BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS EXCELCOM-INDOOR PROJECT
NO. Unit Price Java UNIT
Pole 6m 3 unit Pole 9m 3 unit Pole 12m 3 unit Tower 20m 4L Tower 25m 4L Tower 30m 3L Tower 40m 3L Tower 43m 3L Tower 45m 3L Tower 50m 3L
ITEM
I. PRE-IMPLEMENTATION
Standard
- Site Acquisition (Inc. Documentation, accessories and complete ground lease, SSR, Admin of Lease Payment) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- IMB Permit (Surat Izin Mendirikan Bangunan dan Izin Prinsip) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Local Community Permit (Community permit, RT+RW+Lurah+Camat recommendation) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Soil Test /Hammer Test Report (Present by University or representative consultant) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Pre Design Package (detailed proposed site layout and access as Protelindo Standard format approved by Engineering Dept.) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- PLN (PLN Avaibility and application through AKLI certified company) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
Non Standard (if applicable)
- Retribution per m' height Ls
- Civil Aviation/Military Ls
- HO (Ijin gangguan) Ls
- AMDAL Ls
II. IMPLEMENTATION
A. Preparation work
- Site Clearing and Preparation (inc. Measurement of tower position, shelter & Landscape) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Establish water supply for site works Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Mobilization and Demobilization Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Mobilization from ground to rooftop for Poles Ls 1.000 1.000 1.000
-- Detailed Sitefrom
Mobilization Design
ground to rooftop for SST Ls 1.000 1.000
- Tower Foundation Design
- Construction Drawing and BoQ)
- Tower Foundation Design Ls
- Construction Drawing and BoQ) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
B. General Construction
B.1 Fence and Yard
Standard
a. Site Construction 10 m x 15 m
- Fence m1 48.500 48.500 48.500 48.500 48.500
- Landscaping (gravel) thickness 15 cm m2 150.000 150.000 150.000 150.000 150.000
- Sliding door 1,5 m width Ls 1.000 1.000 1.000 1.000 1.000
- Yard Lamp TL 2x36w (includes material, labor, cabling and accessories) unit 1.000 1.000 1.000 1.000 1.000
Non Standard (if applicable)
a. Retaining wall m3
b. Excavation at rocky soil m3
c. Cut and fill (labor and material) m3
d. Import soil (inc. Transportation and compaction) m3
e. Gate 3 m unit
f. Open drainage system 1/2 dia 20 cm m'
h. Barbed wire fence for underdeveloped lease area m'
i. concrete post for underdeveloped lease area (15x15x250 cm) pcs
i. Wooden Pile 6 - 8 cm (supply and installation) m'
j. Wooden Pile 8 - 10 cm (supply and installation) m'
k. Wooden Pile 10 - 12 cm (supply and installation) m'
l. Wooden Pile 12 - 15 cm (supply and installation) m'
C. Tower Foundation
C.1 Standard Works
Page 1 of 16
Quantity
BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS EXCELCOM-INDOOR PROJECT
NO. Unit Price Java UNIT
Pole 6m 3 unit Pole 9m 3 unit Pole 12m 3 unit Tower 20m 4L Tower 25m 4L Tower 30m 3L Tower 40m 3L Tower 43m 3L Tower 45m 3L Tower 50m 3L
ITEM
Soil work
a. Excavation of soil for foundation m3 59.400 97.562 114.071 114.071 137.514
b. Sand layer under the foundation t=10cm m3 3.600 4.221 5.110 5.110 6.396
c. Backfilling foundation soil and compaction per 300mm m3 42.400 79.258 92.011 92.011 111.417
Concrete work
d. Concrete work floor (lean concrete 5cm) m3 1.800 2.111 2.555 2.555 3.198
e. Concrete K-225
- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard kg 1,918.000 1,941.991 2,285.831 2,285.831 2,700.464
- Concrete K-225 with SK SNI 03.2002 Standard m3 17.000 18.304 22.060 22.060 26.097
C.2 Non Standard (if applicable)
a. Bored Pile 40cm (supply and installation) longitudinal bar 8 pcs m'
b. Bored Pile 60cm (supply and installation) longitudinal bar 12 pcs m'
c. Well Foundation 80cm (supply and installation) longitudinal Bar 16 pcs (Cassion Foundation) m'
d. Well Foundation 100cm (supply and installation) longitudinal Bar 20 pcs (Cassion Foundation) m'
