PROJECT TITLE Gas Feeding Power Station IPP3 & IPP4 Metering Stations Legends:
Submission Codes:
CUSTOMER PETROJET
0 = For Review And Comments.
END USER Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co 1or2etc. = After comments Implementation if any.
Return Codes:
1 = Approved with no comment, Work to proceed
Project No. 3128/177/15/14 Revision: 1 2 = Revise and resubmit,work may proceed
3 = Revise and resubmit , work may not proceed
Doc. No IPP-SCD0115-REG-700 Date: 2/28/2016 4 = Review is not required ,work may proceed
1 of 1
BILL OF MATERIALS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 6
Doc. No. IPP-SCD0115-ENG-200 Revision 1
PROJECT
BILL OF MATERIALS
Page | 1
BILL OF MATERIALS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 6
Doc. No. IPP-SCD0115-ENG-200 Revision 1
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
0 29/10/2015 Issued For Approval Mohammed Morsi Ayman Metwally Amr Fathi
1 3/1/2016 Resubmission For Approval Mohammed Morsi Ayman Metwally Amr Fathi
Page | 2
BILL OF MATERIALS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 6
Doc. No. IPP-SCD0115-ENG-200 Revision 1
Page | 3
BILL OF MATERIALS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 4 of 6
Doc. No. IPP-SCD0115-ENG-200 Revision 1
Page | 4
BILL OF MATERIALS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 5 of 6
Doc. No. IPP-SCD0115-ENG-200 Revision 1
4. MISCELLANEOUS BOM
S/N Supplier Description Type Qty.
1 OMNISHELTER ACTIVE COOLING SHELTERS 2
10/100T (X) to Single-Mode SC Type Fiber Optic Industrial
2 Advantech EKI-3541S 4
Media Converter
4-port 10/100Mbps + 1-port 100FX Single-mode
3 Advantech EKI-3525S 1
Unmanaged Industrial Ethernet Switch
4 TBD Joint BOX TBD 2
Page | 5
BILL OF MATERIALS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 6 of 6
Doc. No. IPP-SCD0115-ENG-200 Revision 1
Page | 6
A B C D E F G H I J K L M N O P Q R S
1 1
SCADA
Workstations
2 2
3 3
RTU4 RTU6
4 4
RTU5 RTU8
5 5
RTU7 New Ring topology After adding IPP & 3IPP4 INT2
6 6
QATRANA RTU11
7 7
RTU10 RTU12
8 8
EAST
AMMAN
IPP4 IPP3 RTU13 SAMRA III RTU15 REHAB RTU14
9 9
200 m 24 km 22 km SCADA
1310 nm 1310 nm Workstations
1310 nm
10 10
11 Amman 11
Fajr Gas Feeding Power Station IPP3 & IPP4
Office Project Name Metering Stations
Document Name System Architecture
Document No. IPP-SCD0115-DWG-300
12 SCADA WS Designer 12
Mohammed Morsi
Title Fiber Ring Diagram
Customer PETROJET
13 7th Jan. 2016
13
Date
Version 1
A B C D E F G H I J K L M N O P Q R S
A B C D E F G H I J K L M N O P Q R S
1 1
Main Ring(through SDH)
6 6
IPP3
Metering
Station
7 7
Media Converter Media Converter
Ethernet/Fiber Ethernet/Fiber
8 Shelter 8
10 10
11 11
Media Converter Gas Feeding Power Station IPP3 & IPP4
Fiber/Ethernet Media Converter Project Name Metering Stations
Fiber/Ethernet
A B C D E F G H I J K L M N O P Q R S
A B C D E F G H I J K L M N O P Q R S
1 1
2 2
3 3
4 4
STM-L ETH 10-L ETH 10-R STM-R
SDH Switch A SDH Switch B
5 5
HSBY Link
6 6
Primary PLC Secondary PLC
Schneider Premium) Schneider Premium)
HSBY( HSBY( Media Converter
Ethernet/Fiber Modbus TCP
8 8
IPP4
Metering
