PROJECT NO : BY:
Room No :
Location : Chiller No :
1 Model Type / Manefacturer : .
Capacity :
2 Refrigerant Type : ..
3 Compressor :
a. Compression Type :
Centrifugal Screw Reciprocating Scroll .........................
b. Casing Type
Hermetic / Semi - Hermetic Screw Reciprocating Scroll .........................
c. Electrical Chracteristic
d. Starter
Y - Closed Transition Y - Open Auto - Transformer ..........................................
e. Oil level checked ..........................................................................................
f. Oil failure switch differential ..........................................................................................
g. Bearing temperature ..........................................................................................
h. Chilled water Control setting ..........................................................................................
i. Condenser Water Control Setting ..........................................................................................
j. Low Pressure Cutout Setting ..........................................................................................
k. HIgh Pressure Cutout Setting ..........................................................................................
4 Temperature and Pressure Readings Type.
Conventional Gauge/Thermostat Digital
The Following Readings Type. Design Data Actual Data
11 General Comments
SUBMITTED BY : APPROVED BY :
Room No :
Location :
1 Quantity ..................................................................................................................................................................................set
Type / Manufacturer .......................................................................................................................................................................................
2 Duty : From Name Plate ...........................................................................................................................................
Water Cooling Capacity ...........................................................................................................................................
Fan Motor Make/Frame ...........................................................................................................................................
Fan Motor MP (kW) ...........................................................................................................................................
Volts and Ampere per Phase ...........................................................................................................................................
Motor and fan Sheave Diam/Bore ...........................................................................................................................................
No.of Belts/Make/Size ...........................................................................................................................................
Gear Box Specification ...........................................................................................................................................
Fan RPM ...........................................................................................................................................
3 The Visible Parts are clean. Yes No
4 Water Strainer is fitted in. Yes No
5 All pipes are connected correctly
Supply pipe Yes No
Return pipe Yes No
Make up pipe Yes No
Over flow & Drain Yes No
Equalizer pipe Yes No
6 Vibration isolators are provided. Yes No
7 All Units water levels are the same. Yes No
8 Open the drain at the buttom to see the dirt. Yes No
9 Open Shut off valve to check the float valve operation. Yes No
10 Rotate sprinkler (if any) by hand to see the free rotation. Yes No
11 Rotate the the fan by hand to be sure of free rotation and ample tip clearance. Yes No
12 Measure the supply voltage and check if power is suitaed with. Yes No
13 Run the fan monentarity to check the correct rotation. Yes No
14 Check for correct oil level if gear driven. Yes No
15 Check belt correct transion is belt driven. Yes No
During operation, all units supply and return water are correctly balanced and
16 Yes No
always
balanced even interchanging stand by and operation units.
17 During operation, The are free Unsual Noise/Vebration. Yes No
18 Water temp, control thermostat. Yes No
19 Cooling Tower Opertion Data Yes No
The following readings type. Design Data Actual Data
a. Air Flow Rate
b. Water Flow Rate
c. Inlet Static Pressure
d. Outlet Static Pressure
e. Average Entering Wet Bulb
f. Avarage Leaving Wet Bulb
g. Ambient Wet Bulb/Dry Bulb
h. Consumption Power/Amperages
20 During operation, there are free from unsual noise / vibration. Yes No
21 Manual/ Motorized valve.
Inlet Yes No
Outlet Yes No
22 Flexible pipe. Yes No
23 Condition of Cooling Tower
Unstatisfactory Poor Stisfactory Good Verry Good
Cooling Tower Inspection - Testing and Commissioning Document - TBI Project Management 3
24 Will Require replacement in
Immediatelly Within 12 Mounths 0-5 years 5-10 years 10+ years
25 General Comments
SUBMITTED BY : APPROVED BY :
Cooling Tower Inspection - Testing and Commissioning Document - TBI Project Management 4
PROJECT NAME : Holiday Inn Benoa - Bali DATE:
PROJECT NO : BY:
Room No :
Location :
26 General Comments
Chilled Water/ Condenser Water Pump Inspection - Testing and Commissioning Document - TBI Project Management 5
SUBMITTED BY : APPROVED BY :
Chilled Water/ Condenser Water Pump Inspection - Testing and Commissioning Document - TBI Project Management 6
PROJECT NAME : Holiday Inn Benoa - Bali DATE:
PROJECT NO : BY:
Room No :
Location : Fan Coil No. .................................................................................................
