RESUMEN DE METRADO

MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI


Presupuesto: -ANCASH
Fecha : July , 2014

DESCRIPCION UNID.
Partida
01.00 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und
01.02 CARPAS PARA CAMPAMENTO und
01.03 MOVILIZACION DE MAQUINARIAS Y HERRAMIENTAS PARA LA OBRA GLB
02.00 BOCATOMA
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL m2
02.01.02 TRAZO NIVELACION Y REPLANTEO m2
02.01.03 ENCAUSAMIENTO DE CURSOS DE AGUA CON ENROCADO m3
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL TERRENO ROCOSO m3
02.02.02 EXCAVACION EN ROCA/CON EXPLOSIVOS m3
02.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
02.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3
02.02.05 DEMOLICION DE ESTRUCTURAS DE CONCRETO. m3
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 SOLADO E= 2" m2
02.03.02 MAMPOSTERIA DE PIEDRA Y CONCRETO FC=140 KG/CM2 m3
02.03.03 CONCRETO CICLOPEO FC=175 KG/CM2 + 30 % PG. m3
02.03.04 ENCOFRADO Y DESENCOFRADO DE MUROS m2
02.04 OBRAS DE CONCRETO ARMADO
02.04.01 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
02.04.02 CONCRETO FC=175 KG/CM2 m3
02.04.03 CONCRETO F'C= 210 KG/CM2 m3
02.04.04 ACERO FY= 4200 KG/CM2 kg
02.05 VARIOS
02.05.01 COMPUERTAS PLANCHA METALICA EN BOCATOMA GLB
02.05.02 REJILLA EN LA VENTANA DE CAPTACION (0.25x0.80 m) und
02.05.03 CURADO DE CONCRETO CON ADITIVO m2
02.05.04 JUNTA DE CONTRUCCION SELLADO CON ELASTOMERICO DE POLIURETANO ML
02.05.05 JUNTA CON WATER STOP PVC 4" + SELLO ELASTOMERICO ML
03.00 DESARENADOR
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2
03.01.02 TRAZO NIVELACION Y REPLANTEO m2
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL TERRENO ROCOSO m3
03.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
03.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 SOLADO E= 2" m2
03.03.02 CONCRETO FC=175 KG/CM2 m3
03.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS m2
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C= 210 KG/CM2 m3
03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
03.04.03 ACERO FY= 4200 KG/CM2 kg
03.05 VARIOS
RESUMEN DE METRADO
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI
Presupuesto: -ANCASH
Fecha : July , 2014

DESCRIPCION UNID.
Partida
03.05.01 COMPUERTA METALICA CON VOLANTE 0.30 x0.80m, H=1.00M und
03.05.02 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
03.05.03 CURADO DE CONCRETO CON ADITIVO m2
04.00 AFORADOR PARSHALL
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2
04.01.02 TRAZO NIVELACION Y REPLANTEO m2
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL TERRENO ROCOSO m3
04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
04.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADO E= 2" m2
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 ENCOFRADO Y DESENCOFRADO DE MUROS m2
04.04.02 CONCRETO F'C= 210 KG/CM2 m3
04.04.03 ACERO FY= 4200 KG/CM2 kg
04.05 REVOQUES Y ENLUCIDOS
04.05.01 TARRAJEO C/IMPERMEABILIZANTE MORTERO C:A 1:5 E=1.5 CM m2
04.05.02 TARRAJEO MORTERO C:A 1:5 E=1.5 CM EXTERIOR m2
04.06 VARIOS
04.06.01 ACCESORIOS AFORADOR PARSHALL und
04.06.02 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
05.00 CANAL REVESTIDO (3,232.50 ML)
05.01 OBRAS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL m2
05.01.02 DESBROCE DE BERMA DEL CANAL m2
05.01.03 TRAZO NIVELACION Y REPLANTEO INICIALES DE LA OBRA ML
05.01.04 TRAZO, NIVELACION DURANTE LA EJECUCION DE LA OBRA ML
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN TIERRA m3
05.02.02 EXCAVACION EN ROCA SUELTA m3
05.02.03 DEMOLICION DE ESTRUCTURAS DE CONCRETO. m3
05.02.04 EXCAVACION EN ROCA/CON EXPLOSIVOS m3
05.02.05 PERFILADO Y REFINE MANUAL DE CAJA DE CANAL m2
05.02.06 CONFORMACION Y COMPACTACION DE LA SUBRASANTE C/EQUIPO m2
05.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3
05.02.08 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
05.03 OBRAS DE CONCRETO
05.03.01 CONCRETO F'C= 175 KG/CM2, EN CANAL m3
05.03.02 ENCOFRADO Y DESENCOFRADO DE CANALES m2
05.04 JUNTAS
05.04.01 JUNTA DE CONTRACCION SELLADO CON ELASTOMERICO DE POLIURETANO ML
05.04.02 JUNTA DE DILATACION SELLADO CON ELASTOMERICO DE POLIURETANO ML
05.05 VARIOS
05.05.01 CURADO DE CONCRETO CON ADITIVO m2
06.00 OBRAS DE ARTE
06.01 TOMAS PARCELARIAS (68 UND)
RESUMEN DE METRADO
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI
Presupuesto: -ANCASH
Fecha : July , 2014

DESCRIPCION UNID.
Partida
06.01.01 EXCAVACION MANUAL EN TIERRA m3
06.01.02 RELLENO COMPACTADO A MANO m3
06.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.01.04 SOLADO E= 2" m2
06.01.05 CONCRETO F'C= 210 KG/CM2 m3
06.01.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
06.01.07 ACERO FY= 4200 KG/CM2 kg
06.01.08 COMPUERTA METALICA TIPO IZAJE 0.30x0.40 M, H=0.80M und
06.01.09 ATAGUIAS DE MADERA DE 30X40m und
06.01.10 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
06.02 PASES DE AGUA (02)
06.02.01 EXCAVACION MANUAL TERRENO ROCOSO m3
06.02.02 RELLENO COMPACTADO A MANO m3
06.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.02.04 MAMPOSTERIA DE PIEDRA Y CONCRETO FC=140 KG/CM2 m3
06.02.05 CONCRETO CICLOPEO FC=175 KG/CM2 + 30 % PG. m3
06.02.06 CONCRETO FC=175 KG/CM2 m3
06.02.07 CONCRETO F'C= 210 KG/CM2 m3
06.02.08 ENCOFRADO Y DESENCOFRADO DE MUROS m2
06.02.09 ACERO FY= 4200 KG/CM2 kg
06.03 MURO DE CONTENCIN (17m)
06.03.01 EXCAVACION MANUAL TERRENO ROCOSO m3
06.03.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
06.03.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.03.04 CONCRETO FC=175 KG/CM2 + 30% P.M. m3
06.03.05 ENCOFRADO Y DESENCOFRADO DE MUROS m2
06.03.06 TUBERIA DE DRENAJE DE 4" ML
06.03.07 JUNTA DE CONTRACCION SELLADO CON ELASTOMERICO DE POLIURETANO ML
06.04 PASARELA PEATONAL (02)
06.04.01 EXCAVACION MANUAL EN TIERRA m3
06.04.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
06.04.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.04.04 CONCRETO FC=175 KG/CM2 + 30% P.M. m3
06.04.05 CONCRETO F'C= 210 KG/CM2 m3
06.04.06 ENCOFRADO Y DESENCOFRADO DE MUROS m2
06.04.07 ENCOFRADO Y DESENCOFRADO DE LOSA m2
06.04.08 ACERO FY= 4200 KG/CM2 kg
06.05 CAIDA VERTICAL (06 UND)
06.05.01 EXCAVACION MANUAL EN TIERRA m3
06.05.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
06.05.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.05.04 SOLADO E= 2" m2
06.05.05 CONCRETO F'C= 210 KG/CM2 m3
06.05.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
06.05.07 ACERO FY= 4200 KG/CM2 kg
06.05.08 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
06.06 POZA DE DISIPACION (05 UND)
06.06.01 EXCAVACION MANUAL EN TIERRA m3
RESUMEN DE METRADO
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI
Presupuesto: -ANCASH
Fecha : July , 2014

DESCRIPCION UNID.
Partida
06.06.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3
06.06.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 30 M m3
06.06.04 SOLADO E= 2" m2
06.06.05 CONCRETO F'C= 210 KG/CM2 m3
06.06.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS m2
06.06.07 ACERO FY= 4200 KG/CM2 kg
06.06.08 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SELLO ELASTOMERICO ML
7.00 CAPACITACION
7.01 CAPACITACION EN OPERACION Y MANTENIMIENTO GLB
8.00 MITIGACION DE MPACTO AMBIENTAL NEGATIVO
8.01 REFORESTACION Y/O REVEGETACION HA
8.02 ACONDICIONAMIENTO DE MATERIAL DE DESECHO EN BOTADERO m3
8.03 RESTAURACION DE AREAS UTILIZADAS EN PREPARACION DE CONCRETO m2
9.00 PLAN DE SEGURIDAD INDUSTRIAL
9.01 IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD GLB
10.00 FLETES
10.01 FLETE TERRESTRE GLB
10.02 FLETE RURAL GLB
Metrado

1.00
4.00
1.00
-
-
91.00
91.00
7.20
-
10.46
60.87
89.16
30.83
1.50
-
6.98
11.00
53.11
78.99
-
58.40
4.65
4.99
567.81
-
1.00
1.00
137.38
4.20
1.20
-
-
21.60
21.60
-
12.94
5.81
8.91
-
22.66
0.19
1.92
-
2.84
21.57
116.64
-
Metrado

1.00
35.20
2.00
-
-
17.65
17.65
-
7.25
3.34
4.88
-
6.50
-
1.13
18.05
81.89
-
7.51
7.51
-
1.00
1.50
-
-
9,701.52
9,701.52
3,233.84
3,233.84
-
1,684.12
431.83
77.28
73.40
2,263.69
1,778.61
2,061.55
205.08
-
572.26
3,467.38
-
1,478.96
250.35
-
3,467.38
-
-
Metrado

119.83
39.94
99.86
115.19
36.63
357.33
1,563.56
68.00
68.00
163.20
-
17.24
1.55
19.61
5.81
2.71
5.41
2.46
56.65
179.27
-
99.82
54.99
56.05
43.35
110.11
17.00
19.40
-
11.70
4.03
9.59
4.07
2.94
16.24
16.16
76.84
-
10.66
6.39
5.33
20.18
8.37
69.98
321.43
13.80
-
16.20
Metrado

6.75
11.81
27.60
10.78
58.32
267.37
11.50
-
1.00
-
0.50
50.00
150.00
-
1.00
-
1.00
1.00
PLANILLA DE METRADOS

OBRA : MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOG


UBICACIN :
LOCALIDAD: SANTA ROSA PROV. : BOLOGNESI
DISTRITO : CAJACAY REGION.: ANCASH

DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

01.00 ACTIVIDADES PRELIMINARES


01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 4.80 X 3.60 M UND
1.00

01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 M UND 4.00

01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 M UND


1.00

02.00 BOCATOMA

02.01 TRABAJOS PRELIMINARES


02.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 13.00 7.00

02.01.02 TRAZO NIVELACION Y REPLANTEO M2 1.00 13.00 7.00

02.01.03 ENCAUSAMIENTO DE CURSOS DE AGUA CON ENROCADO M3


Eucausamiento de agua de la quebrada 1.00 15.00 0.60
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL TERRENO ROCOSO M3
Canal de salida 1.00 0.50 10.90 1.60
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

02.02.02 EXCAVACION EN ROCA C/EXPLOSIVOS M3


Barraje 1.00 4.20 1.60
Piso Anterior Barraje 1.00 3.00 5.00
Piso Posterior Barraje 1.00 3.00 5.00
Piso Posterior Barraje (enrocado) 1.00 3.00 5.00
Excavacionpara zapata (muros Laeraless)
Pared derecho
Aleta 1.00 4.00 1.80
Muro anterior barraje h 1.9 m) 1.00 3.00 1.80
Muro junto al barraje) 1.00 1.40 1.80
Muro posterior al barraje) 1.00 6.00 1.60
Pared izquierdo
Aleta 1.00 0.50 1.80
Muro anterior barraje h 1.9 m) 1.00 3.00 1.80
Muro junto al barraje) 1.00 1.40 1.80
Muro posterior al barraje) 1.00 6.00 1.60
Pilar 1.00 4.60 0.80
Canal de salida 1.00 0.50 10.90 1.60
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

02.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM = 50 M M3


Eliminacion de material excedente de terreno rocoso y exc. en Rocas 1.25 71.33

02.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3


Relleno de estructuras en muros de encausamiento 2.00 11.40 0.60
Relleno talud de canal de limpia 2.00 8.11 0.60
02.02.05 DEMOLICION DE ESTRUCTURAS DE CONCRETO M3
Muro de concreto rustico existente 1.00 3.00 1.00

02.03 OBRAS DE CONCRETO SIMPLE


02.03.01 SOLADO E=2" M2
Canal de salida de compuerta 1.00 3.00 1.10
Para el pilar (muro divisorio) 1.00 4.60 0.80

02.03.02 MAMPOSTERIA DE PIEDRA Y CONCRETO FC=140 KG/CM2 M3


CARA FRONTAL DE BARRAJE 1.00 5.00 3.00
CARA POSTERIOR DE BARRAJE 1.00 5.00 3.00
PROTECCION DE BOCATOMA CARAS LATERALES 1.00 10.00 0.20

02.03.03 CONCRETO CICLOPEO FC=175 KG/CM2+30%P.M. M3 Area (m2) seccion transversal)


En Barraje fijo 1.00 1.65 4.20

ZAPATA MUROS DE PROTECCION DERECHO


Aleta 1.00 4.00 1.80
Muro anterior barraje h 1.9 m) 1.00 3.00 1.80
Muro junto al barraje) 1.00 1.40 1.80
Muro posterior al barraje) 1.00 6.00 1.60
ZAPATA MUROS DE PROTECCIONIZQUIERDO
Aleta 1.00 0.50 1.80
Muro anterior barraje h 1.9 m) 1.00 3.00 1.80
Muro junto al barraje) 1.00 1.40 1.80
Muro posterior al barraje) 1.00 6.00 1.60
MUROS DE PROTECCION DERECHO
Aleta 1.00 4.00 0.65
Muro anterior barraje h 1.9 m) 1.00 3.00 0.65
Muro junto al barraje) 1.00 1.40 0.65
Muro posterior al barraje) 1.00 6.00 0.55
MUROS DE PROTECCION IZQUIERDO
Aleta 1.00 0.50 0.65
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Muro anterior barraje h 1.9 m) 1.00 3.00 0.65


Muro junto al barraje) 1.00 1.40 0.65
Muro posterior al barraje) 1.00 6.00 0.55

02.03.04 ENCOFRADO Y DESENCOFRADO DE MUROS M2


Muros encausamiento bocatoma
MUROS DE PROTECCION DERECHO
Aleta 2.00 4.00
Muro anterior barraje h 1.9 m) 2.00 3.00
Muro junto al barraje) 2.00 1.40
Muro posterior al barraje) 2.00 6.00
MUROS DE PROTECCION IZQUIERDO
Aleta 2.00 0.50
Muro anterior barraje h 1.9 m) 2.00 3.00
Muro junto al barraje) 2.00 1.40
Muro posterior al barraje) 2.00 6.00
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

02.04 OBRAS DE CONCRETO ARMADO


02.04.01 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS M2
canal de salida
Muros canal de salida izquierdo 1.00 2.00 4.10
Muros canal de salida derecha 1.00 2.00 3.40
Canal de salida, aliviadero muros de transicion 2.00 2.00 0.90
Muro Posterior a transicin ( L=0.95 m) derecho 1.00 2.00 0.95
Muro Posterior a transicin ( L=0.95 m) izquierdo 1.00 2.00 2.15
Muro Posterior a transicin aliviadero ( L=1.20 m) 1.00 2.00 1.20
Muro Posterior a transicin compuerta ( L=0.90 m) 2.00 2.00 0.90
Pilar (muro divisorio)
Costado Barraje fijo 2.00 1.40
Posterior a Barraje fijo 2.00 3.20
Frontal 1.00 1.90
Posterior a Barraje fijo 1.00 1.26
Losas de operacin
Compuerta de Barraje fijo 1.00 0.80 0.90
compuerta de canal de limpia 1.00 0.80 0.90
Compuerta de salida 1.00 0.90 0.70