Station
9 9
Shelter
10 10
11 11
Gas Feeding Power Station IPP3 & IPP4
Project Name Metering Stations
Document Name System Architecture
Document No. IPP-SCD0115-DWG-300
12 Designer 12
Mohammed Morsi
Title IPP4 RTU Block Diagram
Customer PETROJET
13 7th Jan. 2016
13
Date
Version 1
A B C D E F G H I J K L M N O P Q R S
A B C D E F G H I J K L M N O P Q R S
1310 nm FO Link
1 1550 nm FO Link 1
GOV OUTDOOR PANEL
Blank (Dark) FO Link
GOV M/C FO Link
2 2
1 1
2 2
To 3
4
3
4
3
5
6
GOV
PATCH
GOV 5
6 To 3
RTU 7 PANEL
PATCH
PANEL 1 7
8
9
10
1
FROM
FROM
8
9
10 IPP4
4
13 11
12
(1-12)
(13-24 )
11
12
4
5 5
GOV
PATCH
PANEL 2
6 6
10
11
12
12
11
7 10 7
9
8
7
1
2
3
4
5
6
6
5
4
3
2
1
7
8
9
IPP3 PANEL
8 8
IPP3
PATCH
PANEL 1
9 9
11 11
Gas Feeding Power Station IPP3 & IPP4
Project Name Metering Stations
Document Name System Architecture
Document No. IPP-SCD0115-DWG-300
12 Designer 12
Mohammed Morsi
Title Fiber Connection & Termination Diagram
STM-L ETH 10-L ETH 10-R STM-R
Customer PETROJET
13 7th Jan. 2016
13
Date
Version 1
A B C D E F G H I J K L M N O P Q R S
IPP3 & IPP4
POWER STATIONS
NATURAL GAS FEEDING PROJECTS
This page is a record of all revisions of this document. All previous issues are hereby superseded and are to
be destroyed.
Proprietary Information: This document contains proprietary information and may not be partly or wholly
reproduced without prior written permission from JORDANIAN EGYPTIAN COMPANY / ELSTER-
INSTROMET.
NOTES:
(a) Revisions are denoted by a vertical line placed in the right-hand margin against the revised text
and/or (b).
(c) PREP = Prepared by, CHKD = Checked by, REVD = Reviewed by, APP'D by Elster = Approved by.
(d) In case of conflict between any requirements stipulated in this document with the contractual
requirements, the contractual requirements shall prevail.
IPP3 & IPP4
POWER STATIONS
NATURAL GAS FEEDING PROJECTS
TABLE OF CONTENT
SECTION No. DESCRIPTION PAGE No.
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
124 DCS-AI124 Setpoint in SVC (local) next day hour 1 MMscft 32-bit float 246 03 R
125 DCS-AI125 Setpoint in SVC (local) next day hour 2 MMscft 32-bit float 248 03 R
126 DCS-AI126 Setpoint in SVC (local) next day hour 3 MMscft 32-bit float 250 03 R
127 DCS-AI127 Setpoint in SVC (local) next day hour 4 MMscft 32-bit float 252 03 R
128 DCS-AI128 Setpoint in SVC (local) next day hour 5 MMscft 32-bit float 254 03 R
129 DCS-AI129 Setpoint in SVC (local) next day hour 6 MMscft 32-bit float 256 03 R
130 DCS-AI130 Setpoint in SVC (local) next day hour 7 MMscft 32-bit float 258 03 R
131 DCS-AI131 Setpoint in SVC (local) next day hour 8 MMscft 32-bit float 260 03 R
132 DCS-AI132 Setpoint in SVC (local) next day hour 9 MMscft 32-bit float 262 03 R
133 DCS-AI133 Setpoint in SVC (local) next day hour 10 MMscft 32-bit float 264 03 R
134 DCS-AI134 Setpoint in SVC (local) next day hour 11 MMscft 32-bit float 266 03 R
135 DCS-AI135 Setpoint in SVC (local) next day hour 12 MMscft 32-bit float 268 03 R
136 DCS-AI136 Setpoint in SVC (local) next day hour 13 MMscft 32-bit float 270 03 R
