Architect/
Consultant
Procurement MUBP-90
Reference Number
ORT
5/42016
KELLE UNIVERISTY
YOHANNES ABAY
SIDENTIAL BUILDING
RESS REPORT
MONTHLY REPORT
FOR THE MONTH OF Feb-16
Architect/
Consultant
Procurement MUBP-90
Reference Number
ORT
Feb-16
ELLE UNIVERISTY
YOHANNES ABAY
DENTIAL BUILDING
ESS REPORT
4. METEOROLOGICAL REPORT
Week 1 Week 2 Week 3 Week4 Effect on Work
Temperature
Rainfall none none none none no
Humidity
REMARKS:
II. MATERIALS DELIVERED TO SITE ON REPORTING MONTH
Item Description Unit Quantity Remark
1 cement QT
2 6 Kg -
8 Kg
10 Kg
12 Kg
14 Kg
16 Kg
20 Kg -
20 Kg -
3 Sand M3
4 Formwork
Agg - 02 M3
5 (different M2 -
6 size)
Timber pcs -
7 Ribbed Block pcs -
8 Electric cable Roll -
Black wire
9 kg -
1.5mm
Junction box
10 pcs -
85
11 Nail 6 kg -
12 Nail 7 kg -
13 L pcs -
14 T '' -
15 Z '' -
16 Ferma '' -
17 Condut '' -
18 Pvc pipe dia 70,110mm '' -
REMARKS:
III, CURRENT STAGE OF CONSTRUCTION
Value of work As % Executed % of
Item Type of work
of total work total work
A Sub Structure
01 Excavation and Earthwork
02 Concrete works
03 Masonry works
B Superstructure
01 Concrete works
02 Masonry works
03 Roofing
04 Carpentry & Joinery
05 Metal works
06 Finishing
07 Floor & wall finishing
08 Glazing
09 Painting
10 Sanitary Installation
11 Electrical Installation
12 Site Work
C General item
Total
Page 2 of 5 Pages
IV STATUS OF WORK PROGRESS
Activity Summary based on cost
Execution of works by percentage
Total
01 Material shortage
02 Equipment shortage
03 Cash Shortage
04 Manpower shortage
05 Weather condition
06 Design
07 Drawing
08 Supervision
09 Client's participation
10 Others
Page 3 of 5 Pages
VI INSTRUCTION GIVEN DURING THE REPORTING PERIOD
Quantity Variation
Supervision
Material Change
Rectification
Others
REMARKS:
TEST RESULTS
TEST CONDUCTED DATE REPORTED
(ACCEPTED/ REJECTED)
REMARKS:
Page 4 of 5 Pages
VIII. VARIATIONS APPROVED
REMARKS:
None
________________________ __________________________
Page 5 of 5 Pages
HAWASSA UNIVERSITY ###
Subject of Procurement:
Construction of Library, Laboratory, Staff
residence, Sports field & Student complex
GRAND SUMMARY
1. BILL No. 1
BIG LIBRARY BUILDING-Main Campus ET.BIRR 10,842,130.16
2. BILL No. 2
SMALL LIBRARY BUILDING-ACA Campus ET.BIRR 6,241,229.14
3. BILL No. 3
STUDENT COMPLEX- Main Campus ET.BIRR 9,571,189.22
4. BILL No. 4
LABORATORY BUILDING-Main Campus (I) ET.BIRR 4,569,593.30
5. BILL No. 5
LABORATORY BUILDING-Main Campus (II) ET.BIRR 4,569,593.30
HOSPITAL
6. BILL No. 6
LABORATORY BUILDING-REFERRAL ET.BIRR 4,569,593.30
7. BILL No. 7
STAFF RESIDENCE-REFERRAL HOSPITAL TypET.BIRR 6,679,284.90
8. BILL No. 8
SPORT FIELD ET.BIRR 23,590,100.50
9. BILL No. 9
SITE WORK FOR MAIN CAMPUS & REFERR ET.BIRR 4,005,500.00
24,237.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
24,237.00 0.00
3,635.55 0.00
27,872.55 0.00
GRAND SUMMARY
A. SUB - STRUCTURE
B. SUPER STRUCTURE
24,237.00
0.00
0.00
24,237.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24,237.00
MONTHLY REPORT
FOR THE MONTH OF
Augest &September 2008
Procuring Entity
Hawassa University
Architect/
Consultant B E T consulting architects
Contractor
JV China Jiangsu Rama Construction
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
A. SUB STRUCTURE
Fill
07 Suitable non expansive well graded soil or
granular material with no rock
lumps(selected borrowed material) fill
under hard core and around foundation
column and footing in material well
rammed in layers not exceeding 20cm
thick at a time. The degree of compaction
and the material shall be approved by the
supervising Architect/Engineer.
m3 2,142.85 75.00 160,713.75
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Disposal
Sub Base
09 25cm hard core in basaltic or equivalent
stone well rolled consolidated and blinded
with 20mm crushed stone or aggregate. m2 1,807.00 55.00 99,385.00
2. Concrete Work
01 5cm thick lean concrete in class c-7 with
minimum cement content of 150kg/m3
Under foundation footing and grade
beam and mixing of concrete shall be
done mechanicaly(with appropriate
concrete mixer).
m2 628.00 52.00 32,656.00
Footing
In situ sub structure concrete
02 Reinforced concrete C.25 with minimum
cement content of 360 kg/m3
mechanically mixed and filled in to form
work and vibrated around rod
reinforcement (reinforcement bar and
formwork for precast beam measured
separately) in :-
a. Footing m3 240.00 1,300.00 312,000.00
b. Foundation column m3 14.00 1,300.00 18,200.00
c. Ground floor grade beam m3 96.00 1,300.00 124,800.00
0.00
03 In 10 cm thick floor slab evenly spread
and levelled of class C-25 reinforced
concrete with minimum cement content
of 360kg/m3 and mixing shall be done
mechanically.
a. Ground slab m2 1,807.00 143.70 259,665.90
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
In foundation footing
a. Dia. 12mm deformed bar kg 8,018.00 15.00 120,270.00
b. Dia. 10mm deformed bar kg 368.00 15.00 5,520.00
In foundation column
a. Dia. 20mm deformed bar kg 6,215.00 15.00 93,225.00
b. Dia. 16mm deformed bar kg 468.00 15.00 7,020.00
c. Dia. 14mm deformed bar kg 54.00 15.00 810.00
d. Dia. 6mm plain bar kg 206.00 15.50 3,193.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
3.Masonry work
01 50cm thick stone masonry wall for various
structure as per the instruction given by
the supervising Engineers in cements
mortar 1:3 height above ground level
exposed face left for further finish. m3 10.00 500.00 5,000.00
B. SUPER STRUCTURE
1. Concrete work
Insitu Concrete
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
2. Masonry Work
Hollow concrete Block Wall
01 19cm thick approved type of H.C.B wall
bedded and jointed in cement mortar
(1:3) two side left for appropriate
finishing. The hollow block wall shall be
built with selected blocks to the width,
depth, height and bonded as detailed on
the drawings or directed by the Architect.
The horizontal and vertical joints of block
walls shall be raked out to form adequate
key to resive further finish. Price shall
include preparation of surface for further
finishing.
a. In ground floor m2 744.00 210.00 156,240.00
b. In first floor m2 867.00 210.00 182,070.00
c. In second floor m2 1,021.00 210.00 214,410.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
3.1 Roofing
01 Supply and fix pre coated EGA 400 with a
thickness of 0.4mm sheet roof covering as
per the manufacturer instruction price
shall includes all the necessary
accessories for fixing, bolting screwing
m2 2,510.00 115.00 288,650.00
and the like..
Flashing
02 supply and fix flashing made from
galvanized sheet metal properly fixed to
purlines on other side of the parapet wall
or wall price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing ml 90.00 63.00 5,670.00
500mm).
Ridge cups
03 supply and fix Ridge cups made from
galvanized sheet metal properly fixed to
purlines price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing
ml 205.00 52.00 10,660.00
400mm).
Down pipe
04 PVC down pipe with a diameter of 80mm
fixed to wall with metal straps. Price shall
include all the necessary civil works.. ml 232.00 25.00 5,800.00
Valley Gutter
05 supply and fix valley gutter made from
galvanized sheet metal properly fixed to
purlines price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing
ml 81.00 150.00 12,150.00
1500mm).
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Joinery
01 Supply and fix 8mm thick chip wood
ceiling on steel truss and ceiling battens
placed c/c 60cm as per the instruction
given by the supervising engineer. Price
shall include all the necessary civil work
and material for fixing.
m2 715.00 140.00 100,100.00
02 Supply and fix PVC ceiling on steel truss
and ceiling battens placed c/c 60cm as
per the instruction given by the
supervising engineer. Price shall include
all the necessary civil work and material m2 565.00 180.00 101,700.00
for fixing.
03 Supply and fix flush wooden doors semi
solid core covered on both sides with best
quality ply wood veneer and provided
with a hard wood edging and leaping, a
hard wood kick plate and the necessary
iron mongery. Price shall includes all the
necessary civil works.
a. Ground floor
Normal type
Size :- 90 x 210 pcs 5.00 1,890.00 9,450.00
b. First floor
Normal type
Size :- 90 x 210 pcs 5.00 1,890.00 9,450.00
c. Second floor
Normal type
Size :- 90 x 210 pcs 5.00 1,890.00 9,450.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
5. A, Metal Work
Windows and Door
01 Supply and fix window, door and window
door of LTZ black iron profile frame 38mm
wide and 1.5mm thick partially glazed
and partially covered with 0.8mm thick
ribbed sheet all as per the drawing. Price
shall includes glazing and all the
necessary civil works .
a. Door
D. 180 x 321cm pcs 1.00 2,889.00 2,889.00
D. 210 x 90 cm pcs 2.00 945.00 1,890.00
D. 210 x 70 cm pcs 5.00 735.00 3,675.00
b.Window
NW. (325 x 121cm)x2+(0.65 x 320) pcs 28.00 2,996.60 83,904.91
NW. (203 x 121cm)x2+(0.65 x 320) pcs 6.00 1,874.69 11,248.15
NW. 177 x 152 cm pcs 24.00 1,022.35 24,536.45
NW. 231 x 223cm pcs 4.00 1,957.49 7,829.98
NW. 144 x 121 cm pcs 9.00 662.11 5,959.01
TW. 410 x 65 cm pcs 1.00 1,012.70 1,012.70
Alumunium profile .
Supply and fix anodized Aluminum frames
complete with all necessary accessories
and sealing gaskets all as per the
drawing.Price shall includes glazing and
all the necessary civil works .
a. Door
D. 180 x 321cm pcs 1.00 6,933.60 6,933.60
D. 210 x 90 cm pcs 1.00 2,268.00 2,268.00
D. 210 x 70 cm pcs 3.00 1,764.00 5,292.00
b.Window
NW. (325 x 121cm)x2+(0.65 x 320) pcs 20.00 11,934.00 238,680.00
NW. (203 x 121cm)x2+(0.65 x 320) pcs 10.00 8,391.12 83,911.20
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
03 Corner protection
Perforated metal angle fixed to the corner
for exposed corners plastered over and
painted.
size 30x30x3mm with a length not
exceeding 1500mm. ml 410.00 45.00 18,450.00
04 Strainer
Supply and fix wire dome leaf guard
strainer to each down pipe in let on the
gutter. Price shall includes fabrication,
antirust painting,placind and all the pcs 24.00 40.00 960.00
necessary civil works.
05
Supply and fix wooden and circular pipe
hand rails to90cm
On a height all down
andopening area as per
size of pipes ml 125.00 750.00 93,750.00
the drawing. Price shall includes all one
dia.38mm
row of wooden hand rail and two rows of
N.B. All the necessary accessories & door
metal circular piper hand rails and the
lock with handle must be approved.
necessary accessories for fixing.
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
B: Latise Purline
Size:- 25 x 25 x 2.5mm kg 9,145.00 28.00 256,060.00
C: Angle Iron
Size:- 30 x 25 x 25 x 4mm kg 45.00 28.00 1,260.00
D: Plate
Size:- 2/400 x 200 x 5mm with 2 holes kg 811.00 60.00 48,660.00
E: Plate
Size:- 2/400 x 250 x 5mm with 4 holes kg 16.00 75.00 1,200.00
F: Gusset Plate
Size:- 2/400 x 300 x 5mm kg 274.00 75.00 20,550.00
G: Bolts
J- bolts
Size:- Dia.16 with a length of 400mm pcs 258.00 33.00 8,514.00
Size:- Dia.20 with a length of 400mm pcs 16.00 35.00 560.00
Normal bolt
Size:- M-Dia.12 with a length of 100mm pcs 972.00 22.00 21,384.00
6. Finishing
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Plastic tile
01 4.8cm thick cement screed smooth
finished floor finish 2mm thick PVC tile
shall be laid on properly finished , cured
and aged floor screed with approved glue
in accordance with the manufacturers and
instruction give by the Architect. Price
shall include all the necessary civil works.
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Wall finishing
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Windows Cill
06 Size 27x3cm marble window cill
weathered & throated mounted in place.
Price shall includes all the necessary civil ml 391.00 224.00 87,584.00
works.