e. Mini Pile 40cm (supply and installation) m'
f. Wooden Pile 6 - 8 cm (supply and installation) m'
g. Wooden Pile 8 - 10 cm (supply and installation) m'
h. Wooden Pile 10 - 12 cm (supply and installation) m'
i. Wooden Pile 12 - 15 cm (supply and installation) m'
j. Excavation at rocky soil (Labor and Equipment) m3
E. Shelter / BTS
E.1 Shelter / BTS Foundation
- Soil Excavation m3
- Sand Layering 100mm m3
- Lean Concrete 50mm m3
- River Stone Masonry m3 2.891 2.891 2.891 2.891 2.891
- Concrete K-225
- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard kg 80.474 80.474 80.474 80.474 80.474 80.474 80.474 80.474 80.474 80.474
- Concrete K-225 with SK SNI 03.2002 Standard m3 1.036 1.036 1.036 1.036 1.036 1.036 1.036 1.036 1.036 1.036
E.2 Shelter / BTS
- CKD Shelter (material supply by Protelindo)
a. Delivery Ls
b. Installation Ls
- Permanent Shelter (refer to drawing)
a. Building Ls
- Baseframe (material supply by Protelindo)
a. Delivery Ls
b. Installation Ls
b. Installation Ls
Page 2 of 16
Quantity
BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS EXCELCOM-INDOOR PROJECT
NO. Unit Price Java UNIT
Pole 6m 3 unit Pole 9m 3 unit Pole 12m 3 unit Tower 20m 4L Tower 25m 4L Tower 30m 3L Tower 40m 3L Tower 43m 3L Tower 45m 3L Tower 50m 3L
ITEM
c. Mini Pile 40cm (supply and installation) m'
d. Wooden Pile 6 - 8 cm (supply and installation) m'
e. Wooden Pile 8 - 10 cm (supply and installation) m'
f. Wooden Pile 10 - 12 cm (supply and installation) m'
g. Wooden Pile 12 - 15 cm (supply and installation) m'
h. Cut and fill (labor and material) m3
i. Soil Import m3
j. Concrete K-225
- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard kg
- Concrete K-225 with SK SNI 03.2002 Standard m3
k. Stone Masonry m3
G. Earthing system
G.1 Upper Earthing System
Grounding system (Max : 1 ohm) as per drawing CME -11
- Spitzen steel 3/4" x 150 cm + connection pipe 2" x 2 m+isolator unit 3.000 3.000 3.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
- BC 50 mm2 from spitzen to copper rod m'
- Steel Cable min 80 mm2 (tower leg, fence, EGB) m' 80.000 80.000 80.000 55.000 55.000 45.000 45.000 45.000 45.000 45.000
- Steel Busbar 10x30x0,8 cm 16 holes with isolator unit 4.000 5.000 5.000 4.000 4.000 2.000 2.000 3.000 3.000 3.000
H. Mechanical Electrical
H.1 Standard
H.1.1 M/E for Indoor (Mobile-8)
- Supply Complete M/E as specification unit
- Delivery Ls
- Installation Ls
a. Fire Alarm
- Fire Alarm complete with battery - NITTAN pcs 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Smoke detector pcs 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Fixed heat detector pcs 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Alarm horn bell pcs 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Fire Extinguisher 5 kg (Halotron,Gunebbo) pcs 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Magnetic Door Sensor unit 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Installation and testing Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
Page 3 of 16
Quantity
BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS EXCELCOM-INDOOR PROJECT
NO. Unit Price Java UNIT
Pole 6m 3 unit Pole 9m 3 unit Pole 12m 3 unit Tower 20m 4L Tower 25m 4L Tower 30m 3L Tower 40m 3L Tower 43m 3L Tower 45m 3L Tower 50m 3L
ITEM
- Cable ties White Color 25cm wrap 2.000 2.000 2.000 ### 2.000 2.000 2.000 2.000 2.000 2.000
- Flexible White Color 20mm roll 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Sealant White Color tube 4.000 4.000 4.000 ### 4.000 4.000 4.000 4.000 4.000 4.000
- Sealant Black Color tube 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Feeder Entry Point (Roxtec) 18 holes unit 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
d. Emergency fan 2 x 24 / 48 Volt DC (Included Grill) 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Inlet Box
- Thermostat telemecanic
- Installation
f. Sub Distribution Panel (ACPDB) unit 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Panel Box 60 x 40 x 40 cm + key
- Indicator Lamp RST + Fuse
- MCB Merlin Gerin 63 A 3 Phase I pcs
- MCB Merlin Gerin 20 A 3 Phase 2 pcs
