Documente Academic
Documente Profesional
Documente Cultură
Faculty of Engineering
Civil Engineering Department
Surveying Laboratory
Experiment No. 2
Part1: Horizontal Tapping Over Uneven or Sloping Ground
Part2: Measuring The Sides & The Diagonals of A Quadrilateral
FWD BWD
(m) (m)
AB(d 1.83 1.923
Part1: Horizontal Tapping Over Uneven
1)
BC(d 1.97 2.016 Or Sloping Ground
2)
CD(d 1.79 1.857
3)
D1
D2 A
D3 B B
**Accuracy Relative
error 0.206
Accuracy Relative To AD = AD = 5.59 = 1/27.135
error 0.206
Accuracy Relative To DA = = DA = 5.796 = 1/28.135
1 2 1
BC 2.58 2.70 2.625
9 m
CD 3.42 3.57 2.775
7 m
AD 3.66 3.30 3.63
8 m
AC 3.88 4.01 3.855
9 m
DB 5.12 5.25 4.34
1 m
C
B
1AND2:
cos 1
(DA)2=(CD)2+(AC)2-2 (CD)(AC)
cos 1
(3.63)2 = (2.775)2+(3.855)2-2(2.775)*(3.855)
1=63.98
cos 2
(AB)2=(BC)2+(AC)2-2 (BC)(AC)
cos 2
(2.875)2 = (2.625)2+(3.855)2-2(2.625)*(3.855)
2=48.21
1 AND2:
cos 1
(AB)2=(DA)2+(BD)2-2 (DA)(BD)
cos 1
(2.875)2 = (3.63)2+(4.34)2-2(3.63)*(4.34)
1=40.67
cos 2
(BC)2=(CD)2+(BD)2-2 (DA)(BD)
cos 2
(2.625)2 = (2.775)2+(4.34)2-2(2.775)*(4.34)
2=35.35
Diagonals length
3= 1+ 2=112.19
3= 1+ 2=76.02
Diagonals Error
DiagonalsAccuracy ...
error 0.14 1
accuracy BD = BD calc . 4.480 = 32 =0.03125
error 0.145 1
accuracy AC = AC calc = 4.00 = 27.58 = 0.03625