Step& tread
07 2cm thick Gojam marble riser m2 14.00 650.00 9,100.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
8. Glazing
01 Supply and fix 4mm plate glass mounted
between frames. Price shall includes all
the necessary glazing beads and putty. m2 510.00 90.00 45,900.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
9. Painting
Plastic emulsion paint
01 Apply 3 coats of approved type plastic
emulsion paints to internal plastered m2 1,737.00 16.00 27,792.00
vertical wall surface
02 Apply 3 coats of approved type plastic
emulsion paints to external plastered m2 1,530.00 18.00 27,540.00
vertical wall surface
03 Ditto but to concrete ceiling and soffits. m2 1,993.00 18.00 35,874.00
Synthetic paint
05 Apply 3 coats of approved type synthetic m2 1.00 18.00 18.00
paint.
TOTAL TO SUMMARY ..ET.BIRR 104,094.00
10.SANITARY INSTALLATION
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
11.ELECTRICAL INSTALLATION
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
01 RZB 10248.002 with A60, 60w lamp pcs 240.00 845.00 202,800.00
Siemens 5LG 3092 2-1c with 1xTLD 36w
02 lamp pcs 4.00 910.00 3,640.00
03 RZB 34550.002 with A60, 60w lamp pcs 16.00 650.00 10,400.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
3. Telephone System
01 Telephone points only thermoplastic
conduits of 19mm with junction boxes
and covers for flush mounting. pcs 8.00 180.00 1,440.00
Only pvc conduits of 50mm for tele
02 intake ml 9.00 250.00 2,250.00
Computer outlet points only thermoplastic
4.Computer networking
conduits of 25mm systemboxes
with junction
01 and covers for flush mounting. pcs 6.00 100.00 600.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Fill
02 Suitable non expansive well graded soil or
granular material with no rock
lumps(selected borrowed material) fill
around the building under pavements in
material well rammed in layers not
exceeding 20cm thick at a time. The
degree of compaction and the material
m3 125.00 75.00 9,375.00
shall be approved by the supervising
Architect.
Disposal
03 Remove surplus excavated materials and m3 175.00 35.00 6,125.00
deposit to a distance ordered by the
Architect/Engineer from the site.
Paving
04 Supply and fix approved type of dressed
or roughly dressed stone shall be fair
chiseled or dressed out of sound stone or
equivalent cement pavement tiles .
Paving materials shall be laid on
compacted earth/fill and 10mm sand
bedding and joints pointed with cement,
sand, mix 1:2 mortar around the
periphery of the building. Price shall
includes all the necessary civil works.
m2 250.00 195.00 48,750.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Manholes
05 Construct manholes on a sanitary sewer
as where shown on the drawing in precast
concrete round pipes on 100mm thick
reinforced concrete bottom slab in dia.
10c/c 200mm both ways and 120mm
thick manhole cover in dia.10c/c 150mm
both ways. Price shall include all
assistance civil works and handle.
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Dia. 600 mm, average depth 800 mm pcs 8.00 1,400.00 11,200.00
Dia. 800 mm, average depth 1400 mm pcs 4.00 2,100.00 8,400.00
Septic tanks
06 Construct septic tanks out of stone
masonry walls on reinforced concrete
bottom and top slabs, reinforced concrete
manhole covers. The work shall be carried
out in accordance with the structural and
sanitary drawings & instructions . Price
shall include excavation,backfilling,cart
away & all assistance civil works
a )20 m3 Septic tank[ size 6.4 x 3.3 x
average depth 2.85m] pcs 1.00 35,000.00 35,000.00
DAILY
### ### ### ### ### ### 1-May-08 2-May-08
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
35
008]
### ### ### ### ### ### ###
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
008]
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 24,237.00
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
0.00 0
0.00 0
24,237.00
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
MONTHLY MONTHLY
TOTAL TOTAL
QUANTITY AMOUNT
GRAND SUMMARY
SMALL LIBRARY BUILDING - ACA Campus
A. SUB - STRUCTURE
B. SUPER STRUCTURE
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
A. SUB STRUCTURE
Fill
07 Suitable non expansive well graded soil or
granular material with no rock lumps
(selected borrowed material) fill under
hard core, around foundation column,
footing and around periphery of the
building in material well rammed in
layers not exceeding 20cm thick at a
time. The degree of compaction and the
material shall be approved by the
supervising Architect. m3 802.25 75.00 60,168.75
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Disposal
Sub Base
09 25cm hard core in basaltic or equivalent
stone well rolled consolidated and blinded
with 20mm crushed stone or aggregate. m2 ### 55.00 57,750.00
2. Concrete Work
01 5cm thick lean concrete in class c-7 with
minimum cement content of 150kg/m3
Under foundation footing and grade
beam and mixing of concrete shall be
done mechanically (with appropriate m2 289.00 52.00 15,028.00
concrete mixer).
Footing
In situ sub structure concrete
02 Reinforced concrete C.25 with minimum
cement content of 360 kg/m3
mechanically mixed and filled in to form
work and vibrated around rod
reinforcement (reinforcement bar and
formwork for precast beam measured
a. Footing in :- m3 100.00 1,300.00 130,000.00
separately)
b. Foundation column m3 8.00 1,300.00 10,400.00
c. Ground floor grade beam m3 53.00 1,300.00 68,900.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
04 Provide, cut and fix in position approved
type form work and price shall include
construction, removal of formworks,
making good of concrete honeycombs
and making good of concrete surface to
attain the standard of finish desired by
the approved type of formwork
In foundation footing
a. Dia. 14mm deformed bar kg 322.00 15.00 4,830.00
b. Dia. 12mm deformed bar kg ### 15.00 38,445.00
c. Dia. 10mm deformed bar kg 235.00 15.00 3,525.00
In foundation column
a. Dia. 20mm deformed bar kg ### 15.00 31,770.00
b. Dia. 16mm deformed bar kg ### 15.00 18,600.00
c. Dia. 14mm deformed bar kg 27.00 15.00 405.00
d. Dia. 6mm plain bar kg 126.00 15.50 1,953.00
06 Concrete Ancillaries
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Expansion joints between walls and
columns ( Price shall includes material ,
labour and all the necessary works).
In Styrofoam. m2 86.00 35.00 3,010.00
3.Masonry work
01 50cm thick stone masonry wall for
various structure as per the instruction
given by the supervising Engineers in
cements mortar 1:3 height above ground
level exposed face left for further finish. m3 10.00 500.00 5,000.00
B. SUPER STRUCTURE
1. Concrete work
Insitu Concrete
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
h. in lintels m3 3.00 1,320.00 3,960.00
i. in concrete gutter m3 18.00 1,320.00 23,760.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Dia. 14mm deformed bar kg 87.00 15.00 1,305.00
Dia. 16mm deformed bar kg ### 15.00 28,395.00
Dia. 20mm deformed bar kg ### 15.00 21,345.00
C. In second floor elevation column
Dia.6mm plain bar kg ### 15.50 17,809.50
Dia. 14mm deformed bar kg 198.00 15.00 2,970.00
Dia. 16mm deformed bar kg 935.00 15.00 14,025.00
D. In first floor beam
Dia. 8mm deformed bar kg 828.00 15.50 12,834.00
Dia. 10mm deformed bar kg 315.00 15.00 4,725.00
Dia. 12mm deformed bar kg 581.00 15.00 8,715.00
Dia. 14mm deformed bar kg ### 15.00 34,995.00
Dia. 16mm deformed bar kg 267.00 15.00 4,005.00
Dia. 20mm deformed bar kg ### 15.00 40,890.00
E. In second floor beam
Dia. 8mm deformed bar kg 828.00 15.50 12,834.00
Dia. 10mm deformed bar kg 315.00 15.00 4,725.00
Dia. 12mm deformed bar kg 581.00 15.00 8,715.00
Dia. 14mm deformed bar kg ### 15.00 34,995.00
Dia. 16mm deformed bar kg 267.00 15.00 4,005.00
Dia. 20mm deformed bar kg ### 15.00 40,890.00
F. In roof (top tie) beam
Dia. 8mm deformed bar kg 927.00 15.50 14,368.50
Dia. 12mm deformed bar kg ### 15.00 17,910.00
Dia. 16mm deformed bar kg 24.00 15.00 360.00
G. In first floor mesh
Dia. 6mm deformed bar kg ### 15.50 18,197.00
H. In second floor mesh
Dia. 6mm deformed bar kg ### 15.50 18,197.00
I. In first floor pheripheral
Dia. 14mm deformed bar kg 176.00 15.00 2,640.00
J. In second floor peripheral
Dia. 14mm deformed bar kg 176.00 15.00 2,640.00
K. In stair cases including beams and
landings
Dia. 8mm deformed bar kg 222.00 15.50 3,441.00
Dia. 10mm deformed bar kg 236.00 15.00 3,540.00
Dia. 14mm deformed bar kg ### 15.00 33,510.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Dia. 16mm deformed bar kg 140.00 15.00 2,100.00
L. In lintel
Dia.8mm deformed bar kg 125.00 15.50 1,937.50
Dia. 10mm deformed bar kg 148.00 15.00 2,220.00
M. In first floor precast beam
Dia.6mm deformed bar kg ### 15.50 66,991.00
Dia.12mm deformed bar kg ### 15.00 21,300.00
Dia. 14mm deformed bar kg ### 15.00 53,550.00
N. In second floor precast beam
Dia.6mm deformed bar kg ### 15.50 62,062.00
Dia.12mm deformed bar kg ### 15.00 19,725.00
Dia. 14mm deformed bar kg ### 15.00 49,620.00
O. In concrete gutter
Dia.8mm deformed bar kg 969.00 15.50 15,019.50
Dia.10mm deformed bar kg 958.00 15.00 14,370.00
Dia. 12mm deformed bar kg ### 15.00 27,735.00
2. Masonry Work
Hollow concrete Block Wall
01 19cm thick approved type of H.C.B wall
bedded and jointed in cement mortar
(1:3) two side left for appropriate
finishing. The hollow block wall shall be
built with selected blocks to the width,
depth, height and bonded as detailed on
the drawings or directed by the Architect.
The horizontal and vertical joints of block
walls shall be raked out to form adequate
key to resive further finish. Price shall
include preparation of surface for further
finishing.
a. In ground floor m2 389.00 210.00 81,690.00
b. In first floor m2 565.00 210.00 118,650.00
c. In second floor m2 655.00 210.00 137,550.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
b. In first floor m2 10.00 175.00 1,750.00
c. In second floor m2 10.00 175.00 1,750.00
3.1 Roofing
01 Supply and fix pre coated EGA 400 with a
thickness of 0.4mm sheet roof covering
as per the manufacturer instruction price
shall includes all the necessary
accessories for fixing, bolting screwing m2 ### 115.00 122,015.00
and the like..
Flashing
02 supply and fix flashing made from
galvanized sheet metal properly fixed to
purlines on other side of the parapet wall
or wall price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing
500mm). ml 210.00 63.00 13,230.00
Ridge cups
03 supply and fix Ridge cups made from
galvanized sheet metal properly fixed to
purlines price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing ml 67.00 52.00 3,484.00
400mm).
Down pipe
04 PVC down pipe with a diameter of 80mm
fixed to wall with metal straps. Price shall
include all the necessary civil works.. ml 189.00 25.00 4,725.00
Valley Gutter
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
05 supply and fix valley gutter made from
galvanized sheet metal properly fixed to
purlines price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing ml 12.00 150.00 1,800.00
1500mm).
Joinery
01 Supply and fix 8mm thick chip wood
ceiling on steel truss and ceiling battens
placed c/c 60cm as per the instruction
given by the supervising engineer. Price
shall include all the necessary civil work m2 360.00 140.00 50,400.00
and material for fixing.
02 Supply and fix PVC ceiling on steel truss
and ceiling battens placed c/c 60cm as
per the instruction given by the
supervising engineer. Price shall include
all the necessary civil work and material
for fixing. m2 380.00 180.00 68,400.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Size :- 90 x 210 pcs 7.00 1,890.00 13,230.00
c. Second floor
Normal type
Size :- 90 x 210 pcs 7.00 1,890.00 13,230.00
5. A. Metal Work
Windows and Door
01 Supply and fix window, door and window
door of LTZ black iron profile frame 38mm
wide and 1.5mm thick partially glazed
and partially covered with 0.8mm thick
ribbed sheet all as per the drawing. Price
shall includes all the necessary civil works
.
1. Door
A. Ground floor
D. 318 x 115cm (Entrance) pcs 1.00 1,828.50 1,828.50
D. 210 x 90 cm pcs 1.00 945.00 945.00
First floor
D. 210 x 70cm pcs 1.00 735.00 735.00
Second floor
D. 210 x 70 cm pcs 2.00 735.00 1,470.00
2.Window
A. Ground floor
Top windows
TW. 115 x 551cm pcs 2.00 2,407.87 4,815.74
TW. 318 x 115cm pcs 1.00 1,389.66 1,389.66
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
TW. 461 x 121cm pcs 2.00 2,119.68 4,239.36
Louvered Window
LW. 461 x 121cm pcs 2.00 2,119.68 4,239.36
Edge Windows
EW. (353 x 121) + (115 x 321)cm pcs 2.00 3,025.86 6,051.73
B. First floor
Top windows
TW. 461 x 60cm pcs 1.00 1,106.40 1,106.40
TW. 461 x 121cm pcs 2.00 2,231.24 4,462.48
Louvered Window
LW. 200 x 121cm pcs 3.00 968.00 2,904.00
LW. 209 x 60cm pcs 2.00 501.60 1,003.20
Edge Windows
EW. (353 x 121) + (115 x 321)cm pcs 1.00 3,025.86 3,025.86
EW. (450 x 121) + (115 x 321)cm pcs 1.00 3,471.87 3,471.87
EW. (318 x 121) + (115 x 321)cm pcs 1.00 2,864.93 2,864.93
C.Second floor
Top windows
TW. 461 x 60cm pcs 1.00 1,051.08 1,051.08
TW. 461 x 121cm pcs 2.00 2,119.68 4,239.36
Louvered Window
LW. 200 x 121cm pcs 3.00 919.60 2,758.80
LW. 209 x 60cm pcs 2.00 476.52 953.04
Edge Windows
EW. (353 x 121) + (115 x 321)cm pcs 1.00 3,025.86 3,025.86
EW. (450 x 121) + (115 x 321)cm pcs 1.00 3,471.87 3,471.87
EW. (336 x 121)2 + (120 x 903)cm pcs 1.00 4,492.63 4,492.63
EW. 318 x 115cm pcs 1.00 1,389.66 1,389.66
Alumunium profile .
