and as indicated in the
drawing.

5 T.V SYSTEM 48,824.40


T.V outlet with coxial cable inside P.V.C conduit extended from T.V Junction box each outlet
complete with socket and all accessories acc. to the specifications and drawings.

6 Supplying ,installing , connecting of T.V Janction Box . 26,631.38


FIRE FIGHTING SYSTEM

7 Supply and install fire fighting materials as per drawings, all as specified:

7.1 4.5 kg dry chemical portable fire extinguishers. 11,096.51

7.2 Ditto but CO2 4.5 kg. 13,315.69

Type-D - [ 253 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type D - # 61 V

BOQ Reference Description Contract Amount (AED)

7.3 Ditto but CO2 2.5 kg. 15,534.87


7.5 fire blanket 11,096.51
7.5 Civil works in connection with the plumbing and fire fighting system including all sleeves,
opening, etc.

SECTION L - TOTAL ELECTRICAL INSTALLATIONS 3,323,965.03


8,975,595.51

Type-D - [ 254 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

11.93% 6,881.41 50,800.19 25,400.09

19.70% 51,370.27 209,392.53 104,696.26

Type-D - [ 255 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-

13.93% 43,898.41 271,237.35 135,618.67

35.90% 28,283.43 50,500.51 25,250.25

23.11% 35,388.09 117,740.82 58,870.41

1.48% 2,496.22 166,167.56 83,083.78

1.48% 919.66 61,219.82 30,609.91

Type-D - [ 256 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-

-
-
75.49% 60,987.16 19,801.24
-
76.89% 46,415.11 13,950.49 6,975.25
-
74.67% 111,179.82 37,715.08

Type-D - [ 257 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
60.08% 26,401.80 17,542.60 8,771.30
-
-
-
-
-
-
93.61% 75,626.02 5,162.38
-
-
-
62.95% 8,382.23 4,933.46
-
67.13% 80,449.40 39,391.81

Type-D - [ 258 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
14.92% 5,960.10 33,986.97
-
52.79% 42,176.12 37,718.02
-
0.00% - 6,447.70

Type-D - [ 259 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-
-
-
39.10% 19,522.04 30,406.46
-
41.23% 28,550.62 40,696.58
-
41.97% 29,806.78 41,212.47
-
-
-
-

Type-D - [ 260 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
58.79% 88,719.47 62,189.65
-
-
-
20.98% 14,901.76 56,126.64
-
4.26% 1,058.88 23,797.40
-
100.00% 62,139.48 -
-
-
-

Type-D - [ 261 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

Type-D - [ 262 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-
-

- -
43.00% 19,085.47 25,299.35 12,649.67 Manhole Construction delay
-

-
- -
18.20% 8,724.51 39,212.34 19,606.17 Manhole Construction delay
-

Type-D - [ 263 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

46.64% 25,876.78 29,605.16

- -

Type-D - [ 264 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

9.43% 7,533.96 72,359.57

1.56% 4,154.47 262,157.50

Type-D - [ 265 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

1.56% 4,154.47 262,157.50

-
-

Type-D - [ 266 ]
Hi Electrical contracting LLC
15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-
-
-
-
-
-
-
- 66,577.84
-

30.39% 941,043.95

Type-D - [ 267 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-

-
-

- -

66.80% 140,834.46 69,995.57 34,997.78

- - -
Roof foundation delay by ALT
66.80% 393,625.68 195,634.32 97,817.16
- - -

Type-D - [ 268 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
Roof foundation delay by ALT
claim % pending civil
Amount Claim
clearance
66.80% 266,844.39 132,623.26 66,311.63
- - -
66.80% 266,844.39 132,623.26 66,311.63
- -
62.70% 83,488.61 49,667.07 24,833.53
- -
27.54% 11,001.42 28,945.65
- -
24.10% 6,418.16 20,213.22
Waiting for Fans
- -
24.10% 4,385.75 13,812.38

24.10% 4,385.75 13,812.38

- -

Type-D - [ 269 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
25.08% 66,791.04 199,520.93
- -
- -

Type-D - [ 270 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

- -

- -
- -
- - -
- - -
- - -
1.31% 58.14 4,380.22 4,380.22
- -
3.18% 423.42 12,891.66 12,891.66
- -
1.31% 209.32 15,769.02 15,769.02
- -
1.31% 43.61 3,285.16 3,285.16
- -
3.18% 352.85 10,743.05 10,743.05

False ceiling not ready Type-D - [ 271 ]


Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
1.31% 156.99 11,827.07 11,827.07
- -
False ceiling not ready
- -
3.67% 1,319.45 34,632.73 34,632.73
- -
- -
- -
2.49% 442.06 17,311.38 17,311.38

- -
29.34% 50,006.77 120,432.11 120,432.11
- -
5.64% 1,952.56 32,667.38 32,667.38
- -

Type-D - [ 272 ]
Hi Electrical contracting LLC Running Bill-13

False ceiling not ready


15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
1.31% 87.21 6,570.33 6,570.33
-
1.31% 72.68 5,475.27 5,475.27

3.08% 1,025.26 32,262.44 32,262.44


- -
2.85% 1,328.21 45,275.79 45,275.79
2.08% 886.28 41,723.44 41,723.44

- -

51.00% 1,302,984.47

Type-D - [ 273 ]
Hi Electrical contracting LLC
15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-

68.52% 111,006.68 50,999.56 50,999.56

75.08% 129,965.54 43,137.21 43,137.21

75.08% 91,642.48 30,417.30 30,417.30

Type-D - [ 274 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-

-
44.26% 35,360.88 44,532.65 44,532.65
-

58.00% 25,125.46 18,194.30 18,194.30

Type-D - [ 275 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

60.08% 32,640.89 21,688.15 21,688.15

70.33% 35,176.92 14,840.03 14,840.03

-
- -

Type-D - [ 276 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
- -

85.33% 316,998.66 54,498.66

- -

82.54% 69,608.05 14,724.45

- -

34.43% 4,584.59 8,731.10

- - -

Type-D - [ 277 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
- - -

- - -

- - -

0.23% 245.01 106,280.51 53,140.26

- -

0.16% 301.83 188,338.84 94,169.42

- -

10.00% 6,657.85 59,920.61 29,960.30

- -

Type-D - [ 278 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

13.15% 18,969.24 125,283.56 62,641.78

- -

13.00% 10,155.48 67,963.56 33,981.78

Type-D - [ 279 ]
Hi Electrical contracting LLC
15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
- -
-

