Ao Poblacion

2007 805
2008 812
2009 819
2010 825
2011 832
1 2012 839
2 2013 846
3 2014 854
4 2015 861
5 2016 868
6 2017 875
7 2018 883
8 2019 890
9 2020 897
10 2021 905
Tasa de crecimiento Poblacional = 0.84%
Censo 2007
RESUMEN DEL MONTO DE INVERSION
ALTERNATIVA 1 ( a Precios Privados)
(En Nuevos Soles)
COSTO DIRECTO 187,140.90
GASTOS GENERALES (10%) 18,714.09
UTILIDAD (5%) 9,357.04
SUB TOTAL 215,212.04
IGV(18%) 38,738.17
COSTO TOTAL DE LA OBRA 253,950.21

INTANGIBLES
SUPERVISION(5% CT) = 9,357.04
EXPEDIENTE TECNICO (5% CT) = 9,357.04
GASTOS DE MITIGACION AMBIENTAL (3 %) 5,614.23
SUB TOTAL 24,328.32

MONTO DE INVERSION S/. = 278,278.53

RESUMEN DEL MONTO DE INVERSION


ALTERNATIVA 1 ( a Precios Sociales)
(En Nuevos Soles)
PRESUPUESTO TOTAL DE LA OBRA 219,840.04

RESUMEN DE INVERSIONES POR ALTERNATIVA


INVERSIN PRECIOS SOCIALES
COSTOS ALTERNATIVA 1
Costo Directo 187,140.90
Gastos Generales 18,714.09
Utilidad 9,357.04
IGV 38,738.17
Supervisin 9,357.04
Expediente Tcnico 9,357.04
278,278.53

219840.04
RESUMEN DEL MONTO DE INVERSION
ALTERNATIVA 2 ( a Precios Privados)
(En Nuevos Soles)
COSTO DIRECTO 217,140.90
GASTOS GENERALES (10%) 21,714.09
UTILIDAD (5%) 10,857.04
SUB TOTAL 249,712.03
IGV(19%) 47,445.29
COSTO TOTAL DE LA OBRA 297,157.32

INTANGIBLES
SUPERVISION(5% CT) = 10,857.04
EXPEDIENTE TECNICO (3% CT) = 10,857.04
- GASTOS DE MITIGACION AMBIENTAL (3 %) 6,514.23
SUB TOTAL 28,228.32

MONTO DE INVERSION S/. = 325,385.64

RESUMEN DEL MONTO DE INVERSION


ALTERNATIVA 2 ( a Precios Sociales)
(En Nuevos Soles)
PRESUPUESTO TOTAL DE LA OBRA 257,054.65

NES POR ALTERNATIVA


ERSIN PRECIOS SOCIALES
ALTERNATIVA 2
217,140.90
21,714.09
10,857.04
47,445.29
10,857.04
10,857.04
EVALUACION COSTO EFECTIVIDAD
PRECIOS SOCIALES ALTERNATIVA 1
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO POBLACION
COST. COST. INCREMENTAL BENEFICIADA
INVERSIONES
MANTENIMIENTO. MANTENIMIENTO
0 219,840.04 219,840.04
1 0.00 5899.86 5899.86 839
2 0.00 5899.86 5899.86 846
3 0.00 5899.86 5899.86 854
4 0.00 5899.86 5899.86 861
5 0.00 12389.71 12389.71 868
6 0.00 5899.86 5899.86 875
7 0.00 5899.86 5899.86 883
8 0.00 5899.86 5899.86 890
9 0.00 5899.86 5899.86 897
10 0.00 12389.71 12389.71 905
VAC S/. 260,722.71
Promedio Poblacion Beneficiada 872.36
ICE (S/. X Poblacion Beneficiada) S/. 298.87
EVALUACION COSTO EFECTIVIDAD
PRECIOS SOCIALES ALTERNATIVA 2
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO
COST. COST.
INVERSIONES INCREMENTAL
MANTENIMIENTO MANTENIMIENTO
0 257,054.65 257,054.65
1 0.00 6439.86 6439.86
2 0.00 6439.86 6439.86
3 0.00 6439.86 6439.86
4 0.00 6439.86 6439.86
5 0.00 13523.71 13523.71
6 0.00 6439.86 6439.86
7 0.00 6439.86 6439.86
8 0.00 6439.86 6439.86
9 0.00 6439.86 6439.86
10 0.00 13523.71 13523.71
VAC S/. 301,679.22
Promedio Poblacion Beneficiada 540.00
ICE (S/. X Poblacion Beneficiada) S/. 558.66

0.53
POBLACION
BENEFICIADA

475
488
502
516
530
545
561
576
592
609
CUADRO 05

RESUMEN COSTO OPERACIN Y MANTENIMIENTO

PRECIOS PRIVADOS
(EN NUEVOS SOLES)
Con Proyecto
Actividad Periodo Sin Proyecto
Alternativa 1 Alternativa 2
Mantenimiento Rutinario Anual 0.00 7866.48 8586.48
Mantenimiento Periodico 1/ 0.00 16519.61 18031.61
Factor de Conversin a Precios Privados 0.75
CUADRO 05

RESUMEN COSTO OPERACIN Y MANTENIMIENTO

PRECIOS SOCIALES
(EN NUEVOS SOLES)
Sin Con Proyecto
Actividad Periodo
Proyecto Alternativa 1 Alternativa 2
Mantenimiento Rutinario Anual 0.00 5899.86 6439.86
Mantenimiento Periodico 1/ 0.00 12389.71 13523.71
Factor de Conversin a Precios Sociales
EVALUACION COSTO EFECTIVIDAD - PAVIMENTO DESMONTABLE ( Puente)
PRECIOS PRIVADOS ALTERNATIVA 1
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO POBLACION
COST. COST.
INVERSIONES INCREMENTAL BENEFICIADA
MANTENIMIENTO. MANTENIMIENTO
0 278,278.53 278,278.53
1 0.00 7866.48 7866.48 839
2 0.00 7866.48 7866.48 846
3 0.00 7866.48 7866.48 854
4 0.00 7866.48 7866.48 861
5 0.00 16519.61 16519.61 868
6 0.00 7866.48 7866.48 875
7 0.00 7866.48 7866.48 883
8 0.00 7866.48 7866.48 890
9 0.00 7866.48 7866.48 897
10 0.00 16519.61 16519.61 905
VAC S/. 332,788.76
Promedio Poblacion Beneficiada 872.36
ICE (S/. X Poblacion Beneficiada) S/. 381.48
m de Pavimento 32.00
ICE (S/. X m ) S/. 10,399.65

EVALUACION COSTO EFECTIVIDAD - PAVIMENTO DESMONTABLE ( Puente)


PRECIOS SOCIALES ALTERNATIVA 1
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO POBLACION
COST. COST.
INVERSIONES INCREMENTAL BENEFICIADA
MANTENIMIENTO. MANTENIMIENTO
0 219,840.04 219,840.04
1 0.00 5899.86 5899.86 839
2 0.00 5899.86 5899.86 846
3 0.00 5899.86 5899.86 854
4 0.00 5899.86 5899.86 861
5 0.00 12389.71 12389.71 868
6 0.00 5899.86 5899.86 875
7 0.00 5899.86 5899.86 883
8 0.00 5899.86 5899.86 890
9 0.00 5899.86 5899.86 897
10 0.00 12389.71 12389.71 905
VAC S/. 260,722.71
Promedio Poblacion Beneficiada 872.36
ICE (S/. X Poblacion Beneficiada) S/. 298.87
M2 de Pavimento 32.00
ICE (S/. X M2 ) S/. 8,147.58
INDICADORES COSTO - EFECTIVIDAD - PRIVADOS
Concepto Indicador Alternativa 1 Alternativa 2
VAC S/. 332,788.76 S/. 384,885.06
PUENTE 1/
ICE (S/.Hab) S/. 381.48 S/. 441.20