Supply and fix anodized Aluminum frames
complete with all necessary accessories
and sealing gaskets all as per the
drawing.Price shall includes glazing and
all the necessary civil works .
1. Door
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Ground floor
D. 318 x 115cm (Entrance) pcs 1.00 4,388.40 4,388.40
D. 210 x 90 cm pcs 1.00 2,268.00 2,268.00
First floor
D. 210 x 70cm pcs 3.00 1,764.00 5,292.00
Second floor
D. 210 x 70 cm pcs 2.00 1,764.00 3,528.00
2.Window
Ground floor
Top windows
TW. 115 x 551cm pcs 2.00 7,603.80 15,207.60
TW. 318 x 115cm pcs 1.00 4,388.40 4,388.40
TW. 461 x 121cm pcs 2.00 6,693.72 13,387.44
Louvered Window
LW. 461 x 121cm pcs 4.00 6,693.72 26,774.88
Edge Windows
EW. (353 x 121) + (115 x 321)cm pcs 2.00 9,555.36 19,110.72
B. First floor
Top windows
TW. 461 x 121cm pcs 2.00 6,693.72 13,387.44
Louvered Window
LW. 200 x 121cm pcs 3.00 2,904.00 8,712.00
LW. 209 x 60cm pcs 2.00 1,504.80 3,009.60
Edge Windows
EW. (353 x 121) + (115 x 321)cm pcs 1.00 9,555.36 9,555.36
EW. (450 x 121) + (115 x 321)cm pcs 1.00 ### 10,963.80
EW. (318 x 121) + (115 x 321)cm pcs 1.00 9,047.16 9,047.16
C.Second floor
Top windows
TW. 461 x 121cm pcs 2.00 6,693.72 13,387.44
Louvered Window
LW. 200 x 121cm pcs 4.00 2,904.00 11,616.00
LW. 209 x 60cm pcs 1.00 1,504.80 1,504.80
Edge Windows
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
EW. (353 x 121) + (115 x 321)cm pcs 1.00 9,555.36 9,555.36
EW. (450 x 121) + (115 x 321)cm pcs 1.00 ### 10,963.80
EW. (336 x 121)2 + (120 x 903)cm pcs 1.00 9,047.16 9,047.16
EW. 318 x 115cm pcs 1.00 1,462.80 1,462.80
Corner protection
02 Supply and fix 30x30x3mm Angle Iron
corner protection secured to R.C.
columns, & walls with screw & fisher to a
total height 1500mm from finished floor ml 291.00 45.00 13,095.00
level flushed to the wall.
03 Supply and fix wooden hand rails and
circular pipe hand rails to all down
opening area as per the drawing. Price
shall includes all one row of wooden hand
rail and two rows of metal circular piper
hand rails and the necessary accessories
for fixing.
On a height 90cm and size of pipes ml 22.25 1,500.00 33,375.00
dia.38mm
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Strainer
04 Supply and fix wire dome leaf guard
strainer to each down pipe in let on the
gutter. Price shall includes fabrication,
antirust painting,placind and all the pcs 18.00 40.00 720.00
necessary civil works.
N.B. All the necessary accessories & door
lock with handle must be approved.
B: Lattice Purline
Size:- 25 x 25 x 2.5mm kg ### 28.00 134,428.00
C: Angle Iron
Size:- 30 x 25 x 25 x 4mm kg 16.00 28.00 448.00
D: Plate
Size:- 2/400 x 200 x 5mm with 2 holes kg 446.00 60.00 26,760.00
E: Plate
Size:- 2/400 x 250 x 5mm with 4 holes kg 24.00 75.00 1,800.00
F: Gusset Plate
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Size:- 2/400 x 300 x 5mm kg 193.00 75.00 14,475.00
G: Bolts
J- bolts
Size:- Dia.16 with a length of 250mm pcs 12.00 33.00 396.00
Size:- Dia.16 with a length of 200mm pcs 148.00 33.00 4,884.00
Normal bolt
Size:- M-Dia.12 with a length of 100mm pcs 295.00 22.00 6,490.00
6. Finishing
02 Concrete soffite
2.1. Ceiling slab
a. Ground floor m2 752.00 55.00 41,360.00
b. First floor m2 736.00 55.00 40,480.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Two coats of plaster in cement
mortar ratio 1:3 to External wall
03 surface
External H.C.B wall surface, concrete
vertical surface wall. Price shall included
preparation of back ground like hacking,
racking out joints grouts, beddings ,joints,
key formation, all works in narrow widths, m2 ### 55.00 88,550.00
corners, angles and openings.
07 Gypsum plastering
Internal plastered vertical surface. Price
shall includes all activity.
a. Ground floor m3 330.00 14.00 4,620.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
b. First floor m2 430.00 14.00 6,020.00
c. Second floor m2 360.00 14.00 5,040.00
08 Ditto but concrete soffite
2.1. Ceiling slab
a.In Ground floor m2 230.00 15.00 3,450.00
b.In First floor m2 337.00 15.00 5,055.00
09 Apply quartize finishes to external wall .
Material shoud approve prior to apply.
Price Shall include all activity. m2 789.00 100.00 78,900.00
Bush Hammer
Plastic tile
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
01 4.8cm thick cement screed smooth
finished floor finish 2mm thick PVC tile
shall be laid on properly finished , cured
and aged floor screed with approved glue
in accordance with the manufacturers
and instruction give by the
Architect/Engineer. Price shall include all
the necessary civil works.
a. Ground floor m2 336.00 170.00 57,120.00
b. First floor m2 312.00 170.00 53,040.00
c. Second floor m2
370.00 170.00 62,900.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
04 Supply and fix approved type of stone
pavement floor finishing tile on spaces
provided (veranda) . It shall be laid on
compacted earth/fill and 10mm sand
bedding and joints pointed with cement,
sand, mix 1:2 mortar. Price shall includes
all the necessary civil works.
a. Ground floor m2 240.00 195.00 46,800.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Wall finishing
05 Supply and fix approved type of Ceramic
wall tile to a height not exceeding
150cm.The pattern and colour of the tiles
shall be as per the Architect/ Engineer
instruction and the entire work shall be
approved by the Architect. Price shall
include cement mortar (1:3) bed and
grouting.
a. First floor m2 62.00 140.00 8,680.00
b. Second floor m2 53.00 140.00 7,420.00
Window Cill
06 Size 27x3cm marble window cill
weathered & throated mounted in place. ml 227.00 224.00 50,848.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
8. Glazing
01 Supply and fix 4mm plate glass mounted
between frames. Price shall includes all
the necessary glazing beads and putty. m2 355.00 90.00 31,950.00
9. Painting
Plastic emulsion paint
01 Apply 3 coats of approved type plastic
emulsion paints to internal plastered m2 ### 16.00 24,000.00
vertical wall surface
02 Apply 3 coats of approved type plastic
emulsion paints to external plastered m2 821.00 18.00 14,778.00
vertical wall surface
03 Ditto but to concrete ceiling, around
gutter and soffits. m2 ### 18.00 29,722.32
Synthetic paint
04 Apply 3 coats of approved type synthetic m2 10.00 18.00 180.00
paint.
TOTAL TO SUMMARY ..ET.BIRR 68,680.32
10.SANITARY INSTALLATION
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
Supply and fix Awassa ceramics wash [ETB] [ETB]
02 down water closets made of white
vitreous china with plastic seat and cover
including low flush cistern. Complete with
all necessary accessories. pcs 8.00 980.00 7,840.00
Supply and fix toilet paper holder out of
03 Awassa ceramics or equivalent , fixed
with chrome plated brass wall flanged roll
chrome plated fastening screws and other
accessories. pcs 8.00 55.00 440.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
2.WATER
Water SUPPLY
pipes shall bePIPES AND steel
galvanized VALVES
and
be fixed to , walls, beams or etc.Unit price
shall include all assistance civil works and
necessary fittings such T, bends, Y,
reducers. Gate valves and other
necessary valves shall be fixed properly
as per the manufacturer's instruction and
according to where shown on the
drawing. All water pipes shall be tested
two times the working pressure or 00
meters head, which ever is greater at the
expense of the contractor.
01 Supply and install galvanized steel pipes
to internal water distribution system as
shown on the drawing. complete with all
the necessary accessories.
Dia. 15 mm ml 18.00 25.00 450.00
" 20 " ml 21.00 33.00 693.00
" 25 " ml 9.00 50.00 450.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
b) 50mm dia. Float valve pcs 1.00 280.00 280.00
c) Provide dia. 40 mm G.S.P overflow &
drain pipe to water tank. ml 3.00 105.00 315.00
f) Supply and fix bronze gate valves of
approved quality.
i) On pipe inlet point to tank, dia. 32mm pcs 1.00 455.00 455.00
ii) On water distribution pipe after tank,
dia.25mm pcs 1.00 325.00 325.00
iii) On drain pipe of the tank, dia.40mm pcs 1.00 390.00 390.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Light points fed through copper
08 conductors of 2x2.5sq. mm in
thermoplastic conduits of 13.5/16 mm
in/under surface including junction boxes
with covers, instalating screw caps and
flash mounted switches type Legrand or
equivalent. pcs 456.00 250.00 114,000.00
02 RZB 10248.002 with A60, 60w lamp pcs 32.00 960.00 30,720.00
Siemens 5LG 3092 2-1c with 1xTLD 36w
03 lamp pcs 4.00 1,070.00 4,280.00
04 RZB 34550.002 with A60, 60w lamp pcs 14.00 760.00 10,640.00
Massive 73175/08/43 with A60, 8x40w
05 lamp pcs 2.00 750.00 1,500.00
Siemens 5LG 224 2-2A with 4xTLD18w
06 lamp pcs 54.00 1,070.00 57,780.00
Siemens 5LG 224 2-4A with 4xTLD18w
07 lamp pcs 338.00 1,100.00 371,800.00
Siemens 5LG 8011-4LD with 1xTLD8w
08 lamp pcs 12.00 960.00 11,520.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
3. Telephone System
Fill
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
02 Suitable non expansive well graded soil or
granular material with no rock
lumps(selected borrowed material) fill
around the building under pavements in
material well rammed in layers not
exceeding 20cm thick at a time. The
degree of compaction and the material
m3 112.50 75.00 8,437.50
shall be approved by the supervising
Architect.
Disposal
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
03 Remove surplus excavated materials and
deposit to a distance ordered by the
Architect/Engineer from the site. m3 158.20 35.00 5,537.00
Paving
04 Supply and fix approved type of dressed
or roughly dressed stone shall be fair
chiselled or dressed out of sound stone or
equivalent cement pavement tiles .
Paving materials shall be laid on
compacted earth/fill and 10mm sand
bedding and joints pointed with cement,
sand, mix 1:2 mortar around the
periphery of the building. Price shall m2 225.00 195.00 43,875.00
includes all the necessary civil works.
05 Supply and fix bench sets made of
concrete around specified building
areas.Concrete benches shall be cut ,
shaped to the sections and placed as
shown on the drawings. Bench sites shal
be constructed with two sets and all
productes shall be approved prior to
installation by supervising Engineer
/Architects .price shall includes all the pcs 10.00 1,500.00 15,000.00
necessary civil works.
2.SITE /EXTERNAL/ WATER SUPPLY SYSTEMS
Supply and install 32mm Dia. G.S.P pipes
01 from municipal water supply to roof water
tanks as shown on the drawing. Complete
with all the necessary fittings and
accessories. [LUMP SUM] ml 50.00 250.00 12,500.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
3. SITE /EXTERNAL/ WASTE WATER DRAINAGE
01 Supply and lay uPVC sewage pipes to BS
5481: 1977 or equivalent according to the
drawing shown with a minimum slope of
1-1.5% or natural ground slope which
ever is greater on a firm bed sand
100mm thick below and 200mm thick
above the crown of the pipe in open
ground. The joints shall be made tight
and installation shall make the best
condition for cleaning and maintenance.
Unit price shall include excavation of the
trench and cart away. (Installation shall
also follow manufacturers' instruction .)
Dia 110 ml 20.00 250.00 5,000.00
" 160 ml 50.00 320.00 16,000.00
" 200 ml 25.00 450.00 11,250.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Manholes
Construct manholes on a sanitary sewer
05
as where shown on the drawing in precast
concrete round pipes on 100mm thick
reinforced concrete bottom slab in dia.
10c/c 200mm both ways and 120mm
thick manhole cover in dia.10c/c 150mm
both ways. Price shall include all
assistance civil works and handle.
Dia. 600 mm, average depth 800 mm pcs 7.00 1,400.00 9,800.00
Dia. 800 mm, average depth 1400 mm pcs 3.00 2,100.00 6,300.00
GRAND SUMMARY
STUDENT COMPLEX in Main Campus
A. SUB - STRUCTURE
B. SUPER STRUCTURE
2. Concrete Work
01 5cm thick lean concrete in class c-7
with minimum cement content of
150kg/m3 Under foundation footing
and grade beam and mixing of
concrete shall be done mechanically m2 527.60 52.00 27,435.20
(with appropriate concrete mixer).