- -

45.41% 3,626.50 4,359.62 2,179.81

- -
62.13% 3,088.03 1,882.25 941.12
-
62.13% 6,204.12 3,781.58 1,890.79
-
62.13% 2,894.37 1,764.20 882.10
-

Type-D - [ 280 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
61.80% 3,839.54 2,373.31 1,186.65
-
62.13% 1,240.82 756.32 378.16
-
-
-
-
-
-
-
-
-
-
-
-
-

Type-D - [ 281 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

38.69% 34,345.45 54,425.41 27,212.71

27.87% 18,555.24 48,022.60 24,011.30


-
34.92% 46,497.96 86,657.72 43,328.86
-
39.59% 26,358.17 40,219.67 20,109.84

42.46% 14,134.48 19,154.44 9,577.22


-

Type-D - [ 282 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

46.39% 117,778.12 136,108.76 68,054.38

-
48.70% 7,565.48 7,969.39 3,984.69
-
50.33% 13,403.57 13,227.81 6,613.90
-
38.36% 5,533.54 8,891.74 4,445.87
-

59.43% 13,188.95 9,003.46 4,501.73

57.70% 12,805.02 9,387.39 4,693.69

Type-D - [ 283 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

58.20% 12,915.98 9,276.43 4,638.21

-
55.00% 48,823.30 39,946.34 19,973.17

Type-D - [ 284 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-

75.90% 60,639.65 19,254.49 9,627.24

-
67.05% 29,760.84 14,625.20 7,312.60
-
64.59% 50,170.65 27,504.92 13,752.46
-
-

0.00% - 33,288.92

Type-D - [ 285 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-

43.77% 34,192.70 43,926.34 21,963.17

-
42.46% 4,146.17 5,618.71 2,809.36
-
46.56% 22,732.64 26,091.76 13,045.88

63.93% 25,538.16 14,408.91 7,204.45

60.49% 8,054.66 5,261.03 2,630.51


-
-

Type-D - [ 286 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

2.30% 1,276.08 54,205.86

Type-D - [ 287 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
-
-
-

21.15% 18,775.04 69,995.82

Type-D - [ 288 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
46.72% 22,810.76 26,013.64

62.62% 16,676.57 9,954.81

0.00% - 11,096.51
-
0.00% - 13,315.69

Type-D - [ 289 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e D - # 61 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance
0.00% - 15,534.87
0.00% - 11,096.51

-
47.41% 1,576,012.12
42.56% 3,820,040.55 5,155,554.96 2,021,703.19

Type-D - [ 290 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

SANITARY INSTALLATION
1 Install the following sanitary ware
complete with all fixings, fittings, accessories, connections;and piping (drain pipe ,cold water , hot
water and all necessary valves)
all in accordance with the drawings and specifications

1.1 Supply & fix pedestal wash basin including all fittings,mixers,glass shelf,soap dish and towel rail
complete with all related fittings & mirrors including angle valves at all outlets
45,388.80

-
1.2 Supply & fix undercounter wash basin complete with all related fittings & mirrors including angle
164,152.32
valves at all outlets

Type-E - [ 291 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

-
1.3 Supply & fix Back to wall European water closet concealed with flushing mechanism,shataff and
paper holder complete with all related fittings including angle valves at all outlets 185,981.76

-
1.4 Supply & fix European water closet set (shattaf and paper holder) complete with all related
61,993.92
fittings including angle valves at all outlets.
-
1.5 Supply & fix shower set complete with shower mixer,robe hook,grab bar and all related fittings&
160,659.84
including angle valves at all outlets

1.6 Supply & fix Bath tub including mixer complete with rose hook,grab bar and all related fittings&
including angle valves at all outlets 66,359.52

-
1.7 Supply & fix Kitchen sink double bowl with mixer and complete related fittings
48,896.64

Type-E - [ 292 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

Type-E - [ 293 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

DRAINAGE INSTALLATION

1 Supply and install UPVC soil, waste and vent pipework


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
and accessories; all in accordance with the drawings
and specifications

Above ground UPVC pipes and fittings


1.1 82mm dia pipes and fittings 36,326.40

1 110mm dia pipes and fittings 144,877.44


1.3 supply and install aquasting insulation and the high level pipes and mixer
1 50dia 18,295.20

Type-E - [ 294 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

under ground UPVC pipes and fittings


1.4 160mm dia pipes and fittings 34,579.20

Above ground UPVC pipes and fittings


2 Supply and install UPVC rain drain pipe
including , caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings
Rain drain UPVC all
and accessories; pipes and fittings with the drawings
in accordance
and specifications
2.1 82mm dia pipes and fittings 72,652.80

3 Pipework ancillaries complete; all in accordance with the


drawings and specifications

3.1 Floor Clean Outlets with ss cover 20,955.84

3.2 Floor Traps with ss cover 73,345.44

Type-E - [ 295 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

3.3 Vent Kowl 20,955.84

3.3 RAIN WATER OUTLET 52,389.60

Type-E - [ 296 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

WATER SUPPLY INSTALLATION

COLD WATER INSTALLATION


1 Supply & fix PPR pipe (External PPR pipe will be PN25 with aluminume layer with rubber
1.1 insulation
20mm dia with foster
pipes and all the internal PPR will be PN61), with different diameters for hot and
and fittings 7,857.60
cold water from roof tank to all all toilet, wash, bath, w/c & services.. All as per drawings
including necessary fittings & accessories
1 25mm dia pipes and fittings 67,203.84

1 32mm dia pipes and fittings 46,942.56

HOT WATER INSTALLATION

2 Equipment and ancillaries

Type-E - [ 297 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

2.2 Electric Water Heater -80 ltr (horizontal) 89,061.12

3 Supply and install PVC irrigation pipe


including pipe sleeves, caps, plugs, supports, insulation
(where necessary), bends, branches, joints, fixings, fittings,hosebibe
3.1 15mm dia pipes and
and accessories; fittings
all in accordance with the drawings 67,069.44
and specifications
3.2 Bib tap for irrigation 14,669.28