02.04.02 CONCRETO FC=175 KG/CM2 M3

canal de salida
Losa canal de salida 1.00 4.10 1.10
Muros canal de salida izquierdo 1.00 4.10 0.15
Muros canal de salida derecha 1.00 3.40 0.15
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Canal de salida, aliviadero losa de transicion 1.00 0.90 0.60


Canal de salida, aliviadero losa de transicion (vertical) 1.00 0.25 1.10
Canal de salida, aliviadero muros de transicion 2.00 0.90 0.15
Losa posterior a transicion 1.00 3.34 0.90
Muro Posterior a transicin ( L=0.95 m) derecho 1.00 0.95 0.15
Muro Posterior a transicin ( L=0.95 m) izquierdo 1.00 2.15 0.15
Muro Posterior a transicin aliviadero ( L=1.20 m) 1.00 1.20 0.15
Muro Posterior a transicin compuerta ( L=0.90 m) 2.00 0.90 0.15

02.04.03 CONCRETO FC=210 KG/CM2 M3


Zapata de Muro divisorio (pilar) costado barraje fijo 1.00 1.40 1.00
Zapata de Muro divisorio (pilar) posterior barraje fijo 1.00 3.20 0.80
Pantalla Muro divosorio (pilar) costdo barraje fijo 1.00 1.40 0.20
Pantalla Muro divosorio (pilar) posterior barraje fijo 1.00 3.20 0.20
Losas de operacin
Compuerta de Barraje fijo 1.00 0.80 0.90
compuerta de canal de limpia 1.00 0.80 0.90
Compuerta de salida 1.00 0.90 0.70

02.04.04 ACERO FY=4200 KG/CM2 KG


PILARES

Acero Vertical 1/2" @0.20m (muro h =1.90m , L1.40) 2.00 7.00 3.05
Acero Vertical 1/2" @0.20m (muro h =1.26m L=3.0) 2.00 18.00 2.39

Acero Hz 1/2" @0.20m (muro h =1.90m , L1.40) 2.00 14.00 1.50


Acero Hz 1/2" @0.20m (muro h =1.26m L=3.0) 2.00 11.00 3.70

Acero losa de Operacin barraje 1/2" @ 0.20 m longitudinal 1.00 5.00 1.20
Acero losa de Operacin barraje 1/2" @ 0.20 m transversal 1.00 4.00 1.10
Acero losa de Oper comp. Limpia 1/2" @ 0.20 m longitudinal 1.00 5.00 1.10
Acero losa de Oper comp. Limpia 1/2" @ 0.20 m transversal 1.00 4.00 1.10
Acero losa de Oper. comp. Descarga 1/2" @ 0.20 m longitudinal 1.00 3.00 0.80
Acero losa de Oper. comp. Descarga 1/2" @ 0.20 m transversal 1.00 3.00 0.80
Acero Sobre ventana de captacion
Acero Hz 1/2" longitudinal @0.20m (L=0.79m) 1.00 5.00 0.79
Acero Hz 1/2" transversal @0.20m (L=1.5) 1.00 4.00 1.50
Canal de salida
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Losa canal de salida


Acero 1/2" @ 0.20m longitudinal 1.00 5.00 4.30
Acero 1/2" @ 0.20m Transversal 1.00 15.00 1.30
Muros canal de salida izquierdo
Acero 1/2" @ 0.20m longitudinal 1.00 8.00 4.30
Acero 1/2" @ 0.20m Transversal 1.00 20.00 1.90
Muros canal de salida derecha
Acero 1/2" @ 0.20m longitudinal 1.00 8.00 3.60
Acero 1/2" @ 0.20m Transversal 1.00 15.00 1.90
Canal de salida, aliviadero losa de transicion
Acero 1/2" @ 0.20m longitudinal 1.00 4.00 1.10
Acero 1/2" @ 0.20m Transversal 1.00 5.00 1.00
Canal de salida, aliviadero losa de transicion (vertical)
Acero 1/2" @ 0.20m longitudinal 1.00 4.00 0.45
Acero 1/2" @ 0.20m Transversal 1.00 2.00 1.00
Canal de salida, aliviadero muros de transicion
Acero 1/2" @ 0.20m longitudinal 1.00 6.00 1.10
Acero 1/2" @ 0.20m Transversal 1.00 4.00 1.00
Losa posterior a transicion
Acero 1/2" @ 0.20m longitudinal 1.00 4.00 3.54
Acero 1/2" @ 0.20m Transversal 1.00 16.00 1.10
Muro Posterior a transicin ( L=0.95 m) derecho
Acero 1/2" @ 0.20m longitudinal 1.00 6.00 1.15
Acero 1/2" @ 0.20m Transversal 1.00 5.00 1.45
Muro Posterior a transicin ( L=0.95 m) izquierdo
Acero 1/2" @ 0.20m longitudinal 1.00 6.00 2.35
Acero 1/2" @ 0.20m Transversal 1.00 5.00 1.45
Muro Posterior a transicin aliviadero ( L=1.20 m)
Acero 1/2" @ 0.20m longitudinal 1.00 2.00 1.40
Acero 1/2" @ 0.20m Transversal 1.00 5.00 0.60
Muro Posterior a transicin compuerta ( L=0.90 m)
Acero 1/2" @ 0.20m longitudinal 2.00 4.00 1.10
Acero 1/2" @ 0.20m Transversal 2.00 5.00 1.00
02.05 VARIOS
02.05.01 COMPUERTA METALICA 1/4"X0.5X1.00M UND 1.00

02.05.02 REJILLA EN LA VENTANA DE CAPTACION (0.25x0.80m) UND 1.00


DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

02.05.03 CURADO DE CONCRETO CON ADITIVO M2


Muros encausamiento bocatoma
MUROS DE PROTECCION DERECHO
Aleta 2.00 4.00
Muro anterior barraje h 1.9 m) 2.00 3.00
Muro junto al barraje) 2.00 1.40
Muro posterior al barraje) 2.00 6.00
MUROS DE PROTECCION IZQUIERDO
Aleta 2.00 0.50
Muro anterior barraje h 1.9 m) 2.00 3.00
Muro junto al barraje) 2.00 1.40
Muro posterior al barraje) 2.00 6.00
canal de salida
Muros canal de salida izquierdo 1.00 2.00 4.10
Muros canal de salida derecha 1.00 2.00 3.40
Canal de salida, aliviadero muros de transicion 2.00 2.00 0.90
Muro Posterior a transicin ( L=0.95 m) derecho 1.00 2.00 0.95
Muro Posterior a transicin ( L=0.95 m) izquierdo 1.00 2.00 2.15
Muro Posterior a transicin aliviadero ( L=1.20 m) 1.00 2.00 1.20
Muro Posterior a transicin compuerta ( L=0.90 m) 2.00 2.00 0.90
Pilar (muro divisorio)
Costado Barraje fijo 2.00 1.40
Posterior a Barraje fijo 2.00 3.20
Frontal 1.00 1.90
Posterior a Barraje fijo 1.00 1.26
Losas de operacin
Compuerta de Barraje fijo 1.00 0.80 0.90
compuerta de canal de limpia 1.00 0.80 0.90
Compuerta de salida 1.00 0.90 0.70

02.05.04 JUNTA DE CONSTRUCCION SELLADO CON ELASTOMERICO DEML 1.00


Junta vertical de construccion entre el Muro y Canal de salida 2.00 1.70
Junta losa de construccion entre el Muro y Canal de salida 1.00 0.80

02.05.05 JUNTA CON WATER STOP PVC 4" +SELLO ELASTOMERICO ML 1.00
Junta vertical en los muros del canal de salida y canal principal 2.00 0.40
Junta: en la losa de del canal de salida y canal principal 1.00 0.40

03.00 DESARENADOR (03 UND)

03.01 TRABAJOS PRELIMINARES


03.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 8.00 2.70
Ancho del desarenador + 0.60 m a cada lado

03.01.02 TRAZO NIVELACION Y REPLANTEO M2 1.00 8.00 2.70

03.02 MOVIMIENTO DE TIERRAS


03.02.01 EXCAVACION MANUAL EN TERRENO ROCOSO M3
Desarenador ingreso Transicion 1.00 1.30 3.10
Desarenador cuerpoTransicion 1.00 5.30 3.10
Canal de Limpia 1.00 2.00 1.10

03.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO M3


DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Muro Lado Derecho 1.00 6.60 0.60


Muro Lado Izquierdo 1.00 6.60 0.50
03.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM = 50 M M3
Vol de exc. Menos vol. De relleno 1.25 7.13

03.03 OBRAS DE CONCRETO SIMPLE

03.03.01 SOLADO E = 2" M2


Desarenador ingreso Transicion 1.00 1.30 3.10
Desarenador cuerpoTransicion 1.00 5.30 3.10
Canal de Limpia 1.00 2.00 1.10

03.03.02 CONCRETO SIMPLE FC=175 KG/CM2 M3


Canal de limpia Muros 2.00 1.40 0.10
Canal de limpia Muros salida 2.00 0.20 0.10
Canal de limpia Losa 1.00 1.50 0.40

03.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS M2


Canal de Salida Muros 2.00 2.00 1.40
Canal de Salida Muros salida 2.00 2.00 0.20

03.04 OBRAS DE CONCRETO ARMADO


03.04.01 CONCRETO FC=210 KG/CM2 M3
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Muro ingreso desarenador Transicion 2.00 1.37 0.15


Muro ingreso desarenador izquierdo 1.00 4.20 0.15
Muro ingreso desarenador derecho 1.00 3.90 0.15
Muro ingreso desarenador izquierdo salida 1.00 0.62 0.15
Muro ingreso desarenador derecho salida 1.00 1.00 0.15
Muro ingreso desarenador vertedero 1.00 0.45 0.15
Muro ingreso desarenador vertedero 1.00 1.00 0.15
Losa Transicion ingreso 1.00 1.10 1.10
Losa desarenador 1.00 4.50 1.50
Losa desarenador vertical salida 1.00 0.51 1.50
Losa vertedero 1.00 1.15 0.45

03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS M2


Muro ingreso desarenador Transicion 2.00 2.00 1.37
Muro ingreso desarenador izquierdo 1.00 2.00 4.20
Muro ingreso desarenador derecho 1.00 2.00 3.90
Muro ingreso desarenador izquierdo salida 1.00 2.00 0.62
Muro ingreso desarenador derecho salida 1.00 2.00 1.00
Muro ingreso desarenador vertedero 1.00 2.00 0.45
Muro ingreso desarenador vertedero 1.00 2.00 1.00
Losa Transicion ingreso 1.00 2.00 1.10
Losa desarenador 1.00 2.00 4.50
Losa desarenador vertical salida 1.00 2.00 0.51
Losa vertedero 1.00 2.00 1.15

03.04.03 ACERO FY=4200 KG/CM KG/ML 0.58

Muro ingreso desarenador Transicion


Acero 3/8" @ 0.20m horizontal 2.00 3.00 1.40
Acero 3/8" @ 0.20m vertical 2.00 9.00 1.02
Muro ingreso desarenador izquierdo acero
Acero 3/8" @ 0.20m horizontal 1.00 4.00 4.20
Acero 3/8" @ 0.20m vertical 1.00 22.00 0.92
Muro ingreso desarenador derecho acero
Acero 3/8" @ 0.20m horizontal 1.00 4.00 3.90
Acero 3/8" @ 0.20m vertical 1.00 22.00 0.92
Muro ingreso desarenador izquierdo salida
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Acero 3/8" @ 0.20m horizontal 1.00 3.00 0.62


Acero 3/8" @ 0.20m vertical 1.00 3.00 1.07
Muro ingreso desarenador derecho salida
Acero 3/8" @ 0.20m horizontal 1.00 3.00 1.20
Acero 3/8" @ 0.20m vertical 1.00 5.00 1.07
Muro vertedero desarenador perpendicular
Acero 3/8" @ 0.20m horizontal 1.00 3.00 0.65
Acero 3/8" @ 0.20m vertical 1.00 2.00 1.07
Muro vertedero desarenador paralelo
Acero 3/8" @ 0.20m horizontal 1.00 3.00 1.20
Acero 3/8" @ 0.20m vertical 1.00 4.00 1.07
Losa Transicion ingreso
Acero 3/8" @ 0.20m longitudinal 1.00 4.00 1.30
Acero 3/8" @ 0.20m Transversal 1.00 9.00 0.80
Losa desarenador
Acero 3/8" @ 0.20m longitudinal 1.00 6.00 4.70
Acero 3/8" @ 0.20m Transversal 1.00 22.00 1.30
Losa desarenador vertical salida
Acero 3/8" @ 0.20m longitudinal 1.00 6.00 0.60
Acero 3/8" @ 0.20m Transversal 1.00 3.00 1.30
Losa vertedero
Acero 3/8" @ 0.20m longitudinal 1.00 2.00 1.35
Acero 3/8" @ 0.20m Transversal 1.00 5.00 0.65
03.05 VARIOS
03.05.01 COMPUERTA METALICA CON VOLANTE 0.30 x0.80m, H=1.00M UND 1.00

03.05.02 CURADO DE CONCRETO CON ADITIVO M2


Muro ingreso desarenador Transicion 2.00 2.00 1.37
Muro ingreso desarenador izquierdo 1.00 2.00 4.20
Muro ingreso desarenador derecho 1.00 2.00 3.90
Muro ingreso desarenador izquierdo salida 1.00 2.00 0.62
Muro ingreso desarenador derecho salida 1.00 2.00 1.00
Muro ingreso desarenador vertedero 1.00 2.00 0.45
Muro ingreso desarenador vertedero 1.00 2.00 1.00
Losa Transicion ingreso 1.00 2.00 1.10
Losa desarenador 1.00 2.00 4.50
Losa desarenador vertical salida 1.00 2.00 0.51
Losa vertedero 1.00 2.00 1.15

03.05.03 JUNTA CON WATER STOP PVC 4" +SELLO ELASTOMERICO ML


Junta vertical en los muros del canal 2.00 2.00 0.30
Junta: en la losa de del canal de salida y canal principal 1.00 2.00 0.40

04.00 AFORADOR PARSHALL

04.01 TRABAJOS PRELIMINARES


04.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 9.29 1.90
Ancho del desarenador + 0.60 m a cada lado

04.01.02 TRAZO NIVELACION Y REPLANTEO M2 1.00 9.29 1.90

04.02 MOVIMIENTO DE TIERRAS


04.02.01 EXCAVACION MANUAL EN TERRENO ROCOSO M3
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Longitud del aforador 1.00 9.29 1.30

04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO M3


Muro Lado Derecho 1.00 9.29 0.30
Muro Lado Izquierdo 1.00 9.29 0.30
04.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM = 50 M M3
Vol de exc. Menos vol. De relleno 1.25 3.90

04.03 OBRAS DE CONCRETO SIMPLE


04.03.01 SOLADO E = 2" M2 1.00 9.29 0.70

04.04 OBRAS DE CONCRETO ARMADO


04.04.01 CONCRETO FC=210 KG/CM2 M3

Losa Fondo 1.00 9.39 0.70


Muro 2.00 9.39 0.40

04.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS M2


Losa Fondo 2.00 9.39
Losa Fondo 2.00 0.70
Muro 2.00 2.00 9.39 0.40

04.04.03 ACERO FY=4200 KG/CM KG/ML

Acero 3/8" @ 0.20m longitudinal 1.00 7.00 9.39


Acero 3/8" @ 0.20m transversal 1.00 46.00 1.75

04.05 REVOQUES Y ENLUCIDOS


04.05.01 TARRAJEO C/IMPERMEABILIZANTE MORTERO C:A 1:5 E 1.5 CMM2
Muros interior 2.00 9.39 0.40

04.05.02 TARRAJEO MORTERO C:A 1:5 E 1.5 CM M2


Muros exterior 2.00 9.39 0.40

04.06 VARIOS
04.06.01 ACCESORIO PARA AFORADOR PARSHALL GBL 1.00

04.06.02 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR+SELLML


Junta en muros 2.00 0.50
Junta en losa 1.00 0.50
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

