I'm involved with a project that has tiit-up wall panels 16.7.1.

2-Embedded items are maintained in the


ith steel beam connection plates installed on the correct position while the concrete remains plastic.
face o f the panels. As with most tilt-up panels, 16.7.1.3-The concrete is properly consolidated
they're cast with the exterior face down. Section 4.5.6 o f around the embedded item."
ACI 551R-92, "Tilt-Up Concrete Structures,"' states: 'Yt is The commentary for Section 16.7.1 gives the rationale
important that embeds be securely anchored in place prior for this provision:
to casting and their location carefully checked." "Section 16.7.1 is an exception to the provisions of
We believe that we would achieve a better installation o f 7.5.1. Many precast products are manufactured in
these specific embeds by '%et setting" them in lieu o f trying such a way that it is difficult, if not impossible, to
to anchor them in place before the concrete is placed. This position reinforcement that protrudes from the
will enable us to better control the levelness o f the embed concrete before the concrete is placed. Such items as
plates and achieve better development o f the embedded ties for horizontal shear and inserts can be placed
anchors without additional chairing being used beneath the while the concrete is plastic, if proper precautions
plates. Further, to ensure the accuracy o f our placement, are taken. This exception is not applicable to
we'll not only confirm the placement coordination between reinforcement that is completely embedded, or to
the plate anchors and the preset reinforcing steel, but we'll embedded items that will be hooked or tied to
also locate the center o f the plates using a string line system embedded reinforcement."
established prior to placing the concrete. The commentary for Section 16.1, "Scope," states that
I interpret the statement from ACI 551R-92as instructional- "Tilt-up concrete construction is a form of precast
derting contractors to the importance o f anchoring and concrete." So the provision applies to both site-cast and
Gilsi
securing embedded items in place prior to placing concrete plant-cast precast members. TEI
for the panel, and I don't interpret this sentence to imply Ma1
that wet setting o f weld plates is not permitted. Does wet TEI

setting the weld plates violate any ACI building code 1. ACI Committee 551, "Tilt-Up Concrete Structures (ACI 551R-92)
Mev
TEI
irements? (Reapproved 2003)," American Concrete Institute, Farmington Hills, Vorl
Provisions in the precast concrete chapter of MI, 2003,46 pp. TEI
ACI 318-05' permit wet setting of weld plates when 2. ACI Committee 318, "Building Code Requirements for Structural Box
TEI
approved by the registered design professional. Section 16.7 Concrete (ACI 318-05) and Commentary (ACI 318R-05)," American PCP
is titled "Items embedded after concrete placement," and Concrete Institute, Farmington Hills, MI, 2005,430 pp. TEI
Section 16.7.1 states: PNP
TEI
"When approved by the registered design professional,
Proc
embedded items (such as dowels or inserts) that TEI
either protrude from the concrete or remain exposed Qua
TEI
for inspection %hallbe permitted to be embedded
while the concrete is in a plastic state provided that Qua
TEI
16.7.1.1, 16.7.1.2,and 16.7.1.3 are met. %off
16.7.1.1-Embedded items are not required TE