INDICADORES COSTO - EFECTIVIDAD - SOCIALES


Concepto Indicador Alternativa 1 Alternativa 2
VAC S/. 260,722.71 S/. 301,679.22
PUENTE 1/
ICE (S/.Hab) S/. 298.87 S/. 345.82
EVALUACION COSTO EFECTIVIDAD - PAVIMENTO RIGIDO
PRECIOS PRIVADOS ALTERNATIVA 2
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO POBLACION
COST. COST.
INVERSIONES INCREMENTAL BENEFICIADA
MANTENIMIENTO. MANTENIMIENTO
0 325,385.64 325,385.64
1 0.00 8586.48 8586.48 839
2 0.00 8586.48 8586.48 846
3 0.00 8586.48 8586.48 854
4 0.00 8586.48 8586.48 861
5 0.00 18031.61 18031.61 868
6 0.00 8586.48 8586.48 875
7 0.00 8586.48 8586.48 883
8 0.00 8586.48 8586.48 890
9 0.00 8586.48 8586.48 897
10 0.00 18031.61 18031.61 905
VAC S/. 384,885.06
Promedio Poblacion Beneficiada 872.36
ICE (S/. X Poblacion Beneficiada) S/. 441.20
m de Pavimento 32.00
ICE (S/. X m ) S/. 12,027.66

EVALUACION COSTO EFECTIVIDAD - PAVIMENTO RIGIDO


PRECIOS SOCIALES ALTERNATIVA 2
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO POBLACION
COST. COST.
INVERSIONES INCREMENTAL BENEFICIADA
MANTENIMIENTO. MANTENIMIENTO
0 257,054.65 257,054.65
1 0.00 6439.86 6439.86 839
2 0.00 6439.86 6439.86 846
3 0.00 6439.86 6439.86 854
4 0.00 6439.86 6439.86 861
5 0.00 13523.71 13523.71 868
6 0.00 6439.86 6439.86 875
7 0.00 6439.86 6439.86 883
8 0.00 6439.86 6439.86 890
9 0.00 6439.86 6439.86 897
10 0.00 13523.71 13523.71 905
VAC S/. 301,679.22
Promedio Poblacion Beneficiada 872.36
ICE (S/. X Poblacion Beneficiada) S/. 345.82
M2 de Pavimento 32.00
ICE (S/. X M2 ) S/. 9,427.48
EVALUACION COSTO EFECTIVIDAD - PAVIMENTO DESMONTABLE ( ADOQUINADO)
PRECIOS SOCIALES ALTERNATIVA 1
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO POBLACION
COST. COST.
INVERSIONES INCREMENTAL BENEFICIADA
MANTENIMIENTO. MANTENIMIENTO
0 219,840.04 219,840.04
1 0.00 5899.86 5899.86 839
2 0.00 5899.86 5899.86 846
3 0.00 5899.86 5899.86 854
4 0.00 5899.86 5899.86 861
5 0.00 12389.71 12389.71 868
6 0.00 5899.86 5899.86 875
7 0.00 5899.86 5899.86 883
8 0.00 5899.86 5899.86 890
9 0.00 5899.86 5899.86 897
10 0.00 12389.71 12389.71 905
VAC S/. 260,722.71
Promedio Poblacion Beneficiada 871.83
ICE (S/. X Poblacion Beneficiada) S/. 299.05
M2 de Pavimento 32.00
ICE (S/. X M2 ) S/. 8,147.58
EVALUACION COSTO EFECTIVIDAD - PAVIMENTO RIGIDO (Puente)
PRECIOS SOCIALES ALTERNATIVA 2
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COST. COSTO POBLACION
COST.
MANTENIMIEN INVERSIONES INCREMENTAL BENEFICIADA
MANTENIMIENTO.
TO
0 257,054.65 257,054.65
1 0.00 6439.86 6439.86 475
2 0.00 6439.86 6439.86 488
3 0.00 6439.86 6439.86 502
4 0.00 6439.86 6439.86 516
5 0.00 13523.71 13523.71 530
6 0.00 6439.86 6439.86 545
7 0.00 13523.71 13523.71 561
8 0.00 6439.86 6439.86 576
9 0.00 13523.71 13523.71 592
10 0.00 13523.71 13523.71 609
VAC S/. 307,860.47
Promedio Poblacion Beneficiada 539.47
ICE (S/. X Poblacion Beneficiada) S/. 570.67
M2 de Pavimento 32.00
ICE (S/. X M2 ) S/. 9,620.64
RESULTADO DE ANALISIS DE SENSIBILIDAD PISTA
ALTERNATIVA 1
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO POBLACION
COST. COST.
INVERSIONES INCREMENTAL BENEFICIADA
MANTENIMIENTO. MANTENIMIENTO
0 278,278.53 278,278.53
1 0.00 7866.48 7866.48 839
2 0.00 7866.48 7866.48 846
3 0.00 7866.48 7866.48 854
4 0.00 7866.48 7866.48 861
5 0.00 16519.61 16519.61 868
6 0.00 7866.48 7866.48 875
7 0.00 7866.48 7866.48 883
8 0.00 7866.48 7866.48 890
9 0.00 7866.48 7866.48 897
10 0.00 16519.61 16519.61 905
VAC S/. 332,788.76
Promedio Poblacion Beneficiada 871.83
ICE (S/. X Poblacion Beneficiada) S/. 381.71
M2 de Pavimento 2481.06
ICE (S/. X M2 ) S/. 134.13

INVERSION = 20%

ALTERNATIVA 1
En Nuevos Soles

AOS SIN PROYECTO CON PROYECTO


COSTO POBLACION
COST. COST.
INVERSIONES INCREMENTAL BENEFICIADA
MANTENIMIENTO. MANTENIMIENTO
0 333,934.23 333,934.23
1 0.00 7866.48 7866.48 839
2 0.00 7866.48 7866.48 846
3 0.00 7866.48 7866.48 854
4 0.00 7866.48 7866.48 861
5 0.00 16519.61 16519.61 868
6 0.00 7866.48 7866.48 875
7 0.00 7866.48 7866.48 883
8 0.00 7866.48 7866.48 890
9 0.00 7866.48 7866.48 897
10 0.00 16519.61 16519.61 905
VAC S/. 388,444.47
Promedio Poblacion Beneficiada 871.83
ICE (S/. X Poblacion Beneficiada) S/. 445.55
M2 de Pavimento 2481.06
ICE (S/. X M2 ) S/. 156.56
RESULTADOS DEL ANALISIS DE SOSTENIBILIDAD (Puente)
ALTERNATIVA 1
EN NUEVOS SOLES

Factor de Variacion VAC


1.20 312,867.26
1.15 299,831.12
0 260,722.71
0.85 221,614.31
0.8 208,578.17

VAC social
ICE PUENTES
ICE puentes < valor referencial

Sensibilidad de ICE puentes


ISIS DE SOSTENIBILIDAD (Puente)
TERNATIVA 1
NUEVOS SOLES
Linea Referencial
S/.M2 MTC (S/.M2)
9,777.10
9,369.72
8,147.58 64.00
6,925.45
6,518.07