05.00 CANAL REVESTIDO (1+451.43-4+961 ML) 3+509.57

05.01 OBRAS PRELIMINARES

05.01.01 LIMPIEZA DE TERENO MANUAL M2


TRAMO I 0+000 - 2+408 1.00 2,408.00 3.00
TRAMO II 0+000 - 0+825.84 1.00 825.84 3.00

05.01.02 DESBROCE DE BERMA DEL CANAL M2


TRAMO I 0+000 - 2+408 1.00 2,408.00 3.00
TRAMO II 0+000 - 0+825.84 1.00 825.84 3.00

05.01.03 TRAZO NIVELACION Y REPLANTEO INICIALES DE LA OBRA ML


TRAMO I 0+000 - 1+871.34 1.00 1,871.34
TRAMO I 1+871.34 - 2+408 1.00 536.66
TRAMO II 0+000 - 0+825.84 1.00 825.84

05.01.04 TRAZO, NIVELACION DURANTE LA EJECUCION DE LA OBRA ML


TRAMO I 0+000 - 1+871.34 1.00 1,871.34
TRAMO I 1+871.34 - 2+408 1.00 536.66
TRAMO II 0+000 - 0+825.84 1.00 825.84

05.02 MOVIMIENTO DE TIERRAS


05.02.01 EXCAVACION DE CAJA DE CANAL EN TIERRA M3
De la platilla de excavacin de movimiento de tierras m3
(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 78%)
TRAMO I 0+000 - 1+871.34 1.00 0.78 816.25
TRAMO II 0+000 - 0+825.84 1.00 0.78 906.66

EXCAVACION SOBRE ANCHO PARA ENCOFRADO


TRAMO I 0+000 - 2+408 2.00 0.78 2,408.00 0.20
TRAMO II 0+000 - 0+825.84 2.00 0.78 825.84 0.20

05.02.02 EXCAVACION EN ROCA SUELTA M3


(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 20%)
De la platilla de excavacin de movimiento de tierras m3
(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 80%)
TRAMO I 0+000 - 1+871.34 1.00 0.20 816.25
TRAMO II 0+000 - 0+825.84 1.00 0.20 906.66

EXCAVACION SOBRE ANCHO PARA ENCOFRADO


TRAMO I 0+000 - 2+408 2.00 0.20 2,408.00 0.20
TRAMO II 0+000 - 0+825.84 2.00 0.20 825.84 0.20

05.02.03 DEMOLICION DE ESTRUCTURAS DE CONCRETO. M3


CANAL DE CONCRETO EXISTENTE
TRAMO I 1+871.34 - 2+408 Muro Canal existente 2.00 536.66 0.12
TRAMO I 1+871.34 - 2+408 Losa fondo 1.00 536.66 0.50

05.02.04 EXCAVACION EN ROCA/CON EXPLOSIVOS M3


(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 20%)
De la platilla de excavacin de movimiento de tierras m3
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 2%)


TRAMO I 0+000 - 1+871.34 1.00 0.02 2,408.00
TRAMO II 0+000 - 0+825.84 1.00 0.02 825.84

EXCAVACION SOBRE ANCHO PARA ENCOFRADO


TRAMO I 0+000 - 2+408 2.00 0.02 2,408.00 0.20
TRAMO II 0+000 - 0+825.84 2.00 0.02 825.84 0.20
05.02.05 PERFILADO Y REFINE MANUAL DE CAJA DE CANAL M2
TRAMO I 0+000 - 1+871.34 1.00 1,871.34 0.70
TRAMO I 1+871.34 - 2+408 1.00 536.66 0.70
TRAMO II 0+000 - 0+825.84 1.00 825.84 0.70

05.02.06 CONFORMACION Y COMPACTACION DE LA SUBRASANTE C/EQM2


TRAMO I 0+000 - 1+871.34 1.00 1,871.34 0.55
TRAMO I 1+871.34 - 2+408 1.00 536.66 0.55
TRAMO II 0+000 - 0+825.84 1.00 825.84 0.55

05.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3


(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 20%)
De la platilla de excavacin de movimiento de tierras m3
(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 80%)
TRAMO I 0+000 - 1+871.34 1.00 1,115.96
TRAMO II 0+000 - 0+825.84 1.00 536.66 0.30
TRAMO II 0+000 - 0+825.84 1.00 638.72
RELLENO ENSOBRE ANCHO PARA ENCOFRADO
TRAMO I 0+000 - 2+408 1.00 2,408.00 0.20
TRAMO II 0+000 - 0+825.84 1.00 825.84 0.20

05.02.08 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 3 M3


Volumen de excavacin 1.00 2,266.63
Columen de relleno -1.00 2,061.55

05.03 OBRAS DE CONCRETO


05.03.01 CONCRETO FC=175 KG/CM2, EN CANALES M3
Tramo I Tipo I
Tramo 0+000 - 0+020
Muros de Canal 2.00 20.00 0.15
Losa Canal 1.00 20.00 0.70
Tramo 1+760 - 2+340
Muros de Canal 2.00 250.00 0.15
Losa Canal 1.00 580.00 0.70
Tipo II
Tramo 0+034.36- 1+760
Muros de Canal 2.00 1,725.64 0.15
Losa Canal 1.00 1,725.64 0.65
Tramo 2+340 - 2+408
Muros de Canal 2.00 68.00 0.15
Losa Canal 1.00 68.00 0.65
Tramo II Tipo III
0+000 - 0+825.84
Muros de Canal 2.00 825.84 0.15
Losa Canal 1.00 825.84 0.60
05.03.02 ENCOFRADO Y DESENCOFRADO EN CANALES M3
Tramo I Tipo I
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Tramo 0+000 - 0+020


Muros de Canal 2.00 2.00 20.00
Tramo 1+760 - 2+340
Muros de Canal 2.00 2.00 250.00
Tipo II
Tramo 0+034.36- 1+760
Muros de Canal 2.00 2.00 1,725.64
Tramo 2+340 - 2+408
Muros de Canal 2.00 2.00 68.00
Tramo II Tipo III
0+000 - 0+825.84
Muros de Canal 2.00 2.00 825.84

05.04 JUNTAS
05.04.01 JUNTA DE CONTRACCION SELLADO CON ELASTOMERICO DE ML
Tramo I Tipo I
Tramo 0+000 - 0+020
Junta de Contraccin @ 3 m 1.00 5.00 1.07
Tramo 1+760 - 2+340
Junta de Contraccin @ 3 m 1.00 67.00 1.07
Tipo II
Tramo 0+034.36- 1+760
Junta de Contraccin @ 3 m 2.00 460.00 1.02
Tramo 2+340 - 2+408
Junta de Contraccin @ 3 m 2.00 18.00 1.02
Tramo II Tipo III
0+000 - 0+825.84
Junta de Contraccin @ 3 m 2.00 220.00 0.97

05.04.02 JUNTA DE DILATACION SELLADO CON ELASTOMERICO DE POML


Tramo I Tipo I
Tramo 0+000 - 0+020
Junta de longitudinal @ 15 m 1.00 1.00 1.07
Tramo 1+760 - 2+340
Muros de Canal 1.00 16.00 1.07
Tipo II
Tramo 0+034.36- 1+760
Muros de Canal 1.00 115.00 1.02
Tramo 2+340 - 2+408
Muros de Canal 2.00 4.00 1.02
Tramo II Tipo III
0+000 - 0+825.84
Muros de Canal 2.00 55.00 0.97

05.05 VARIOS
05.05.01 CURADO DE CONCRETO CON ADITIVO M2
Tramo I Tipo I
Tramo 0+000 - 0+020
Muros de Canal 2.00 2.00 20.00
Tramo 1+760 - 2+340
Muros de Canal 2.00 2.00 250.00
Tipo II
Tramo 0+034.36- 1+760
Muros de Canal 2.00 2.00 1,725.64
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Tramo 2+340 - 2+408


Muros de Canal 2.00 2.00 68.00
Tramo II Tipo III
0+000 - 0+825.84
Muros de Canal 2.00 2.00 825.84
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

06.00 OBRAS DE ARTE

06.01 TOMAS PARCELARIAS (68)


06.01.01 EXCAVACION MANUAL EN TIERRA M3
canal Eje rpincipal 68.00 2.30 0.90
Canal de derivacion 68.00 0.87 0.90

06.01.02 RELLENO COMPACTADO A MANO M3


Relleno Laterales de la estructura Canal Principal 68.00 2.00 2.30 0.15
Relleno Laterales de la estructura Canal derivacion 68.00 2.00 0.87 0.15
06.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 3 M3
1.25 79.89

06.01.04 SOLADO E= 2" M2


Losa fondo canal (0.2+0.42+0.90+0.15+0.75) 68.00 2.42 0.70

06.01.05 CONCRETO FC=210 KG/CM2 M3


MUROS (Tramo I Y Tramo II)
Muros Ingreso 68.00 2.00 0.20 0.15
Muros Ingreso rampa 68.00 2.00 0.30 0.15
Muros Salida 68.00 2.00 0.90 0.15
Muros Toma lado Izquierdo 68.00 1.00 0.90 0.15
Muros Toma lado derecho 68.00 1.00 0.50 0.15
Losa Fondo
Tipo II en Km 0.034 al 1+760 14.00 1.00 2.72 0.65
Tipo I en Km 1+760 al 2+340 30.00 1.00 1.20 0.70
Tipo II en Km 2+340 al 2+408 2.00 1.00 0.61 0.65
Tipo III en Km 0+000 al 825.84 22.00 1.00 0.80 0.60
Muros canal de derivacion 68.00 2.00 0.62 0.10
Dados 68.00 2.00 0.25 0.15
Losa 68.00 1.00 0.87 0.60

06.01.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS M2


MUROS (Tramo I Y Tramo II)
Muros Ingreso 68.00 4.00 0.20
Muros Ingreso rampa 68.00 4.00 0.30
Muros Salida 68.00 4.00 0.90
Muros Toma lado Izquierdo 68.00 2.00 0.90
Muros Toma lado derecho 68.00 2.00 0.50
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Losa Fondo
Tipo II en Km 0.034 al 1+760 14.00 2.00 2.72
Tipo I en Km 1+760 al 2+340 30.00 2.00 1.20
Tipo II en Km 2+340 al 2+408 2.00 2.00 0.61
Tipo III en Km 0+000 al 825.84 22.00 2.00 0.80
Muros canal de derivacion 68.00 4.00 0.62
Dados 68.00 4.00 0.25
Losa 68.00 2.00 0.87

06.01.07 ACERO FY= 4200 KG/CM2 KG

Losa fondo Acero 3/8" @ 0.20m longitudinal 68.00 3.00 2.72


Losa Fondo Acero 3/8" @ 0.20m transversal 68.00 13.00 0.70
Muro de la toma Acero 3/8" @ 0.20m horizontal 68.00 4.00 2.30
Muro de la toma Acero 3/8" @ 0.20m vertical 68.00 22.00 0.35

Muro de la toma Acero 3/8" @ 0.20m horozontal (poza) 68.00 4.00 1.20
Muro de la toma Acero 3/8" @ 0.20m vertival (poza) 68.00 6.00 0.35

06.01.08 COMPUERTA METALICA TIPO TARJETA 0.30x0.30M UND


68.00

06.01.09 ATAGUIAS DE MADERA DE 30X40m UND


68.00

06.01.10 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SE ML


Ingreso Muros 68.00 2.00 0.38
Losa 68.00 1.00 0.45
Salida Muros 68.00 2.00 0.38
Losa 68.00 1.00 0.45

06.02 PASE DE AGUA (01 UND)


06.02.01 EXCAVACION MANUAL TERRENO ROCOSO M3

Estribos 2.00 2.00 3.30 0.60


Esxcavacion para ua de anclaje enrocado (lado derecho) 2.00 1.00 3.30 0.50
Excavacion Enrocado (lado derecho) 2.00 1.00 3.30 0.85
Excavacion Enrocado (lado izquierdo) 2.00 1.00 2.00 2.70
Excavacion Enrocado (lado izquierdo aleta) 2.00 1.00 1.00 3.38
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Excavacion Enrocado (lado izquierdo ua de anclaje) 2.00 1.00 4.06 0.30


Exvcacion cimiento muro y aletas 2.00 2.00 2.96 0.30
06.02.02 RELLENO COMPACTADO A MANO M3
Relleno de estructuras 2.00 2.00 4.85 0.20

06.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 3 M3


1.25 15.69

06.02.04 MAMPOSTERIA DE PIEDRA Y CONCRETO FC=140 KG/CM2 M3


Enrocado lado derecho 2.00 1.65 3.30
Enrocado lado izquierdo 2.00 1.80 3.00
Enrocado lado izquierdo aletas 2.00 1.00 3.68

06.02.05 MAMPOSTERIA DE PIEDRA Y CONCRETO FC=140 KG/CM2 M3


ESTRIBOS 2.00 3.30 0.20
2.00 3.30 0.40
2.00 3.30 0.40

06.02.06 CONCRETO CICLOPEO FC=175 KG/CM2+30% PG M3


(area m2)
Area de la seccion (0.41 m2) 2.00 2.00 3.30 0.41

06.02.07 CONCRETO FC=210 KG/CM2 M3


Losa 2.00 1.00 3.30 2.00
Muro 2.00 2.00 2.00 0.15

06.02.08 ENCOFRADO Y DESENCOFRADO DE MUROS M2


Muros (sobre losa) 2.00 4.00 2.00
Estribos Caras frontales 2.00 2.00 3.30
Estribos Caras posteriores 2.00 2.00 3.30

Losa 2.00 3.30 2.00


losa caras laterales 2.00 2.00 2.00
losa caras posterior y anterior 2.00 2.00 3.30

Muros de encausamiento 2.00 4.00 2.00


Muros de encausamiento aletas 2.00 4.00 1.16
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

06.02.09 ACERO F'Y=4200 KG/CM2 KG 1.02


Losa Fondo

Acero 3/8" @ 0.25m longitudinal 2.00 8.00 4.29


Acero 1/2" @ 0.20m transversal 2.00 20.00 2.10

Muro de encusamiento Acero 1/2" @ 0.20m longitudinal 2.00 15.00 1.17


Muro de encusamiento Acero 3/8" @ 0.25m transversal 2.00 6.00 3.26

06.03 MURO DE CONTENCION ( 10 M)


06.03.01 EXCAVACION MANUAL TERRENO ROCOSO M3
Del la seccion transversal Km 0+775 (AC=5.416)
Del la seccion transversal Km 0+782 (4.738) 1.00 7.00
Del la seccion transversal Km 0+775 (AC=6.107)
Del la seccion transversal Km 0+782 (6.75) 1.00 10.00

06.03.02 RELLENO COMPACTADO CON MATERIAL PROPIO M3


Del la seccion transversal Km 0+775 (AR=3.03)
Del la seccion transversal Km 0+782 (2.968) 1.00 7.00
Del la seccion transversal Km 0+775 (AR=3.339)
Del la seccion transversal Km 0+782 (3.46) 1.00 10.00
06.03.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 3 M3
1.25 44.84

06.03.04 CONCRETO FC=175 KG/CM2+30% P.M. M3

MUROS ( Zapata 1.00 17.00 1.65


pantalla Frontal 1.00 17.00 0.65

06.03.05 ENCOFRADO Y DESENCOFRADO DE MUROS M2


Zapata 1.00 2.00 17.00
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

pantalla Frontal 1.00 17.00


pantalla Posterior 1.00 17.00
Laterales 1.00 4.00 0.65
06.03.06 TUBERIA DE DRENAJE DE 4" ML
1.00 17.00

06.03.07 JUNTA DE CONTRACCION SELLADO CON ELASTOMERICO DE ML


Junta con el canal 1.00 17.00
Junta vertival en muro 1.00 2.40

06.04 PASARELA PETAONAL (14 UND)


06.04.01 EXCAVACION MANUAL EN TIERRA M3
Zapatas 2.00 2.00 2.50 0.90
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

06.04.02 RELLENO COMPACTADO CON MATERIAL PROPIO M3


Relleno lado izquierdo y derecho estructura 2.00 2.00 2.50 0.20
Relleno Interior laterales canal 2.00 2.00 2.50 0.54

06.04.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 3 M3


relleno sobrexcavacion 1.25 7.67

06.04.04 CONCRETO FC=175 KG/CM2 + 30% P.M. M3 area seccion


Zapatas Area de sla seccion (0.813 m2) 2.00 2.50 0.81

06.04.05 CONCRETO F'C= 210 KG/CM2 M3


losa 2.00 2.50 2.30
Muros 2.00 2.00 2.30 0.20

06.04.06 ENCOFRADO Y DESENCOFRADO DE MUROS M3


Zapata 2.00 2.00 2.50 area seccio
Zapata laterales 2.00 2.00 0.81

06.04.07 ENCOFRADO Y DESENCOFRADO DE LOSA M2


losa fondlosa fondo 2.00 2.50 2.30
Losa laterales 2.00 2.50
Losa laterales 2.00 2.30
Muros 2.00 2.00 2.30

