Overview of inside the cabinet Overview of inside the cabinet


(front closed door view) (front open door view)

Overview of jumper distribution Overview of inside the cabinet


(closed side view) (side view)

__________________________________________________________________________ 1
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview of ACPDB AC phase cable with label

Include spring washer,


and flat washer

Jumper-Feeder with color ring Installation bolt must have


and yellow plat label insulation pad on each cabinet

__________________________________________________________________________ 2
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview of DCPDB Cabinet Overview of RFC Cabinet


(GRFU and CPRI cable laying)

Fuse 160A
for Battery Fuse 100A
power MCB for for BTS
IDU and power
Alarm Box

Overview of E1 for DDF and IDU Overview of additional equipment


inside BTS include its spare at PDU fuse DC

__________________________________________________________________________ 3
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview of Inside-outside cable Overview of AC phase cable


blocked labeled inside BTS

Overview alarm battery temperature Overview of IDU power


Cable position with label

__________________________________________________________________________ 4
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview of IDU grounding Overview of coax lying with label


at BTS body

Overview of CPRI connection at Overview installation antistatic


GTMU board with label wrist strap

__________________________________________________________________________ 5
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview of power and signal cable installation power battery directly


not over heat ventilation connect to fuse

Overview of battery cabinet Install battery temperature sensor


(open side view) on left battery below

__________________________________________________________________________ 6
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview installation cable external Overview install cable external


alarm to EMU alarm to Rectifier

Overview installation alarm cable Overview installation alarm cable


on ACPDB to EMU on EMU to ACPDB

__________________________________________________________________________ 7
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview of PGND cable at Overview of PGND bar on


PGND bus bar Rectifier cabinet

PGND
3G Link LSA

2G LINK LSA

DDF installed between BBU and RTN board. Up middle and right LSA for 3G link
connection, bottom middle and right LSA for 2G link

__________________________________________________________________________ 8
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview of Microwave antenna Overview of microwave antenna


support Tightly tightened with ODU

MUST scratch the metal paint


before connect to tower body

Overview of ODU PGND connected Overview of ODU PGND


to near metal (tower) connected tightly

__________________________________________________________________________ 9
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview of coax PGND clip Overview of coax waterproofing


tightly connected to bus bar with label

Overview installation antenna Overview installation antenna


At tower bracket on top pole

__________________________________________________________________________ 10
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview installation antenna Overview installation antenna


Bracket on below pole accessories

Overview waterproofing antenna Overview waterproofing installation


installation with label from feeder to jumper with label

__________________________________________________________________________ 11
Huawei Confidential. No enclosure without permission
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only

Overview setting antenna Overview setting antenna


Electrical tilting manual tilting

Overview installation antenna Overview grounding clip on the


waterproofing for grounding clip ground bus bar at tower