Alternativa 1 Alternativa 2
S/. 260,722.71 ###
S/. 8,147.58 S/. 9,427.48
Si No

Hasta 20% No se puede


evaluar
ALTERNATIVA N 01
COEFICIENTE COSTO / EFECTIVIDAD

A precios A precios
RUBROS
Privados Sociales

Valor Actual de Costos (VAC) 530,213.81 453,583.28

Indicador de Resultado:

M2 de Pavimento 2,481.06 2,481.06

Coeficiente Costo / Efectividad B 213.70 182.82

Indicador costo/efectividad:
Valor Actual de Costos a Precio Privado o Precios Sociales (/S)
M2 de Pavimento 0
ALTERNATIVA N 01
COEFICIENTE COSTO / EFECTIVIDAD

A precios A precios
RUBROS
Privados Sociales

Valor Actual de Costos (VAC) 623,661.05 533,706.93

Indicador de Resultado:

M2 de Pavimento 2,481.06 2,481.06

Coeficiente Costo / Efectividad B 251.37 215.11

Indicador costo/efectividad:
Valor Actual de Costos a Precio Privado o Precios Sociales (/S)
M2 de Pavimento
COSTOS DE OPERACIN SIN PROYECTO

CONCEPTOS MESES CANTIDAD P.U.

REMUNERACIONES
Trabajador de Servicios II (Limpieza) 12.00 1.00 0.00
SERVICIOS BSICOS
Agua 12.00 1.00 0.00

Telfono 12.00 1.00 0.00

GASTOS GENERALES (Articulos de Oficina) 12.00 1.00 0.00


TOTAL OPERACIN

COSTOS DE MANTENIMIENTO SIN PROYECTO


CONCEPTOS MESES CANTIDAD P.U.
Bienes (pintura, accesorios, etc.) 12.00 1.00 0.00
mano de obra 12.00 1.00 0.00
gastos generales: instalaciones, servicio de limpieza, et 12.00 1.00 0.00
TOTAL MANTENIMIENTO

TOTAL COSTOS DE OPERACIN Y MANTENIMIENTO

ALTERNATIVA 1
COSTOS DE OPERACIN
CONCEPTOS MESES CANTIDAD P.U.
REMUNERACIONES
Trabajador de Servicios II (Limpieza) 12.00 1.00 120.00
SERVICIOS BSICOS
Agua 12.00 1.00 0.54
Telfono 12.00 1.00 50.00
GASTOS GENERALES (Articulos de Oficina) 12.00 1.00 150.00
TOTAL OPERACIN

COSTOS DE MANTENIMIENTO
CONCEPTOS MESES CANTIDAD P.U.
Bienes (pintura, accesorios, etc.) 12.00 1.00 65.00
mano de obra 12.00 1.00 120.00
gastos generales: instalaciones, servicio de limpieza, et 12.00 1.00 150.00
TOTAL MANTENIMIENTO

TOTAL COSTOS DE OPERACIN Y MANTENIMIENTO

ALTERNATIVA 2
COSTOS DE OPERACIN

CONCEPTOS MESES CANTIDAD P.U.


REMUNERACIONES
Trabajador de Servicios II (Limpieza) 12.00 1.00 120.00
SERVICIOS BSICOS
Agua 12.00 1.00 0.54
Telfono 12.00 1.00 50.00
GASTOS GENERALES (Articulos de Oficina) 12.00 1.00 180.00
TOTAL OPERACIN

COSTOS DE MANTENIMIENTO
CONCEPTOS MESES CANTIDAD P.U.
Bienes (pintura, accesorios, etc.) 12.00 1.00 65.00
mano de obra 12.00 1.00 120.00
gastos generales: instalaciones, servicio de limpieza, et 12.00 1.00 180.00
TOTAL MANTENIMIENTO

TOTAL COSTOS DE OPERACIN Y MANTENIMIENTO


PROYECTO
PRECIO
F.C. PRECIO SOCIAL
PRIVADO

0.00 0.41 0 0.00

0.00 0.84 0 0.00

0.00 0.84 0 0.00

0.00 0.84 0 0.00


- -

SIN PROYECTO
PRECIO
PRECIO SOCIAL
PRIVADO
0.00 0.84 0 0.00
0.00 0.41 0 0.00
0.00 0.84 0 0.00
- -

- -

CIN
PRECIO
F.C. PRECIO SOCIAL
PRIVADO

1440.00 0.41 590.4 1310.40

6.48 0.84 5.4432 5.90


600.00 0.84 504 504.00
1800.00 0.84 1512 1512.00
3,846.48 2,611.84

IENTO
PRECIO
PRECIO SOCIAL
PRIVADO
780.00 0.84 655.2 655.20
1440.00 0.41 590.4 1209.60
1800.00 0.84 1512 1512.00
4,020.00 2,757.60

7,866.48 5,369.44

CIN
PRECIO
F.C. PRECIO SOCIAL
PRIVADO
1440.00 0.41 590.4 1310.40

6.48 0.84 5.4432 5.90


600.00 0.84 504 504.00
2160.00 0.84 1814.4 1814.40
4,206.48 2,914.24

IENTO
PRECIO
PRECIO SOCIAL
PRIVADO
780.00 0.84 655.2 655.20
1440.00 0.41 590.4 1209.60
2160.00 0.84 1814.4 1814.40
4,380.00 3,060.00

8,586.48 5,974.24
RESUMEN DE COSTOS DE OPERACIN Y MANTENIMIENTO

COSTOS O & M PRECIOS PRIVADOS


ALTERNATIVA 1 ALTERNATIVA 2
OPERACIN 3,846.48 4,206.48
MANTENIMIENTO 4,020.00 4,380.00
TOTAL 7,866.48 8,586.48
OPERACIN SIN
PROYECTO -
MANTENIMIENTO SIN
PROYECTO -
TOTAL -
RESUMEN DE COSTOS DE OPERACIN Y MANTENIMIENTO

COSTOS O & M PRECIOS SOCIALES


ALTERNATIVA 1 ALTERNATIVA 2
OPERACIN 2,611.84 2,914.24
MANTENIMIENTO 2,757.60 3,060.00
TOTAL 5,369.44 5,974.24
OPERACIN SIN
PROYECTO -
MANTENIMIENTO SIN
PROYECTO -
TOTAL -
RESUMEN DEL MONTO DE INVERSION
ALTERNATIVA 1 ( a Precios Privados)
(En Nuevos Soles)
Factor de
Precio Privados Correccin Precios Sociales
COSTO DIRECTO 187,140.90
GASTOS GENERALES (10%) 18,714.09
UTILIDAD (5%) 9,357.04
SUB TOTAL 215,212.04
IGV(18%) 38,738.17
COSTO TOTAL DE LA OBRA 253,950.21

INTANGIBLES
SUPERVISION(5% CT) = 9,357.04
EXPEDIENTE TECNICO (5% CT) = 9,357.04
GASTOS DE MITIGACION AMBIENTAL (3 %) 5,614.23
SUB TOTAL 24,328.32

MONTO DE INVERSION S/. = 278,278.53 0.79 219,840.04


Nota:Para la convesion de PP a PS el sector Transportes ha establecido factores de correccin 0.79 para Inversin y
0.75 para Operacin y Mantenimiento