06.04.08 ACERO FY= 4200 KG/CM2 kg


Acero Losa Longitudinal 3/8 @ 0.25 2.00 9.00 1.30
Acero Losa transversal 1/2 @ 0.20 2.00 10.00 0.90
Acero muro estribo 1/48 @ 0..15 4.00 15.00
Acero MurLosa transversal 1/2 @ 0.20 4.00 6.00 2.30
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

06.05 CAIDA VERTICAL ( 06 UND)


DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

06.05.01 EXCAVACION MANUAL EN TIERRA M3


POZA 6.00 2.96 1.50

06.05.02 RELLENO COMPACTADO CON MATERIAL PROPIO M3


Relleno de estructura laterales 6.00 2.00 2.96 0.30

06.05.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 3 M3


Volumen de excavacion 1.00 1.25 10.66
Volumen de relleno 1.00 1.25 -6.39
06.05.04 SOLADO E= 2" M2
Losa Aguas Arriba poza 6.00 1.00 0.70
POZA 6.00 2.96 0.90

06.05.05 CONCRETO F'C= 210 KG/CM2 M3


Losa aguas arriba poza 6.00 1.00 0.70
Losa aguas arriba poza ua ancjaje 6.00 0.70 0.15
Muro Aguas arriba poza 6.00 2.00 1.00 0.15
Losa pared 6.00 0.90 0.15
Losa poza 6.00 3.11 0.90
Losa poza ua anclaje 6.00 0.70 0.15
Muro Pozo 6.00 2.00 1.80 0.15
Muro Pozo aguas abajo 6.00 2.00 1.16 0.15

06.05.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS M2


Losa aguas arriba poza 6.00 2.00 1.00
Losa aguas arriba poza ua ancjaje 6.00 2.00 0.70
Muro Aguas arriba poza 6.00 4.00 1.00
Losa pared 6.00 1.00 0.90
Losa poza 6.00 2.00 3.11
Losa poza ua anclaje 6.00 2.00 0.70
Muro Pozo 6.00 4.00 1.80
Muro Pozo aguas abajo 6.00 4.00 1.16

06.05.07 ACERO FY= 4200 KG/CM2 KG 0.58


DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Losa aguas arriba poza


Acero 3/8 @ 25 longitudinal 6.00 3.00 1.42
Acero 3/8 @ 25 transversal 6.00 5.00 1.00

Muro Aguas arriba poza


Acero 3/8 @ 25 vertical 12.00 4.00 0.35
Acero 3/8 @ 25 horizontal 12.00 3.00 1.00
Losa pared y fondo
Acero 3/8 @ 25 longitudinal 6.00 4.00 3.31
Acero 3/8 @ 25 transversal 6.00 14.00 1.00

Losa aguas abajo


Acero 3/8 @ 25 longitudinal 6.00 3.00 1.61
Acero 3/8 @ 25 transversal 6.00 6.00 0.70

Muro Pozo
Acero 3/8 @ 25 vertical 12.00 7.00 1.20
Acero 3/8 @ 25 horizontal 12.00 4.00 1.80
Muro Pozo aguas abajo
Acero 3/8 @ 25 vertical 12.00 5.00 0.30
Acero 3/8 @ 25 horizontal 12.00 3.00 1.16
06.05.08 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SE ML
Juntas Ingreso Poza 6.00 1.15
Juntas salida Poza 6.00 1.15

06.06 POZA DE DISIPACION ( 5 UND)

06.06.01 EXCAVACION MANUAL EN TIERRA M3


POZA 5.00 4.50 1.80
DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

06.06.02 RELLENO COMPACTADO CON MATERIAL PROPIO M3


Relleno de estructura laterales 5.00 2.00 4.50 0.30

06.06.03 ACARREO DE MATERIAL EXCEDENTE HASTA DIST. APROX. = 3 M3


Volumen de excavacion 1.00 1.25 16.20
Volumen de relleno 1.00 1.25 -6.75
06.06.04 SOLADO E= 2" M2
Losa Aguas Arriba poza 5.00 2.40 1.20
POZA 5.00 2.20 1.20

06.06.05 CONCRETO F'C= 210 KG/CM2 M3


Losa aguas arriba poza 5.00 2.30 0.95
Losa aguas arriba poza ua ancjaje 5.00 1.20 0.30
Muro Aguas arriba poza 5.00 2.00 2.30 0.15
Losa poza 5.00 2.20 1.20
Losa poza SALIDA 5.00 0.40 1.20
Losa poza ua anclaje 5.00 7.00 0.25
Muro Pozo 5.00 2.00 2.40 0.15
Muro Pozo aguas abajo 5.00 2.00 0.20 0.15

06.06.06 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS M2


Losa aguas arriba poza 5.00 2.00 1.00
Losa aguas arriba poza ua ancjaje 5.00 2.00 0.70
Muro Aguas arriba poza 5.00 4.00 1.00
Losa pared 5.00 1.00 0.90
Losa poza 5.00 2.00 3.11
Losa poza ua anclaje 5.00 2.00 0.70
Muro Pozo 5.00 4.00 1.80
Muro Pozo aguas abajo 5.00 4.00 1.16

06.06.07 ACERO FY= 4200 KG/CM2 KG

Losa aguas arriba poza


Acero 3/8 @ 25 longitudinal 5.00 3.00 1.42
Acero 3/8 @ 25 transversal 5.00 5.00 1.00

Muro Aguas arriba poza


Acero 3/8 @ 25 vertical 10.00 4.00 0.35
Acero 3/8 @ 25 horizontal 10.00 3.00 1.00
Losa pared y fondo
Acero 3/8 @ 25 longitudinal 5.00 4.00 3.31
Acero 3/8 @ 25 transversal 5.00 14.00 1.00

Losa aguas abajo


DESCRIPCION
Partida UNID. N Veces Cantidad largo (m) ancho (m)

Acero 3/8 @ 25 longitudinal 5.00 3.00 1.61


Acero 3/8 @ 25 transversal 5.00 6.00 0.70

Muro Pozo
Acero 3/8 @ 25 vertical 10.00 7.00 1.20
Acero 3/8 @ 25 horizontal 10.00 4.00 1.80
Muro Pozo aguas abajo
Acero 3/8 @ 25 vertical 10.00 5.00 0.30
Acero 3/8 @ 25 horizontal 10.00 3.00 1.16
06.06.08 JUNTA CON WATER STOP PVC 4" CANAL RECTANGULAR + SE ML
Juntas Ingreso Poza 5.00 1.15
Juntas salida Poza 5.00 1.15

07.00 CAPACITACION
07.01 CAPACITACION EN OPERACIN Y MANTENIMIENTO gbl 1.00

08.00 MITIGACION DE MPACTO AMBIENTAL NEGATIVO


08.01 REFORESTACIUON Y/O REVEGETACION HA
Hectareas forestadas 0.50

08.02 ACONDICIONAMIENTO DE MATERIAL DE DESECHO EN BOTAD M3 50.00

08.03 RESTAURACION DE AREAS UTILIZADAS EN PREPARACION DE M2 150.00

09.00 SEGURIDAD YU SALUD


09.01 IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDGLB 1.00

10.00 FLETES
LARGO ANCHO
10.01 FLETE TERRESTRE GBL 1.00

10.02 FLETE RURAL GBL 1.00


NILLA DE METRADOS

NCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI -ANCASH

alto (m) Parcial Total

1.00
1.00

4.00 4.00

1.00
1.00

0.00

91.00 91.00

91.00 91.00

7.20
0.80 7.20

10.46
1.20 10.46
alto (m) Parcial Total

60.87
0.90 6.05
0.30 4.50
0.30 4.50
0.30 4.50

0.70 5.04
0.70 3.78
0.70 1.76
0.60 5.76

0.70 0.63
0.70 3.78
0.70 1.76
0.60 5.76
0.70 2.58
1.20 10.46
alto (m) Parcial Total

89.16
89.16

30.83
1.40 19.15
1.20 11.68
1.50
0.50 1.50

6.98
3.30
3.68

11.00
0.30 4.50
0.30 4.50
1.00 2.00

53.11
6.91

0.60 4.32
0.60 3.24
0.60 1.51
0.40 3.84

0.60 0.54
0.60 3.24
0.60 1.51
0.40 3.84

1.90 4.94
1.90 3.71
1.58 1.44
1.26 4.16

1.90 0.62
alto (m) Parcial Total

1.90 3.71
1.58 1.44
1.26 4.16

78.99

1.90 15.20
1.90 11.40
1.58 4.42
1.26 15.12

1.90 1.90
1.90 11.40
1.58 4.42
1.26 15.12
alto (m) Parcial Total

58.40

1.70 13.94
1.70 11.56
1.25 4.50
1.25 2.38
1.25 5.38
0.40 0.96
1.00 3.60

1.90 5.32
1.26 8.06
0.20 0.38
0.20 0.25

0.72
0.72
0.63

4.65

0.20 0.90
1.70 1.05
1.70 0.87
alto (m) Parcial Total

0.15 0.08
0.15 0.04
1.25 0.34
0.15 0.45
1.25 0.18
1.25 0.40
0.40 0.07
1.00 0.27

4.99
0.40 0.56
0.40 1.02
1.90 0.53
1.26 0.81

0.72
0.72
0.63

567.81

Peso acero
Kg/m
0.99 42.27
0.99 85.18

0.99 41.58
0.99 80.59

0.99 5.94
0.99 4.36
0.99 5.45
0.99 4.36
0.99 2.38
0.99 2.38

0.99 3.91
0.99 5.94
alto (m) Parcial Total

0.99 21.29
0.99 19.31

0.99 34.06
0.99 37.62

0.99 28.51
0.99 28.22

0.99 4.36
0.99 4.95

0.99 1.78
0.99 1.98

0.99 6.53
0.99 3.96

0.99 14.02
0.99 17.42

0.99 6.83
0.99 7.18

0.99 13.96
0.99 7.18

0.99 2.77
0.99 2.97

0.99 8.71
0.99 9.90

1.00 1.00

1.00 1.00
alto (m) Parcial Total

137.38

1.90 15.20
1.90 11.40
1.58 4.42
1.26 15.12

1.90 1.90
1.90 11.40
1.58 4.42
1.26 15.12

1.70 13.94
1.70 11.56
1.25 4.50
1.25 2.38
1.25 5.38
0.40 0.96
1.00 3.60

1.90 5.32
1.26 8.06
0.20 0.38
0.20 0.25

0.72
0.72
0.63

1.00 4.20
3.40
0.80

1.00 1.20
0.80
0.40

21.60 21.60

21.60 21.60

12.94
0.60 2.42
0.60 9.86
0.30 0.66

5.81
alto (m) Parcial Total

0.80 3.17
0.80 2.64
8.91
8.91

22.66
4.03
16.43
2.20

0.19
0.40 0.11
0.40 0.02
0.10 0.06

1.92
0.30 1.68
0.30 0.24

2.84
alto (m) Parcial Total

0.44 0.18
0.72 0.45
0.72 0.42
0.87 0.08
0.87 0.13
0.87 0.06
0.87 0.13
0.15 0.18
0.15 1.01
0.15 0.11
0.15 0.08

21.57
0.44 2.38
0.72 6.05
0.72 5.62
0.87 1.08
0.87 1.74
0.87 0.78
0.87 1.74
0.15 0.33
0.15 1.35
0.15 0.15
0.15 0.35

0.58 116.64

Peso acero
Kg/m

0.56 4.70
0.56 10.28

0.56 9.41
0.56 11.33

0.56 8.74
0.56 11.33
alto (m) Parcial Total

0.56 1.04
0.56 1.80

0.56 2.02
0.56 3.00

0.56 1.09
0.56 1.20

0.56 2.02
0.56 2.40

0.56 2.91
0.56 4.03

0.56 15.79
0.56 16.02

0.56 2.02
0.56 2.18

0.56 1.51
0.56 1.82

1.00 1.00

35.20
0.44 2.38
0.72 6.05
0.72 5.62
0.87 1.08
0.87 1.74
0.87 0.78
0.87 1.74
1.60 3.52
1.20 10.80
0.45 0.46
0.45 1.04

2.00
1.20
0.80

17.65 17.65

17.65 17.65

7.25
alto (m) Parcial Total

0.60 7.25

3.34
0.60 1.67
0.60 1.67
4.88
4.88

6.50 6.50

1.13

0.15 0.99
0.15 1.13

18.05
0.15 2.82
0.15 0.21
15.02

81.89
Peso acero
Kg/m

0.56 36.81
0.56 45.08

7.51
7.51

7.51
7.51

1.00 1.00

1.50
1.00
0.50
alto (m) Parcial Total

9,701.52
7,224.00
2,477.52

9,701.52
7,224.00
2,477.52

3,233.84
1,871.34
536.66
825.84

3,233.84
1,871.34
536.66
825.84

1,684.12

636.68
707.19

0.35 262.95
0.30 77.30

431.83

163.25
181.33

0.35 67.42
0.30 19.82

77.28

0.35 45.08
0.12 32.20

73.40
alto (m) Parcial Total

48.16
16.52

0.35 6.74
0.30 1.98
2,263.69
1,309.94
375.66
578.09

1,778.61
1,029.24
295.16
454.21

2,061.55

1,115.96
0.50 80.50
638.72

0.35 168.56
0.35 57.81

205.08
2,266.63
-2,061.55

572.26

0.30 1.80
0.15 2.10

0.30 22.50
0.15 60.90

0.30 155.31
0.15 168.25

0.30 6.12
0.15 6.63

0.30 74.33
0.15 74.33
3,467.38
alto (m) Parcial Total

0.30 24.00

0.30 300.00

0.30 2,070.77

0.30 81.60

0.30 991.01

1,478.96

5.35

71.69

938.40

36.72

426.80

250.35

1.07

17.12

117.30

8.16

106.70

3,467.38

0.30 24.00

0.30 300.00

0.30 2,070.77
alto (m) Parcial Total

0.30 81.60

0.30 991.01
alto (m) Parcial Total

119.83
0.70 98.53
0.40 21.30

39.94
0.70 32.84
0.40 7.10
99.86
99.86

115.19
115.19

36.63

0.30 1.22
0.45 2.75
0.30 5.51
0.60 5.51
0.60 3.06

0.15 3.71
0.15 3.78
0.15 0.12
0.15 1.58
0.30 2.53
0.30 1.53
0.15 5.32

357.33

0.30 16.32
0.45 36.72
0.30 73.44
0.60 73.44
0.60 40.80
alto (m) Parcial Total

0.15 11.42
0.15 10.80
0.15 0.37
0.15 5.28
0.30 50.59
0.30 20.40
0.15 17.75

1,563.56
Peso acero
Kg/m
0.56 310.73
0.56 346.53
0.56 350.34
0.56 293.22

0.56 182.78
0.56 79.97

68.00
68.00

68.00
68.00

163.20
51.00
30.60
51.00
30.60

17.24

0.90 7.13
0.90 2.97
0.20 1.12
0.20 2.16
0.20 1.35
alto (m) Parcial Total

0.30 0.73
0.50 1.78
1.55
0.40 1.55

19.61
19.61

5.81
0.20 2.18
0.20 2.16
0.20 1.47

2.71
0.15 0.20
0.35 0.92
0.60 1.58

5.41

5.41

2.46
0.15 1.98
0.40 0.48

56.65
0.40 6.40
0.90 11.88
0.90 11.88

13.20
0.15 1.20
0.15 1.98

0.40 6.40
0.40 3.71
alto (m) Parcial Total

1.02 179.27
Peso acero
Kg/m

0.56 38.44
0.99 83.16

0.99 34.75
0.56 21.91

99.82
Area Promed
5.08 35.54

6.43 64.29

54.99
Area Promed
3.00 20.99

3.40 34.00
56.05
56.05

43.35

0.60 16.83
2.40 26.52

110.11
0.60 20.40
alto (m) Parcial Total

2.51 42.67
2.40 40.80
2.40 6.24
17.00
17.00

19.40
17.00
2.40

11.70
1.30 11.70
alto (m) Parcial Total

4.03
0.80 1.60
0.45 2.43

9.59
9.59

4.07
4.07

2.94
0.20 2.30
0.35 0.64

16.24
1.30 13.00
3.24

16.16
11.50
0.15 0.75
0.15 0.69
0.35 3.22

Kg/m 76.84
0.56 13.10
0.99 17.82
0.25 15.00
0.56 30.91
alto (m) Parcial Total
alto (m) Parcial Total

10.66
0.40 10.66

6.39
0.60 6.39

5.33
13.32
-7.99
20.18
4.20
15.98

8.37
0.15 0.63
0.25 0.16
0.30 0.54
1.30 1.05
0.15 2.52
0.25 0.16
0.70 2.27
0.50 1.04

69.98
0.15 1.80
0.25 2.10
0.30 7.20
1.30 7.02
0.15 5.60
0.25 2.10
0.70 30.24
0.50 13.92

0.58 321.43
alto (m) Parcial Total

Kg/m

0.56 14.31
0.56 16.80

0.56 9.41
0.56 20.16

0.56 44.49
0.56 47.04

0.56 16.23
0.56 14.11

0.56 56.45
0.56 48.38

0.56 10.08
0.56 23.39
13.80
6.90
6.90

16.20
0.40 16.20
alto (m) Parcial Total

6.75
0.50 6.75

11.81
20.25
-8.44
27.60
14.40
13.20

10.78
0.15 1.64
0.40 0.72
0.35 1.21
0.15 1.98
0.15 0.36
0.30 2.63
0.60 2.16
0.30 0.09

58.32
0.15 1.50
0.25 1.75
0.30 6.00
1.30 5.85
0.15 4.67
0.25 1.75
0.70 25.20
0.50 11.60

267.37
Kg/m

0.56 11.93
0.56 14.00

0.56 7.84
0.56 16.80

0.56 37.07
0.56 39.20
alto (m) Parcial Total

0.56 13.52
0.56 11.76

0.56 47.04
0.56 40.32

0.56 8.40
0.56 19.49
11.50
5.75
5.75

1.00 1.00

0.50
0.50

50.00 50.00

150.00 150.00

1.00 1.00

ALTURA
1.00 1.00 1.00

1.00 1.00 1.00


MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN
DISTRITO DE CAJACAY-BOLOGNESI-ANCASH
TRAMO 1:, KM 0+00 HASTA KM 0+2406.66 L=2,408 ML.