* 1.5 23,664.00

PEX 19,236.00

Type-E - [ 298 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

Type-E - [ 299 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

EXTERNAL WORK

DRAINAGE INSTALLATION
1 Construction of manholes as per drawings with approved covers al with necessary channels and
traps

1.1 MH 17,462.88

2 Constructions of gully traps as per drawings with approved covers

2.1 GT 25,147.20

Type-E - [ 300 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

* Allow for all works necessary for the connections to the


nearest sewer connection including all pipe works, fixings,
fittings, accessories, excavation, backfilling and all other
civil works; all in accordance with the drawings and
specifications

WATER INSTALLATION
3 Equipment and ancillaries, complete; all in accordance with
the drawings and specifications

3.1 300mmx370mm water meter cabinet; including


all necessary valves, fixings, fittings and accessories; 43,657.92
all in accordance with the drawings and specifications

Type-E - [ 301 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

3.2 Construct as per drawings 275gals. 3-layer isolated PVC Roof water tank horizontal type
complete with, valves, vent, internal finished ceramic tiles fixed with waterproof glue & inspection
opening with medium duty cover including necessary fittings & accessories. 62,867.04

3.3 Transfer pump set of 2L/S at 19m head (1 duty & 1 standby) in the pump room with power
supplies, float switches, alum box for protection & controls including necessary fittings & 209,556.96
accessories

Type-E - [ 302 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

1
Booster pump set of 1.5L/S at 17m head with 100ltr pressure vessel (1 duty & 1 standby) in the
pump room with power supplies, float switches, alum box for protection & controls including
necessary fittings & accessories 209,556.96

Allow for all works necessary for the connections to the


existing local water authority main including all pipeworks,
fixings, fittings, accessories, excavation, backfilling and all
other civil works; all in accordance with the drawings and
specifications.

Generally

Type-E - [ 303 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SUNDRIES

Work incidental to the disposal installation


Generally

2 Building in or cutting and pinning brackets or the like


and making good finishings
3 Protective painting and decorative painting

4 Co-ordination with other engineering installations 52,389.12

5 Any works, not included in the above, to complete the


disposal installations, give details

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS 2,164,152.48

Type-E - [ 304 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS
1 Supply and install the air conditioning &ventilation system, complete as specifiedshown and
detailed on Drawings and to theapproval of the Engineer:

EQUIPMENT
1.1 Split ducted unit with capacity of 1.5 TON total load complete as specified with all
accessories and controls with free discharging 1" UPVC condensate pipe completed with
165,899.04
foundation for outdoor unit.

-
1.2 Ditto, but 2 TON total load . 231,840.00
-

Type-E - [ 305 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

1.3 Ditto, but 3.5 TON total load . 256,253.28


-
1.5 Decorative Split unit 1 Ton 104,778.24
-
1.7 Ditto, but 100 CFM. 20,955.84
-
1.8 Ditto, but 150 CFM. 14,319.84

-
1.8 Ditto, but 250 CFM. 14,319.84
DUCT WORK
-

2 Pre-Insulated ducting for air conditioning, complete with volume splitter dampers, access,panels, 157,167.84
hangers supports flexible duct connection and other accessories, as shown on drawings and
specifications.

Type-E - [ 306 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS

HVAC WORKS

3 Supply, return, fresh air and exhaust grilles, registers and diffusers for air conditioning and
ventilation system as per specifications:
Supply Air Grilles

3.1 SAG 36 inch x 6 inch. 12,573.12


Return Air Grilles -
-
3.2 RAG 36 inch x 6 inch. 9,430.08
-
Supply Ceiling Diffusers -
3.3 SCD 9 inch x 9 inch. 28,290.24

Type-E - [ 307 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

-
-
-
Volume Control Dampers -
3.9 VCD 67,057.92
Exhaust Air Diffuser -
3.10 EAD 9 inch x 9 inch. 17,462.40
COMB GRILL -
-
3.11 CG 28 inch x 6 inch. 5,238.72
SLSD ( 3 SLOTS) L 2610MM -
3.12 SLSD ( 3 SLOTS) 36,672.00
3.13 RLSD ( 3 SLOTS) 33,528.96
4 CIVIL WORKS IN CONNECTION WITH A/C AND VENTILATION WORKS

Type-E - [ 308 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION K - MECHANICAL ENGINEERING INSTALLATIONS HVAC 1,175,787.36

Type-E - [ 309 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

Distribution Board
1 Furnishing, Supplying, installing, hooking up and testing the main distribution board. Complete
with Energy meter and all components as specified and as indicated in the drawings.also
including all necessary accessories and ancillary works for preparing low tension panel board
room and all required for complete installation type. SMDB-A 115,256.16
V(A) .According to specs. & load schedule

2 Ditto as above but distribution board type DB-GF According to specs. & load schedule
122,241.60

3 Ditto as above but distribution board type DB-FF . According to specs. & load schedule
76,837.44

Type-E - [ 310 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

4 KWHR meters including all cables, fixing, fittings,and accessories: all in accordance with the
drawing and specifications.

4.1 KWHR meters (CALIBRATED) class 2 FEWA approved 62,867.04


Feeders and Sub Feeders
5 Multicore XLPE /PVC/SWA insulated cable :-
Furnishing, Supplying, installing, connecting and testing of conductors PVC insulated,
including terminations, hooking up, cable trays or U.P.V.C conduits and all necessary
accessories and ancillary works required for complete installation as specified and
the drawings.

5.1 4C 35 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 16 sq.mm. Y/G ECC From Metering Panel to the SMDB Panel according to drawing 25,985.28

Type-E - [ 311 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

5.2 4C 16 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 1- sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 18,823.20

5.3 4C 16 sq.mm. XLPE/SWA/PVC/Cu cable with


1C 1- sq.mm. Y/G ECC From SMDB Panel to the DB-GF Panel according to drawing 37,646.40

Type-E - [ 312 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Lighting Outlet

1 Supplying, installing, connecting and testing of wall or ceiling lighting outlets with ceiling rose
including P.V.C conduits , fittings, boxes, sub circuit and main circuits and all necessary and
ancillary works back to panel board as specified and as indicated in the drawings: 259,845.12
Lighting outlets on ceiling or at wall

2 Ditto as above but With Flexible cable in UPVC pipe for all external light in ground and roof .
39,816.00

3 Supplying, installing & connecting the PVC conduit from SMDB to backyard with switching back
box provision for future external garden layout with IP 65 PVC juncton box at appropriate location 10,477.92
.