RESUMEN DEL MONTO DE INVERSION


ALTERNATIVA 2 ( a Precios Privados)
(En Nuevos Soles)
Factor de
Precio Privados Correccin Precios Sociales
COSTO DIRECTO 14,000.00
GASTOS GENERALES (10%) 1,400.00
UTILIDAD (5%) 700.00
SUB TOTAL 16,100.01
IGV(18%) 2,898.00
COSTO TOTAL DE LA OBRA 18,998.01

INTANGIBLES
SUPERVISION(5% CT) = 700.00
EXPEDIENTE TECNICO (5% CT) = 700.00
GASTOS DE MITIGACION AMBIENTAL (3 %) 420.00
SUB TOTAL 1,820.00

MONTO DE INVERSION S/. = 20,818.01 0.79 16,446.23


Nota:Para la convesion de PP a PS el sector Transportes ha establecido factores de correccin 0.79 para Inversin y
0.75 para Operacin y Mantenimiento

RESUMEN DEL MONTO DE INVERSION


ALTERNATIVA 1 ( a Precios Sociales)
(En Nuevos Soles)
PRESUPUESTO TOTAL DE LA OBR 219,840.04

RESUMEN DE INVERSIONES POR ALTERNATIVA


INVERSIN PRECIOS SOCIALES
COSTOS ALTERNATIVA 1
Costo Directo 187,140.90
Gastos Generales 18,714.09
Utilidad 9,357.04
IGV 38,738.17
Supervisin 9,357.04
Expediente Tcnico 9,357.04
278,278.53

219840.037848614
RESUMEN DEL MONTO DE INVERSION
ALTERNATIVA 2 ( a Precios Privados)
(En Nuevos Soles)
Precio Factor de
Privados Correccin Precios Sociales
COSTO DIRECTO 217,140.90
GASTOS GENERALES (10%) 21,714.09
UTILIDAD (5%) 10,857.04
SUB TOTAL 249,712.03
IGV(18%) 44,948.17
COSTO TOTAL DE LA OBRA 294,660.20

INTANGIBLES
SUPERVISION(5% CT) = 10,857.04
EXPEDIENTE TECNICO (5% CT) = 10,857.04
GASTOS DE MITIGACION AMBIENTAL (3 %) 6,514.23
SUB TOTAL 28,228.32

MONTO DE INVERSION S/. = 322,888.52 0.79 255,081.93


Nota:Para la convesion de PP a PS el sector Transportes ha establecido factores de correccin 0.79 para
Inversin y 0.75 para Operacin y Mantenimiento
SIN PRECIOS SOCIALES
ALTERNATIVA 2
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Caractersticas Tcnicas SIN PROYECTO

Puente

Longitud de Puente (m) 16.00

Ancho de Puente (m) 1.00

Estribos Piedra sin fijar

Plataforma Palos de eucalipto

Vigas de superestructura ******

Vigas de la torre *****

Torre *****

Cmara de anclaje *****

Superestructura *****

Barandas *****

Guarnicin ******
IN PROYECTO ALTERNATIVA 1 ALTERNATIVA 2

20.00 20.000

2.50 2.50

Piedra sin fijar Concreto Armado Concreto Armado

los de eucalipto Concreto Armado Concreto Armado

Loza Maciza Vigas de Fierro

Concreto Concreto

Concreto Concreto

Concreto Concreto

Concreto Acero -Madera


Fierro Fierro

***** *******
PRESUPUESTO - ALTERNATIVA 01
PROYECTO:
PUNTE PEATONAL EL BADO, CASERIO AGUA BLANCA Y YAMOBAMBA

ITEM DESCRIPCION Und Metrado Precio S/.


01 TRABAJOS PROVISIONALES

01.01 CASETA DE ALMACEN Y GUARDIANIA GBL 1.00 1,500.00

02 TRABAJOS PRELIMINARES

02.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 3.60 m. GIGANTOGRAFIA UND 1.00 750.00

02.02 ELIMINACION DE ARBOLES Y RAICES MANUAL UND 5.00 45.00

02.03 RETIRO TABLERO DE MADERA PUENTE EXISTENTE M2 32.00 65.00

02.04 RETIRO VIGAS DE MADERA PUENTE EXISTENTE UND 2.00 65.00

02.05 DEMOLICION DE MURO DE MAMPOSTERIA DE PIEDRA CON MAQUINARIA M3 48.96 35.66

02.06 LIMPIEZA EN AREA DE TRABAJO M2 600.00 2.95

02.07 POSTES PARA SEALIZACIONES EN OBRAS 3", h=1m, dados 0.30m x 0.30m x0.10m, PINTADOS rojo y blanco UND 8.00 15.39
alternado
02.08 CINTA SEALIZADORA DE SEGURIDAD EN OBRA ML 200.00 0.74

02.09 DERIVACION AGUAS DEL RIO GBL 1.00 2,000.00

02.10 TRAZO DE NIVELES Y REPLANTEO M2 50.00 0.92

03 MOVIMIENTO DE TIERRAS

03.01 EXCAVACION ESTRUCTURAS DE MATERIAL GRANULAR L H=4.50m: TERRENO NORMAL M3 382.50 16.06

03.02 RELLENO C/MATERIAL PROPIO: COMPACTACION CON PLANCHA 4HP M3 277.54 14.21

03.03 ELIMINACION DE EXCEDENTES C/VQTE 10 M3 Y CARGADOR D<5KM. M3 187.15 17.82

04 OBRAS DE CONCRETO SIMPLE

04.01 COLOCACION Y CONFORMACION DE OVER E=0.30 M. C/EQUIPO EN ESTRIBOS M2 68.78 28.84

04.02 COMPACTACION DE OVER E=0.40 M. C/EQUIPO EN ESTRIBOS M2 68.78 5.42

04.03 SOLADO DE CONCRETO P/ESTRIBOS Mezcla C:H 1:12, e=4" M2 68.78 15.66

05 OBRAS DE CONCRETO ARMADO

05.01 ESTRUCTURA DE PUENTE: ACERO FY=4200 kG/CM2 KG 5,623.93 3.80

05.02 ESTRUCTURADE PUENTE: ENCOFRADO Y DESENCOFRADO M2 496.20 36.80

05.03 PUENTE: CONCRETO f'c=210 Kg/cm2, ACABADO FROTACHADO. M3 139.96 289.01

06 JUNTAS DE DILATACION
06.01 JUNTAS DE DILATACION CON ASFALTO-ARENA E=1", A=0.20m. M 120.00 2.09
.07 ESTRUCTURA METALICA
07.01 BARANDAS METALICAS M 280.00 150.00
07.02 PLANCHAS METALICAS U 60.00 45.00
07.03 PERNOS 1" U 48.00 3.00
08 PINTURA
08.01 PINTURA OLEO MATE:2 MANOS EN BARANDA METALICA M2 280.00 19.84
09 TRASLADO DE MAQUINARIA PESADA
08.01 TRASLADO DE MAQUINARIA PESADA A OBRA GLB 2.00 7,000.00
10 SEGURIDAD EN OBRA
08.01 PINTURA OLEO MATE:2 MANOS EN BARANDA METALICA GLB 1.00 5,000.00
11 TRANSPORTE
08.01 FLETE TERRESTRE RURAL GLB 1.00 10,000.00

GASTOS GENERALES 10.00%


UTILIDAD 5.00%

SUB TOTAL
IGV 18.00%

TOTAL PRESUPUESTO
GASTOS DE SUPERVISION (5 %)
GASTOS DE ELABORACION DE EXPEDIENTE TECNICO (5%)
GASTOS DE MITIGACION AMBIENTAL (3 %)

MONTO TOTAL DE INVERSION


Parcial S/.