-
Footing -
In situ sub structure concrete -
02 Reinforced concrete C.25 with minimum
cement content of 360 kg/m3
mechanically mixed and filled in to
form work and vibrated around rod
reinforcement (reinforcement bar and
formwork for precast beam measured -
separately) in :-
a. Footing m3 67.30 1,300.00 87,490.00
b. Foundation column m3 27.40 1,300.00 35,620.00
c. Ground floor grade beam m3 164.30 1,300.00 213,590.00
-
03 In 10 cm thick floor slab evenly spread
and levelled of class C-25 reinforced
concrete with minimum cement
content of 360kg/m3 and mixing shall -
be done mechanically. m2
4,278.00 143.70 614,748.60
a. Ground slab
-
In foundation footing
a. Dia. 12mm plain bar kg 3,535.80 15.00 53,037.00
In foundation column
a. Dia. 8mm deformed bar kg 324.00 15.50 5,022.00
b. Dia. 14mm deformed bar kg 1,024.00 15.00 15,360.00
c. Dia. 16mm deformed bar kg 2,715.00 15.00 40,725.00
In ground floor grade beam
a. Dia. 8mm deformed bar kg 3,340.00 15.50 51,770.00
b. Dia. 20mm deformed bar kg 20,892.00 15.00 313,380.00
In ground floor slab
a. Dia 8mm deformed bar kg 10,796.00 15.50 167,338.00
Concrete Ancillaries
06 Expansion joints between walls and
columns ( Price shall includes material
, labour and all the necessary works).
In stayrafoam. ml 168.00 35.00 5,880.00
-
07 Ditto of the above but with a thickness
of 150mm. ml 1,842.00 11.00 20,262.00
3.Masonry work
B. SUPER STRUCTURE
1. Concrete work
Insitu Concrete
2. Masonry Work
Hollow concrete Block Wall
Bamboo wall
03 supply and fix approved type of
bamboo to exterior and interior side of
wall bedded and jointed as per the
detail drawing in two the side of wall.
The bamboo wall shall be built with
selected blocks thickness, diameter,
height and bonded as detailed on the
drawings or directed by the Architect.
The horizontal and vertical joints shall
be fixed with out having a hollow
space. Price shall include preparation of
bamboo surface, stands, bracings and
all the necessary civil work .
a. In ground floor m2 397.00 350.00 138,950.00
04 construct Louver Block Wall made of
concret for vetilation . Price shall
include wire mesh and other
activitys.Detail as per the drawing.
m2 150.00 250.00 37,500.00
3.1 Roofing
Joinery
a. Ground floor
Normal type
Size :- 70 x 210 cm pcs 50.00 1,470.00 73,500.00
80 x 210 cm pcs 4.00 1,680.00 6,720.00
85 x 2 10 cm pcs 14.00 1,785.00 24,990.00
90 x210 cm pcs 2.00 1,890.00 3,780.00
5. A. Metal Work
Corner protection
01 Supply and fix window, door and
window door of LTZ black iron profile
frame 38mm wide and 1.5mm thick
partially glazed and partially covered
with 0.8mm thick ribbed sheet all as
per the drawing. Price shall includes all
the necessary civil works .
Door
D160 x 210 cm pcs 1.00 1,680.00 1,680.00
window Door
WD 441 X 300 cm pcs 11.00 15,876.00 174,636.00
WD 581 X300 cm pcs 2.00 20,916.00 41,832.00
Window
NW. 120 X 60 cm pcs 7.00 864.00 6,048.00
NW. 60 x 60 cm pcs 5.00 432.00 2,160.00
03 Corner protection
Perforated metal angle fixed to the
corner for exposed corners plastered
over and painted.
B: Latise Purline
a) Purine 30/30/2.5mm kg 15,684.00 28.00 439,152.00
b) Purine 20/20/1.5mm kg 4,520.00 28.00 126,560.00
C: Bolts
J- bolts
Size:Diam-12 with a length of pcs 1,276.00 25.00 31,900.00
L=100mm
Size:Diam-14 with a length of pcs 288.00 64.00 18,432.00
L=400mm
Size:Diam-16 with a length of L=500 pcs 144.00 66.00 9,504.00
D: Plate
a) plates /250/250//8mm with 2 holes pcs 144.00 168.75 24,300.00
b) plates /300/300/8mm with 2 holes pcs 56.00 243.00 13,608.00
b) plates /340/340/8mm with 2 holes pcs 16.00 312.12 4,993.92
c) Gusset plates300/300/6mm pcs 142.00 202.50 28,755.00
E: Angle Iron
a) Angle iron- 300/300/700/6mm pcs 142.00 40.00 5,680.00
b) Angle iron- 100/100/100/5mm pcs 1,276.00 30.00 38,280.00
02 Concrete soffite
2.1. Ceiling slab
a. Ground floor m2 225.80 55.00 12,419.00
05 Concrete soffite
2.1. Ceiling slab
Plastic tile
01 4.8cm thick cement screed smooth
finished floor finish 2mm thick PVC tile
shall be laid on properly finished , cured
and aged floor screed with approved
glue in accordance with the
manufacturers and instruction give by
the Architect. Price shall include all the
necessary civil works.
a. Ground & mezzanine floor m2 548.00 170.00 93,160.00
Wall finishing
07 Supply and fix approved type of
Ceramic wall tile to a height not
exceeding 150cm.The pattern and
colour of the tiles shall be as per the
Architect/ Engineer instruction and the
entire work shall be approved by the
Architect. Price shall include cement
mortar (1:3) bed and grouting.
Windows Cill
08 Size 27x3cm snow white marble
window cill weathered & throated ml 108.60 224.00 24,326.40
mounted in place.
Internal building pavement
8. Glazing
01 Supply and fix 4mm plate glass
mounted between frames. Price shall
includes all the necessary glazing m2 660.00 90.00 59,400.00
beads and putty.
02 Ditto but fiber glass for sky light m2 175.00 160.00 28,000.00
TOTAL TO SUMMARY ..ET.BIRR 87,400.00
9. Painting
Plastic emulsion paint
Synthetic paint
04 Apply 2 coats of approved type varnish
paint paints to internal and external
bamboo walls. Price shall includes all m2 794.00 18.00 14,292.00
05 the necessary
Ditto,but civil
to chip works.
wood ceiling. m2 617.00 18.00 11,106.00
10.SANITARY INSTALLATION
4. MECHANICAL WORKS
Manhole
Manhole in bricks and with concrete
01 base internally of 700x700x700mm
including concrete cover with lifting
hole. pcs 2.00 2,500.00 5,000.00
PVC pipes.
02 a) 110 mm diameter. ml 100.00 100.00 10,000.00
CABLES
01 (3x120/70+1x70)mm, Tentative. ml 100.00 1,500.00 150,000.00
4. Light Points
7. Socket Outlets
Flush Mounted Socket Outlet with
Earth Contacty (Type Legrand
Suno or Equivalent)
03 Ditto, but with switch for water heater. pcs 3.00 120.00 360.00
8.Telecom Points/Outlets
01 Telephone points fed through twisted
pair category 5E UTP cable inside PVC
conduit of 20mm diameter. pcs 14.00 250.00 3,500.00
9 .TV System
Fill
Disposal
03 Remove surplus excavated materials
and deposit to a distance ordered by
the Architect/Engineer from the site.
m3 702.00 35.00 24,570.00
Paving
04 Supply and fix approved type of dresed
or rough dressed stone shall be fair
cheseled or dressed out of sound stone
or equivalent cement pevment tiles .
Paving materials shall be laid on
compacted earth/fill and 10mm sand
bedding and joints pointed with
cement, sand, mix 1:2 mortar around
the perifary of the building. Price shall
inludes all the necessary civil works. m2 780.00 195.00 152,100.00
Flower pots
05 Construct flower pots inside of the
complex building as where shown on
the drawing in precast concrete on
100mm thick reinforced concrete
bottom slab in dia. 10c/c 200mm both
ways and 120mm thick brick laid as
per the detail drawing to the wall of
flower pot. Price shall include all
assistance civil works. pcs 24.00 1,500.00 36,000.00
Manholes
04 Construct manholes on a sanitary
sewer as where shown on the drawing
in precast concrete round pipes on
100mm thick reinforced concrete
bottom slab in dia. 10c/c 200mm both
ways and 120mm thick manhole cover
in dia.10c/c 150mm both ways. Price
shall include all assistance civil works
and handle.
Dia. 600 mm, average depth 800 mm pcs 15.00 1,400.00 21,000.00
Dia. 800 mm, average depth 1400 m pcs 6.00 2,100.00 12,600.00
Oil Separator
05 Construct oil and grease separator out
of double brick wall, 150mm thick
R.C.top slab in dia.8 re-bar @ c/c
200mm , and 100mm thick R.C. bottom
slab in dia.8 c/c re-bar@ c/c 200mm ,
checkered plate cover and all required
works in accordance with the detail
drawing. Unit price shall be include
excavation of pit, cart away and all
assistance civil works.
internal size: 1000 x 2000 x
average depth=1600 mm pcs 2.00 9,500.00 19,000.00
Septic tanks
06 Construct septic tanks out of stone
masonry walls on reinforced concrete
bottom and top slabs, reinforced
concrete manhole covers.The work
shall be carried out in accordance with
the structural and sanitary drawings &
instructions . Price shall include
excavation,backfilling,cart away & all
assistance civil works
a )30 m3 Septic tank[ size 7.6 x 3.2 x
average depth 3.10m] pcs 1.00 52,500.00 52,500.00
GRAND SUMMARY
Laboratory building in Main Campus and Referal Hospital
Please insert separately on the total bill summary page
automatically inserted by excel on the bills page
A. SUB - STRUCTURE
TOTAL ET.BIRR
B. SUPER STRUCTURE
3. ROOFING ET.BIRR
6. FINISHING ET.BIRR
8. Galzing ET.BIRR
9. PAINTING ET.BIRR
TOTAL ET.BIRR
TOTAL (A + B) ET.BIRR
Referal Hospital
mmary page
126,769.00
354,139.90
48,070.00
528,978.90
864,124.00
348,600.00
62,289.00
216,418.40
795,088.00
277,034.00
405,847.00
26,730.00
90,894.00
357,657.50
358,065.00
237,867.50
4,040,614.40
4,569,593.30
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
A. SUB STRUCTURE
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Boulder rock excavation
10 Rock Excavation for foundation pit not
exceeding depth of 150 cm starting from
the stripped ground level. m3 11.00 250.00
Fill
12 Suitable non expansive well graded soil
or granular material with no rock
lumps(selected borrowed material) fill
under hard core and around foundation
column and footing in material well
rammed in layers not exceeding 20cm
thick at a time. The degree of
compaction and the material shall be
approved by the supervising Architect. m3 499.00 75.00
Disposal
Sub Base
14 25cm hard core in basaltic or equivalent
stone well rolled consolidated and
blinded with 20mm crushed stone or m2 397.00 55.00
aggregate.
TOTAL TO SUMMARY .. BIRR
2. Concrete Work
01 5cm thick lean concrete in class c-7 with
minimum cement content of 150kg/m3
Under foundation footing and grade
beam and mixing of concrete shall be
done mechanically (with appropriate m2 173.00 52.00
concrete mixer).
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Footing
In situ sub structure concrete
02 Reinforced concrete C.25 with minimum
cement content of 360 kg/m3
mechanically mixed and filled in to form
work and vibrated around rod
reinforcement (reinforcment bar and
formwork for precast beam measured
a. Footing in :- m3 51.00 1,300.00
separately)
b. Foundation column m3 5.00 1,300.00
c. Ground floor grade beam m3 36.00 1,300.00
In footing pad
a. Dia. 12mm plain bar kg 672.00 15.00
b. Dia. 14mm plain bar kg 1,260.00 15.00
In foundation column
a. Dia.8mm deformed bar kg 219.00 15.50
b. Dia. 16mm plain bar kg 1,986.00 15.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
a. Dia. 8mm deformed bar kg 394.00 15.50
b. Dia. 10mm deformed bar kg 549.00 15.00
c. Dia. 14mm deformed bar kg 1,965.00 15.00
06 Concrete Ancillaries
Expansion joints between walls and
columns ( Price shall includes material ,
labor and all the necessary works).