Type-E - [ 313 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

Lighting Fixtures
4 Supply and fix lighting fixtures: including all necessary
fixings, fittings and accessories: complete in
accordance with the drawings and specifications.

4.1 TYPE A:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,6100 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 52,389.60

4.2 TYPE B:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,6100 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR 78,585.12

4.3 TYPE H:IP65 DOWNLIGHT WITH WHITE FINISH TRIM 180mm DIA,3000K,6100 LUMEN,WITH
COMPLETE DIE CAST TRIM AND OPAL DIFFUSER AND MAIN SUPPLY CONTROL GEAR. 41,911.68

Type-E - [ 314 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

4.4 TYPE P:280x144x100mm,1464LM LED WALL MOUNTED BULKHEAD IP67 RATED WITH DIE
CAST BODY AND TEMPERED GLASS DIFFUSER WITH DECORATIVE GRILL 6500K. 79,457.28

4.5 TYPES:75mmDIA,116mmDEPTH,7WATTS,600LUMEN,43 DEGREE BEAM ANGLE,CRI


82,UGR 12 LOW GLARE DEEP DRAWN REFLECTOR WITH GLASS DIFFUSER IP65. 88,364.16

Type-E - [ 315 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Lighting Switches

Supplying, installing, connecting and testing of lighting switches one way. Conduits fitting, boxes,
sub-circuit, and all necessary accessories and ancillary works back to panel board as specified
and as indicated in the drawing 3,142.08

2 Ditto as above but One way, Two gang switch (10A-250V) 3,911.04

3 Ditto as above but One way, Three gang switch (10A-250V) 6,286.08

4 Ditto as above but Two way, One gang switch (10A-250V) 2,618.40

Type-E - [ 316 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

5 Ditto as above but Two way, Two gang switch (10A-250V) 1,955.52

Type-E - [ 317 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Disconnect Switches outlets & sockets:
1 Supplying, installing, connecting and testing of 3PH Disconnecting isolator 40A/415V for A/C
OUT DOOR UNIT ON ROOF FLOOR including fittings, boxes, wiring and all necessary
accessories and ancillary works as specified and as indicated in the drawing. 43,657.92

2 Ditto as above but Disconnecting isolator 40A/415V FOR swimming pool. 52,389.12

3 Ditto as above but Disconnecting isolator 32A/610V FOR 1Ph A/C Units. 104,778.24

4 Ditto as above but Disconnecting isolator 61A/610V FOR 1Ph pump. 52,389.12

5 Ditto as above but Disconnecting isolator 61A/610V FOR 1Ph motorized gate. 26,194.56

Type-E - [ 318 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

6 Supplying, installing, connecting and testing of sockets outlets including PVC conduits. conduit
fittings, boxes and all necessary accessories and ancillary works as specified and as indicated in
the drawings : 130,625.28
1PH Switched Single Socket 13 A/ 610V

7 Ditto as above but 1PH Switched Single Socket outlet 13 A/ 610V weather proof at cartport. 12,224.16

8 Ditto as above but 1PH shaver outlet as per BS EN 61558-2-5. 20,955.84

9 Ditto as above but 13A double Socket outlet for ONT. 11,351.04

10 Ditto as above but 61A spur outlet with 61A DP switch with factory engrated as dish washer 17,462.88

11 Ditto as above but 61A spur outlet with 61A DP switch with factory engrated as washing machine 17,462.88

12 Ditto as above but 61A spur outlet with 61A DP switch with factory engrated as dryer 17,462.88

Type-E - [ 319 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

13 20 A double pole switch for W/H 52,388.64

Type-E - [ 320 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS


Power Outlets
1 Supplying, installing, connecting and testing of 3PH Disconnecting flex. outlet 10A/610V for 1Ph
for Exhaust Fans including boxes, wiring and all necessary accessories and ancillary works as
52,389.60
specified and as indicated in the drawing.

2 20A fused flex outlet for water heater 26,195.04

3 20A fused flex outlet for FCU 34,926.72

Fire Alarm System

Type-E - [ 321 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

4 Supplying ,installing , connecting and testing addressable fire alarm Stand Alone Heat Detector
With sounder and including devices and all necessary accessories and ancillary works as
specified and as indicated in the drawings. 26,194.56

Telephone and Data System


5 Telephone outlet with cable CAT6 copper inside P.V.C conduit extended from ONT to TJB to
Telephone outlet complete with plug and socket (RJ- 45) and all accessories acc. to the 53,786.88
specifications and drawings.

6 Ditto as above but RJ-45 double Data outlet. 7,683.84

7 Ditto as above but E-Vision outlet . 30,735.36


8 Supplying ,installing , connecting the OPTICAL NETWORK UNIT (ONU BOX)
31,433.76

9 Supplying ,installing , connecting of Telephone Janction Box . 10,477.92

Type-E - [ 322 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

Earthing System
10 L. V Earthign System
Supplying, installing, connecting and testing complete earthing pit (earth resistance
value less than 1.0 ohm) for SMDB including welding, earthign electrodes, disturbing
bus bar and test link, earth continuity cable to distribution board of and all necessary 43,657.92
accessories and ancillary materials required for complete installation specified and as
indicated in the drawing.

Type-E - [ 323 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

SECTION L - ELECTRICAL INSTALLATIONS

1 Intercom
Supplying, installing, connecting and testing of main console unit in the main door , complete
installation as specified and as indicated in the drawing.

2
Supplying, installing, connecting and testing indoor room unit in the ground &first floors, complete
installation as specified and as indicated in the drawing: 61,120.80

3
Supplying, installing, connecting and testing data cables in UPVC pipes from the main console
unit to each indoor room unit complete installation as specified and as indicated in the drawing.

Type-E - [ 324 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

Supplying, installing, connecting and testing power Flexable cables in UPVC pipes from the main
console unit to each indoor room unit complete installation as specified and as indicated in the
drawing.