1,500.00

750.00

225.00

2,080.00

130.00

1,745.91

1,770.00

123.12

148.00

2,000.00

46.00

6,142.95

3,943.81

3,335.09

1,983.62

372.79

1,077.09

21,370.93

18,260.16

40,450.42

250.80

42,000.00
2,700.00
180.00

5,555.20

14,000.00

5,000.00

10,000.00
187,140.90 93316.16
18,714.09
9,357.04
============
215,212.04
38,738.17
============
253,950.21
9,357.04
9,357.04
5,614.23
============

278,278.53
PRESUPUESTO - ALTERNATIVA 02
PROYECTO:
PUNTE PEATONAL EL BADO, CASERIO AGUA BLANCA Y YAMOBAMBA

ITEM DESCRIPCION Und


01 TRABAJOS PROVISIONALES

01.01 CASETA DE ALMACEN Y GUARDIANIA GBL

02 TRABAJOS PRELIMINARES

02.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 3.60 m. GIGANTOGRAFIA UND

02.02 ELIMINACION DE ARBOLES Y RAICES MANUAL UND

02.03 RETIRO TABLERO DE MADERA PUENTE EXISTENTE M2

02.04 RETIRO VIGAS DE MADERA PUENTE EXISTENTE UND

02.05 DEMOLICION DE MURO DE MAMPOSTERIA DE PIEDRA CON MAQUINARIA M3

02.06 LIMPIEZA EN AREA DE TRABAJO M2

02.07 POSTES PARA SEALIZACIONES EN OBRAS 3", h=1m, dados 0.30m x 0.30m x0.10m, PINTADOS rojo y blanco UND
alternado
02.08 CINTA SEALIZADORA DE SEGURIDAD EN OBRA ML

02.09 DERIVACION AGUAS DEL RIO GBL

02.10 TRAZO DE NIVELES Y REPLANTEO M2

03 MOVIMIENTO DE TIERRAS

03.01 EXCAVACION ESTRUCTURAS DE MATERIAL GRANULAR L H=4.50m: TERRENO NORMAL M3

03.02 RELLENO C/MATERIAL PROPIO: COMPACTACION CON PLANCHA 4HP M3

03.03 ELIMINACION DE EXCEDENTES C/VQTE 10 M3 Y CARGADOR D<5KM. M3

04 OBRAS DE CONCRETO SIMPLE

04.01 COLOCACION Y CONFORMACION DE OVER E=0.30 M. C/EQUIPO EN ESTRIBOS M2

04.02 COMPACTACION DE OVER E=0.40 M. C/EQUIPO EN ESTRIBOS M2

04.03 SOLADO DE CONCRETO P/ESTRIBOS Mezcla C:H 1:12, e=4" M2

05 OBRAS DE CONCRETO ARMADO

05.01 ESTRUCTURA DE PUENTE: ACERO FY=4200 kG/CM2 KG

05.02 ESTRUCTURADE PUENTE: ENCOFRADO Y DESENCOFRADO M2

05.03 PUENTE: CONCRETO f'c=210 Kg/cm2, ACABADO FROTACHADO. M3

05.04 ESTRUCTURA VIGAS DE ACERO: APOYO FIJO-NEOPRENE SHORE GRADO 60 U

06 JUNTAS DE DILATACION
06.01 JUNTAS DE DILATACION CON ASFALTO-ARENA E=1", A=0.20m. M
.07 ESTRUCTURA METALICA
07.01 BARANDAS METALICAS M
07.02 PLANCHAS METALICAS U
07.03 PERNOS 1" U
08 PINTURA
08.01 PINTURA OLEO MATE:2 MANOS EN BARANDA METALICA M2
09 TRASLADO DE MAQUINARIA PESADA
08.01 TRASLADO DE MAQUINARIA PESADA A OBRA GLB
10 SEGURIDAD EN OBRA
08.01 PINTURA OLEO MATE:2 MANOS EN BARANDA METALICA GLB
11 TRANSPORTE
08.01 FLETE TERRESTRE RURAL GLB

GASTOS GENERALES 10.00%


UTILIDAD 5.00%
SUB TOTAL
IGV 18.00%

TOTAL PRESUPUESTO
GASTOS DE SUPERVISION (5 %)
GASTOS DE ELABORACION DE EXPEDIENTE TECNICO (5%)
GASTOS DE MITIGACION AMBIENTAL (3 %)

MONTO TOTAL DE INVERSION


NATIVA 02

Metrado Precio S/. Parcial S/.

1.00 1,500.00 1,500.00

1.00 750.00 750.00

5.00 45.00 225.00

32.00 65.00 2,080.00

2.00 65.00 130.00

48.96 35.66 1,745.91

600.00 2.95 1,770.00

8.00 15.39 123.12

200.00 0.74 148.00

1.00 2,000.00 2,000.00

50.00 0.92 46.00

382.50 16.06 6,142.95

277.54 14.21 3,943.81

187.15 17.82 3,335.09

68.78 28.84 1,983.62

68.78 5.42 372.79

68.78 15.66 1,077.09

5,623.93 3.80 21,370.93

496.20 36.80 18,260.16

139.96 289.01 40,450.42

2.00 15,000.00 30,000.00

120.00 2.09 250.80

280.00 150.00 42,000.00


60.00 45.00 2,700.00
48.00 3.00 180.00

280.00 19.84 5,555.20

2.00 7,000.00 14,000.00

1.00 5,000.00 5,000.00

1.00 10,000.00 10,000.00


217,140.90 93316.16
21,714.09
10,857.04
============
249,712.04
44,948.17
============
294,660.21
10,857.04
10,857.04
6,514.23
============

322,888.53
METRADOS
PUNTE PEATONAL EL BADO, CASERIO AGUA BLANCA Y YAMOBAMBA
01 TRABAJOS PROVISIONALES
01.01 CASETA DE ALMACEN Y GUARDIANIA

02 TRABAJOS PRELIMINARES
02.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 3.60 m. GIGANTOGRAFIA

02.02 ELIMINACION DE ARBOLES Y RAICES MANUAL

02.03 RETIRO TABLERO DE MADERA PUENTE EXISTENTE


Grafico Descripcin Largo (m) Ancho (m) Alto (m)
Tablero de Madera Existente 12.00 2.00

02.04 RETIRO VIGAS DE MADERA PUENTE EXISTENTE

02.05 DEMOLICION DE MURO DE MAMPOSTERIA DE PIEDRA


Grafico Descripcin Largo (m) Ancho (m) Alto (m)
Muro de Proteccin h=2.40 8.50 1.20 2.40

02.06 LIMPIEZA EN AREA DE TRABAJO


Grafico Descripcin Largo (m) Ancho (m) Alto (m)
Area de Puente y Acceso ambos estremos 100.00 3.00

02.07 POSTES PARA SEALIZACIONES EN OBRAS 3", h=1m, dados 0.30m x 0.30m x0.10m, PINTADOS rojo y bl

02.08 CINTA SEALIZADORA DE SEGURIDAD EN OBRA

02.09 DERIVACION AGUAS DEL RIO

02.10 TRAZO DE NIVELES Y REPLANTEO

Grafico Descripcin Largo (m) Ancho (m) Alto (m)

Trazo durante la ejecucin de la obra puente 20.00 2.50


03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION ESTRUCTURAS DE MATERIAL GRANULAR L H=3.80m: TERRENO NORMAL
Grafico Descripcin Largo (m) Ancho (m) Alto (m)
Base de Puente, Dr-IZ 8.50 5.00 4.50