Refrigerant ............................................................................
Other.....................................................................................
3 Control Valve : Manual / Selenoid/ Modulating Other
Manufacturer .
4 Thermostat : Type .. Speed Selection .. Yes / No
Manufacturer : Type .
Fan Coil Units Inspection - Testing and Commissioning Document - TBI Project Management 7
c Leveling air Temperature (C/ %RH)
28 General Comments
SUBMITTED BY : APPROVED BY :
Fan Coil Units Inspection - Testing and Commissioning Document - TBI Project Management 8
PROJECT NAME : Holiday Inn Benoa - Bali DATE:
PROJECT NO : BY:
Room No :
Location : Fan Coil No. .................................................................................................
Air Handling Unit Inspection - Testing and Commissioning Document - TBI Project Management 9
Anti-vibration device have correct deflection Yes No
28 AHU Operation Data
The following readings type: Design Data Actual Data
a Air volume (L/S) / Wind Speed (M/S)
27 General Comments
SUBMITTED BY : APPROVED BY :
Air Handling Unit Inspection - Testing and Commissioning Document - TBI Project Management 10
PROJECT NAME : Holiday Inn Benoa - Bali DATE:
PROJECT NO : BY:
Location :
5 All components, bolts, fixings etc. Are secure and no distoration has taken place on the -
base in tightening. Yes No
7 The level and plumb of pump and motor shaft and slide rail are correct. Yes No
8 Anti-vibration device
Rubber pad : Yes No
Working : Yes No
22 On multi-speed motors check reduced speed rev/s and motor running currents. Yes No
24 General Comments
SUBMITTED BY : APPROVED BY :
Supply/ Exhaust Fan Inspection - Testing and Commissioning Document - TBI Project Management 11
PROJECT NAME : Holiday Inn Benoa - Bali DATE:
PROJECT NO : BY:
1 Model Type/Manufacturer ..
2 Duty : From name plate .. Motor Data ( Voltage / Ampere/ Hz) ..
Motor H.P .. Inlet diameter ..
Motor Pulley dia. (mm) ..
Blower pulley dia. (mm) ..
Fan Motor Make / Frame ..
Fan Motor kW/ RPM ..
Capacity ..
3 Air Modulation :
Ceiling by pass type Yes No
5 Control type
Pneumatic (Pressure depandent) Yes No
8 Thermostat Yes No
14 General Comments
SUBMITTED BY : APPROVED BY :
VAV Box Inspection - Testing and Commissioning Document - TBI Project Management 12
PROJECT NAME : Holiday Inn Benoa - Bali DATE:
PROJECT NO : BY:
Room No :
Location : Fan Coil No. .................................................................................................
Thickness.......................................................mm.
10 Return air provision :
Type : Chamber/Duct Size Yes No
Working : Yes No
27 General Comments
SUBMITTED BY : APPROVED BY :
Room No :
Location :
Vertical..................................mm Yes No
8 Piping Installation.
- Vibration Yes No
- Expansion Yes No
- Welding Yes No
- Threaded Yes No
- Leakage Yes No
10 Valve.
Type of valve ...........................................................................................................................................
Class ...........................................................................................................................................
Location ...........................................................................................................................................
Type of joint Threaded Flanged
Leakage Yes No
Cause ...........................................................................................................................................
...........................................................................................................................................
Sound Yes ..........................................................
Support No ...........................................................
Accessible Yes No
11 Hydrostatic Test Yes No
12 Painting Yes No
13 Support Yes No
Condensation Yes No
Cause of condensation ..........................................................................................
Any damage ..........................................................................................
18 Condition of Insulation
Unstatisfactory Poor Stisfactory Good Verry Good
19 General Comments
SUBMITTED BY : APPROVED BY :
Piping and Valve Inspection - Testing and Commissioning Document - TBI Project Management 14
PT.Total Bangun Persada PT.Tanjung Benoa Indonesia Intercontinental Hotel Group
Piping and Valve Inspection - Testing and Commissioning Document - TBI Project Management 15