In Styrofoam not exceeding 10 cm ml 347.00 35.00
3.Masonry work
B. SUPER STRUCTURE
1. Concrete work
Insitu Concrete
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
e. In second floor beam m3 18.00 1,320.00
f. In roof (top tie ) beam m3 10.10 1,320.00
g. In stair case including supporting beam m3 10.00 1,320.00
h. in lintels m3 2.50 1,320.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Dia. 8mm deformed bar kg 363.00 15.50
Dia. 10mm deformed bar kg 694.00 15.00
Dia. 14mm deformed bar kg 763.00 15.00
Dia. 20mm deformed bar kg 2,530.00 15.00
E. In second floor beam
Dia. 8mm deformed bar kg 363.00 15.50
Dia. 10mm deformed bar kg 694.00 15.00
Dia. 14mm deformed bar kg 763.00 15.00
Dia. 20mm deformed bar kg 2,530.00 15.00
F. In roof (top tie) beam
Dia. 8mm deformed bar kg 257.00 15.50
Dia. 10mm deformed bar kg 62.00 15.00
Dia. 12mm deformed bar kg 644.00 15.00
G. In first floor mesh
Dia. 6mm deformed bar kg 826.00 15.50
H. In second floor mesh
Dia. 6mm deformed bar kg 826.00 15.50
I. In stair cases including beams
Dia. 8mm deformed bar kg 231.00 15.50
Dia.12mm deformed bar kg 1,148.00 15.00
J. In lintel
Dia.8mm deformed bar kg 103.00 15.50
Dia. 10mm deformed bar kg 161.00 15.00
K. In first floor precast beam
Dia.6mm deformed bar kg 2,587.00 15.50
Dia. 12mm deformed bar kg 744.00 15.00
Dia. 14mm deformed bar kg 1,943.50 15.00
L. In second floor precast beam
Dia.6mm deformed bar kg 2,587.00 15.50
Dia. 12mm deformed bar kg 744.00 15.00
Dia. 14mm deformed bar kg 1,943.50 15.00
M. In first floor peripheral
Dia. 12mm deformed bar kg 836.00 15.00
N. In second floor peripheral
Dia. 12mm deformed bar kg 836.00 15.00
2. Masonry Work
Hollow concrete Block Wall
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
01 19cm thick approved type of H.C.B wall
bedded and jointed in cement mortar
(1:3) two side left for appropriate
finishing. The hollow block wall shall be
built with selected blocks to the width,
depth, height and bonded as detailed on
the drawings or directed by the Architect.
The horizontal and vertical joints of block
walls shall be raked out to form adequate
key to resive further finish. Price shall
include preparation of surface for further
finishing.
a. In ground, first and second floor m2 1,660.00 210.00
3 Roofing
Flashing
02 supply and fix flashing made from
galvanized sheet metal properly fixed to
purlines on other side of the parapet wall
or wall price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing
500mm). ml 17.00 40.00
copying
03 supply and fix copying made from
galvanized sheet metal properly fixed to
purlines on the side of the parapet wall or
wall price shall include all the necessary
accessories for fixing(Gage 32 girth
development length for fixing 700mm).
ml 18.00 88.20
Down pipe
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
04 PVC down pipe with a diameter of 80mm
fixed to wall with metal straps. Price shall
include all the necessary civil works.. ml 173.00 25.00
Gutter
05 Supply and fix G 28 galvanized flat sheet
metal Gutter dev. Length 330mm.Price
include Gutter outlet , Holder and all
necessary accessories . ml 59.00 39.60
5. A. Metal Work
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
01 Supply and fix window and door of LTZ
black iron profile frame 38mm wide and
1.5mm thick partially glazed and partially
covered with 0.8mm thick ribbed sheet
all as per the drawing. Price shall
includes all the necessary civil works .
Window
W1. 4600 x 2000 mm pcs 10.00 4,600.00
W2. 2000 x 2000 mm pcs 5.00 2,000.00
W3. 1400 x 800 mm pcs 3.00 560.00
Metal doors
02 All metal door frames shall be fabricate
from quality and approved LTZ profile
with 1.5mm thick ribbed or flat metal
sheet( According to the drawing ) . Price
shall include hinges,Cylinderical locks of
approved quality and all the necessary
accessories
D1. 850 x 3200 mm pcs 8.00 1,360.00
03 Aluminum profile Door and Windows.
Window
W1. 4600 x 2000 mm pcs 8.00 11,040.00
W2. 2000 x 2000 mm pcs 7.00 4,800.00
W3. 1400 x 800 mm pcs 3.00 1,344.00
Corner protection
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
04 Supply and fix 30x30x3mm Angle Iron
corner protection secured to R.C.
columns, & walls with screw & fisher to a
total height 1500mm from finished floor pcs 90.00 45.00
level flushed to the wall.
05 Supply and fix 90 cm high and dia 50mm
steel pipe guard and hand Rail around
balcony and staircase. Price shall
includes one coats of anti rust and two
coats of synthetic enamel paint to all
steel parts and all the necessary
accessories to complete the works. ml 278.00 1,200.00
Strainer
06 Supply and fix wire dome leaf guard
strainer to each down pipe in let on the
gutter. Price shall includes fabrication,
antirust painting,placind and all the pcs 16.00 40.00
necessary civil works.
N.B. All the necessary accessories & door
lock with handle must be approved .
B: Latise Purline
Purline size 25/25/2.5mm kg 2,585.00 28.00
C: Anchor Bolt
j - bolt
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Size:- Diam-16 with a length of L=400 pcs 48.00 66.00
Size:-Diam-12 with a length of L=100 pcs 112.00 25.00
D: Plate
Size:- 200x200x6mm with 2 holes pcs 46.00 250.00
E: Angle Iron
Size:- 30x25x25/4mm pcs 112.00 28.00
6. Finishing
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
05 External H.C.B wall surface, concrete
vertical surface and Parapet wall. Price
shall included preparation of back ground
like hacking, racking out joints grouts,
beddings ,joints, key formation, all works
in narrow widths, corners, angles and
opening.
m2 262.00 70.00
Final coat Finishing
06 Gypsum plastering
Plastic tile
01 4.8cm thick cement screed smooth
finished floor finish 2mm thick PVC tile
shall be laid on properly finished , cured
and aged floor screed with approved glue
in accordance with the manufacturers
and instruction give by the Architect.
Price shall include all the necessary civil
works.
a. Ground, first and second floor m2 113.00 170.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Wall finishing
05 Supply and fix approved type of Ceramic
wall tile to a height not exceeding
150cm.The pattern and color of the tiles
shall be as per the Architect/ Engineer
instruction and the entire work shall be
approved by the Architect. Price shall
include cement mortar (1:3) bed and
grouting.
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Step& tread
08 3cm thick Gojam marble landing m2 18.00 850.00
8. Glazing
01 Supply and fix 4mm plate glass mounted
between frames. Price shall includes all
the necessary glazing beads and putty.
a) for doors with a thickness of 4mm m2 76.00 90.00
b) for windows with a thickness of 4mm m2 221.00 90.00
9. Painting
Plastic emulsion paint
01 Apply 3 coats of approved type plastic
emulsion paints to internal plastered
vertical wall surface m2 2,676.00 16.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
10-SANITERY INSTALLATION
RATE
ITEM DESCRIPTION UNIT QTY
Supply and fix single tubular chrome [ETB]
05 plated swing pattern towel rails, with
chrome plated fastening screws,
complete with all the accessories. /For
hand wash basins/ pcs 12.00 55.00
RATE
ITEM DESCRIPTION UNIT QTY
Cold and hot water pipes shall be uPVC [ETB]
and cPVC pipes respectively, and be fixed
to slabs, walls, beams or etcwith metal
straps or similar material. Unit price shall
include all assistance civil works and
necessary fittings such as T, bends,
elbows, etc; and according to where
shown on the drawing. All water pipes
shall be tested two times the working
pressure or 50 meters head, which ever
is greater at the expense of the
contractor.
Supply, install, test disinfect and
commissioning domestic cold and hot
01
water supply PPR (PN-6) piping, including
pipe fittings, supports anchors, (if
necessary) and cutting and making of
chisels on walls (if necessary) and
necessary accessories, all as specified in
the technical specification and shown on
the drawings.
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Supply, fix, test, and commission
03
isolating valves made of brass on the
water supply pipe including accessories,
all as specified in the technical
specification and shown on the drawings
The work shall be carried out in
accordance with the technical
specification and this document.
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
03 Supply and lay approved quality storm
water PVC down pipes according to where
shown on the drawing. Price shall include
all the necessary connecting pieces.
Dia. 80 mm ml 84.00 45.00
4.MECHANICAL INSTALLATION
PVC pipes.
02 110 mm diameter. ml 50.00 52.50
3. Distribution Boards
5. Light Points
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
8. Socket Outlets
Flush Mounted Socket Outlet with
Earth Contact (Type Legrand Suno
or Equivalent)
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Fill
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
02 Suitable non expansive well graded soil
or granular material with no rock
lumps(selected borrowed material) fill
around the building under pavements in
material well rammed in layers not
exceeding 20cm thick at a time. The
degree of compaction and the material
m3 52.50 75.00
shall be approved by the supervising
Architect.
Disposal
03 Remove surplus excavated materials and
deposit to a distance ordered by the
Architect/Engineer from the site. m3 84.00 35.00
Paving
04 Supply and fix approved type of dressed
or rough dressed stone shall be fair
chiselled or dressed out of sound stone or
equivalent cement pavement tiles .
Paving materials shall be laid on
compacted earth/fill and 10mm sand
bedding and joints pointed with cement,
sand, mix 1:2 mortar around the
periphery of the building. Price shall m2 105.00 195.00
includes all the necessary civil works.
2.Sanitary site work
Construct slab covered ditch as per the
01 detail drawing. Price shall include
excavation, cart away and all civil
assistance works. ml 20.00 250.00
02
Cold water pipes shall be galvanized
steel and be fixed to slabs, walls, beams
or etcwith metal straps or similar
material. Unit price shall include all
assistance civil works and necessary
fittings such as T, instruction and
according to where shown on the
drawing. All water pipes shall be tested
two times the working pressure or 50
meters head, which ever is greater at the
expense of the contractor.
Dia. 20 mm ml 30.00 33.00
Dia. 50 mm ml 80.00 150.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
03 Supply and install water meter of
approved quality price shall include gate
valves after and before water meter.
Dia. 50 mm. pcs 1.00 2,500.00
Supply and lay external PVC waste pipes
04 according to where shown on the
drawings. Complete with all the
necessary fittings as per the slope table
shown on the drawing.
Dia. 150 mm ml 80.00 320.00
Dia. 200 mm ml 30.00 450.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Pumps Accessories
10 Centrifugal pumps
Supply,fix,test
Domestic pumps and commission approved
quality Electric driven centrifugal
domestic water pumps as per the
manufacturer's instruction, technical
specification and drawing shown. Price
shall include all the necessary valves
(one-way and stop valves), water
hammer arrestor, common base plate,
level switch to protect dry-running. (Duty
and standby)
Capacity : Discharge =2.8 liters/second
Total head =28 meters
Estimated power = 4.0Kw
Efficiency >70% pcs 1.00 25,000.00
Supply and install Roto or Equivalent
11 approved quality elevated water tank on
concrete support as shown on the
Sanitary drawing and site plan.
Piping should
Price shall be asallper
include thethe detail drawing.
necessary pipe
connections.
5m3 capacity pcs 1.00 10,000.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
AMOUNT
[ETB]
3,864.00
6,630.00
7,680.00
3,840.00
840.00
3,000.00
1,000.00
8,750.00
3,300.00
AMOUNT
[ETB]
2,750.00
900.00
37,425.00
24,955.00
21,835.00
126,769.00
8,996.00
AMOUNT
[ETB]
66,300.00
6,500.00
46,800.00
57,048.90
6,180.00
4,500.00
14,160.00
10,080.00
18,900.00
3,394.50
29,790.00
AMOUNT
[ETB]
6,107.00
8,235.00
29,475.00
25,528.50
12,145.00
354,139.90
11,500.00
36,570.00
48,070.00
10,560.00
10,560.00
15,840.00
23,760.00
AMOUNT
[ETB]
23,760.00
13,332.00
13,200.00
3,300.00
212,420.00
7,140.00
7,140.00
10,740.00
20,280.00
20,280.00
8,710.00
5,520.00
2,210.00
3,611.50
25,845.00
3,611.50
19,395.00
5,192.50
15,960.00
AMOUNT
[ETB]
5,626.50
10,410.00
11,445.00
37,950.00
5,626.50
10,410.00
11,445.00
37,950.00
3,983.50
930.00
9,660.00
12,803.00
12,803.00
3,580.50
17,220.00
1,596.50
2,415.00
40,098.50
11,160.00
29,152.50
40,098.50
11,160.00
29,152.50
12,540.00
12,540.00
864,124.00
AMOUNT
[ETB]
348,600.00
348,600.00
53,360.00
680.00
1,587.60
AMOUNT
[ETB]
4,325.00
2,336.40
62,289.00
31,220.00
48,600.00
84,823.20
51,775.20
216,418.40
AMOUNT
[ETB]
46,000.00
10,000.00
1,680.00
13,440.00
10,240.00
3,930.00
2,880.00
1,920.00
10,880.00
88,320.00
33,600.00
4,032.00
23,040.00
12,288.00
9,792.00
13,824.00
9,216.00
32,640.00
AMOUNT
[ETB]
4,050.00
333,600.00
640.00
30,548.00
5,544.00
72,380.00
AMOUNT
[ETB]
3,168.00
2,800.00
11,500.00
3,136.00
795,088.00
126,750.00
42,000.00
46,130.00
4,510.00
AMOUNT
[ETB]
18,340.00
10,500.00
5,400.00
22,000.00
1,404.00
277,034.00
19,210.00
AMOUNT
[ETB]
2,500.00
38,850.00
5,775.00
37,800.00
8,760.00
11,480.00
190,000.00
19,020.00
25,984.00
AMOUNT
[ETB]
15,300.00
21,250.00
8,550.00
684.00
684.00
405,847.00
6,840.00
19,890.00
26,730.00
42,816.00
17,262.00
11,862.00
AMOUNT
[ETB]
8,676.00
1,404.00
8,874.00
90,894.00
8,400.00
11,760.00
660.00
4,200.00
AMOUNT
[ETB]
660.00
660.00
1,020.00
1,900.00
18,000.00
39,200.00
12,000.00
4,800.00
AMOUNT
[ETB]
1,710.00
3,255.00
2,680.00
2,115.00
1,350.00
780.00
840.00
770.00
13,020.00
AMOUNT
[ETB]
2,940.00
3,000.00
960.00
600.00
800.00
1,170.00
1,890.00
2,257.50
120.00
360.00
AMOUNT
[ETB]
3,780.00
210,000.00
357,657.50
2,800.00
2,625.00
500.00
320.00
AMOUNT
[ETB]
6,640.00
10,350.00
7,500.00
60,250.00
330.00
2,025.00
120.00
125.00
AMOUNT
[ETB]
11,250.00
3,150.00
47,040.00
2,430.00
0.00
1,620.00
12,600.00
1,350.00
4,680.00
AMOUNT
[ETB]
3,060.00
630.00
59,150.00
52,000.00
26,520.00
10,920.00
28,080.00
358,065.00
2,520.00
AMOUNT
[ETB]
3,937.50
2,940.00
20,475.00
5,000.00
990.00
12,000.00
AMOUNT
[ETB]
2,500.00
25,600.00
13,500.00
2,730.00
3,225.00
15,000.00
600.00
11,200.00
6,300.00
AMOUNT
[ETB]
7,000.00
4,200.00
25,000.00
10,000.00
20,000.00
5,000.00
AMOUNT
[ETB]
3,150.00
35,000.00
237,867.50
GRAND SUMMARY
Staff Residence Type A
A. SUB - STRUCTURE
TOTAL ET.BIRR
B. SUPER STRUCTURE
3. ROOFING ET.BIRR
6. FINISHING ET.BIRR
8. Galzing ET.BIRR
9. PAINTING ET.BIRR
TOTAL ET.BIRR
TOTAL (A + B) ET.BIRR
126,058.00
468,763.50
60,300.00
655,121.50
1,181,089.00
593,475.00
154,496.00
659,440.50
273,824.40
410,591.00
537,552.00
26,820.00
98,756.00
510,599.50
660,165.00
396,712.00
5,503,520.40
6,158,641.90
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
A. SUB STRUCTURE
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Fill
13 Suitable non expansive well graded soil or
granular material with no rock lumps(selected
borrowed material) fill under hard core and
around foundation column and footing in
material well rammed in layers not exceeding
20cm thick at a time. The degree of
compaction and the material shall be
m3 228.00 75.00
approved by the supervising Architect.