137 DCS-AI137 Setpoint in SVC (local) next day hour 14 MMscft 32-bit float 272 03 R
138 DCS-AI138 Setpoint in SVC (local) next day hour 15 MMscft 32-bit float 274 03 R
139 DCS-AI139 Setpoint in SVC (local) next day hour 16 MMscft 32-bit float 276 03 R
140 DCS-AI140 Setpoint in SVC (local) next day hour 17 MMscft 32-bit float 278 03 R
141 DCS-AI141 Setpoint in SVC (local) next day hour 18 MMscft 32-bit float 280 03 R
142 DCS-AI142 Setpoint in SVC (local) next day hour 19 MMscft 32-bit float 282 03 R
143 DCS-AI143 Setpoint in SVC (local) next day hour 20 MMscft 32-bit float 284 03 R
144 DCS-AI144 Setpoint in SVC (local) next day hour 21 MMscft 32-bit float 286 03 R
145 DCS-AI145 Setpoint in SVC (local) next day hour 22 MMscft 32-bit float 288 03 R
146 DCS-AI146 Setpoint in SVC (local) next day hour 23 MMscft 32-bit float 290 03 R
147 DCS-AI147 Setpoint in SVC (local) next day hour 24 MMscft 32-bit float 292 03 R
148 DCS-AI148 In Use setpoint FCV current day hour 1 MMscft 32-bit float 294 03 R
149 DCS-AI149 In Use setpoint FCV current day hour 2 MMscft 32-bit float 296 03 R
150 DCS-AI150 In Use setpoint FCV current day hour 3 MMscft 32-bit float 298 03 R
151 DCS-AI151 In Use setpoint FCV current day hour 4 MMscft 32-bit float 300 03 R
152 DCS-AI152 In Use setpoint FCV current day hour 5 MMscft 32-bit float 302 03 R
153 DCS-AI153 In Use setpoint FCV current day hour 6 MMscft 32-bit float 304 03 R
154 DCS-AI154 In Use setpoint FCV current day hour 7 MMscft 32-bit float 306 03 R
155 DCS-AI155 In Use setpoint FCV current day hour 8 MMscft 32-bit float 308 03 R
156 DCS-AI156 In Use setpoint FCV current day hour 9 MMscft 32-bit float 310 03 R
157 DCS-AI157 In Use setpoint FCV current day hour 10 MMscft 32-bit float 312 03 R
158 DCS-AI158 In Use setpoint FCV current day hour 11 MMscft 32-bit float 314 03 R
159 DCS-AI159 In Use setpoint FCV current day hour 12 MMscft 32-bit float 316 03 R
160 DCS-AI160 In Use setpoint FCV current day hour 13 MMscft 32-bit float 318 03 R
161 DCS-AI161 In Use setpoint FCV current day hour 14 MMscft 32-bit float 320 03 R
162 DCS-AI162 In Use setpoint FCV current day hour 15 MMscft 32-bit float 322 03 R
163 DCS-AI163 In Use setpoint FCV current day hour 16 MMscft 32-bit float 324 03 R
164 DCS-AI164 In Use setpoint FCV current day hour 17 MMscft 32-bit float 326 03 R
165 DCS-AI165 In Use setpoint FCV current day hour 18 MMscft 32-bit float 328 03 R
166 DCS-AI166 In Use setpoint FCV current day hour 19 MMscft 32-bit float 330 03 R
167 DCS-AI167 In Use setpoint FCV current day hour 20 MMscft 32-bit float 332 03 R
168 DCS-AI168 In Use setpoint FCV current day hour 21 MMscft 32-bit float 334 03 R
169 DCS-AI169 In Use setpoint FCV current day hour 22 MMscft 32-bit float 336 03 R
170 DCS-AI170 In Use setpoint FCV current day hour 23 MMscft 32-bit float 338 03 R
171 DCS-AI171 In Use setpoint FCV current day hour 24 MMscft 32-bit float 340 03 R
PROJECT IPP3 & IPP4 POWER STATION NATURLA FEEDING PROJECTS
CLIENT JORDANIAN EGYPTION COMPANY
VENDOR DOCUMENT NO. 2819-650-IPP3-4-213
Communication Tag List - SCADA
VENDOR Elster-Instromet Sdn. Bhd.