- MCB Merlin Gerin 16 A 1 Phase 8 pcs
- Magnetic contactor telemecanic 3P 25A 2 pcs
- Timer theben Cell (2 unit)
- Timer switch SDPT 24 hours 220 VAC, 1 pcs
- Thermostat telemecanic/honeywell, 1 pcs
- Phase Failure Relays 2 Poles, 5A, 220VAC 3 pcs
- Fuse cartridge c/w fuse break indicator lapm 2A, 3 pcs
- AC Indicator, 220 VAC, 16mm, LED type, green, 2 pcs
- Terminal connection 6 mm 24 pcs
- Terminal connection for control & status , 2,5 mm
- Terminal connection 16 mm 2 pcs
- Bar CU size 20 x 1.5 x 0.3 cm
- Endstop
- Arrester 20 kA , C Class
- Polycarbonate Cover
g. Panel KWH unit 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Panel Box size 500 x 700 x 300,colour RAL 7032 Pepper and salt anti corossive plate,thickness 2mm powder coating
- Grounding Cu busbar 170x15xx3mm c/w stainless bolt
- Neutral Cu busbar 120x15x3mm c/w isolator & stainless bolt
- Unistrut
- Terminal Block
- Clamp omega 3'
- Cable Gland PG 16
- Cable Gland PG 36
- Box OKA
- Receptacle 3P+N+PE 32 A 1 pc
- Endstop
- Surge Arrester 3P+NPE
h. Change Over Switch ( COS ) unit 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Panel Box canopy,size 300 x 400 x 200,colour RAL 7032 Pepper and salt anti corossive plate,thickness 2mm powder coating
- Grounding Cu busbar 15x3mm c/w stainless bolt
- MCB for load breakers,1pole, 4,5kA,6A
- MCB for load breakers,1pole, 4,5kA,10A
- Change over Switch 63A,
- Arrester 220 VAC
- Endstop
j. Pole Kwh meter unit 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Pole dia 3''- 5 meter Included Foundation ( 1 pcs )
- Steel Pipe dia 1.5" safety for cable PLN (1 pcs)
- Clamp pipe dia 3" -1.5" Included Bout & Nut (4 pcs)
I. Documentation
- Site Binder (2 hardcopies and softcopies) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
Refer to Site Binder Check list
GRAND TOTAL
Page 4 of 16
Quantity
BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS EXCELCOM-INDOOR PROJECT
NO. Unit Price Java UNIT
Pole 6m 3 unit Pole 9m 3 unit Pole 12m 3 unit Tower 20m 4L Tower 25m 4L Tower 30m 3L Tower 40m 3L Tower 43m 3L Tower 45m 3L Tower 50m 3L
ITEM
Approved by
( ) ( . ) ( ) ( )
Page 5 of 16
Quantity
Tower 53m 3L Tower 55m 3L Tower 60m 3L Tower 70m 3L Tower 80m 3L Tower 100m 3L
Page 6 of 16
Quantity
Tower 53m 3L Tower 55m 3L Tower 60m 3L Tower 70m 3L Tower 80m 3L Tower 100m 3L
Page 7 of 16
Quantity
Tower 53m 3L Tower 55m 3L Tower 60m 3L Tower 70m 3L Tower 80m 3L Tower 100m 3L
Page 8 of 16
Quantity
Tower 53m 3L Tower 55m 3L Tower 60m 3L Tower 70m 3L Tower 80m 3L Tower 100m 3L
Page 9 of 16
Quantity
Tower 53m 3L Tower 55m 3L Tower 60m 3L Tower 70m 3L Tower 80m 3L Tower 100m 3L
VP Engineering VP Finance
( ) ( )
Page 10 of 16
PROTELINDO BoQ 2010
PROJECT CME TOWER ROLL OUT - New Site Outdoor
Indonesia
Quantity
BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS EXCELCOM-OUTDOOR PROJECT
NO. Unit Price UNIT
Pole 6m 3 unit Pole 9m 3 unit Pole 12m 3 unit Tower 20m 4L Tower 25m 4L Tower 30m 3L Tower 40m 3L Tower 43m 3L Tower 45m 3L Tower 50m 3L
ITEM
I. PRE-IMPLEMENTATION
Standard
- Site Acquisition (Inc. Documentation, accessories and complete ground lease, SSR, Admin of Lease Payment) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- IMB Permit (Surat Izin Mendirikan Bangunan dan Izin Prinsip) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Local Community Permit (Community permit, RT+RW+Lurah+Camat recommendation) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Soil Test /Hammer Test Report (Present by University or representative consultant) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Pre Design Package (detailed proposed site layout and access as Protelindo Standard format approved by Engineering Dept.) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- PLN (PLN Avaibility and application through AKLI certified company) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
Non Standard (if applicable)
- Retribution per m' height Ls
- Civil Aviation/Military Ls
- HO (Ijin gangguan) Ls
- AMDAL Ls
II. IMPLEMENTATION
A. Preparation work