PLANILLA DE METRADO DE EXPLANACIONES


Estaca REAS (m2) VOLUMEN (m3)

KM Corte Relleno Distancia (ml) Total Corte Total relleno

0+000 0.055 0.323


0+020 - 0.548 20.00 0.280 8.700
0+040 - 0.742 20.00 - 12.895
0+060 0.372 0.559 20.00 1.860 13.010
0+080 0.804 0.113 20.00 11.760 6.720
0+100 0.210 0.809 20.00 10.140 9.220
0+120 4.440 0.054 20.00 46.500 8.630
0+140 0.099 1.317 20.00 45.390 13.710
0+160 - 0.596 20.00 0.500 19.125
0+180 0.021 0.377 20.00 0.110 9.725
0+200 - 0.605 20.00 0.110 9.820
0+220 0.026 0.264 20.00 0.130 8.690
0+240 0.070 0.287 20.00 0.960 5.510
0+260 0.548 0.712 20.00 6.180 9.990
0+280 0.974 0.113 20.00 15.220 8.250
0+300 0.242 0.179 20.00 12.160 2.920
0+320 0.022 0.300 20.00 2.640 4.790
0+340 0.036 0.271 20.00 0.580 5.710
0+360 0.014 0.402 20.00 0.500 6.730
0+380 0.131 0.386 20.00 1.450 7.875
0+400 0.425 0.491 20.00 5.560 8.765
0+420 0.026 0.487 20.00 4.510 9.775
0+440 0.050 0.384 20.00 0.760 8.705
0+460 0.005 0.347 20.00 0.550 7.310
0+480 0.159 0.220 20.00 1.640 5.665
0+500 0.249 0.191 20.00 4.080 4.100
0+520 0.525 0.847 20.00 7.740 10.375
0+540 - 0.265 20.00 2.630 11.115
0+560 0.058 0.261 20.00 0.290 5.250
0+580 0.017 0.528 20.00 0.750 7.880
0+600 0.916 0.413 20.00 9.330 9.400
0+620 0.767 0.486 20.00 16.830 8.980
0+640 0.004 0.631 20.00 7.710 11.165
0+660 - 0.746 20.00 0.020 13.770
0+680 - 0.598 20.00 - 13.435
0+700 0.800 0.240 20.00 4.000 8.370
0+720 0.016 0.432 20.00 8.160 6.715
0+740 0.057 0.353 20.00 0.730 7.845
0+760 2.023 - 20.00 20.800 1.763
0+780 0.573 0.230 20.00 25.960 1.150
0+800 0.887 0.419 20.00 14.600 6.485
0+820 0.284 0.903 20.00 8.570 11.330
0+840 0.156 0.266 20.00 10.430 6.840
0+860 0.049 0.547 20.00 2.050 8.125
0+880 0.253 0.663 20.00 3.020 12.095
0+900 1.321 0.510 20.00 15.740 11.720
0+920 0.798 0.374 20.00 21.190 8.830
0+940 1.396 0.113 20.00 21.940 4.865
0+960 2.628 0.113 20.00 40.240 2.260
0+980 0.935 0.113 20.00 23.310 2.260
1000.00 0.056 0.335 20.00 26.840 4.480
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN
DISTRITO DE CAJACAY-BOLOGNESI-ANCASH
TRAMO 1:, KM 0+00 HASTA KM 0+2406.66 L=2,408 ML.

PLANILLA DE METRADO DE EXPLANACIONES


Estaca REAS (m2) VOLUMEN (m3)

KM Corte Relleno Distancia (ml) Total Corte Total relleno

1+020 1.764 0.090 20.00 18.200 4.245


1+040 1.360 0.155 20.00 31.240 2.440
1+060 - 1.765 20.00 6.800 19.190
1+080 0.236 0.937 20.00 1.180 27.010
1+100 0.490 0.682 20.00 7.260 16.180
1+120 1.950 0.644 20.00 24.400 13.255
1+140 1.209 0.369 20.00 31.590 10.130
1+160 1.193 0.114 20.00 24.020 4.830
1+180 0.360 0.483 20.00 15.530 5.970
1+200 0.621 0.279 20.00 8.570 12.155
1+220 0.802 0.409 20.00 14.230 6.880
1+240 1.480 0.067 20.00 21.010 3.460
1+260 - 0.734 20.00 4.010 11.425
1+280 - 3.181 20.00 - 39.140
1+300 - 2.890 20.00 - 60.700
1+320 - 2.740 20.00 - 56.295
1+340 - 2.209 20.00 - 49.485
1+360 - 1.740 20.00 - 39.485
1+380 0.002 0.455 20.00 0.010 21.950
1+400 0.004 0.914 20.00 0.020 26.540
1+420 0.236 1.169 20.00 2.380 16.240
1+440 1.312 0.113 20.00 15.480 12.820
1+460 0.256 1.294 20.00 15.680 14.065
1+480 0.978 0.469 20.00 12.340 17.620
1+500 0.007 0.512 20.00 9.850 9.800
1+520 0.442 0.808 20.00 4.490 13.195
1+540 0.105 0.426 20.00 5.470 12.335
1+560 1.205 0.113 20.00 16.470 9.210
1+580 0.165 1.079 20.00 2.700 15.040
1+600 0.181 0.893 20.00 3.460 19.715
1+620 0.075 0.628 20.00 2.560 15.210
1+640 0.126 0.296 20.00 2.010 9.235
1+660 0.134 0.320 20.00 2.600 6.155
1+680 0.351 0.634 20.00 4.850 9.540
1+700 0.398 0.593 20.00 7.490 12.265
1+720 0.700 0.308 20.00 10.510 9.420
1+740 0.209 0.226 20.00 6.070 8.180
1+760 0.004 0.618 20.00 2.130 8.430
1+780 0.001 0.640 20.00 0.050 12.575
1+800 0.005 0.609 20.00 0.060 12.490
1+820 0.005 0.387 20.00 0.100 9.955
1+840 0.037 0.330 20.00 0.420 7.165
1+860 0.052 0.397 20.00 0.890 7.265
1+880 1.330 0.113 20.00 13.670 4.430

TOTAL 0+00 - 2+400.66 816.25 1115.96


MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN DISTRITO
DE CAJACAY-BOLOGNESI-ANCASH
TRAMO 2:, KM 0+00 HASTA KM 0+825.84 L=825.84 ML.

PLANILLA DE METRADO DE EXPLANACIONES


Estaca REAS (m2) VOLUMEN M3

KM Corte Relleno Distancia (ml) Total Corte Total relleno

0+000 - 0.023
0+020 0.003 0.827 20.00 0.020 8.495
0+040 0.134 0.571 20.00 1.370 13.970
0+060 0.131 0.451 20.00 2.650 10.215
0+080 0.853 1.256 20.00 9.840 17.070
0+100 0.846 0.544 20.00 16.990 18.000
0+120 0.448 0.463 20.00 12.940 10.065
0+140 0.057 0.594 20.00 5.050 10.565
0+160 0.181 0.489 20.00 2.380 10.825
0+180 0.151 0.587 20.00 3.320 10.755
0+200 0.075 1.012 20.00 2.260 15.990
0+220 0.259 0.544 20.00 3.340 15.560
0+240 0.409 0.771 20.00 6.680 13.145
0+260 1.519 0.113 20.00 19.280 8.835
0+280 2.262 0.343 20.00 37.810 4.555
0+300 0.528 1.072 20.00 27.900 14.140
0+320 0.717 0.892 20.00 12.450 19.630
0+340 0.320 1.287 20.00 10.370 21.785
0+360 1.108 1.407 20.00 14.280 26.940
0+380 0.091 0.926 20.00 11.990 23.325
0+400 0.046 1.474 20.00 1.370 23.990
0+420 0.258 0.951 20.00 3.040 24.245
0+440 2.622 0.113 20.00 28.800 10.640
0+460 1.881 0.113 20.00 45.030 2.260
0+480 0.085 1.130 20.00 19.660 12.430
0+500 2.774 0.113 20.00 28.590 12.430
0+520 0.001 1.124 20.00 27.750 12.370
0+540 0.100 1.116 20.00 1.010 22.395
0+560 0.040 1.353 20.00 1.400 24.680
0+580 0.066 1.406 20.00 1.060 27.580
0+600 0.970 0.568 20.00 10.360 19.730
0+620 1.887 0.193 20.00 28.570 7.605
0+640 2.331 0.653 20.00 42.180 8.460
0+660 4.238 0.113 20.00 65.690 7.660
0+680 4.367 0.868 20.00 86.050 9.805
0+700 0.165 1.203 20.00 45.320 20.705
0+720 2.000 0.113 20.00 21.650 13.160
0+740 - 0.113 20.00 10.000 2.260
0+760 1.592 0.705 20.00 7.960 8.175
0+780 1.593 2.818 20.00 31.850 35.225
0+800 6.229 0.113 20.00 78.220 29.310
0+820 8.570 0.113 20.00 101.630 29.310
0+826 0.123 0.035 5.84 18.550 0.432
SUB TOTAL 0+000 - 0+825.84 906.66 638.72
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN
DISTRITO DE CAJACAY-BOLOGNESI-ANCASH
TRAMO 1:, KM 0+00 HASTA KM 0+2406.66 L=2,406.66 ML.

PLANILLA DE METRADO DE EXPLANACIONES


Estaca REAS (m2) VOLUMEN (m3)

KM Corte Relleno Distancia (ml) Total Corte Total relleno

0+000 0.055 0.645


0+020 - 1.095 20.00 0.280 17.400
0+040 - 1.484 20.00 - 25.790
0+060 0.372 1.118 20.00 1.860 26.020
0+080 0.804 0.226 20.00 11.760 13.440
0+100 0.210 1.618 20.00 10.140 18.440
0+120 4.440 0.108 20.00 46.500 17.260
0+140 0.099 2.634 20.00 45.390 27.420
0+160 - 1.191 20.00 0.500 38.250
0+180 0.021 0.754 20.00 0.110 19.450
0+200 - 1.210 20.00 0.110 19.640
0+220 0.026 0.528 20.00 0.130 17.380
0+240 0.070 0.574 20.00 0.960 11.020
0+260 0.548 1.424 20.00 6.180 19.980
0+280 0.974 0.226 20.00 15.220 16.500
0+300 0.242 0.358 20.00 12.160 5.840
0+320 0.022 0.600 20.00 2.640 9.580
0+340 0.036 0.542 20.00 0.580 11.420
0+360 0.014 0.804 20.00 0.500 13.460
0+380 0.131 0.771 20.00 1.450 15.750
0+400 0.425 0.982 20.00 5.560 17.530
0+420 0.026 0.973 20.00 4.510 19.550
0+440 0.050 0.768 20.00 0.760 17.410
0+460 0.005 0.694 20.00 0.550 14.620
0+480 0.159 0.439 20.00 1.640 11.330
0+500 0.249 0.381 20.00 4.080 8.200
0+520 0.525 1.694 20.00 7.740 20.750
0+540 - 0.529 20.00 2.630 22.230
0+560 0.058 0.521 20.00 0.290 10.500
0+580 0.017 1.055 20.00 0.750 15.760
0+600 0.916 0.825 20.00 9.330 18.800
0+620 0.767 0.971 20.00 16.830 17.960
0+640 0.004 1.262 20.00 7.710 22.330
0+660 - 1.492 20.00 0.020 27.540
0+680 - 1.195 20.00 - 26.870
0+700 0.800 0.479 20.00 4.000 16.740
0+720 0.016 0.864 20.00 8.160 13.430
0+740 0.057 0.705 20.00 0.730 15.690
0+760 2.023 - 20.00 20.800 3.525
0+780 0.573 0.460 20.00 25.960 2.300
0+800 0.887 0.837 20.00 14.600 12.970
0+820 0.284 1.806 20.00 8.570 22.660
0+840 0.156 0.531 20.00 10.430 13.680
0+860 0.049 1.094 20.00 2.050 16.250
0+880 0.253 1.325 20.00 3.020 24.190
0+900 1.321 1.019 20.00 15.740 23.440
0+920 0.798 0.747 20.00 21.190 17.660
0+940 1.396 0.226 20.00 21.940 9.730
0+960 2.628 0.226 20.00 40.240 4.520
0+980 0.935 0.226 20.00 23.310 4.520
1000.00 0.056 0.670 20.00 26.840 8.960
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN
DISTRITO DE CAJACAY-BOLOGNESI-ANCASH
TRAMO 1:, KM 0+00 HASTA KM 0+2406.66 L=2,406.66 ML.

PLANILLA DE METRADO DE EXPLANACIONES


Estaca REAS (m2) VOLUMEN (m3)

KM Corte Relleno Distancia (ml) Total Corte Total relleno

1+020 1.764 0.179 20.00 18.200 8.490


1+040 1.360 0.309 20.00 31.240 4.880
1+060 - 3.529 20.00 6.800 38.380
1+080 0.236 1.873 20.00 1.180 54.020
1+100 0.490 1.363 20.00 7.260 32.360
1+120 1.950 1.288 20.00 24.400 26.510
1+140 1.209 0.738 20.00 31.590 20.260
1+160 1.193 0.228 20.00 24.020 9.660
1+180 0.360 0.966 20.00 15.530 11.940
1+200 0.621 0.558 20.00 8.570 24.310
1+220 0.802 0.818 20.00 14.230 13.760
1+240 1.480 0.134 20.00 21.010 6.920
1+260 - 1.467 20.00 4.010 22.850
1+280 - 6.361 20.00 - 78.280
1+300 - 5.779 20.00 - 121.400
1+320 - 5.480 20.00 - 112.590
1+340 - 4.417 20.00 - 98.970
1+360 - 3.480 20.00 - 78.970
1+380 0.002 0.910 20.00 0.010 43.900
1+400 0.004 1.828 20.00 0.020 53.080
1+420 0.236 2.338 20.00 2.380 32.480
1+440 1.312 0.226 20.00 15.480 25.640
1+460 0.256 2.587 20.00 15.680 28.130
1+480 0.978 0.937 20.00 12.340 35.240
1+500 0.007 1.023 20.00 9.850 19.600
1+520 0.442 1.616 20.00 4.490 26.390
1+540 0.105 0.851 20.00 5.470 24.670
1+560 1.205 0.226 20.00 16.470 18.420
1+580 0.165 2.157 20.00 2.700 30.080
1+600 0.181 1.786 20.00 3.460 39.430
1+620 0.075 1.256 20.00 2.560 30.420
1+640 0.126 0.591 20.00 2.010 18.470
1+660 0.134 0.640 20.00 2.600 12.310
1+680 0.351 1.268 20.00 4.850 19.080
1+700 0.398 1.185 20.00 7.490 24.530
1+720 0.700 0.616 20.00 10.510 18.840
1+740 0.209 0.451 20.00 6.070 16.360
1+760 0.004 1.235 20.00 2.130 16.860
1+780 0.001 1.280 20.00 0.050 25.150
1+800 0.005 1.218 20.00 0.060 24.980
1+820 0.005 0.773 20.00 0.100 19.910
1+840 0.037 0.660 20.00 0.420 14.330
1+860 0.052 0.793 20.00 0.890 14.530
1+880 1.330 0.226 20.00 13.670 8.860
1+900 3.719 0.226 20.00 37.710 10.190
1+920 1.248 0.502 20.00 49.670 7.280
1+940 0.023 1.202 20.00 12.710 17.040
1+960 0.098 0.902 20.00 1.210 21.040
1+980 0.254 2.778 20.00 3.520 36.800
2+000 1.090 0.636 20.00 13.440 34.140
2+020 1.736 0.226 20.00 28.260 8.620
2+040 0.178 0.367 20.00 12.680 10.030
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN
DISTRITO DE CAJACAY-BOLOGNESI-ANCASH
TRAMO 1:, KM 0+00 HASTA KM 0+2406.66 L=2,406.66 ML.