03.02 RELLENO C/MATERIAL PROPIO: COMPACTACION CON PLANCHA 4HP


Grafico Descripcin Veces Vol excav

EXCAVACION ESTRUCTURAS DE MATERIAL GRANULAR L H=3.80 1.00 382.50

03.03 ELIMINACION DE EXCEDENTES C/VQTE 10 M3 Y CARGADOR D<5KM.


Grafico Descripcion Veces CANTIDAD
EXCAVACION ESTRUCTURAS DE MATERIAL GRANULAR L H=3.80m: 1.00 382.50
RELLENO C/MATERIAL PROPIO: COMPACTACION CON PLANCHA 4HP (1.00) 277.54
DEMOLICION DE MURO DE MAMPOSTERIA DE PIEDRA 1.00 48.96

04 OBRAS DE CONCRETO SIMPLE


04.01 COLOCACION Y CONFORMACION DE OVER E=0.30 M. C/EQUIPO EN ESTRIBOS
Grafico Descripcin Area (m2)
P1 TIRANTE DERECHO (b) 34.39
P2 TIRANTE IZQUIERDO (b) 34.39

04.02 COMPACTACION DE OVER E=0.40 M. C/EQUIPO EN ESTRIBOS

04.03 SOLADO DE CONCRETO P/ESTRIBOS Mezcla C:H 1:12, e=4"


Grafico Descripcin Area (m2)
P1 TIRANTE DERECHO (b) 34.39
P2 TIRANTE IZQUIERDO (b) 34.39

05 OBRAS DE CONCRETO ARMADO


05.01 ESTRUCTURA DE PUENTE: ACERO FY=4200 kG/CM2
Grafico Descripcin Factor Long (m) Repeticiones
LOSA MAZISA - MUROS

05.02 ESTRUCTURADE PUENTE: ENCOFRADO Y DESENCOFRADO


Grafico Descripcin Cant. Largo (m) Ancho (m)
P1 ENCOFRADO LONGITUDINAL LOSA 1.00 20.00 2.50
ENCOFRADO LONGITUDINAL H=1.20 1.00 20.00 1.20
ENCOFRADO LONGITUDINAL H=1.20 1.00 20.00 1.20
ENCOFRADO ESTRIBOS
1.00 8.50 9.80
INTERIORES
ENCOFRADO ESTRIBOS
1.00 8.50 9.80
EXTERIORES
1.00 Area (m2) 8.50

05.03 PUENTE: CONCRETO f'c=210 Kg/cm2, ACABADO FROTACHADO.


Grafico Descripcin Cant. Area (m2) Alto (m)
P1 Base 1.00 34.39 0.70
Estructura Puente 1.00 2.36 5.30
Brazos 1.00 3.00 5.30
Loza maciza 1.00 50.00 0.70

06 JUNTAS DE DILATACION
06.01 JUNTAS DE DILATACION CON ASFALTO-ARENA E=1", A=0.20m.
Grafico Descripcin Largo (m) Veces Long. Parcial
P1 Vertical 6.00 2.00 12.00
Horizontal 2.00 4.00 8.00

07 ESTRUCTURA METALICA
07.01 BARANDAS METALICAS
Grafico Descripcin N Veces
Tubos FG 2 1/2" 200.00
Tubos FG 2 1/2" 2.00

07.02 PLANCHAS METALICAS


Grafico Descripcin N Veces
Plancha de F e=1/2" : 0.27 X 0.22 cm 2.00
Plancha de F e=3/8" : 0.50 X 0.50 cm 2.00

07.03 PERNOS 1"


Grafico Descripcin N Veces
Pernos 1" 12.00

08 PINTURA
08.01 PINTURA OLEO MATE:2 MANOS EN BARANDA METALICA
Grafico Descripcin Largo (m) N Veces Cantidad (m2)
BARANDAS METALICAS 280.00 1.00 280.00

09 TRASLADO DE MAQUINARIA PESADA


09.01 TRASLADO DE MAQUINARIA PESADA A OBRA
Grafico Descripcin KM N Veces Cantidad (m2)
10 SEGURIDAD EN OBRA
10.01 IMPLEMENTPS DE SEGURIDAD (EPPS)
Grafico Descripcin

11 TRANSPORTE
10.01 FLETE TERRESTRE RURAL
Grafico Descripcin
UNIDAD GBL
T O TAL: 1.00

UNIDAD UND
T O TAL: 1.00

UNIDAD UND
T O TAL: 5.00

UNIDAD M2
Veces PARCIAL
1.00 24.00
T O TAL: 32.00

UNIDAD UND
T O TAL: 2.00

UNIDAD M3
Veces PARCIAL
2.00 48.96
T O TAL: 48.96

UNIDAD M2
Veces PARCIAL
2.00 600.00
T O TAL: 600.00

UNIDAD UND
T O TAL: 8.00

UNIDAD ML
T O TAL: 200.00

UNIDAD GBL
T O TAL: 1.00

UNIDAD M2

Veces PARCIAL

1.00 50.00

T O TAL: 50.00
UNIDAD M3
Factor PARCIAL
2.00 382.50
T O TAL: 382.50

UNIDAD M3
Vol Conc. PARCIAL

104.96 277.54

T O TAL: 277.54

UNIDAD M3
Coef.ESPONJ. PARCIAL
1.20 459.00
1.20 (333.05)
1.25 61.20
T O TAL: 187.15

UNIDAD M2
Veces PARCIAL
1.00 34.39
1.00 34.39
T O TAL: 68.78

UNIDAD M2
T O TAL: 68.78

UNIDAD M2
Veces PARCIAL
1.00 34.39
1.00 34.39
T O TAL: 68.78

UNIDAD KG
N Elementos PARCIAL
5,623.93
T O TAL: 5,623.93

UNIDAD M2
Veces PARCIAL
1.00 50.00
2.00 48.00
2.00 48.00
2.00 166.60
2.00 166.60
2.00 17.00
T O TAL: 496.20

UNIDAD M3
Veces PARCIAL
2.00 48.15
2.00 25.02
2.00 31.80
1.00 35.00
T O TAL: 139.96

UNIDAD M
Elementos PARCIAL
2.00 24.00
1.00 8.00
T O TAL: 120.00

UNIDAD M
Largo (m) Parcial
1.20 240.00
20.00 40.00
T O TAL: 280.00

UNIDAD U
Largo (m) Parcial
6.00 12.00
24.00 48.00
T O TAL: 60.00

UNIDAD U
Largo (m) Parcial
4.00 48.00
T O TAL: 48.00

UNIDAD M2
Repeticin PARCIAL
1.00 280.00
T O TAL: 280.00

UNIDAD GBL
Repeticin PARCIAL
T O TAL: 2.00
UNIDAD GLB
Repeticin PARCIAL
T O TAL: 1.00

UNIDAD GLB
Repeticin PARCIAL
T O TAL: 1.00
METRADOS
PUNTE PEATONAL EL BADO, CASERIO AGUA BLANCA Y YAMOBAMBA
01 TRABAJOS PROVISIONALES
01.01 CASETA DE ALMACEN Y GUARDIANIA

02 TRABAJOS PRELIMINARES
02.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 x 3.60 m. GIGANTOGRAFIA

02.02 ELIMINACION DE ARBOLES Y RAICES MANUAL

02.03 RETIRO TABLERO DE MADERA PUENTE EXISTENTE


Grafico Descripcin Largo (m) Ancho (m) Alto (m)
Tablero de Madera Existente 12.00 2.00