5 T.V SYSTEM 30,735.36


T.V outlet with coxial cable inside P.V.C conduit extended from T.V Junction box each outlet
complete with socket and all accessories acc. to the specifications and drawings.

6 Supplying ,installing , connecting of T.V Janction Box . 20,955.84


FIRE FIGHTING SYSTEM

7 Supply and install fire fighting materials as per drawings, all as specified:

7.1 4.5 kg dry chemical portable fire extinguishers. 8,731.68

Type-E - [ 325 ]
Hi Electrical contracting LLC Running Bill-13

Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah


Client RAK Properties
Consultant Al Bonian Consultant Engineers
Contractor Al Taameer General Contracting Company
Villa Type E - # 48 V

BOQ Reference Description Contract Amount (AED)

7.2 Ditto but CO2 4.5 kg. 10,477.92


7.3 Ditto but CO2 2.5 kg. 12,224.16
7.5 fire blanket 8,731.68
7.5 Civil works in connection with the plumbing and fire fighting system including all sleeves,
opening, etc.

SECTION L - TOTAL ELECTRICAL INSTALLATIONS 2,158,218.72


5,498,158.56

Type-E - [ 326 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

23.42% 10,630.06 34,758.74 34,758.74 Tile work not completed, No civil clearance

6.00% 9,849.14 154,303.18 154,303.18 Tile work not completed, No civil clearance

Type-E - [ 327 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

1.88% 3,496.46 182,485.30 182,485.30 Tile work not completed, No civil clearance

40.63% 25,188.13 36,805.79 36,805.79 Tile work not completed, No civil clearance

23.42% 37,626.53 123,033.31 123,033.31 Tile work not completed, No civil clearance

1.88% 1,247.56 65,111.96 65,111.96 Tile work not completed, No civil clearance

1.88% 919.26 47,977.38 47,977.38 Tile work not completed, No civil clearance

Type-E - [ 328 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

Type-E - [ 329 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-
-
-

-
-
88.96% 32,315.97 4,010.43 Manhole Construction delay
-
88.75% 128,578.73 16,298.71 16,298.71 Manhole Construction delay
- -
90.63% 16,580.94 1,714.26 Manhole Construction delay

Type-E - [ 330 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
66.87% 23,123.11 11,456.09 11,456.09 Manhole Construction delay
-
-
-
-
-
-
90.21% 65,540.09 7,112.71
-
-
-
80.00% 16,764.67 4,191.17
-
63.23% 46,376.32 26,969.12

Type-E - [ 331 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
100.00% 20,955.84 -
-
100.00% 52,389.60 -
-
-

Type-E - [ 332 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-
-
-
-
-
56.46% 4,436.40 3,421.20
-
56.46% 37,943.29 29,260.55
-
64.69% 30,367.14 16,575.42
-
-
-
-

Type-E - [ 333 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-
-
85.21% 75,888.98 13,172.14
-
-
-
42.92% 28,786.20 38,283.24
-
9.17% 1,345.17 13,324.11
-
46.46% 10,994.29 12,669.71
-
97.92% 18,835.89 400.11
-

Type-E - [ 334 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

Type-E - [ 335 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-
-
-
-

- -
44.19% 7,716.85 9,746.03 9,746.03 Manhole Construction delay
-

-
- -
25.21% 6,339.61 18,807.59 18,807.59 Manhole Construction delay
-

Type-E - [ 336 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

45.00% 19,646.06 24,011.86

- -

Type-E - [ 337 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

10.42% 6,550.75 56,316.29

1.98% 4,149.23 205,407.73

Type-E - [ 338 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

1.98% 4,149.23 205,407.73

-
-

Type-E - [ 339 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-
-
-
-
-
-
-
-
0.00% - 52,389.12
-

34.60% 748,731.50

Type-E - [ 340 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

- -

74.48% 123,561.60 42,337.44 42,337.44

- - -
Roof foundation delay by ALT
74.69% 173,161.30 58,678.70 58,678.70
- - -

Type-E - [ 341 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
Roof foundation delay by ALT
claim % pending civil
Amount Claim
clearance

74.48% 190,857.44 65,395.84 65,395.84


-
64.48% 67,561.01 37,217.23 37,217.23
- -
51.04% 10,695.86 10,259.98
- -
51.04% 7,308.85 7,010.99

51.04% 7,308.85 7,010.99

- -

58.96% 92,666.16 64,501.68


- -
- -

Type-E - [ 342 ]
Hi Electrical contracting LLC
15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

- -

- -
- -
- -
- -
- -
- -
28.10% 3,533.05 9,040.07 9,040.07
- -
-
28.10% 2,649.85 6,780.23 6,780.23
- -
- -
28.00% 7,921.27 20,368.97 20,368.97

Type-E - [ 343 ]
Hi Electrical contracting LLC
15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
- -
-
- -
68.33% 45,820.68 21,237.24 21,237.24
- -
24.19% 4,224.15 13,238.25 13,238.25
- -
-
11.46% 600.36 4,638.36 4,638.36
- -
46.71% 17,129.49 19,542.51 19,542.51
46.71% 15,661.38 17,867.58 17,867.58

- -

Type-E - [ 344 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

65.54% 770,661.29

Type-E - [ 345 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

- -
- -
- -

73.96% 85,243.46 30,012.70 30,012.70

- -

80.21% 98,049.99 24,191.61 24,191.61

- -

80.00% 61,469.95 15,367.49 15,367.49

Type-E - [ 346 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
42.81% 26,913.38 35,953.66 35,953.66
-

59.38% 15,430.06 10,555.22 10,555.22

Type-E - [ 347 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

70.42% 13,255.30 5,567.90 5,567.90

16.56% 6,234.24 31,412.16 31,412.16

-
-

Type-E - [ 348 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

85.10% 221,128.20 38,716.92

85.10% 33,883.42 5,932.58

43.75% 4,584.09 5,893.83

Type-E - [ 349 ]
Hi Electrical contracting LLC
15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