REV. 04
PAGE 10 of 24
No. TAG Description Units Min Max Type Address Function R/W Rev
172 DCS-AI172 Current in use FCV setpoint MMscft/h 32-bit float 342 03 R
32-bit float 03 R
173 DCS-AI173 Actual flow hour 1 MMscft 32-bit float 344 03 R
174 DCS-AI174 Actual flow hour 2 MMscft 32-bit float 346 03 R
175 DCS-AI175 Actual flow hour 3 MMscft 32-bit float 348 03 R
176 DCS-AI176 Actual flow hour 4 MMscft 32-bit float 350 03 R
177 DCS-AI177 Actual flow hour 5 MMscft 32-bit float 352 03 R
178 DCS-AI178 Actual flow hour 6 MMscft 32-bit float 354 03 R
179 DCS-AI179 Actual flow hour 7 MMscft 32-bit float 356 03 R
180 DCS-AI180 Actual flow hour 8 MMscft 32-bit float 358 03 R
181 DCS-AI181 Actual flow hour 9 MMscft 32-bit float 360 03 R
182 DCS-AI182 Actual flow hour 10 MMscft 32-bit float 362 03 R
183 DCS-AI183 Actual flow hour 11 MMscft 32-bit float 364 03 R
184 DCS-AI184 Actual flow hour 12 MMscft 32-bit float 366 03 R
185 DCS-AI185 Actual flow hour 13 MMscft 32-bit float 368 03 R
186 DCS-AI186 Actual flow hour 14 MMscft 32-bit float 370 03 R
187 DCS-AI187 Actual flow hour 15 MMscft 32-bit float 372 03 R
188 DCS-AI188 Actual flow hour 16 MMscft 32-bit float 374 03 R
189 DCS-AI189 Actual flow hour 17 MMscft 32-bit float 376 03 R
190 DCS-AI190 Actual flow hour 18 MMscft 32-bit float 378 03 R
191 DCS-AI191 Actual flow hour 19 MMscft 32-bit float 380 03 R
192 DCS-AI192 Actual flow hour 20 MMscft 32-bit float 382 03 R
193 DCS-AI193 Actual flow hour 21 MMscft 32-bit float 384 03 R
194 DCS-AI194 Actual flow hour 22 MMscft 32-bit float 386 03 R
195 DCS-AI195 Actual flow hour 23 MMscft 32-bit float 388 03 R
196 DCS-AI196 Actual flow hour 24 MMscft 32-bit float 390 03 R
System status
200 DCS-DI001 SVC 1 in duty - 1-bit Coil 450:00 03 R
201 DCS-DI002 SVC 2 in duty - 1-bit Coil 450:01 03 R
Stream 1 alarms
202 DCS-DI003 Stream 1 Maximum flow alarm - 1-bit Coil 450:02 03 R
203 DCS-DI004 Stream 1 Maximum flow alarm (1 minute) - 1-bit Coil 450:03 03 R
204 DCS-DI005 Stream 1 Default pressure in use - 1-bit Coil 450:04 03 R
205 DCS-DI006 Stream 1 Default temperature in use - 1-bit Coil 450:05 03 R
206 DCS-DI007 Stream 1 Measured VOS deviates from calculated VOS - 1-bit Coil 450:06 03 R
207 DCS-DI008 Stream 1 Communication alarm - 1-bit Coil 450:07 03 R
PROJECT IPP3 & IPP4 POWER STATION NATURLA FEEDING PROJECTS
CLIENT JORDANIAN EGYPTION COMPANY
VENDOR DOCUMENT NO. 2819-650-IPP3-4-213
Communication Tag List - SCADA
VENDOR Elster-Instromet Sdn. Bhd.
REV. 04
PAGE 11 of 24
No. TAG Description Units Min Max Type Address Function R/W Rev
Stream 2 alarms
208 DCS-DI009 Stream 2 Maximum flow alarm - 1-bit Coil 450:08 03 R
209 DCS-DI010 Stream 2 Maximum flow alarm (1 minute) - 1-bit Coil 450:09 03 R
210 DCS-DI011 Stream 2 Default pressure in use - 1-bit Coil 450:10 03 R
211 DCS-DI012 Stream 2 Default temperature in use - 1-bit Coil 450:11 03 R
212 DCS-DI013 Stream 2 Measured VOS deviates from calculated VOS - 1-bit Coil 450:12 03 R
213 DCS-DI014 Stream 2 Communication alarm - 1-bit Coil 450:13 03 R
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
332 DCS-AI218 Setpoint FCV from SCADA current day hour 16 MMscft 32-bit float 2 03/16 R/W 04
333 DCS-AI219 Setpoint FCV from SCADA current day hour 17 MMscft 32-bit float 4 03/16 R/W 04
334 DCS-AI220 Setpoint FCV from SCADA current day hour 18 MMscft 32-bit float 6 03/16 R/W 04
335 DCS-AI221 Setpoint FCV from SCADA current day hour 19 MMscft 32-bit float 8 03/16 R/W 04
336 DCS-AI222 Setpoint FCV from SCADA current day hour 20 MMscft 32-bit float 10 03/16 R/W 04