PLANILLA DE METRADO DE EXPLANACIONES


Estaca REAS (m2) VOLUMEN (m3)

KM Corte Relleno Distancia (ml) Total Corte Total relleno

2+060 0.284 2.959 20.00 4.620 33.260


2+080 0.768 2.822 20.00 10.520 57.810
2+100 0.210 1.578 20.00 9.780 44.000
2+120 0.196 1.795 20.00 4.060 33.730
2+140 0.370 2.695 20.00 5.660 44.900
2+160 0.264 1.016 20.00 6.340 37.110
2+180 0.052 0.918 20.00 3.160 36.130
2+200 1.067 1.617 20.00 11.190 25.350
2+220 0.236 1.429 20.00 13.030 30.460
2+240 0.161 1.761 20.00 3.970 31.900
2+260 0.226 0.479 20.00 3.870 22.400
2+280 0.515 0.903 20.00 7.410 13.820
2+300 1.727 0.226 20.00 22.420 11.290
2+320 0.091 0.416 20.00 18.180 13.190
2+340 0.004 0.601 20.00 0.950 8.270
2+360 0.226 0.358 20.00 2.300 9.590
2+380 - 1.594 20.00 1.130 19.520
2+400 0.001 0.732 20.00 0.010 23.260
2406.66 0.001 0.732 6.66 0.010 4.875
TOTAL 0+00 - 2+400.66 1104.06 2877.93
PLANILLA DE METRADOS

OBRA : MEJORAMIENTO DEL CANAL DE RIEGO MOLINO

UBICACIN :
LOCALIDAD: SANTA ROSA PROV. : BOLOGNESI
DISTRITO : CAJACAY REGION.: ANCASH

02 - BOCATOMA

DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
02.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 5.00 50.00 90.00
1.00 8.00 5.00 40.00
02.01.02 ENCAUSAMIENTO DE CURSO DE AGUA M3 1.00 20.00 20.00 20.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION MANUAL TERRENO ROCOSO M3 21.60
CANAL DE SALIDA 1.00 4.00 1.00 0.40 1.60
MUROS DE ENCAUZAMIENTO 1.00 8.00 2.50 1.00 20.00

02.02.02 EXCAVACION EN ROCA C/EXPLOSIVOS M3 13.50


BARRAJE 1.00 3.00 1.50 1.00 4.50
MUROS DE ENCAUZAMIENTO 1.00 3.00 3.00 1.00 9.00

02.02.03 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM = 50 M M3 1.20 35.10 42.12

02.03 OBRAS DE CONCRETO SIMPLE


02.03.01 SOLADO E=2" M2 3.30
CANAL DE SALIDA(COMPUERTA) 1.00 3.00 1.10

02.03.01 MAMPOSTERIA DE PIEDRA Y CONCRETO FC=140 KG/CM2 M3 10.25


CARA FRONTAL DE BARRAJE 1.00 5.00 3.00 0.30 4.50
CARA POSTERIOR DE BARRAJE 1.00 5.00 2.50 0.30 3.75
PROTECCION DE BOCATOMA CARAS LATERALES 1.00 10.00 0.20 1.00 2.00
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
02.03.02 CONCRETO CICLOPEO FC=140 KG/CM2+70%P.M. M3 6.90
BARRAJE 1.00 3.00 2.30 1.00 6.90

02.03.03 CONCRETO CICLOPEO FC=140 KG/CM2+30%P.M. M3 34.23


MUROS DE PROTECCION 1.00 4.50 0.65 2.60 7.61
1.00 3.00 0.65 2.60 5.07
1.00 5.00 0.65 2.60 8.45
1.00 5.00 0.65 2.60 8.45
1.00 2.50 0.65 2.60 4.23

02.03.04 CONCRETO SIMPLE FC=175 KG/CM2 M3 0.33


MURO CANAL DE SALIDA 1.00 8.00 0.30 0.18 0.43
CANAL DE SALIDA, ALIVIADERO 1.00 1.50 0.75 0.15 0.17
2.00 1.50 0.35 0.15 0.16

02.03.05 ENCOFRADO Y DESENCOFRADO DE MUROS M2 72.00


MURO DE PROTECION 2.00 12.50 1.80 45.00
2.00 7.50 1.80 27.00

02.03.06 ENCOFRADO Y DESENCOFRADO DE MUROS CARA VISTA M2 5.60


MURO CANAL DE SALIDA, SOBRE MURO EXISTENTE 2.00 8.00 0.20 3.20
CANAL DE SALIDA, ALIVIADERO 4.00 1.50 0.40 2.40

02.04 OBRAS DE CONCRETO ARMADO


02.04.01 CONCRETO FC=210 KG/CM2 M3 1.39
PILARES PARA COMPUERTAS DE SALIDA 2.00 1.50 0.30 1.50 1.35
LOSA DE OPERACIONES 1.00 0.75 0.50 0.10 0.04

02.04.02 ENCOFRADO Y DESENCOFRADO DE MURO CARA VISTA M2 11.03


PILARES PARA COMPUERTAS DE SALIDA 4.00 1.80 1.50 10.80
LOSA DE COMPUERTA 1.00 0.45 0.50 0.23

02.04.03 ACERO FY=4200 KG/CM2 KG 49.74


PILARES PARA COMPUERTAS DE SALIDA, ACERO 1/2" 1.02 20.00 1.50 30.60
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
0.58 10.00 2.20 12.76
LOSA DE OPRACIONES 1.02 5.00 0.75 3.83
1.02 5.00 0.50 2.55

02.05 VARIOS
02.05.01 COMPUERTA METALICA 1/8"X0.5X0.80M UND 1.00 1.00 1.00
02.05.02 REJILLA EN LA VENTANA DE CAPTACION (0.40x0.50m) UND 1.00 1.00 1.00
02.05.03 CURADO DE CONCRETO CON ADITIVO M2 62.28
PLANILLA DE METRADOS

OBRA : MEJORAMIENTO DEL CANAL DE RIEGO MOLINO

UBICACIN :
LOCALIDAD: SANTA ROSA PROV. : BOLOGNESI
DISTRITO : CAJACAY REGION.: ANCASH

03- DESARENADOR

DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 1.00 10.00 1.50 15.00 15.00

03.02 MOVIMIENTO DE TIERRAS


03.02.01 EXCAVACION MANUAL EN TERRENO ROCOSO M3 12.69
DESARENADOR 1.00 8.50 1.00 1.20 10.20
VERTEDERO 1.00 2.50 1.00 0.90 2.25
CANAL DE LIMPIA 1.00 0.80 1.00 0.30 0.24

03.02.02 ACARREO DE MATERIAL EXCEDENTE HASTA D PROM = 50 M M3 1.20 12.69 15.23

03.03 OBRAS DE CONCRETO SIMPLE

03.03.01 SOLADO E = 2" M2 11.80


DESARENADOR 1.00 8.50 1.00 8.50
VERTEDERO 1.00 2.50 1.00 2.50
CANAL DE LIMPIA 1.00 0.80 1.00 0.80

03.03.02 CONCRETO SIMPLE FC=175 KG/CM2 M3 0.83


VERTEDERO 1.00 6.70 0.30 0.15 0.30
1.00 6.70 0.10 0.45 0.30
CANAL DE SALIDA 1.00 1.00 0.70 0.15 0.11
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
2.00 1.00 0.15 0.40 0.12
03.03.03 ENCOFRADO Y DESENCOFRADO DE MUROS M2 20.08
VERTEDERO 2.00 10.00 0.90 18.00
CANAL DE LIMPIA 2.00 0.80 1.30 2.08
110.00
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO FC=210 KG/CM2 M3 5.04
MUROS DESARENADOR 2.00 12.00 0.15 0.90 3.24
PISO DESARENADOR 1.00 12.00 1.00 0.15 1.80

03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MUROS M2 57.60


DESARENADOR 4.00 12.00 1.20 57.60

03.04.03 ACERO FY=4200 KG/CM D=3/8" KG/ML 0.58 190.00 110.20


TRANSICION ENTRADA 8.00 2.80 22.40
7.00 1.40 9.80

DESARENADOR 24.00 4.20 100.80


12.00 3.50 42.00

TRANSICION DE SALIDA 3.00 1.40 4.20


9.00 1.20 10.80

03.05 VARIOS
03.05.01 COMPUERTA DE LIMPIA TIPO TARJETA 0.30 x0.30m UND 1.00 1.00 1.00
03.05.02 REJILLA DE FIERRO 1/2" (0.50 x 0.50 M) UND 1.00 1.00 1.00
03.05.03 CURADO DE CONCRETO CON ADITIVO M2 36.00
PLANILLA DE METRADOS
MAYUCANCHA
OBRA :MEJORAMIENTO DEL CANAL DE RIEGO MOLINO

UBICACIN :
LOCALIDAD: SANTA ROSA PROV. : BOLOGNESI
DISTRITO : CAJACAY REGION.: ANCASH

04- CAJA DE CANAL

DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
04.01 OBRAS PRELIMINARES
04.01.02 LIMPIEZA DE TERENO MANUAL M2 9,697.50
TRAMO 0+000 - 3+232.50 3,232.50 3.00 9,697.50

04.02 MOVIMIENTO DE TIERRAS


04.01.01 EXCAVACION DE CAJA DE CANAL EN TIERRA M3 872.78
(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 80%) 945.51
EXCAVACION SOBRE ANCHO PARA ENCOFRADO 2,586.00 0.10 0.45 116.37

04.01.02 EXCAVACION DE CAJA DE CANAL EN ROCA SUELTA M3 218.19


(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, EXCAVACION EN CANAL DE CONCRETO, 32%) 945.51
EXCAVACION SOBRE ANCHO PARA ENCOFRADO 646.50 0.10 0.45 29.09

04.01.03 RELLENO DE CANAL COMPACTADO CON MAT. PROPIO M3 484.88


(VER PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS, RELLENO EN CANAL DE CONCRETO) 339.42
RELLENO DE SOBRE ANCHO PARA ENCOFRADO 145.46

04.01.04 PERFILADO Y REFINE MANUAL DE CAJA DE CANAL M2 2,262.75


LONGITUD TOTAL ( 5,288.40 M) 3,232.50 0.70 2,262.75

04.01.05 ELIMINACION DE MATERIAL EXCEDENTE M3 727.31


1.20 606.09
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

04.03 OBRAS DE CONCRETO


04.03.01 CONCRETO FC=175 KG/CM2, EN CANALES M3 692.44
TRAMO I : 0+000 - 2+406.66 1.00 3,077.50 0.70 0.15 323.14
TRAMO I I: 0+000 - 0+825.84 2.00 3,077.50 0.15 0.40 369.30

04.03.02 ENCOFRADO Y DESENCOFRADO EN CANALES M3 5,539.50


TRAMO 0+000 - 3232.50 4.00 3,077.50 0.45 5,539.50

04.04 JUNTAS
04.04.01 JUNTAS ELASTOMERICAS DE DILATACION ML 1,761.20
(LONG. TOTAL: 3232.50 C/3 M) 1,035.83 1,036.00 1.70 1,761.20

04.05 VARIOS
04.05.01 CURADO DE CONCRETO CON ADITIVO M2 4,000.75
(EN SUPERFICIE DE CANAL) 3,077.50 1.30 4,000.75
PLANILLA DE METRADOS

OBRA Mejoramiento canal Mayucancha

UBICACIN :
LOCALIDADSta. Rosa PROV. : Bolognesi
DISTRITO Cajacay REGION.: Ancash

05- OBRAS DE ARTE

DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

05.01 TOMAS LATERALES (68) 68


05.01.01 EXCAVACION MANUAL (POZA) M3 37.54
68.00 2.30 0.60 0.40 37.54
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

05.01.02 RELLENO COMPACTADO A MANO M3 15.30


68.00 1.50 0.50 0.30 15.30

05.01.03 SOLADO E=0.05 (CONCRETO FC=100 KG/CM2) M2 68.00 164.56


1.00 2.72 0.70 1.90 2.42
1.00 0.86 0.60 0.52

05.01.04 CONCRETO FC=210 KG/CM2 M3 59.40


MUROS (Tramo I Y Tramo II) 46.00 22.46
TRAMO I , h= 0.30 , 46 2.00 1.10 0.15 0.30 0.10 0.49
2.00 1.20 0.15 0.60 0.22
2.00 0.61 0.10 0.60 0.07
2.00 0.80 0.25 0.25 0.10
TRAMO II. H= 0.40, 22 22.00 12.26
2.00 1.10 0.15 0.40 0.13 0.56
2.00 1.20 0.15 0.70 0.25
2.00 0.61 0.10 0.60 0.07
2.00 0.80 0.25 0.25 0.10
LOSA (Tramo I y Tramo II) 68.00 24.68
TRAMO I y TRAMO II 1.00 2.72 0.70 0.15 0.29 0.36
1.00 0.86 0.60 0.15 0.08

05.01.05 ENCOFRADO Y DESECOFRADO MUROS CARAVISTA M2 450.16


MUROS 46.00 294.40
TRAMO I, 46, h=0.30 2.00 1.10 0.45 0.99 6.40
2.00 1.20 0.75 1.80
2.00 1.10 0.30 0.66
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

2.00 1.20 0.60 1.44


2.00 0.86 0.75 1.29
2.00 0.55 0.20 0.22
TRAMO II, 22, h=0.40 22.00 155.76
2.00 1.10 0.55 1.21 7.08
2.00 1.20 0.85 2.04
2.00 1.10 0.40 0.88
2.00 1.20 0.60 1.44
2.00 0.86 0.75 1.29
2.00 0.55 0.20 0.22

05.01.06 ACERO F'Y=4200 KG/CM2 (3/8") KG 4,977.60 2,887.01


0.58
1,632.00 2.30 3,753.60
816.00 1.50 1,224.00
05.01.07 COMPUERTA METALICA 3/16" X 0.30m X 0.60m U 68.00
68.00 68.00

05.01.08 JUNTAS DE DILATACION ELASTOMERICA ML 102.00


68.00 1.50 102.00
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

05.02 PASE DE QUEBRADA (02 UND) 2.00


05.02.01 EXCAVACION MANUAL M3 13.07

2 3.21 0.5 0.5 1.605


ESTRIBOS 2 3.30 0.8 0.6 3.168
Sobre excavacin 2 2 0.44 1.76
05.01.02 RELLENO COMPACTADO A MANO M3 3.52
2 2 0.44 1.76
05.02.02 ACARREO DE MATERIAL EXCENTE D=30m M3 9.55 9.55

05.02.03 MAMPOSTERIA DE PIEDRA ASENTADA EN FC=140 KG/CM2 M3 7.64


1 3.10 2.90 0.20 1.80
1 4.66 3.30 0.20 0.80
1 0.75 2.30 0.20 0.35
1 2.30 0.40 0.50 0.46
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
1 4.66 0.30 0.30 0.42