Disposal
14 Remove surplus excavated materials and
deposit to a distance ordered by the
Architect/Engineer from the site. m3 954.00 35.00
Sub Base
15 25cm hard core in basaltic or equivalent
stone well rolled consolidated and blinded
with 20mm crushed stone or aggregate. m2 550.00 55.00
2. Concrete Work
01 5cm thick lean concrete in class c-7 with
minimum cement content of 150kg/m3 Under
foundation footing and grade beam and
mixing of concrete shall be done
mechanically (with appropriate concrete m2 195.00 52.00
mixer).
Footing
In situ sub structure concrete
02 Reinforced concrete C.25 with minimum
cement content of 360 kg/m3 mechanically
mixed and filled in to form work and vibrated
around rod reinforcement (reinforcment bar
and formwork for precast beam measured
separately) in :-
a. Footing m3 64.00 1,300.00
b. Foundation column m3
7.00 1,300.00
c. Ground floor grade beam m3
43.00 1,300.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
03 In 10 cm thick floor slab evenly spread and
leveled of class C-25 reinforced concrete with
minimum cement content of 360kg/m3 and
mixing shall be done mechanically.
a. Ground slab m2 550.00 143.70
In foundation column
b. Dia. 20mm deformed bar kg 3,220.00 15.00
c. Dia. 14mm deformed bar kg 57.00 15.00
d. Dia. 6mm plain bar kg 113.00 15.50
Concrete Ancillaries
06 Expansion joints between walls and columns
( Price shall includes material , labour
and all the necessary works).
In Styrofoam width not exceeding10cm. ml 513.00 35.00
Ditto but width not exceeding 50cm ml 23.00 175.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
3.Masonry work
01 50cm thick stone masonry wall for various
structure as per the instruction given by the
supervising Engineers in cements mortar 1:3
height concealed from view.
m3 110.00 500.00
B. SUPER STRUCTURE
1. Concrete work
Insitu Concrete
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
a. In ground floor elevation column m2 155.00 60.00
b. In first floor elevation column m 2
155.00 60.00
c. In second floor elevation column m 2
155.00 60.00
d. In first floor beam m 2
267.00 65.00
e. In second floor beam m 2
267.00 65.00
f. In roof (top tie ) beam m 2
237.00 65.00
g. In stair case including supporting beam m 2
51.00 80.00
h. in lintels m 2
79.00 65.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Dia. 8mm deformed bar kg 76.00 15.50
Dia.10mm deformed bar kg 114.00 15.00
Dia. 12mm deformed bar kg 378.00 15.00
Dia. 14mm deformed bar kg 106.00 15.00
J. In lintel
Dia.6mm deformed bar kg 110.00 15.50
Dia. 12mm deformed bar kg 459.00 15.00
K. In first floor precast beam
Dia.8mm deformed bar kg 6,950.00 15.50
Dia. 10mm deformed bar kg 2,217.00 15.00
L. In second floor precast beam
Dia.8mm deformed bar kg 6,950.00 15.50
Dia. 10mm deformed bar kg 2,217.00 15.00
2. Masonry Work
Hollow concrete Block Wall
01 19cm thick approved type of H.C.B wall
bedded and jointed in cement mortar (1:3)
two side left for appropriate finishing. The
hollow block wall shall be built with selected
blocks to the width, depth, height and bonded
as detailed on the drawings or directed by the
Architect. The horizontal and vertical joints of
block walls shall be raked out to form
adequate key to resive further finish. Price
shall include preparation of surface for further
finishing.
a. In ground floor m2 550.00 210.00
b. In first floor m2
550.00 210.00
c. In second floor m2
550.00 210.00
3. Roofing
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
01 Supply and fix pre coated EGA 400 sheet roof
with a thickness of 0.4 mm covering as per
the manufacturer instruction price shall
includes all the necessary accessories for
fixing, bolting screwing and the like. m2 706.00 115.00
Eucalyptus truss
02 All truss shall be firmly fixed to concrete
beam with diameter 6mm plain bars.
a) upper & lower chord f 10cm ml 544.00 8.00
b) vertical & diagonal members f 6 - 8cm ml 1,230.00 7.00
c) 4x5cm swan zigba wood purlin placed at
c/c 33cm ml 745.00 15.00
d) 25 x 2.5 cm facia board ml 145.00 45.00
Strainer
03 Supply and fix wire dome leaf guard strainer
to each down pipe in let on the gutter.Price
shall includes fabrication, antirust
painting,placind and all the necessary civil pcs 25.00 40.00
works.
Flashing
04 supply and fix flashing made from galvanized
sheet metal properly fixed to purlines on
other side of the parapet wall or wall price
shall include all the necessary accessories for
fixing(Gage 32 girth development length for ml 50.00 63.00
fixing 500mm).
Copping
05 supply and fix copping made from galvanized
sheet metal properly fixed to purlines price
shall include all the necessary accessories for
fixing(Gage 32 girth development length for
fixing 400mm). ml 22.00 52.00
Down pipe
06 PVC down pipe with a diameter of 80mm
fixed to wall with metal straps. Price shall
include all the necessary civil works.. ml 240.00 25.00
Valley Gutter
07 supply and fix valley gutter made from
galvanized sheet metal properly fixed to
purlines price shall include all the necessary
accessories for fixing(Gage 32 girth
development length for fixing 1500mm). ml 64.00 150.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Normal Gutter
08 supply and fix normal gutter made from
galvanized sheet metal properly fixed to
purlines price shall include all the necessary
accessories for fixing(Gage 32 girth
development length for fixing 1500mm). ml 145.00 150.00
Joinery
a. Ground floor
a) Size :- 70 x 210 pcs 9.00 1,470.00
b) Size :-80 x 211 pcs 16.00 1,688.00
c) Size :- 90 x 210 pcs 4.00 1,890.00
d) Size :- 120 x 210 pcs 4.00 2,520.00
b. First floor
c. Second floor
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
5. A. Metal Work
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
MD1. 80x281 cm Pcs 2.00 1,124.00
MD2. 120 x 300 cm Pcs 5.00 1,800.00
Window
NW 1. 160x180 cm Pcs 27.00 1,440.00
NW 2. 80x50 cm Pcs 15.00 200.00
Door Windows
Dw1. 80x281+ 80x281 cm Pcs 8.00 2,248.00
DW2. 240 x300 cm Pcs 2.00 3,600.00
Door
MD1. 80x281 cm Pcs 4.00 2,697.60
MD2. 120 x 300 cm Pcs 7.00 4,320.00
Window
NW 1. 160x180 cm Pcs 15.00 3,456.00
NW 2. 80x50 cm Pcs 21.00 480.00
Door Windows
Dw1. 80x281+ 80x281 cm Pcs 10.00 5,395.20
DW2. 240 x300 cm Pcs 4.00 8,640.00
Corner protection
02 Perforated metal angle fixed to the corner for
exposed corners plastered over and painted.
size 30x30x3mm with a length not exceeding ml 90.00 45.00
1500mm.
N.B. All the necessary accessories & door
lock with handle must be approved.
6. Finishing
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
01 Hollow Block and brick wall surface including
concrete vertical surface. Price shall included
preparation of back ground like hacking,
racking out joints grouts, beddings ,joints, key
formation, all works in narrow widths, corners,
angles, opening and metal/steel lath which is
provided on the chiselled wall surface formed
during imbedding pvc conduits to wall.
a. Ground floor m2 890.00 50.00
b. First floor m2
890.00 50.00
c. Second floor m2
890.00 50.00
02 Concrete soffite
2.1. Ceiling slab
a. First floor m2 610.00 55.00
b. Second floor m2
610.00 55.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
2.1. Ceiling slab
a. First floor m2 350.00 15.00
b. Second floor m2
370.00 15.00
08 Apply quartize finishes to external wall .
Material shoud approve prior to apply. Price
Shall include all activity. m2 680.00 100.00
Bush Hammer
Plastic tile
01 4.8cm thick cement screed smooth finished
floor finish 2mm thick PVC tile shall be laid on
properly finished , cured and aged floor
screed with approved glue in accordance with
the manufacturers and instruction give by the
Architect. Price shall include all the necessary
civil works.
a. Ground floor m2 450.00 170.00
b. First floor m2
450.00 170.00
c. Second floor m2
450.00 170.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Wall finishing
07 Supply and fix approved type of Ceramic wall
tile to a height not exceeding 150cm.
a. Ground floor m2 201.00 140.00
b. First floor m2
201.00 140.00
c. Second floor m2
201.00 140.00
Windows Cill
08 Size 27x 2cm snow white marble window cill
weathered & throated mounted in place. ml 96.00 224.00
Step& tread
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
8. Glazing
01 Supply and fix 4mm plate glass mounted
between frames. Price shall includes all the
necessary glazing beads and putty. m2 298.00 90.00
9. Painting
Plastic emulsion paint
01 Apply 3 coats of approved type plastic
emulsion paints to internal plastered vertical m2 2,498.00 16.00
wall surface.
02 Ditto but to External wall m2 1,420.00 18.00
10-SANITERY INSTALLATION
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Supply and fix electric water heater with a
08 capacity given below. Complete with all water
proofing, mounting and fastening material,
safety, one-way valve and gate valve and
with all the accessories.
a) Capacity 50 Litter pcs 48.00 1,900.00
b) Capacity 80 Litter pcs 12.00 2,200.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Supply, install, test disinfect and
01
commissioning domestic cold and hot water
supply PPR (PN-6) piping, including pipe
fittings, supports anchors, (if necessary) and
cutting and making of chisels on walls (if
necessary) and necessary accessories, all as
specified in the technical specification and
shown on the drawings.
RATE
ITEM DESCRIPTION UNIT QTY
All domestic waste, vent and storm water [ETB]
pipe lines shall comply to BS45/4:1983 and
DIN 19531 PVC pipes and shall be provided
with a minimum slope as specified in the
drawing. Pipes and necessary fittings shall be
standard quality and be free from damage
during storage, construction and etc. Unit
price shall include all the necessary
assistance civil works, such as excavation,
cart away, fixing or hanging to walls, beams
or slabs. etc., necessary fittings such as
bends, Y, T, etc. Storm water PVC pipes shall
resist the external temperature and the
quality shall meet the purpose.
Quantity)
Manhole
01 Manhole in bricks and with concrete base
internally of 700x700x700mm including
concrete cover with lifting hole. pcs 4.00 1,400.00
PVC pipes.
02 110 mm diameter. ml 100.00 52.50
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
03 Tele Terminal Box ( By Telephone Utility). pcs 1.00 1,200.00
3. kWH-Meters board
01 kWh Meter Board for 1 three-phase KWH-
meter, and 19 single-phase KWH-meters
made of RHS frame and backelite board to be
fixed to wall as per EEPCo requirement. pcs 1.00 45,220.00
4. Distribution Boards
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
CABLES
01 3x6 mm sq. ml 200.00 52.00
6. Light Points
01 Flush mounted light points fed through PVC
insulated conductors of 2x2.5mm2 inside PVC
conduits of 16mm diameter, including
junction boxes with covers and insulating pcs 300.00 250.00
screw cap connectors, complete
7. Extra Over Light Points for Flush
Mounted Switches Type Legrand Suno or
Equivalent
01 Flush mounting single switch, 7740 01 + pcs 48.00 55.00
02 Ditto, but with switch for water heater. pcs 48.00 110.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
12. TV System
01 TV point fed through co-axial cable of RG/59
BU inside PVC conduit of 25mm diameter
including junction boxes with covers,
insulating screw cap connectors, and flush pcs 18.00 280.00
mounted terminal TV socket .