- Site Clearing and Preparation (inc. Measurement of tower position, shelter & Landscape) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Establish water supply for site works Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Mobilization and Demobilization Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
- Mobilization from ground to rooftop for Poles Ls 1.000 1.000 1.000
-- Mobilization
Detailed Sitefrom
Design
ground to rooftop for SST Ls 1.000 1.000
- Tower Foundation Design
- Construction Drawing and BoQ)
- Tower Foundation Design Ls
- Construction Drawing and BoQ) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
B. General Construction
B.1 Fence and Yard
Standard
a. Site Construction 10 m x 15 m
- Fence m1 48.500 48.500 48.500 48.500 48.500
- Landscaping (gravel) thickness 15 cm m2 150.000 150.000 150.000 150.000 150.000
- Sliding door 1,5 m width Ls 1.000 1.000 1.000 1.000 1.000
- Yard Lamp TL 2x36w (includes material, labor, cabling and accessories) unit 1.000 1.000 1.000 1.000 1.000
Non Standard (if applicable)
a. Retaining wall m3
b. Excavation at rocky soil m3
c. Cut and fill (labor and material) m3
d. Import soil (inc. Transportation and compaction) m3
e. Gate 3 m unit
f. Open drainage system 1/2 dia 20 cm m'
h. Barbed wire fence for underdeveloped lease area m'
i. concrete post for underdeveloped lease area (15x15x250 cm) pcs
i. Wooden Pile 6 - 8 cm (supply and installation) m'
j. Wooden Pile 8 - 10 cm (supply and installation) m'
k. Wooden Pile 10 - 12 cm (supply and installation) m'
l. Wooden Pile 12 - 15 cm (supply and installation) m'
C. Tower Foundation
C.1 Standard Works
Soil work
a. Excavation of soil for foundation m3 59.400 97.562 114.071 114.071 137.514
b. Sand layer under the foundation t=10cm m3 3.600 4.221 5.110 5.110 6.396
c. Backfilling foundation soil and compaction per 300mm m3 42.400 79.258 92.011 92.011 111.417
Page 11 of 16
Quantity
BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS EXCELCOM-OUTDOOR PROJECT
NO. Unit Price UNIT
Pole 6m 3 unit Pole 9m 3 unit Pole 12m 3 unit Tower 20m 4L Tower 25m 4L Tower 30m 3L Tower 40m 3L Tower 43m 3L Tower 45m 3L Tower 50m 3L
ITEM
Concrete work
d. Concrete work floor (lean concrete 5cm) m3 1.800 2.111 2.555 2.555 3.198
e. Concrete K-225
- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard kg 1,918.000 1,941.991 2,285.831 2,285.831 2,700.464
- Concrete K-225 with SK SNI 03.2002 Standard m3 17.000 18.304 22.060 22.060 26.097
E. Shelter / BTS
E.3 Shelter / BTS Foundation
- Soil Excavation m3
- Sand Layering 100mm m3
- Lean Concrete 50mm m3
- River Stone Masonry m3 3.750 3.750 3.750 3.750 3.750
- Concrete K-225
- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard kg 90.272 90.272 90.272 ### 90.272 90.272 90.272 90.272 90.272 90.272
- Concrete K-225 with SK SNI 03.2002 Standard m3 1.250 1.250 1.250 ### 1.250 1.250 1.250 1.250 1.250 1.250
E.4 Shelter / BTS
- CKD Shelter (material supply by Protelindo)
a. Delivery Ls
b. Installation Ls
- Permanent Shelter (refer to drawing)
a. Building Ls
- Baseframe (material supply by Protelindo)
a. Delivery Ls
b. Installation Ls
G. Earthing system
G.1 Upper Earthing System
Grounding system (Max : 1 ohm) as per drawing CME -11
- Spitzen steel 3/4" x 150 cm + connection pipe 2" x 2 m+isolator unit 3.000 3.000 3.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
- BC 50 mm2 from spitzen to copper rod m'
- Steel Cable min 80 mm2 (tower leg, fence, EGB) m' 80.000 80.000 80.000 55.000 55.000 45.000 45.000 45.000 45.000 45.000
- Steel Busbar 10x30x0,8 cm 16 holes with isolator unit 4.000 5.000 5.000 4.000 4.000 2.000 2.000 3.000 3.000 3.000
H. Mechanical Electrical
H.1 Standard
H.1.1 M/E for Indoor (Mobile-8)
- Supply Complete M/E as specification unit
- Delivery Ls
- Installation Ls
I. Documentation
- Site Binder (2 hardcopies and softcopies) Ls 1.000 1.000 1.000 ### 1.000 1.000 1.000 1.000 1.000 1.000
Refer to Site Binder Check list
GRAND TOTAL
Approved by
( ) ( ) ( . ) ( ..
Page 13 of 16
Quantity
Tower 53m 3L Tower 55m 3L Tower 60m 3L Tower 70m 3L Tower 80m 3L Tower 100m 3L
Page 14 of 16
Quantity
Tower 53m 3L Tower 55m 3L Tower 60m 3L Tower 70m 3L Tower 80m 3L Tower 100m 3L