05.02.04 CONCRETO FC=140 KG/CM2 + 30 % P.M M3 5.41


ESTRIBOS 2 3.30 0.20 0.15 0.20 5.41
2 3.30 0.40 0.35 0.92
2 3.30 0.40 0.60 1.58

05.02.05 CONCRETO FC=140 KG/CM2 M3 3.53


MUROS 2 3.21 0.40 0.50 1.28
2 3.21 0.15 0.50 0.48

05.02.06 CONCRETO FC=210 KG/CM2 M3 2.46


LOSA 1 3.30 2.00 0.15 0.99
2 2.00 0.15 0.40 0.24

05.02.07 ENCOFRADO Y DESECOFRADO MUROS CARAVISTA M2 68.97


MUROS 4.00 5.71 0.40 9.14
ESTRIBOS 2.00 3.30 0.75 4.95
2.00 3.30 0.90 5.94
2.00 3.30 0.15 0.99
2.00 3.30 0.40 2.64
1.00 3.30 0.50 1.65
1.00 3.30 0.30 0.99

LOSA 1.00 3.30 2.00 6.60


2.00 3.30 0.15 0.99
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

2.00 2.00 0.15 0.60

05.02.08 ACERO F'Y=4200 KG/CM2 (1/2") KG 1.02 79.25 158.50


LOSA 12.00 4.20 51.41
(3/8") 0.58
24.00 2.00 27.84

05.03 MURO DE CONTENCION ( 7 y 10 M)


05.03.01 EXCAVACION MANUAL TERRENO ROCOSO M3 99.83
corte 7.00 35.54

corte 10 64.29

Plano de Secciones Transversales


DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

05.03.02 RELLENO COMPACTADO M3 54.98


7.00 20.99
10.00 33.99
05.03.03 ACARREO DE MATERIAL EXCEDENTE D=30m 44.85

M3 44.85
05.03.04 CONCRETO FC=175 KG/CM2+30% P.M. M3 24.43
M3
MUROS (H=2.60 m) 1.00 17.00 1.10 0.50 9.35
1.00 17.00 0.30 2.60 13.26
1.00 17.00 0.20 2.60 1.82

05.03.05 ENCOFRADO Y DESECOFRADO MUROS M2 105.40


MUROS (H=2.60 m) 2.00 17.00 2.60 88.40 105.40
2.00 17.00 0.50 17.00

05.03.06 JUNTAS DE DILATACION ELASTOMERICA ML 9.35


1.00 17.00 0.55 9.35

05.04 PASARELA PETAONAL (02 UND) 2.00


DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

05.04.01 EXCAVACION MANUAL M3 6.36


2.00 2.50 0.50 0.60 1.50
2.00 2.50 1.00 0.30 1.50

Sobreexcavacin M3 1.68 3.36


05.04.02 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO M3 1.50
2.00 2.50 0.50 0.60 1.50

05.04.03 RELLENO COMPACTADO CON MATERIAL PROPIO M3


relleno sobrexcavacion 2.00 2.50 1.00 0.30 1.50 4.86
2.00 1.68 3.36

05.04.04 CONCRETO CICLOPEO FC=175 KG/CM2+30% PM M3 7.45


MUROS 2.00 2.50 0.90 0.50 2.25
LOSA 2.00 2.50 0.50 0.50 1.25
1.00 2.50 0.30 0.3 0.23
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

05.04.05 CONCRETO FC=210 KG/CM2 M3 1.50


VIGAS 2.00 2.60 0.15 0.25 0.20
LOSA 2.00 2.00 0.15 0.25 0.15
1.00 1.80 1.50 0.15 0.41

05.04.06 ENCOFRADO Y DESECOFRADO M2 58.38


LOSA 1.00 2.30 2.00 4.60 15.69
2.00 2.30 0.15 0.69
4.00 0.15 0.15 10.40
MUROS M2 13.50
4.00 1.30 2.00 10.40
4.00 0.90 0.50 1.80
4.00 0.50 0.50 1.00
4.00 0.30 0.25 0.30

05.04.07 ACERO F'Y=4200 KG/CM2 (1/2" y 3/8") KG 1.02 96.60 354.59


VIGAS 12.00 2.00 24.00
12.00 2.30 27.60
LOSA 18.00 2.50 45.00
0.58 135.80
VIGAS 90.00 1.10 99.00
LOSA 16.00 2.30 36.80
05.01.08 JUNTAS DE DILATACION ELASTOMERICA ML 8.80
2.00 2.00 0.55 4.40
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

05.05 CAIDA VERTICAL ( 06 UND) 6.00


M3 7.20
05.05.01 EXCAVACION MANUAL 6.00 5.00 0.60 0.40 7.20
POZA
05.05.02 RELLENO COMPACTADO A MANO M3 3.60
KM 2+660 6.00 5.00 0.40 0.30 3.60

05.05.03 ACARREO DE MATERIAL EXCENTE D=30m M3 3.60 3.60

05.05.04 SOLADO E=0.05 (CONCRETO FC=100 KG/CM2) M2


CAIDA 10.20
POZA 1.00 1.00 0.80 0.80
1.00 1.00 0.90 0.90
05.05.05 CONCRETO FC=210 KG/CM2 M3 6.74
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

LOSA 1.00 0.80 0.15 0.12 0.66


Caida 1.00 1.00 0.70 0.15 0.11
1.00 0.50 0.75 0.15 0.11
Poza 1.00 1.06 0.90 0.15 0.14
1.00 0.50 0.90 0.15 0.07
1.00 0.75 0.90 0.15 0.10
1.00 0.20 0.60 0.10 0.01
MURO 0.46
Caida 2.00 2.00 0.40 0.15 0.24
Poza
2.00 1.15 0.40 0.15 0.14
2.00 0.03 0.15 0.01
2.00 0.70 0.20 0.15 0.04
2.00 0.11 0.15 0.03
05.05.06 ENCOFRADO Y DESECOFRADO MUROS CARAVISTA M2 41.64
MUROS 4.00 2.00 0.475 3.80
4.00 1.00 0.675 2.70
4.00 0.55 0.40 0.11 0.44
05.05.07 ACERO F'Y=4200 KG/CM2 (3/8") KG 0.58 256.95
MUROS
0.90 0.25 2.55 9.18
LOSA DE POZA 2.55 0.25 0.90 9.18
Base 2.00 0.60 0.25 1.15 5.52
2.00 1.15 0.25 0.60 5.52
Muros 1.25 0.25 0.70 3.50
DIMENSIONES
ITEM PARTIDA UNIDAD N VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

0.70 0.25 1.25 3.50

4.00 0.55 0.25 0.40 3.52

2.00 0.55 0.25 1.00 4.40


2.00 1.00 0.25 0.55 4.40
1.25 0.25 0.80 4.00
0.80 0.25 1.25 4.00
2.00 0.55 0.25 1.00 4.40
2.00 1.00 0.25 0.55 4.40
4.00 1.00 0.25 0.30 4.80

05.05.08 JUNTAS DE DILATACION ELASTOMERICA ML 14.40


6.00 2.40 14.40
HOJA DE METRADOS
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI -ANCASH
Presupuesto:
Fecha : July , 2014
metrado
ITEM DESCRIPCION UNID.
Cant veces largo ancho alto TOTAL
01 ACTIVIDADES PROVISIONALES

01.01 CASETA PARA ALMACEN Y GUARDIANIA glb 1.00 1.00

01.02 CARTEL DE IDENTIFICACION DE ACTIVIDAD DE 3.60 x2.40 m. und 1.00 1.00

02 TRABAJOS PRELIMINARES

02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00

03 MANTENIMEINTO DEL SISTEMA DE AGUA POTABLE

03.01 MANTENIMIENTO DE CAPTACIN (04 UND)


03.01.01 TRABAJOS PRELIMINARES
03.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 4.00 4.20 3.20 53.76

03.01.01.02 TRAZO Y REPLANTEO m2 4.00 4.20 3.20 53.76

03.01.02 MOVIMIENTO DE TIERRAS


03.01.02.01 DEMOLICION DE CONCRETO EXISTENTE m3 2.00 1.20 1.20 2.88

03.01.02.02 EXCAVACIN EN TERRENO NORMAL m3 4.00 3.80 2.80 0.80 34.05

03.01.02.03 ELIMINACIN DE MATERIAL EXCEDENTE m3 1.25 36.93 46.16

03.01.03 OBRAS DE CONCRETO SIMPLE


03.01.03.01 SOLADO DE 2" MEZCLA 1:12 CEMENTO - HORMIGN m2 10.56
Captaciones 4.00 1.20 1.20 5.76
Piso filtro 4.00 1.50 0.80 4.80

03.01.03.02 EMPEDRADO E=.15M, A=0.60-0.80 EMBOQUILLADO m2 4.00 4.60 0.60 11.04

03.01.04 OBRAS DE CONCRETO ARMADO


03.01.04.01 ENCOFRADO Y DESENCOFRADO m2 60.56
Muros, encofrado interior 4.00 4.00 0.85 0.70 9.52
Muros, encofrado exterior 4.00 4.00 0.85 1.00 13.60
Losa de fondo 4.00 4.00 1.20 0.15 2.88
Fondo de aleros 4.00 1.00 3.20 0.10 1.28
Fondo de losa de cubierta interior 4.00 1.00 2.60 0.05 0.52
Friso exterior 4.00 4.00 1.20 0.10 1.92
Friso interior en ventana inspeccin 4.00 4.00 0.60 0.15 1.44
Pestaa ventana inspeccin 4.00 4.00 0.75 0.05 0.60
Aletas 4.00 4.00 1.50 1.20 28.80

03.01.04.02 ACERO FY= 4200 KG/CM2, GRADO 60 kg kg/m 137.54


Acero 3/8" en techo 4.00 4.00 1.05 0.56 9.41
Acero 3/8" en techo 4.00 4.00 1.15 0.56 10.30
Acero 3/8" en techo 4.00 8.00 0.35 0.56 6.27
Acero 3/8" refuerzo pestaa 4.00 4.00 0.65 0.56 5.82
Acero 3/8" muro-vertical/piso 4.00 4.00 4.15 0.56 37.18
Acero 3/8" muro-vertical/piso 4.00 4.00 3.40 0.56 30.46
Acero 3/8" muro, horizontal 4.00 5.00 3.40 0.56 38.08

03.01.04.03 CONCRETO F'C= 210 KG/CM2 m3 5.40


Losa de fondo 4.00 1.10 1.20 0.15 0.79
Dentelln posterior 4.00 1.20 0.15 0.25 0.18
Dentelln frontal 4.00 1.20 0.15 0.15 0.11
Muros frontal y posterior 16.00 0.85 0.15 0.85 1.73
Losa superior, inc. ventana inspeccin 4.00 1.10 1.20 0.10 0.53
Ventana de inspeccin (se descuenta) -4.00 0.60 0.60 0.10 -0.14
Pestaa en ventana de inspeccin 4.00 2.70 0.08 0.05 0.04
HOJA DE METRADOS
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI -ANCASH
Presupuesto:
Fecha : July , 2014
metrado
ITEM DESCRIPCION UNID.
Cant veces largo ancho alto TOTAL
Concreto en aletas 4.00 2.00 1.50 1.20 0.15 2.16

03.01.05 REVOQUES Y ENLUCIDOS


03.01.05.01 TARRAJEO IMPERMABILIZADO EN MUROS INTERIORES m2 13.16
Muros 16.00 0.70 0.85 9.52
Friso interior en ventana inspeccin 16.00 0.70 0.15 1.68
Piso 4.00 0.70 0.70 1.96

03.01.05.02 TARRAJEO EN EXTERIORES m2 35.74


Muro exterior 12.00 0.85 1.00 10.20
Fondo de losa superior, zona frontal 4.00 1.20 0.10 0.48
Fondo de losa superior, zona lateral 8.00 1.00 0.10 0.80
Friso exterior 4.00 4.80 0.10 1.92
Pestaa ventana inspeccin 16.00 0.75 0.05 0.60
Cara superior techo 4.00 4.20 0.18 2.94
Aletas 4.00 2.00 1.50 1.10 13.20
Sello en zona filtro 4.00 1.40 1.00 5.60

03.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS


03.01.06.01 CONCRETO f'c=140 kg/cm2 PARA SELLO CAPTACION m3 5.60
Sello filtro 4.00 1.40 1.00 5.60

03.01.06.02 SUMINISTRO Y COLOCACION DE ACCESORIOS EN CAPTACION und 4.00 4.00

03.01.06.03 SELLO HIDRAULICO und 4.00 4.00

03.01.06.04 FILTRO DE GRAVA m3 4.00 1.50 1.20 0.70 5.04

03.01.06.05 TAPA METALICA SANITARIA DE 0.70 X 0.70 m und 4.00 4.00

03.01.06.06 TAPA SANITARIA METALICA DE 0.40 X 0.40 m und 4.00 4.00

03.01.07 PINTURAS
03.01.07.01 PINTURA ESMALTE EN MUROS EXTERIORES m2 35.74
Area de tarrajeo exterior 1.00 16.94 16.94
Aletas 1.00 13.20 13.20
Sellado filtro 1.00 5.60 5.60

03.01.07.02 PINTURA ESMALTE EN TAPA METALICA m2 5.20


4.00 2.00 0.70 0.70 3.92
4.00 2.00 0.40 0.40 1.28

03.02 CERCO PERIMETRICO CON MALLA METALICA EN CAPTACION


03.02.01 TRAZO Y REPLANTEO m2 140.61
Captacion 1.00 4.00 6.45 5.45 140.61

03.02.02 EXCAVACION EN TERRENO NORMAL m3 3.84


Captacion 12.00 4.00 0.40 0.40 0.50 3.84

03.02.03 ELIMINACIN DE MATERIAL EXCEDENTE m3 15.36


Captacion 4.00 3.84 15.36

03.02.04 ENCOFRADO Y DESENCOFRADO m2 9.60


Dados de poste 12.00 4.00 0.40 0.50 9.60

03.02.05 CONCRETO f'c=175 kg/cm2 +30% PM (DADOS) m3 3.84


Captacion 12.00 4.00 0.40 0.40 0.50 3.84

03.02.06 TUBO DE FIERRO GALVANIZADO DE D=2"x2.45m und 48.00


Captacion 12.00 4.00 48.00
HOJA DE METRADOS
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI -ANCASH
Presupuesto:
Fecha : July , 2014
metrado
ITEM DESCRIPCION UNID.
Cant veces largo ancho alto TOTAL
03.02.07 MALLA GALVANIZADA COCADA 2"x2" N10(INC. MARCO DE ANGULO 1.5") m 85.60
Captacion 1.00 4.00 21.40 85.60

03.02.08 PUERTA DE MALLA GALVANIZADA (inc. marco de tubo F.G. de 11/2", amfulo de 1.25und 4.00
Captacion 4.00 4.00

03.02.09 PINTURA ESMALTE CERCO DE MALLA METALICA m2 89.88


Captacion 4.00 0.50 21.40 2.10 89.88

03.03 MANTENIMIENTO DE RESERVORIO 30 M3


03.03.01 TRABAJOS PRELIMINARES
03.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1.00 8.00 7.00 56.00

03.03.01.02 TRAZO Y REPLANTEO m2 1.00 8.00 7.00 56.00

03.03.02 MOVIMIENTO DE TIERRAS


03.03.02.01 EXCAVACIN EN TERRENO NORMAL m3 1.00 5.50 5.50 0.75 22.69

03.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 1.25 22.69 28.36

03.03.03 OBRAS DE CONCRETO SIMPLE


03.03.03.01 EMPEDRADO E=.15M, A=0.60-0.80 EMBOQUILLADO m2 62.52
Area de empedrado 1.00 62.52 62.52

03.03.03.02 SOLADO: F'C=100 Kg/Cm2 m2 1.00 5.10 5.10 26.01

03.03.04 OBRAS DE CONCRETO ARMADO


03.03.04.01 ENCOFRADO Y DESENCOFRADO m2 96.33
Muros, encofrado interior 4.00 4.10 2.10 34.44
Muros, encofrado exterior 4.00 4.50 2.10 37.80
Losa de fondo 4.00 4.90 0.15 2.94
Fondo de aleros 1.00 18.40 0.10 1.84
Fondo de losa, inc. Ventana inspeccin 1.00 4.10 4.10 16.81
Ventana de inspeccin (se descuenta) -1.00 0.60 0.60 -0.36
Friso exterior 4.00 4.70 0.13 2.35
Friso interior en ventana inspeccin 4.00 0.60 0.15 0.36
Pestaa ventana inspeccin 4.00 0.75 0.05 0.15