13. Bell Call Points
01 Bell call points fed through PVC insulated
conductors of 2x2.5mm, inside PVC
conduits of 16 mm diameter , including
junction boxes with covers and insulating pcs 18.00 250.00
screwcap connectors.
14 . Extra Over Bell Call Points
(TYPE LEGRAND SUNO OR EQUIVALENT)
01 Flush mounting bell push button 7740 13 +
7740 41. pcs 18.00 250.00
02 Bell. pcs 18.00 70.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
05 RZB 58127.003+1xGLS 75W lamp. pcs 30.00 650.00
Paving
04 Supply and fix approved type of dressed or
rough dressed stone which shall be fair
chiselled or dressed out of sound stone or
equivalent stone . Paving materials shall be
laid on compacted earth/fill and 10mm red
ash bedding and joints pointed with cement,
sand, mix 1:2 mortar around the periphery of
the building. Price shall includes all the
necessary civil works. m2 212.00 195.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
Construct manholes on a sanitary sewer
08
drainage systems as where shown on the
drawing in precast concrete round pipes on
150mm thick reinforced concrete bottom slab
in dia.10c.c150mm both ways and 120mm
thick reinforced cover slab in dia.10c.c150
mm both ways. Price shall include all
assistance civil works and handle.
a) dia. 600 mm
average depth = 850 mm pcs 14.00 1,400.00
b) dia. 800 mm
average depth = 1200 mm pcs 10.00 2,100.00
Pumps Accessories
10 Centrifugal pumps
Domestic pumps
quality Electric driven centrifugal domestic
water pumps as per the manufacturer's
instruction, technical specification and
drawing shown.Price shall include all the
necessary valves (one-way and stop valves),
water hammer arrestor,common base
plate,level switch to protect dry-running.
(Duty and standby)
Capacity : Discharge =5.6 liters/second
Total head =28 meters
Estimated power = 4.0Kw
Efficiency >70% pcs 2.00 35,000.00
Supply and install Roto or Equivalent
11 approved quality elevated water tank on
concrete support as shown on the Sanitary
drawing and site plan.
Piping should be as per the detail drawing.
connections.
5m3 capacity pcs 2.00 10,000.00
Construct open ditch out of half precast
12 concrete round pipes Price shall include
excavation, cart away and all civil works.and
openable slab cover as shown on the detailed
drawing.
b) Ditch size: 1/2 Diameter 300mm ml 30.00 250.00
RATE
ITEM DESCRIPTION UNIT QTY
[ETB]
13 cover
b) Ditch size: 1/2 Diameter 300mm ml 60.00 105.00
AMOUNT
[ETB]
5,698.00
9,780.00
30.00
9,630.00
1,620.00
2,760.00
2,700.00
800.00
7,000.00
3,000.00
2,000.00
AMOUNT
[ETB]
300.00
17,100.00
33,390.00
30,250.00
126,058.00
10,140.00
83,200.00
9,100.00
55,900.00
AMOUNT
[ETB]
79,035.00
8,160.00
4,860.00
20,220.00
2,085.00
29,505.00
3,105.00
48,300.00
855.00
1,751.50
40,905.00
14,291.00
35,371.00
17,955.00
4,025.00
468,763.50
AMOUNT
[ETB]
55,000.00
5,300.00
60,300.00
14,520.00
14,520.00
14,520.00
30,360.00
30,360.00
23,760.00
6,600.00
10,560.00
150,800.00
150,800.00
AMOUNT
[ETB]
9,300.00
9,300.00
9,300.00
17,355.00
17,355.00
15,405.00
4,080.00
5,135.00
2,821.00
570.00
52,230.00
2,898.50
915.00
14,325.00
29,985.00
3,503.00
7,755.00
12,180.00
9,455.00
5,190.00
17,925.00
3,465.00
42,255.00
9,455.00
5,190.00
17,925.00
3,465.00
42,255.00
9,377.50
16,920.00
18,150.50
18,150.50
AMOUNT
[ETB]
1,178.00
1,710.00
5,670.00
1,590.00
1,705.00
6,885.00
107,725.00
33,255.00
107,725.00
33,255.00
###
115,500.00
115,500.00
115,500.00
82,325.00
82,325.00
82,325.00
593,475.00
AMOUNT
[ETB]
81,190.00
4,352.00
8,610.00
11,175.00
6,525.00
1,000.00
3,150.00
1,144.00
6,000.00
9,600.00
AMOUNT
[ETB]
21,750.00
154,496.00
46,200.00
39,600.00
13,230.00
27,008.00
7,560.00
10,080.00
13,230.00
27,008.00
7,560.00
10,080.00
AMOUNT
[ETB]
13,230.00
27,008.00
7,560.00
10,080.00
25,500.00
131,220.00
58,320.00
71,280.00
24,624.00
48,222.00
18,753.00
15,903.00
6,184.50
659,440.50
AMOUNT
[ETB]
2,248.00
9,000.00
38,880.00
3,000.00
17,984.00
7,200.00
10,790.40
30,240.00
51,840.00
10,080.00
53,952.00
34,560.00
4,050.00
273,824.40
AMOUNT
[ETB]
44,500.00
44,500.00
44,500.00
33,550.00
33,550.00
78,100.00
8,400.00
5,700.00
6,015.00
3,900.00
4,800.00
4,620.00
7,140.00
6,846.00
AMOUNT
[ETB]
5,250.00
5,550.00
68,000.00
342.00
5,328.00
410,591.00
76,500.00
76,500.00
76,500.00
7,025.00
7,025.00
7,025.00
AMOUNT
[ETB]
13,350.00
13,350.00
13,350.00
3,150.00
3,150.00
3,150.00
16,465.00
16,465.00
16,465.00
3,640.00
3,640.00
3,640.00
28,140.00
28,140.00
28,140.00
21,504.00
AMOUNT
[ETB]
5,950.00
34,850.00
23,370.00
7,068.00
537,552.00
26,820.00
26,820.00
39,968.00
25,560.00
21,600.00
9,900.00
1,728.00
98,756.00
AMOUNT
[ETB]
16,800.00
36,000.00
35,280.00
1,980.00
12,600.00
1,980.00
1,980.00
6,120.00
AMOUNT
[ETB]
91,200.00
26,400.00
33,600.00
33,000.00
48,000.00
28,800.00
18,000.00
AMOUNT
[ETB]
8,190.00
10,972.00
4,260.00
4,725.00
3,760.00
3,705.00
2,465.00
4,995.00
2,756.00
41,370.00
270.00
624.00
240.00
300.00
80.00
95.00
AMOUNT
[ETB]
5,512.50
2,610.00
9,030.00
480.00
180.00
12,240.00
510,599.50
5,600.00
5,250.00
AMOUNT
[ETB]
1,200.00
500.00
1,500.00
45,220.00
18,960.00
17,280.00
1,580.00
AMOUNT
[ETB]
10,400.00
90,000.00
1,725.00
75,000.00
2,640.00
6,000.00
4,620.00
125.00
84,360.00
5,580.00
11,500.00
5,280.00
1,530.00
AMOUNT
[ETB]
5,850.00
5,250.00
13,440.00
4,320.00
630.00
5,040.00
4,500.00
4,500.00
1,260.00
5,550.00
21,750.00
36,720.00
55,860.00
AMOUNT
[ETB]
19,500.00
42,120.00
27,300.00
10,725.00
660,165.00
5,724.00
7,950.00
6,678.00
41,340.00
AMOUNT
[ETB]
5,000.00
1,320.00
18,000.00
5,000.00
6,400.00
18,000.00
2,100.00
4,500.00
15,000.00
1,200.00
AMOUNT
[ETB]
19,600.00
21,000.00
14,000.00
12,600.00
70,000.00
20,000.00
7,500.00
AMOUNT
[ETB]
6,300.00
87,500.00
396,712.00
GRAND SUMMARY
Staff Residence Type B
A. SUB - STRUCTURE
TOTAL ET.BIRR
B. SUPER STRUCTURE
3. ROOFING ET.BIRR
6. FINISHING ET.BIRR
8. Galzing ET.BIRR
9. PAINTING ET.BIRR
TOTAL ET.BIRR
TOTAL (A + B) ET.BIRR
198,417.00
610,226.50
74,530.00
883,173.50
1,160,675.90
641,370.00
179,372.00
752,885.50
267,930.00
534,705.00
548,368.00
23,670.00
173,634.00
399,019.00
714,035.00
400,447.00
5,796,111.40
6,679,284.90
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
A. SUB STRUCTURE
Rock excavation
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Fill
13 Suitable non expansive well graded soil or
granular material with no rock
lumps(selected borrowed material) fill
under hard core and around foundation
column and footing in material well
rammed in layers not exceeding 20cm
thick at a time. The degree of compaction
and the material shall be approved by the
supervising Architect. m3 545.00 75.00 40,875.00
Disposal
14 Remove surplus excavated materials and
deposit to a distance ordered by the
Architect/Engineer from the site. m3 1,548.00 35.00 54,180.00
Sub Base
15 25cm hard core in basaltic or equivalent
stone well rolled consolidated and blinded
with 20mm crushed stone or aggregate. m2 726.00 55.00 39,930.00
2. Concrete Work
01 5cm thick lean concrete in class c-7 with
minimum cement content of 150kg/m3
Under foundation footing and grade beam
and mixing of concrete shall be done
mechanicaly (with aproprate concrete m2 300.00 52.00 15,600.00
mixer).
Footing
In situ sub structure concrete
02 Reinforced concrete C.25 with minimum
cement content of 360 kg/m3
mechanically mixed and filled in to form
work and vibrated around rod
reinforcement (reinforcment bar and
formwork for precast beam measured
a. Footing m3 74.00 1,300.00 96,200.00
b. Foundation column m 3
13.00 1,300.00 16,900.00
c. Ground floor grade beam m 3
76.00 1,300.00 98,800.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
03 In 10 cm thick floor slab evenly spread
and leveled of class C-25 reinforced
concrete with minimum cement content of
360kg/m3 and mixing shall be done
mechanicaly.
a. Ground slab m2 726.00 130.00 94,380.00
In foundation footing
a. Dia. 12mm deformed bar kg 2,322.00 15.00 34,830.00
b. Dia. 10mm deformed bar kg 198.00 15.00 2,970.00
In foundation column
b. Dia. 14mm deformed bar kg 4,000.00 15.00 60,000.00
c. Dia. 14mm deformed bar kg 216.00 15.00 3,240.00
d. Dia. 8mm plain bar kg 239.00 15.50 3,704.50
Concrete Ancillaries
06 Expansion joints between walls and
columns ( Price shall includes material ,
labour and all the necessary works).
In stayrafoam. m2 565.00 35.00 19,775.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
3.Masonry work
01 50cm thick stone masonry wall for various
structure as per the instruction given by
the supervising Engineers in cements
mortar 1:3 height above ground level not m3 148.00 500.00 74,000.00
exceeding 150cm.
02 50cm thick stone masonry wall for various
structure as per the instruction given by
the supervising Engineers in cements
mortar 1:3 height below ground not m3 1.00 530.00 530.00
exceeding 150cm.
TOTAL TO SUMMARY ..ET.BIRR 74,530.00
B. SUPER STRUCTURE
1. Concrete work
Insitu Concrete
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
c. In second floor elevation column m2 198.00 60.00 11,880.00
d. In first floor beam m2 410.00 65.00 26,650.00
e. In second floor beam m 2
418.00 65.00 27,170.00
f. In roof (top tie ) beam m 2
257.00 65.00 16,705.00
g. In stair case including supporting beam m 2
41.00 80.00 3,280.00
h. in lintels m 2
85.00 65.00 5,525.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
K. In first floor precast beam
Dia.6mm deformed bar kg 500.00 15.50 7,750.00
Dia. 12mm deformed bar kg 640.00 15.00 9,600.00
Dia. 14mm deformed bar kg 1,674.00 15.00 25,110.00
L. In second floor precast beam
Dia.6mm deformed bar kg 500.00 15.50 7,750.00
Dia. 12mm deformed bar kg 640.00 15.00 9,600.00
Dia. 14mm deformed bar kg 1,674.00 15.00 25,110.00
2. Masonry Work
Hollow concrete Block Wall
01 19cm thick approved type of H.C.B wall
bedded and jointed in cement mortar (1:3)
two side left for aproprate finishing. The
hollow block wall shall be built with
selected blocks to the width,depth, height
and bonded as detailed on the drawings or
directed by the Architect. The horizontal
and vertical joints of block walls shall be
raked out to form adequate key to resive
further finish. Price shall include
preparation of surface for further finishing.
3.1 Roofing
01 Supply and fix pre coated EGA 400 sheet
roof with a thicknees of 0.4 mm covering
as per the manufacturer instruction price
shall includes all the necessary
accessories for fixing, bolting screwing
m2 884.00 115.00 101,660.00
and the like.
Eucalyptus truss
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
02 All structural members each truss shall be
firmly fixed to concrete beam with
diameter 6mm plain bars.
Strainer
03 Supply and fix wire dome leaf guard
strainer to each down pipe in let on the
gutter.Price shall includs fabrication,
antirust painting,placind and all the pcs 32.00 40.00 1,280.00
necessary civil works.