0.00% - 52,389.60 52,389.60

0.00% - 78,585.12 78,585.12

8.33% 3,491.24 38,420.44 38,420.44

Type-E - [ 350 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

0.00% - 79,457.28 79,457.28

- -

1.63% 1,440.34 86,923.82 86,923.82

Type-E - [ 351 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

- -
- -
- -

- -

False ceiling delay by ALT


65.63% 2,062.15 1,079.93 1,079.93

- -
65.63% 2,566.82 1,344.22 1,344.22
-
65.63% 4,125.55 2,160.53 2,160.53
-
65.63% 1,718.46 899.94 899.94
-

Type-E - [ 352 ]
Hi Electrical contracting LLC
15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

65.63% 1,283.41 672.11 672.11


-
- -
-
- -
-
- -
-
- -
-
-
-
-
-
-

Type-E - [ 353 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

49.79% 21,737.28 21,920.64 21,920.64

63.75% 33,398.06 18,991.06 18,991.06


- -
67.29% 70,505.28 34,272.96 34,272.96
- -
67.19% 35,200.25 17,188.87 17,188.87

- -

65.73% 17,217.68 8,976.88 8,976.88


- -

Type-E - [ 354 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

65.21% 85,180.75 45,444.53 45,444.53

- -
63.33% 7,741.56 4,482.60 4,482.60
- -
53.54% 11,219.76 9,736.08 9,736.08
- -
60.21% 6,834.46 4,516.58 4,516.58
- -
75.73% 13,224.64 4,238.24 4,238.24
- -
71.77% 12,533.11 4,929.77 4,929.77
- -
65.94% 11,515.02 5,947.86 5,947.86

Type-E - [ 355 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

- -
68.23% 35,744.77 16,643.87 16,643.87

Type-E - [ 356 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-
-

80.21% 42,021.70 10,367.90 10,367.90

-
80.21% 21,011.04 5,184.00 5,184.00
-
80.21% 28,014.72 6,912.00 6,912.00
-
-

Type-E - [ 357 ]
Hi Electrical contracting LLC 15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

0.00% - 26,194.56

-
-

76.67% 41,238.40 12,548.48

-
76.67% 5,891.20 1,792.64
-
76.67% 23,564.80 7,170.56

68.65% 21,579.28 9,854.48

80.21% 8,404.34 2,073.58

Type-E - [ 358 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-

1.88% 820.77 42,837.15

Type-E - [ 359 ]
Hi Electrical contracting LLC Running Bill-13
15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
-
-

21.15% 12,927.05 48,193.75

Type-E - [ 360 ]
Hi Electrical contracting LLC
15 Running Bill-13

31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

-
62.50% 19,209.60 11,525.76

81.98% 17,179.60 3,776.24

0.00% - 8,731.68
-

Type-E - [ 361 ]
Hi Electrical contracting LLC Running Bill-13

15
31-Jul-16

e E - # 48 Villas

Amount on
Current Balance
Current hold due to
claimed Amount to Remarks
claim % pending civil
Amount Claim
clearance

0.00% - 10,477.92
0.00% - 12,224.16
0.00% - 8,731.68

-
54.99% 1,186,795.15
49.22% 2,706,187.94 2,791,970.62 1,731,874.10

Type-E - [ 362 ]
Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

A - SEWERAGE

BOQ: GRAVITY SEWER


SUPPLY OF PIPELINES
1 Supply of the following uPVC class 16 pipes, fittings along with detectable warning
tape and jointing accessories as per the specifications.
1.1 OD 160 mm
m 227 108.95

INSTALLATION OF PIPELINES
2 Installation of the gravity sewerage pipelines with the warning jtape, geotextile and
including excavation, dewatering, jointing, laying of pipes in trench, granular and
surround, backfill, disposal of the surplus excavated materials as specified for the
average depth and pipe sizes stated below. All the works to be tested and
commissioned as per specification.
160 mm OD uPVC Class 16
2.1 160 mm OD Pipe. m 227 76.59

MANHOLES & HOUSE CONNECTION CHAMBER

LAYOUT MEP - [ 363 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

3 Construction of Manhole with outlet pipe diameter less than 400mm, as per drawings
and
Basespecifications
Units complete in all respects and backdrops.
Construction of manhole base unit as per drawings and specifications, complete in all
respects.
3.1 House connection Chamber (Invert Level shall be considered as per the nearest No. 50
existing house connection chamber or as per site condition)
3.2 600x600 Manhole with Ductile Iron manhole cover (D400) & frame( Invert level shall No.
be as per infrastructure drawing)
Works to Complete
4 All other works to make gravity sewer complete as per drawings and specifications
L.S 1

TOTAL -SEWERAGE

LAYOUT MEP - [ 364 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

B - POTABOLE WATER

1 Supply and install of HDPE pipe SDR-11 Pipes including earthworks; excavation;
backfilling, bedding, concrete surround, draining, reinstatement etc.

1.1 180mm external dia. pipe. m 844 116.42

2 Supply and install the following valves complete with all necessary PN16 fittings and
accessories, risers, RCC valve chamber DI manhole cover 600mm x 600mm including
flange adaptor, etc. as detailed

2.1 6" valve No. 4 7,276.28

3 Double Flange Washout valve, RCC valve chamber, DI cover & frame assembly as per No. 2 6,912.47
specification & typical installation drawing.
4 Water Meter No. 157 1,600.78

LAYOUT MEP - [ 365 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

5 Final Inspection Chamber No. 159 1,273.35

Works to Complete
6 All other works to make Water system complete as per drawings and specifications L.S 1
including as
drawing &
BOQ

TOTAL-POTABOLE WATER

LAYOUT MEP - [ 366 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

D - EXTERNAL ELECTRICAL

MV Work
1 Furnishing, Supplying, installing, hooking up and testing 11/0.4 k.v transformer. No. 2 122,242
ONAN type Complete with all components as per the existing transformers in the site
as well as FEWA Standard.Also including all necessary accessories and ancillary
2 Furnishing, Supplying, installing, hooking up and testing 11 k.v RING MAIN UNIT with No. 2 34,199
works required for complete installation type.1500kva Transformer.
630Amp isolators and 200Amp circuit breaker . Complete with all components as per
existing RMU's in site as well as FEWA Standard.Also including all necessary
Feeders and Sub feeders
accessories and ancillary works required for complete
Multicore XLPE/PVC/SWA
installation type. insulated cable:
3 Furnishing, Supplying, installing, connecting and testing of
H.V cables XLPE insulated, including terminations, hooking up, cable trays or UPVC
conduits and all necessary accessories and ancillary works required for complete
installation and re routing of HV cable as per the existing site condition and drawings
3.1 H.V Cable (3Cx240)mm2, CU, XLPE/PVC/SWA L.S 1
for new substations.
Necessary HV cable joints as per the re routing shown in the drawing