03.03.04.02 ACERO FY= 4200 KG/CM2, GRADO 60 kg 1,179.05


Acero vertical 3/8", muro (pasa al piso) 90.00 3.50 0.56 176.40
Acero horizontal 3/8", muro 22.00 18.00 0.56 221.76
Acero vertical 1/2", muro (pasa al piso) 90.00 3.50 0.99 313.11
Acero piso 1/2" 50.00 4.90 0.99 243.53
Acero losa superior 1/2" 48.00 4.70 0.99 224.25

03.03.04.03 CONCRETO F'C= 210 KG/CM2 m3 12.90


Losa de fondo 1.00 4.90 4.90 0.15 3.60
Muros frontal y posterior 2.00 4.50 0.20 2.10 3.78
Muros laterales 2.00 4.10 0.20 2.10 3.44
Losa superior, inc. ventana inspeccin 1.00 4.10 4.10 0.13 2.10
Ventana de inspeccin (se descuenta) -1.00 0.60 0.60 0.10 -0.04
Pestaa en ventana de inspeccin 1.00 2.70 0.10 0.05 0.01

03.03.05 REVOQUES Y ENLUCIDOS


03.03.05.01 TARRAJEO IMPERMABILIZADO EN MUROS INTERIORES m2 68.42
Losa fondo 1.00 4.10 4.10 16.81
Muros 4.00 4.10 2.10 34.44
Friso interior en ventana inspeccin 4.00 0.60 0.15 0.36
Piso 1.00 4.10 4.10 16.81
03.03.05.02 TARRAJEO EN EXTERIORES m2 63.87
HOJA DE METRADOS
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI -ANCASH
Presupuesto:
Fecha : July , 2014
metrado
ITEM DESCRIPCION UNID.
Cant veces largo ancho alto TOTAL
Muro exterior 4.00 4.50 2.10 37.80
Losa superior, fondo de aleros 1.00 18.40 0.10 1.84
Friso exterior 4.00 4.70 0.13 2.35
Pestaa ventana inspeccin 4.00 0.75 0.05 0.15
Cara superior techo, inc. ventana inspeccin 1.00 4.70 4.70 22.09
Ventana inspeccin (se descuenta) -1.00 0.60 0.60 -0.36
03.03.06 SUMINISTRO E INSTALACION DE ACCESORIOS
03.03.06.01 SELLO HIDRAULICO und 1.00 1.00

03.03.06.02 TAPA METALICA PSANITARIA DE 0.60 X 0.60 m und 1.00 1.00

03.03.06.03 SUMINISTRO Y COLOCACION DE ACCESORIOS EN RESERVORIO. und 1.00 1.00

03.03.07 PINTURAS
03.03.07.01 PINTURA ESMALTE EN MUROS EXTERIORES m2 62.52
Area tarrajeo exterior 1.00 62.52 62.52

03.03.07.02 PINTURA ESMALTE EN TAPA METALICA m2 2.00 0.60 0.60 0.72

03.04 CASETA DE VALVULA DE RESERVORIO


03.04.01 MOVIMIENTO DE TIERRAS
03.04.01.01 EXCAVACIN EN TERRENO NORMAL m3 1.00 1.20 1.20 0.50 0.72

03.04.01.02 ELIMINACIN DE MATERIAL EXCEDENTE 30M APROX m3 1.25 0.72 0.90

03.04.02 OBRAS DE CONCRETO SIMPLE


03.04.02.01 SOLADO DE 2" MEZCLA 1:12 CEMENTO - HORMIGN m2 1.00 1.40 1.20 1.68

03.04.03 OBRAS DE CONCRETO ARMADO


03.04.03.01 ENCOFRADO Y DESENCOFRADO m2 10.62
Muros, encofrado interior 3.00 1.00 1.00 3.00
Muros, encofrado exterior 1.00 3.20 1.00 3.20
Fondo de aleros 3.00 3.40 0.10 1.02
Fondo de losa, inc. Ventana inspeccin 1.00 1.00 1.00 1.00
Ventana de inspeccin (se descuenta) -1.00 0.60 0.60 -0.36
Friso exterior 1.00 3.60 0.10 0.36
Friso interior en ventana inspeccin 4.00 0.60 0.15 0.36
Pestaa ventana inspeccin 4.00 0.75 0.05 0.15
Columnetas de proteccion de r-d/ce 2.00 0.45 2.10 1.89

03.04.03.02 ACERO FY= 4200 KG/CM2, GRADO 60 kg KG/M 29.18


Acero 3/8" en techo 4.00 1.15 0.56 2.58
Acero 3/8" en zona de tapa 4.00 1.65 0.56 3.70
Acero 3*8" refuerzo tapa 7.00 0.70 0.56 2.74
Acero 3/8" refuerzo tapa 4.00 0.75 0.56 1.68
Acero 3/8" en muro vertical 12.00 1.25 0.56 8.40
Acero 3/8" en muro horizontal 5.00 3.60 0.56 10.08

03.04.03.03 CONCRETO F'C= 210 KG/CM2 m3 0.70


Muro frontal 1.00 1.20 0.10 1.00 0.12
Muros laterales 2.00 1.00 0.10 1.00 0.20
Cimiento 1.00 3.20 0.45 0.10 0.14
Losa superior, inc. ventana inspeccin 1.00 1.40 1.20 0.10 0.17
Ventana de inspeccin (se descuenta) -1.00 0.60 0.60 0.10 -0.04
Pestaa en ventana de inspeccin 1.00 2.80 0.08 0.05 0.01
Columnetas de proteccion de r-d/ce 2.00 0.15 0.15 2.10 0.09
03.04.04 REVOQUES Y ENLUCIDOS
03.04.04.01 TARRAJEO EN EXTERIORES m2 9.78
Muros interiores 3.00 1.00 1.00 3.00
Friso interior en ventana inspeccin 4.00 0.60 0.15 0.36
HOJA DE METRADOS
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI -ANCASH
Presupuesto:
Fecha : July , 2014
metrado
ITEM DESCRIPCION UNID.
Cant veces largo ancho alto TOTAL
Fondo de losa, inc. ventana inspeccin 1.00 1.20 1.00 1.20
Ventana inspeccin (se descuenta) -1.00 0.60 0.60 -0.36
Muros exteriores 1.00 3.40 1.00 3.40
Losa superior, fondo de aleros 3.00 1.10 0.10 0.33
Friso exterior 1.00 3.80 0.10 0.38
Pestaa ventana inspeccin 4.00 0.75 0.05 0.15
Cara superior techo, inc. ventana inspeccin 1.00 1.40 1.20 1.68
Ventana inspeccin (se descuenta) -1.00 0.60 0.60 -0.36

03.04.05 SUMINISTRO E INSTALACION DE ACCESORIOS


03.04.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN CASETA DE VALVULA und 1.00 1.00

03.04.05.02 TAPA METALICA SANITARIA DE 0.70 X 0.70 m und 1.00 1.00

03.04.06 PINTURAS
03.04.06.01 PINTURA ESMALTE EN MUROS EXTERIORES m2 1.00 5.22 5.22

03.04.06.02 PINTURA ESMALTE EN TAPA METALICA m2 2.00 0.70 0.70 0.98

03.05 SISTEMA DE CLORACIN POR EROSIN(EN RESERVORIO)


03.05.01 LIMPIEZA DEL TERRENO MANUAL m2 2.00 1.00 4.00 3.00 24.00

03.05.02 TRAZO Y REPLANTEO m2 1.00 1.00 2.10 1.60 3.36

03.05.03 EXCAVACIN DE TERRENO m3 1.00 1.00 2.10 1.60 0.60 2.02

03.05.04 ELIMINACIN DE MATERIAL EXCEDENTE 30M APROX m3 1.00 1.25 2.10 1.60 0.60 2.52

03.05.05 CONCRETO FC=100kG/CM2 (SOLADO) m2 1.00 2.10 1.60 3.36

03.05.06 CONCRETO F'C= 210 KG/CM2 m3 1.96


LOSA DE FONDO 1.00 1.00 2.10 1.60 0.20 0.67
MUROS LATERALES 2.00 1.00 1.80 0.15 1.22 0.66
MUROS FRONTAL Y POSTERIOR 2.00 1.00 1.00 0.15 1.22 0.37
LOSA DE TECHO 1.00 1.00 2.00 1.50 0.10 0.30
Ventana inspeccin (se descuenta) -1.00 1.00 0.60 0.60 0.10 -0.04

03.05.07 ENCOFRADO Y DESCENCOFRADO NORMAL m2 13.22


MUROS LATERAL EXT. 2.00 1.80 1.22 4.39
MUROS LATERAL INT. 2.00 1.50 1.22 3.66
FRONTAL Y POST EXT. 2.00 1.30 1.22 3.17
FRONTAL Y POST INT. 2.00 1.00 1..2 2.00

03.05.08 ACERO FY= 4200 KG/CM2, GRADO 60 kg Kg/m 69.05


LOSA Y VERTICAL LONG 3/8 1.00 6.00 5.52 0.56 18.55
LOSA Y VERTICAL TRANSVERSAL 3/8" 1.00 9.00 4.92 0.56 24.80
Acero HORIZONTAL 3/8" 1.00 6.00 5.20 0.56 17.47
TECHO 3/8" 1.00 6.00 1.20 0.56 4.03
1.00 6.00 1.25 0.56 4.20

03.05.09 TARRAJEO EN INTERIORES Y EXTERIORES m2 13.66


MURO INT 2.00 1.00 1.50 1.22 3.66
MURO INT 2.00 1.00 1.00 1.22 2.44
MURO EXT 2.00 1.00 1.80 1.22 4.39
2.00 1.00 1.30 1.22 3.17

03.05.10 TAPA METALICA DE 0.60 X 0.60 m und 1.00 1.00

03.05.11 SUM. E INST. CLORADOR POR EROSIN und 1.00 1.00

03.05.12 PINTURA ESMALTE EN MUROS EXTERIORES m2 6.36


Muro exterior, frontal y posterior 1.00 2.00 1.30 0.60 1.56
Muro exterior, laterales 1.00 2.00 1.80 0.60 2.16
Techo 1.00 1.00 2.00 1.50 3.00
Ventana inspeccin (se descuenta) 1.00 -1.00 0.60 0.60 -0.36
HOJA DE METRADOS
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI -ANCASH
Presupuesto:
Fecha : July , 2014
metrado
ITEM DESCRIPCION UNID.
Cant veces largo ancho alto TOTAL

03.06 CAMARA DE REUNION


03.06.01 TRAZO Y REPLANTEO m2 1.00 2.50 2.50 6.25

03.06.02 EXCAVACIN EN TERRENO NORMAL m3 1.00 2.30 2.30 0.50 2.65

03.06.03 ELIMINACIN DE MATERIAL EXCEDENTE m3 1.25 2.65 3.31

03.06.04 SOLADO DE 2" MEZCLA 1:12 CEMENTO - HORMIGN m2 1.44


CR 1.00 1.20 1.20 1.44

03.06.05 EMPEDRADO E=.15M, A=0.60-0.80 EMBOQUILLADO m2 1.00 4.60 4.60 0.60 12.70

03.06.06 ENCOFRADO Y DESENCOFRADO m2 7.41


Muros, encofrado interior 4.00 0.60 0.90 2.16
Muros, encofrado exterior 4.00 0.90 0.90 3.24
Losa de fondo 4.00 1.10 0.15 0.66
Fondo de aleros 1.00 4.00 0.10 0.40
Friso exterior 4.00 1.10 0.10 0.44
Friso interior en ventana inspeccin 4.00 0.60 0.15 0.36
Pestaa ventana inspeccin 4.00 0.75 0.05 0.15

03.06.07 ACERO FY= 4200 KG/CM2, GRADO 60 kg kg/m 38.08


Acero 3/8" en techo 12.00 0.30 0.56 2.02
Acero 3/8" en techo 8.00 0.70 0.56 3.14
Acero 3/8" refuerzo pestaa 4.00 1.05 0.56 2.35
Acero 3/8" en muro/piso 8.00 3.90 0.56 17.47
Acero 3/8" muro, horizontal 5.00 3.00 0.56 8.40
Acero 3/8" refuerzo dentellon 2.00 4.20 0.56 4.70

03.06.08 CONCRETO F'C= 210 KG/CM2 m3 0.68


Losa de fondo 1.00 1.10 1.10 0.15 0.18
Muros frontal y posterior 2.00 0.90 0.15 0.90 0.24
Muros laterales 2.00 0.60 0.15 0.90 0.16
Losa superior, inc. ventana inspeccin 1.00 1.10 1.10 0.10 0.12
Ventana de inspeccin (se descuenta) -1.00 0.60 0.60 0.10 -0.04
Pestaa en ventana de inspeccin 1.00 2.70 0.08 0.05 0.01

03.06.09 TARRAJEO IMPERMABILIZADO EN MUROS INTERIORES m2 3.29


Muros 4.00 0.70 0.85 2.38
Friso interior en ventana inspeccin 4.00 0.70 0.15 0.42
Piso 1.00 0.70 0.70 0.49

03.06.10 TARRAJEO EN EXTERIORES m2 5.08


Muro exterior 4.00 0.90 0.90 3.24
Losa superior, fondo de aleros 1.00 4.00 0.10 0.40
Friso exterior 4.00 1.10 0.10 0.44
Pestaa ventana inspeccin 4.00 0.75 0.05 0.15
Cara superior techo, inc. ventana inspeccin 1.00 1.10 1.10 1.21
Ventana inspeccin (se descuenta) -1.00 0.60 0.60 -0.36

03.06.11 SUMINISTRO Y COLOCACION DE ACCESORIOS EN CAMARA DE REUNION und 1.00 1.00

03.06.12 TAPA METALICA SANITARIA DE 0.60 X 0.60 m und 1.00 1.00

03.06.13 SELLO HIDRAULICO und 1.00 1.00

03.06.14 PINTURA ESMALTE EN MUROS EXTERIORES m2 5.08


Area de tarrajeo exterior 1.00 5.08 5.08

03.06.15 PINTURA ESMALTE EN TAPA METALICA m2 0.98


1.00 2.00 0.70 0.70 0.98

3.07 CERCO PERIMETRICO CON MALLA METALICA EN RESERVORIO

03.07.01 TRAZO Y REPLANTEO m2 1.00 8.50 7.80 66.30


HOJA DE METRADOS
MEJORAMIENTO DEL CANAL DE RIEGO MAYUCANCHA-CHANCHALLIN, DISTRITO DE CAJACAY - BOLOGNESI -ANCASH
Presupuesto:
Fecha : July , 2014
metrado
ITEM DESCRIPCION UNID.
Cant veces largo ancho alto TOTAL

03.07.02 EXCAVACIN EN TERRENO NORMAL m3 16.00 0.40 0.40 0.50 1.28

03.07.03 ELIMINACIN DE MATERIAL EXCEDENTE 30M APROX m3 1.25 18.00 0.40 0.40 0.50 1.80

03.07.04 ENCOFRADO Y DESENCOFRADO m2 16.00 4.00 0.40 0.20 5.12

03.07.05 CONCRETO f'c=175 kg/cm2 +30% PM (DADOS) m3 16.00 1.00 0.40 0.40 0.50 1.28

03.07.06 TUBO DE FIERRO GALVANIZADO DE D=2"x2.30m und 16.00 16.00

03.07.07 MALLA GALVANIZADA COCADA 2"x2" N10(INC. MARCO DE ANGULO 1.5") m 29.20
1.00 29.20 29.20

03.07.08 PUERTA DE MALLA GALVANIZADA (inc. marco de tubo F.G. de 11/2", amfulo de 1.25und 1.00 1.00

03.07.09 PINTURA ESMALTE CERCO DE MALLA METALICA m2 0.50 58.40 2.20 64.24

04 SEGURIDAD Y SALUD

04.01 EQUIPOS DE PROTECCIN INDIVIDUAL glb 1.00 1.00

04.02 EQUIPOS DE PROTECCIN COLECTIVA glb 1.00 1.00

05 CAPACITACIN Y EQUIPAMIENTO

05.01 CAPACITACIN A LA POBLACION C.D JASS EN SISTEMA DE SANEAMIENTO glb 1.00 1.00

05.02 EQUIPAMIENTO PARA LA OPERACIN Y MANTENIMIENTO DE LOS SISTEMA DE glb 1.00 1.00

06 FLETE

06.01 FLETE TERRESTRE glb 1.00 1.00

06.02 FLETE RURAL glb 1.00 1.00