02.04 RETIRO VIGAS DE MADERA PUENTE EXISTENTE

02.05 DEMOLICION DE MURO DE MAMPOSTERIA DE PIEDRA


Grafico Descripcin Largo (m) Ancho (m) Alto (m)
Muro de Proteccin h=2.40 3.00 0.50 2.40

02.06 LIMPIEZA EN AREA DE TRABAJO


Grafico Descripcin Largo (m) Ancho (m) Alto (m)
Area de Puente 10.00 5.00

02.07 POSTES PARA SEALIZACIONES EN OBRAS 3", h=1m, dados 0.30m x 0.30m x0.10m, PINTADOS rojo y bl

02.08 CINTA SEALIZADORA DE SEGURIDAD EN OBRA

02.09 DERIVACION AGUAS DEL RIO

02.10 TRAZO DE NIVELES Y REPLANTEO

Grafico Descripcin Largo (m) Ancho (m) Alto (m)

Trazo durante la ejecucin de la obra puente 10.00 5.00

03.01 MOVIMIENTO DE TIERRAS


03.01.01 EXCAVACION ESTRUCTURAS DE MATERIAL GRANULAR L H=3.80m: TERRENO NORMAL
Grafico Descripcin Largo (m) Ancho (m) Alto (m)
Base de Puente, Dr-IZ 10.00 5.00 3.80

03.01.02 RELLENO C/MATERIAL PROPIO: COMPACTACION CON PLANCHA 4HP


Grafico Descripcin Veces Vol excav

EXCAVACION ESTRUCTURAS DE MATERIAL GRANULAR L H=3.80 1.00 380.00

03.01.03 ELIMINACION DE EXCEDENTES C/VQTE 10 M3 Y CARGADOR D<5KM.


Grafico Descripcion Veces CANTIDAD
EXCAVACION ESTRUCTURAS DE MATERIAL GRANULAR L H=3.80m: 1.00 380.00
RELLENO C/MATERIAL PROPIO: COMPACTACION CON PLANCHA 4HP (1.00) 346.36
DEMOLICION DE MURO DE MAMPOSTERIA DE PIEDRA 1.00 7.20

04.03 OBRAS DE CONCRETO SIMPLE


04.03.01 COLOCACION Y CONFORMACION DE OVER E=0.30 M. C/EQUIPO EN ESTRIBOS
Grafico Descripcin Area (m2)
P1 TIRANTE DERECHO (b) 3.77
P2 TIRANTE IZQUIERDO (b) 3.77

04.03.02 COMPACTACION DE OVER E=0.40 M. C/EQUIPO EN ESTRIBOS

04.03.03 SOLADO DE CONCRETO P/ESTRIBOS Mezcla C:H 1:12, e=4"


Grafico Descripcin Area (m2)
P1 TIRANTE DERECHO (b) 3.77
P2 TIRANTE IZQUIERDO (b) 3.77

04.04 OBRAS DE CONCRETO ARMADO


04.04.01 ESTRUCTURA DE PUENTE: ACERO FY=4200 kG/CM2
Grafico Descripcin Factor Long (m) Repeticiones
LOSA MAZISA - MUROS

04.04.01 PLANCHA DE NEOPRENE Y PLANCHA DE ACERO


Grafico Descripcin Factor Long (m) Repeticiones
LOSA MAZISA - MUROS

04.04.02 ESTRUCTURADE PUENTE: ENCOFRADO Y DESENCOFRADO


Grafico Descripcin Cant. Largo (m) Ancho (m)
ENCOFRADO ESTRIBOS
1.00 6.46 9.80
INTERIORES
ENCOFRADO ESTRIBOS
1.00 6.07 9.80
EXTERIORES
1.00 Area (m2) 5.49

04.04.03 PUENTE: CONCRETO f'c=210 Kg/cm2, ACABADO FROTACHADO.


Grafico Descripcin Cant. Area (m2) Alto (m)
P1 Base 1.00 3.77 0.70
Estructura Puente 1.00 5.50 2.00
Brazos 2.00 0.30 5.30

04.05 JUNTAS DE DILATACION


04.05.01 JUNTAS DE DILATACION CON ASFALTO-ARENA E=1", A=0.20m.
Grafico Descripcin Largo (m) Veces Long. Parcial
P1 Vertical 6.00 2.00 12.00

05.01 ESTRUCTURA METALICA


05.01.01 BARANDAS METALICAS
Descripcin N Veces
Tubos FG 2 1/2" 12.00
Tubos FG 2 1/2" 8.00

05.01.02 PLANCHAS METALICAS


Descripcin N Veces
Plancha de F e=1/2" : 0.27 X 0.22 cm 2.00
Plancha de F e=3/8" : 0.50 X 0.50 cm 2.00

05.01.03 PERNOS 1"


Descripcin N Veces
Pernos 1" 12.00

06.01 PINTURA
06.01.01 PINTURA OLEO MATE:2 MANOS EN BARANDA METALICA
Grafico Descripcin Largo (m) N Veces Cantidad (m2)
BARANDAS METALICAS 142.40 1.00 142.40
UNIDAD GBL
T O TAL: 1.00

UNIDAD UND
T O TAL: 1.00

UNIDAD UND
T O TAL: 2.00

UNIDAD M2
Veces PARCIAL
1.00 24.00
T O TAL: 24.00

UNIDAD UND
T O TAL: 2.00

UNIDAD M3
Veces PARCIAL
2.00 7.20
T O TAL: 7.20

UNIDAD M2
Veces PARCIAL
2.00 100.00
T O TAL: 100.00

UNIDAD UND
T O TAL: 8.00

UNIDAD ML
T O TAL: 100.00

UNIDAD GBL
T O TAL: 1.00

UNIDAD M2

Veces PARCIAL

2.00 100.00

T O TAL: 100.00

UNIDAD M3
Factor PARCIAL
2.00 380.00
T O TAL: 380.00

UNIDAD M3
Vol Conc. PARCIAL

33.64 346.36

T O TAL: 346.36

UNIDAD M3
Coef.ESPONJ. PARCIAL
1.20 456.00
1.20 (415.63)
1.25 9.00
T O TAL: 49.37

UNIDAD M2
Veces PARCIAL
1.00 3.77
1.00 3.77
T O TAL: 7.54

UNIDAD M2
T O TAL: 7.54

UNIDAD M2
Veces PARCIAL
1.00 3.77
1.00 3.77
T O TAL: 7.54

UNIDAD KG
N Elementos PARCIAL
2,250.00
T O TAL: 2,250.00

UNIDAD U
N Elementos PARCIAL
2.00
T O TAL: 2.00

UNIDAD M2
Veces PARCIAL
2.00 126.62
2.00 118.97
2.00 10.98
T O TAL: 256.57

UNIDAD M3
Veces PARCIAL
2.00 5.28
2.00 22.00
2.00 6.36
T O TAL: 33.64

UNIDAD M
Elementos PARCIAL
2.00 24.00
T O TAL: 24.00

UNIDAD M
Largo (m) Parcial
1.20 14.40
16.00 128.00
T O TAL: 142.40

UNIDAD U
Largo (m) Parcial
6.00 12.00
24.00 48.00
T O TAL: 60.00

UNIDAD U
Largo (m) Parcial
4.00 48.00
T O TAL: 48.00

UNIDAD M2
Repeticin PARCIAL
1.00 142.40
T O TAL: 142.40
ALTERNATIVA N 01 ALTERNATIVA N 01
COEFICIENTE COSTO / EFECTIVIDAD COEFICIENTE COSTO / EFECTIVIDAD