3.2

LAYOUT MEP - [ 367 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

TOTAL EXTERNAL ELECTRICAL

LAYOUT MEP - [ 368 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

D - EXTERNAL ELECTRICAL

Distribution Board
1 Furnishing, Supplying, installing, hooking up and testing the main distribution board.
Complete with Energy meter and all components as specified and as indicated in the
drawings.also including all necessary accessories and ancillary works for preparing
low tension panel board room and all required for complete installation of MDB-2
(2500A)
No. 2 76,401

2 Ditto as above but distribution board type FP-02/S2-601. according to specs. & load
No. 1 9,823
schedule .

3 Ditto as above but distribution board type FP-01/S2-605P. according to specs. & load No. 1 9,095
schedule .
4 Ditto as above but distribution board type FP-05/S2-605P. according to specs. & load No. 1 7,458
schedule .
5 Ditto as above but distribution board type FP-07/S2-605P. according to specs. & load No. 1 7,458
schedule .

LAYOUT MEP - [ 369 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

6 Ditto as above but distribution board type FP-03/S2-604. according to specs. & load No. 1 7,458
schedule .
7 Ditto as above but distribution board type FP-04/S2-604. according to specs. & load No. 1 7,131
schedule .
8 Ditto as above but distribution board type FP-05/S2-604. according to specs. & load
No. 1 8,186
schedule .

9 Ditto as above but distribution board type FP-02/S2-606P. according to specs. & load No. 1 6,912
schedule .
10 Ditto as above but distribution board type FP-05/S2-606P. according to specs. & load No. 1 7,458
schedule .
11 Ditto as above but distribution board type FP-08/S2-606P. according to specs. & load No. 1 7,458
schedule .
12 Ditto as above but distribution board type FP-02/S2-602. according to specs. & load No. 1 7,458
schedule .
13 Ditto as above but distribution board type FP-06/S2-602. according to specs. & load
schedule . No. 1 9,823
14 supply & Installation of Motor Control Center for pumping station as per the drawing.
No. 2 8,732
15 Modification works in existing Feeder Pillers & MDBs LS 1

LAYOUT MEP - [ 370 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

TOTAL EXTERNAL ELECTRICAL

LAYOUT MEP - [ 371 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

D - EXTERNAL ELECTRICAL

Feeders and Sub feeders


1 Multicore XLPE/PVC/SWA insulated cable:
Furnishing, Supplying, installing, connecting and testing of conductors PVC insulated,
including terminations, hooking up, cable trays or UPVC conduits and all necessary L.S 1
accessories and ancillary works required for complete installation as specified and
the drawings. 50,934
Cable (1Cx630)mm2, CU, XLPE/PVC/SWA

2 Ditto as above but cable (4x300)mm2, cu+150E/Y/G according to drawing m 441 400

3 Ditto as above but cable (4x240)mm2, cu+120E/Y/G according to drawing m 1,682 327

4 Ditto as above but cable (4x185)mm2, cu+95E/Y/G according to drawing m 334 260

5 Ditto as above but cable (4x150)mm2, cu+95E/Y/G according to drawing m 55 220

6 Ditto as above but cable (4x120)mm2, cu+70E/Y/G according to drawing m 233 180

LAYOUT MEP - [ 372 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

7 Ditto as above but cable (4x95)mm2, cu+50E/Y/G according to drawing m 1,386 143

8 Ditto as above but cable (4x70)mm2, cu+35E/Y/G according to drawing m 611 106

9 Ditto as above but cable (4x50)mm2, cu+25E/Y/G according to drawing m 1,303 79

10 Ditto as above but cable (4x35)mm2, cu+16E/Y/G according to drawing m 1,113 60

11 Ditto as above but cable (4x16)mm2, cu+10E/Y/G according to drawing m 118 35

12 Ditto as above but cable (4x10)mm2, cu+10E/Y/G according to drawing m 32 25

TOTAL EXTERNAL ELECTRICAL

LAYOUT MEP - [ 373 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

D - EXTERNAL ELECTRICAL

Earthing System
Medium Voltage Earthign System
1 Supplying, installing, connecting and testing complete earthing pit (not more than 10
ohm) for transformer and R.M.U including welding, earthign electrodes, disturbing
bus bar and test link, earth continuity cable to distribution board of and all necessary
accessories and ancillary materials required for complete installation specified and as L.S 1 16,008
indicated in the drawing:

2 Low Voltage Earthign System L.S 1 11,642


Supplying, installing, connecting and testing complete earthing pit (not more than 1
ohm) for transformer and MDB and street light poles including welding, earthign
Manholes & Pipe for all electrical & telephone
electrodes,disturbing bus bar and test link, earth continuity cable to distribution
3 Supply
board ofand
andinstallation of hand
all necessary hole forand
accessories power cablesmaterials
ancillary and etisalat manhole
required with
for complete
dimension 600x600x800mm and the unit price include
installation specified and as indicated in the drawing: all required excavation and
backfilling according to drawing and specification. L.S 1

LAYOUT MEP - [ 374 ]


Project Bermuda Villas, Precinct 6 - Mina Al Arab Ras Al Khaimah
Client: RAK Properties
Consultant: Al Bonian Consultant Engineers
Contractor: Al Taameer General Contracting Company
MEP LAYOUT WORK
BOQ
Reference Description Unit QTY Rate

Telephone and Data System


5 Supply and Laying of 2x4" UPVC Pipe including all required excavation and
backfilling according to drawing. L.S 1

E - SUB STATIONS

SUBSTATION ARCHITECTURE, STRUCTURE & MEP


6 Construction of single transformer Substations complete with architectural, structural
and MEP items as per the existing Substations in the site as well as FEWA & Civil
Defense Regulation. L.S 1