Flashing
04 supply and fix flashing made from
galvanized sheet metal properly fixed to
purlines on other side of the parapete wall
or wall price shall include all the necessary
accessories for fixing(Gage 32 girth
development length for fixing 500mm).
ml 50.00 63.00 3,150.00
Copping
05 supply and fix copping made from
galvanized sheet metal properly fixed to
purlines price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing ml 1.00 52.00 52.00
400mm).
Down pipe
06 PVC down pipe with a diameter of 80mm
fixed to wall with metal straps. Price shall
include all the necessary civil works.. ml 352.00 25.00 8,800.00
Vally Gutter
07 supply and fix vally gutter made from
galvanized sheet metal properly fixed to
purlines price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing ml 17.00 150.00 2,550.00
1500mm).
Normal Gutter
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
08 supply and fix normal gutter made from
galvanized sheet metal properly fixed to
purlines price shall include all the
necessary accessories for fixing(Gage 32
girth development length for fixing ml 152.00 150.00 22,800.00
1500mm).
Joinery
b. First floor
c. Second floor
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
c) Size :- 90 x 210 pcs 4.00 1,890.00 7,560.00
d) Size :- 120 x 210 pcs 4.00 2,520.00 10,080.00
06 and sink
a)KC1 466x90x60 cm pcs 6.00 4,018.50 24,111.00
b)TC1 466x60x35mm pcs 6.00 1,562.75 9,376.50
c)KC2 500x90x60 cm pcs 6.00 4,275.00 25,650.00
d)TC2 500x60x35mm pcs 6.00 1,662.50 9,975.00
e)KC3 320x90x60 cm pcs 12.00 2,650.50 31,806.00
f)TC3 320x60x35mm pcs 12.00 1,030.75 12,369.00
5. A. Metal Work
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Window
NW.160x180 cm Pcs 66.00 1,440.00 95,040.00
NW. 800x700 cm Pcs 36.00 2,800.00 100,800.00
NW. 240 x 180 cm Pcs 12.00 2,160.00 25,920.00
Corner protection
02 Perforated metal angle fixed to the corner
for exposed corners plastered over and
painted.
size 30x30x3mm with a length not
exceeding 1500mm. ml 146.00 45.00 6,570.00
6. Finishing
02 Concrete soffite
2.1. Ceiling slab
a. First floor m2 740.00 55.00 40,700.00
b. Second floor m2 740.00 55.00 40,700.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
03 External H.C.B wall surface,concrete
vertical surface and Parapete wall.Price
shall includeed preparation of back ground
like hacking,racking out joints grouths,
beddings ,joints, key formation, all works
in narrow wigths, corners, angles and
m2 712.00 55.00 39,160.00
opening.
05 Concrete soffite
2.1. Ceiling slab
a. First floor m2 740.00 15.00 11,100.00
b. Second floor m 2
200.00 15.00 3,000.00
Bush Hammer
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Cement mortar Pointing
Recessed Pointing
Plastic tile
01 4.8cm thick cement screed smooth
finished floor finish 2mm thick PVC tile
shall be laid on properly finished , cured
and aged floor screed with approved glue
in accordance with the manufacturers and
instraction give by the Architect. Price
shall inclued all the necessary civil works.
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
05 Supply and fix approved tayp of ceramic
floor finishing tile on spaces provided .Size
30x 30 cm includes mortar bar
a. Ground floor m2 58.00 185.00 10,730.00
b. First floor m 2
58.00 185.00 10,730.00
c. Second floor m 3
58.00 185.00 10,730.00
Wall finishing
07 Supply and fix approved type of Ceramic
wall tile to a hight not exceeding 150cm.
a. Ground floor m2 164.00 140.00 22,960.00
b. First floor m 2
164.00 140.00 22,960.00
c. Second floor m 2
164.00 140.00 22,960.00
Window Cill
08 Size 27x3cm snow white marble window
cill weathered & throuted mounted in ml 130.00 224.00 29,120.00
place.
Step& tread
8. Galzing
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
01 Supply and fix 4mm plate glassmounted
between frames. Price shall includs all the
necessary glazing beads and putty. m2 263.00 90.00 23,670.00
9. Painting
Plastic emulsion paint
01 Apply 3 coats of approved type plastic
emulsion paints to internal plastered m2 4,740.00 16.00 75,840.00
vertical wall surface
02 Ditto but to External wall m3 1,570.00 18.00 28,260.00
10-SANITERY INSTALLATION
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Supply and fix toilet paper holder with
03 chrome plated brass wall flanged roll with
chrome plated fastening screws and other
accessories. pcs 30.00 55.00 1,650.00
Supply and fix crystal glass mirrors for
04 toilets and wash basins with copper back
protection, size: 500/400 mm including
chrome plated brass mirror clips with
chrome plated screws and etc... for hand
wash basins. pcs 30.00 350.00 10,500.00
Supply and fix single tubular chrome
05 plated swing pattern towel rails, with
chrome plated fastening screws, complete
with all the accessories. /For hand wash
basins/ pcs 30.00 55.00 1,650.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Supply and fix pressed steel enameled
11 cast iron shower tray, including shower
head, mixing faucet, smell trap, etc..
Complete with all the necessary
accessories. pcs
Size:- 700mm X 700mm pcs 18.00 2,000.00 36,000.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Supply and fix chrome valves of approved
02 standard before hand wash basins, water
closets and other fixtures. Complete with
unions, elastic water proofing, hand
wheels of normal quality and with all other
necessary accessories.
Dia. 15 mm pcs 167.00 210.00 35,070.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Dia. 75 mm pcs 4.00 45.00 180.00
Manhole
01 Manhole in bricks and with concrete base
internally of 700x700x700mm including
concrete cover with lifting hole. pcs 3.00 1,400.00 4,200.00
PVC pipes.
02 110 mm diameter. ml 100.00 52.50 5,250.00
3. kWH-Meters board
kWh Meter Board for 1 three-phase KWH-
01 meter, and 25single-phase KWH-meters
made of RHS frame and backelite board to
be fixed to wall as per EEPCo
requirement. pcs 1.00 45,220.00 45,220.00
4. Distribution Boards
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
8 pcs 16A, MCB, 1 Phase
1 pc 20A, MCB, 1 Phase
1 pc 50A MCB, 1Phase pcs 12.00 1,580.00 18,960.00
CABLES
01 3x6 mm sq. ml 350.00 52.00 18,200.00
6. Light Points
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
Points
02 Ditto, but with switch for water heeater pcs 60.00 110.00 6,600.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
02 RJ 11 outlet type LEGRAND 74341
category 5E with 4 contacts complete with
clip on support frame. pcs 48.00 90.00 4,320.00
12. TV System
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
08 RZB 621015.004 with 1xA60/60W lamp pcs 15.00 715.00 10,725.00
Disposal
03 Remove surplus excavated materials and
deposit to a distance ordered by the
Architect/Engineer from the site. m3 267.30 35.00 9,355.50
Paving
04 Supply and fix approved type of dresed or
rough dressed stone shall be fair cheseled
or dressed out of sound stone or
equivalent cement pevment tiles . Paving
materials shall be laid on compacted
earth/fill and 10mm sand bedding and
joints pointed with cement, sand, mix 1:2
mortar around the perifary of the building.
Price shall inludes all the necessary civil m2 297.00 195.00 57,915.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
02 Cold water pipes shall be galvanized steel
and be fixed to slabs, walls, beams or
etcwith metal straps or similar material.
Unit price shall include all assistance civil
works and necessary fittings such as T,
instruction and according to where shown
on the drawing. All water pipes shall be
tested two times the working pressure or
50 meters head, which ever is greater at
the expense of the contractor.
Dia. 20 mm ml 40.00 33.00 1,320.00
Dia. 65 mm ml 120.00 150.00 18,000.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
drainage systems as where shown on the
08
drawing in precast concrete round pipes
on 150mm thick reinforced concrete
bottom slab in dia.10c.c150mm both ways
and 120mm thick reinforced cover slab in
dia.10c.c150 mm both ways. Price shall
include all assistance civil works and
handle.
a) dia. 600 mm
average depth = 850 mm pcs 10.00 1,400.00 14,000.00
b) dia. 800 mm
average depth = 1200 mm pcs 6.00 2,100.00 12,600.00
Pumps Accessories
10 Centrifugal pumps
Domestic pumps
Supply,fix,test and commission approved
quality Electric driven centrifugal domestic
water pumps as per the manufacturer's
instruction, technical specification and
drawing shown.Price shall include all the
necessary valves (one-way and stop
valves), water hammer arrestor,common
base plate,level switch to protect dry-
running. (Duty and standby)
Capacity : Discharge =5.6 liters/second
Total head =28 meters
Estimated power = 4.0Kw
Efficiency >70% pcs 2.00 35,000.00 70,000.00
Supply and install Roto or Equivalent
11 approved quality elevated water tank on
concrete support as shown on the
Sanitary drawing and site plan.
Piping should be as per the detail drawing.
Price shall include all the necessary pipe
connections.
5m3 capacity pcs 2.00 10,000.00 20,000.00
Construct open ditch out of half precast
12 concrete round pipes Price shall include
excavation, cart away and all civil
works.and openable slab cover as shown
on the detailed drawing.
b) Ditch size: 1/2 Diameter 300mm ml 30.00 250.00 7,500.00
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
[ETB] [ETB]
GRAND SUMMARY
Sports Field
A. SUB - STRUCTURE
TOTAL ET.BIRR
862,604.00
577,176.50
376,819.00
11,834,020.00
9,939,481.00
23,590,100.50
Fill
Sub-base
Concrete work
In situ concrete
(Use ordinary portland cement)
06 Plain blinding concrete c-5 m3 8 900.00 7,200.00
Reinforced concrete sub-structure
07 C-25 in beam. m3 24 1,400.00 33,600.00
08 C-25 in R.C seat smooth finish while green m3 111 1,400.00 155,400.00
Form work
Sub-structure normal finish to
09 To beam m2 110 60.00 6,600.00
10 To R.C seat m2 90 60.00 5,400.00
Reinforcement
Excavation
(as per the attached soil report)
01 Excavation to design level. m3 901 30.00 27,030.00
Fill
Compaction shall be every 20 cm thick
until it attain aminimum proctor density
of 95%
02 Selected borrowed fill. m3 598 75.00 44,850.00
03 Disposal. m3 901 35.00 31,535.00
Sub-base
Sub-structure
Excavation
(as per the attached soil report)
Excavation to design level. m3 476 30.00 14,280.00
Fill
Compaction shall be every 20 cm thick
until it attain aminimuim proctor of 95%
02 Selected borrowed fill. m3 367 75.00 27,525.00
03 Disposal m3 476 35.00 16,660.00
Sub-base
04 25 cm thick basaltic hard core chocked
with crushed aggrigate size 50-70mm m2 404 55.00 22,220.00
05 7 cm thick crushed aggregate chocked
with crushed aggrigate size 50-70mm m2 162 20.00 3,240.00
03.CONCRET WORK
In situ concrete
(Use ordinary portland cement)
06 Plain blinding concretec- 5 m3 4 900.00 3,600.00
Reinforced concret sub-structure
07 C-25 in pedestal m3 1 1,400.00 1,400.00
08 C-25 in beam m3 13 1,400.00 18,200.00
09 C-25 in R.C seat smooth finish while green m3 60 1,400.00 84,000.00
Form work
Sub-structure normal finish to
10 To beam m2 64 60.00 3,840.00
11 To R.C seat m2 52 60.00 3,120.00
Reinforcement
12 DIA .8 mm Kg 1,412 15.50 21,886.00
13 DIA .10 mm Kg 1,106 15.00 16,590.00
14 DIA .12 mm Kg 1,552 15.00 23,280.00
15 DIA .16 mm Kg 558 15.00 8,370.00
Excavation
(as per the attached report)
01 Excavation to design level. m3 52,000 30.00 1,560,000.00
Fill
Compaction shall be every 20 cm thick
until it attain aminium density of 95%
02 Selected borrowed fill. m3 22,580 75.00 1,693,500.00
03 Fertile soil (foot ball filed) m 3
4,032 50.00 201,600.00
04 Disposal m3 51,261 35.00 1,794,135.00
Sub-base
04 25 cm thick hard core m2 3,590 55.00 197,450.00
03.Concrete work
Insitu concrete
Form work
Stone wall
In cement mortar
02.Excavation
(As per the attached soil report )
Trench excavation
02 Not exceeding 1.5 m m3 1,369 30.00 41,070.00
Fill
Compaction shall be every 20 cm thick
until it attain aminiuim proctor density of
03 95 %
Selected borrowed fill. m3 33,739 75.00 2,530,425.00
Sub base
In situ concrete
(Use ordinary portland cement)
Form work
Sub- structure normal finish to
Stone wall
Coppying
Paving
GRAND SUMMARY
Site Work Main Campus and Referral Hospital
A. SUB - STRUCTURE
TOTAL ET.BIRR
l Hospital
3,429,500.00
576,000.00
4,005,500.00
Architect/
Consultant
Procurement MUBP-90
Reference Number
ORT
May-16
LLE UNIVERISTY
YOHANNES ABAY
DENTIAL BUILDING
ESS REPORT
MONTHLY CONSTRUCTION PROGRESS REPORT
I.PROJECT INFORMATION
1.GENERAL
Report No 7
For the Month of APRIL
Date filled 7-May-16
contractor MOGET CONSTRUCTION PLC
Client MEKELLE UNIVERISTY
YOHANNES ABBAY CONSULTING ARCHITECTS &
Architect/Consultant ENGINEERS
2. PROJECT PARTICULAR
3. PROJECT STATUS
475.16
total
unit qty unit price %
amount
m2 703 5 3515 0.020
1683151 9.800