A precios A precios A precios A precios


RUBROS RUBROS
Privados Sociales Privados Sociales

Valor Actual de Costos (VAC) 530,213.81 453,583.28 Valor Actual de Costos (VAC) 623,661.05 533,706.93

Indicador de Resultado: Indicador de Resultado:

M2 de Pavimento 2,481.06 2,481.06 M2 de Pavimento 2,481.06 2,481.06

Coeficiente Costo / Efectividad B 213.70 182.82 Coeficiente Costo / Efectividad B 251.37 215.11

Indicador costo/efectividad: Indicador costo/efectividad:


Valor Actual de Costos a Precio Privado o Precios Sociales (/S) Valor Actual de Costos a Precio Privado o Precios Sociales (/S)
M2 de Pavimento 0 M2 de Pavimento 0
Planilla de Metrado: Puente L = 11.00 Vehicular Huamachuco
Partida 3.00 Movimiento de Tierras
Partida 3.01 Excavacion Para Estructuras en Material Granular
Sector N Veces Area Prom (m2) Largo (m) Parcial (m3)
Lado Derecho Extribo 1.00 42.010 8.500 357.09
Ala del Extribo 2.00 37.060 5.040 373.56
Lado Isquierdo Extribo 1.00 41.910 8.500 356.24
Ala del Extribo 2.00 36.670 5.040 369.63
Metrado total 1456.52

Partida 3.02 Compactacin de Superficie


Exc. Cimentcin Sector N Veces Largo (m) Alto (m) Ancho (m) Parcial (m2)
Fondo Excav. 2.00 73.610 147.22
Metrado total 147.22

Partida 3.03 Relleno Compactado Para Estructuras


Sector N Veces Area Prom (m2) Ancho (m) Parcial (m3)
Lado Derecho Estribo 1 1.00 22.480 8.500 191.08
Estribo 2 1.00 3.310 8.500 28.14
Ala Estribo 2.00 32.150 5.040 324.07

Lado Izquierdo Estribo 1 1.00 22.480 8.500 191.08


Estribo 2 1.00 3.300 8.500 28.05
Ala Estribo 2.00 31.760 5.040 320.14
Esponjamiento 1.20
Metrado total 1299.07

Partida 4.00 Concreto en Superficie.


Partida 4.01 Concreto Simple F'c = 100 kg/cm2 para solado.
Solado Sector N Veces Largo (m) Ancho (m) Alta (m) Parcial (m3)
Completo 2.00 55.060 0.100 11.01

Metrado total 11.01

Partida 4.02 Concreto Reforzado F'c = 210 kg/cm2


Descripcin Sector N Veces Largo (m) Ancho (m) Alto (m) Parcial (m3)
Zapata
Central 2.00 8.500 4.100 0.700 48.79
Ala 4.00 10.020 0.700 28.06
Estribo
1 2.00 0.540 8.500 4.030 37.00
2 2.00 0.550 8.500 0.320 2.99
3 2.00 0.650 8.500 0.200 2.21
4 2.00 0.200 7.700 0.750 2.31
5 4.00 0.450 0.400 0.750 0.54

Ala 1 4.00 3.840 0.465 4.720 33.71

Losa
Losa 1.00 11.000 7.700 0.750 63.53
Vereda 2.00 11.000 0.825 0.250 4.54
Metrado total 223.67
Partida 4.03 Encofrado Plano
Descripcin Sector N Veces Largo (m) Alto (m) Ancho (m) Parcial (m2)
Solado
2.00 35.200 0.100 7.04
Zapata
2.00 35.200 0.700 49.28
Estribo
Cara Exterior 2.00 4.550 8.500 77.35
Ala 4.00 3.840 4.725 72.58
Cara Interior 2.00 4.550 8.500 77.35
Ala 4.00 3.840 4.725 72.58
Cajuela 2.00 7.700 0.750 11.55
Extremos 4.00 4.550 0.300 5.46
Extremo de Cajuel 8.00 0.400 0.750 2.40
Losa
Inferior 1.00 11.000 7.700 84.70
Lateral 2.00 11.000 0.750 16.50
Cajuelas 2.00 0.750 7.700 11.55
Vereda 2.00 11.000 0.250 5.50
Vereda 4.00 0.250 0.825 0.83

Metrado total 494.66

Partida 4.04 Acero de Refuerzo Metrado total 5623.93

Partida 5.15 Planchas de Neoprene y Planchas de Acero


Descripcin Sector N Veces Largo (m) Alto (m) Ancho (m) Parcial (m2)
P. Neoprene Apoyo movil 3.00 0.40 0.45 0.54
Apoyo Fijo 3.00 1.50 0.45 2.03
Metrado total 2.57

Partida 5.16 Barandas Metlicas


Descripcin Unidad N Veces Largo (m) Alto (m) Ancho (m) Parcial
Tubos FG 2 1/2" ml. 8.00 5.50 44.00
Tubos FG 2 1/2" ml. 4.00 5.50 22.00
Plancha de F e=1/2" m2 16.00 0.27 0.22 0.95
Pernos 1" unid. 64.00 64.00
Plancha de F e=3/8" ml. 16.00 2.40 38.40
ml. 16.00 1.20 19.20
Partida 4.05 Acero de Refuerzo
Descripcin Grficos de referencia Cantidad Longitud (m) N Veces 1/4" 3/8" 1/2" 5/8" 3/4" 1"
Zapata
Transversales
1.00 19.62 2.00 5/8 39.24

Longitudinales 96.00 4.82 4.00 5/8 1908.22

314.50

Estribos
Parte Central
Vertical Interior 27.00 6.53 2.00 1/2 352.62

Vertical Exterior 61.00 6.49 2.00 3/4

Vertical Exterior Inferior 61.00 3.20 2.00 3/4

Ala
Vertical Interior 14.00 4.66 4.00 1/2 260.96

Vertical Exterior 31.00 4.63 4.00 3/4

Vertical Exterior Inferior 31.00 3.00 2.00 3/4

Cajuela
Superior Exterior 23.00 3.31 2.00 1/2 152.26

Superior Interior 23.00 1.44 2.00 1/2 66.24

Estribo 14.00 17.90 2.00 1/2 501.20


Reparticion Transversal
Exterior
Reparticion Transversal 14.00 17.90 2.00 1/2 501.20
Interior

Extremo superior 4.00 2.16 4.00 1/2 34.56


Exterior

Extremo superior 4.00 2.16 4.00 1/2 34.56


Interior

Cajuela del Estrivo 4.00 7.82 2.00 1/2 62.56


Transversal

Losa

Superior 44.00 11.80 1.00 1/2 519.20

Superior 2 44.00 2.75 2.00 1/2 242.00

Inferior 56.00 11.80 1.00 1"

Inferior 2 56.00 9.05 1.00 3/4

Trnnsversal superior 63.00 8.40 1.00 1/2 529.20

Tranversal Inferior 54.00 8.40 1.00 1/2 453.60

Veredas 2.00 11.70 2.00 1/2 46.80

56.00 2.91 2.00 3/8 325.86

Estrivos 29.00 2.16 6.00 3/8 375.84


Estrivos Con fines Constructivos

Total en Metros 0.00 701.70 3756.96 39.24 1908.22 314.50


Kg / m 0.25 0.58 1.02 1.60 2.26 3.97
Total en Kg. 0.00 0.00 0.00 62.78 4312.58 1248.57
Metrado Total 5,623.93