TOTAL EXTERNAL ELECTRICAL

LAYOUT MEP - [ 375 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

24,731.65 20.00% 0.00% 20.00% 4,946.33 - 4,946.33

- - -

17,386.84 20.00% 0.00% 20.00% 3,477.37 - 3,477.37

LAYOUT MEP - [ 376 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

- 0% 0.00% 0.00% - - -

- 0% 0.00% 0.00% - - -

- 0.00% 0.00% 0.00% - - -

42,118.49 20.00% 0.00% 20.00% 8,423.70 - 8,423.70

LAYOUT MEP - [ 377 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

98,258.48 65.00% 0.00% 65.00% 63,868.01 - 63,868.01

29,105.12 0.00% 0.00% 0.00% - - -

13,824.94 0.00% - - -

251,322.46 65.00% 0.00% 65.00% 163,359.60 - 163,359.60

LAYOUT MEP - [ 378 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

202,462.65 0.00% - - -

594,973.65 38.19% 0.00% 38.19% 227,227.61 - 227,227.61

LAYOUT MEP - [ 379 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

244,483.04 0.00% 0.00% 0.00% - - -

68,397.04 0.00% 0.00% 0.00% - - -

56,754.99 0.00% - - -

0.00% - - -

LAYOUT MEP - [ 380 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

369,635.08 - - - - - -

LAYOUT MEP - [ 381 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

35.00% 0.00% 35.00% 53,480.67 - 53,480.67

152,801.90

9,822.98 60.00% 0.00% 60.00% 5,893.79 - 5,893.79

9,095.35 60.00% 0.00% 60.00% 5,457.21 - 5,457.21

7,458.19 55.00% 0.00% 55.00% 4,102.00 - 4,102.00

7,458.19 57.00% 0.00% 57.00% 4,251.17 - 4,251.17

LAYOUT MEP - [ 382 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total
7,458.19 60.00% 0.00% 60.00% 4,474.91 - 4,474.91

7,130.76 60.00% 0.00% 60.00% 4,278.45 - 4,278.45

8,185.82 60.00% 0.00% 60.00% 4,911.49 - 4,911.49

6,912.47 60.00% 0.00% 60.00% 4,147.48 - 4,147.48

7,458.19 60.00% 0.00% 60.00% 4,474.91 - 4,474.91

7,458.19 60.00% 0.00% 60.00% 4,474.91 - 4,474.91

7,458.19 60.00% 0.00% 60.00% 4,474.91 - 4,474.91

60.00% 0.00% 60.00% 5,893.79 - 5,893.79


9,822.98
0.00% 0.00% 0.00% - - -
17,463.07
0.00% 0.00% - - -

LAYOUT MEP - [ 383 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

265,984.45 41.47% 0.00% 41.47% 110,315.70 - 110,315.70

LAYOUT MEP - [ 384 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

50,933.97 0.00% 0.00% 0.00% - - -

176,486.20 75.00% 0.00% 75.00% 132,364.65 - 132,364.65

550,741.71 70.00% 9.00% 79.00% 385,519.20 49,566.75 435,085.95

87,003.95 90.00% 0.00% 90.00% 78,303.55 - 78,303.55

12,085.90 52.00% 25.00% 77.00% 6,284.67 3,021.48 9,306.15

42,045.26 56.00% 0.00% 56.00% 23,545.35 - 23,545.35

LAYOUT MEP - [ 385 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

198,673.03 44.00% 10.00% 54.00% 87,416.13 19,867.30 107,283.44

64,908.79 52.00% 10.00% 62.00% 33,752.57 6,490.88 40,243.45

102,394.74 80.00% 0.00% 80.00% 81,915.79 - 81,915.79

66,407.71 75.00% 0.00% 75.00% 49,805.78 - 49,805.78

4,121.29 0.00% 0.00% 0.00% - - -

814.94 44.00% 0.00% 44.00% 358.58 - 358.58

1,356,617.48 64.81% 5.82% 70.63% 879,266.26 78,946.41 958,212.68

LAYOUT MEP - [ 386 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

16,007.82 0.00% 0.00% 0.00% - - -

11,642.05 0.00% 0.00% 0.00% - - -

0.00% 0.00% 0.00% - - -

LAYOUT MEP - [ 387 ]


Payment No. 15
Period Ending 30-Dec-99
Original Contract Duration in days
Revised Contract Duration in days
Elapsed Duration in days
WORKS
Contract VALUATION PERCENTAGE (%) VALUATION AMOUNT (DHS)
Amount (AED)
Remarks
Previous Current Total Previous Current Total

0.00% 0.00% 0.00% - - -

0.00% 0.00% 0.00% - - -

27,649.87 0.00% 0.00% 0.00% - - -

LAYOUT MEP - [ 388 ]


Sl. No Description of work A B C

A MEP Work done, unable to claim due to


pending civil work

1 Drainage Manhole construction 17,265.49 77,965.46 77,129.53

2 Electrical Cables - Energy meter to DB's 35,096.27 109,671.45 137,983.72

B MEP Works hold due to civil clearance

1 Sanitary ware & Mixtures installation

2 Roof A/C foundations

3 Grilles & Diffusers


4 Light fittings

5
Switch & Sockets

10% Less for testing & Commissioning


D E BOQ Amount on hold Remarks

48,002.39 56,308.43 276,671.30 Drainage piping & Manhole cover claims on hold

Cable installation, DB dressing, SMDB, Energy meter


223,809.20 153,060.74 659,621.40
termination claims on hold
Total 936,292.70

Zone-4: E- type 30 villas & D-type 19 villas, Zone-1: E-


type 18 villas & D type 10 villas MEP works are ready
231,764.69 644,475.67 876,240.36
for final fittings installation need civil clearance
urgently

Roof foundation to be done & Out door air opening


145,135.87 203,629.21 348,765.08
shall be modified as per mockup villas

137,407.47 112,713.22 250,120.68 False ceiling closing required ASAP


136,946.77 335,776.26 472,723.03 False ceiling closing required ASAP
Switch socket back box finishing shall be done
properly, switches installation rejected due improper
152,493.36 225,910.58 378,403.94 civil finishing
Total 2,326,253.09
ss for testing & Commissioning 232,625.31
2,093,627.78