337 DCS-AI223 Setpoint FCV from SCADA current day hour 21 MMscft 32-bit float 12 03/16 R/W 04
338 DCS-AI224 Setpoint FCV from SCADA current day hour 22 MMscft 32-bit float 942 03/16 R/W 04
339 DCS-AI225 Setpoint FCV from SCADA current day hour 23 MMscft 32-bit float 944 03/16 R/W 04
340 DCS-AI226 Setpoint FCV from SCADA current day hour 24 MMscft 32-bit float 946 03/16 R/W 04
341 DCS-AI227 Setpoint FCV from SCADA next day hour 1 MMscft 32-bit float 948 03/16 R/W 04
342 DCS-AI228 Setpoint FCV from SCADA next day hour 2 MMscft 32-bit float 950 03/16 R/W 04
343 DCS-AI229 Setpoint FCV from SCADA next day hour 3 MMscft 32-bit float 952 03/16 R/W 04
344 DCS-AI230 Setpoint FCV from SCADA next day hour 4 MMscft 32-bit float 954 03/16 R/W 04
345 DCS-AI231 Setpoint FCV from SCADA next day hour 5 MMscft 32-bit float 956 03/16 R/W 04
346 DCS-AI232 Setpoint FCV from SCADA next day hour 6 MMscft 32-bit float 958 03/16 R/W 04
347 DCS-AI233 Setpoint FCV from SCADA next day hour 7 MMscft 32-bit float 960 03/16 R/W 04
348 DCS-AI234 Setpoint FCV from SCADA next day hour 8 MMscft 32-bit float 962 03/16 R/W 04
349 DCS-AI235 Setpoint FCV from SCADA next day hour 9 MMscft 32-bit float 964 03/16 R/W 04
350 DCS-AI236 Setpoint FCV from SCADA next day hour 10 MMscft 32-bit float 966 03/16 R/W 04
351 DCS-AI237 Setpoint FCV from SCADA next day hour 11 MMscft 32-bit float 968 03/16 R/W 04
352 DCS-AI238 Setpoint FCV from SCADA next day hour 12 MMscft 32-bit float 970 03/16 R/W 04
353 DCS-AI239 Setpoint FCV from SCADA next day hour 13 MMscft 32-bit float 972 03/16 R/W 04
354 DCS-AI240 Setpoint FCV from SCADA next day hour 14 MMscft 32-bit float 974 03/16 R/W 04
355 DCS-AI241 Setpoint FCV from SCADA next day hour 15 MMscft 32-bit float 976 03/16 R/W 04
356 DCS-AI242 Setpoint FCV from SCADA next day hour 16 MMscft 32-bit float 978 03/16 R/W 04
357 DCS-AI243 Setpoint FCV from SCADA next day hour 17 MMscft 32-bit float 980 03/16 R/W 04
358 DCS-AI244 Setpoint FCV from SCADA next day hour 18 MMscft 32-bit float 982 03/16 R/W 04
359 DCS-AI245 Setpoint FCV from SCADA next day hour 19 MMscft 32-bit float 984 03/16 R/W 04
360 DCS-AI246 Setpoint FCV from SCADA next day hour 20 MMscft 32-bit float 986 03/16 R/W 04
361 DCS-AI247 Setpoint FCV from SCADA next day hour 21 MMscft 32-bit float 988 03/16 R/W 04
362 DCS-AI248 Setpoint FCV from SCADA next day hour 22 MMscft 32-bit float 990 03/16 R/W 04
363 DCS-AI249 Setpoint FCV from SCADA next day hour 23 MMscft 32-bit float 992 03/16 R/W 04
364 DCS-AI250 Setpoint FCV from SCADA next day hour 24 MMscft 32-bit float 994 03/16 R/W 04
365 DCS-AI251 Manual FCV Percentage setpoint from SCADA MMscft 32-bit float 996 03/16 R/W 04
366 DCS-AI252 Pressure Control setpoint from SCADA MMscft 32-bit float 998 03/16 R/W 04
IPP3 & IPP4
POWER STATIONS
NATURAL GAS FEEDING PROJECTS
Communication Tag List
Jordanian Egyptian COMPANY
PURCHASE ORDER No.
DOC No: 2819-650-IPP3-4-213 Rev.04 Page 15 of 24
FOR03/2015 & FOR04/2015
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
124 DCS-AI124 Setpoint in SVC (local) next day hour 1 MMscft 32-bit float 246 03 R
125 DCS-AI125 Setpoint in SVC (local) next day hour 2 MMscft 32-bit float 248 03 R
126 DCS-AI126 Setpoint in SVC (local) next day hour 3 MMscft 32-bit float 250 03 R
127 DCS-AI127 Setpoint in SVC (local) next day hour 4 MMscft 32-bit float 252 03 R
128 DCS-AI128 Setpoint in SVC (local) next day hour 5 MMscft 32-bit float 254 03 R
129 DCS-AI129 Setpoint in SVC (local) next day hour 6 MMscft 32-bit float 256 03 R
130 DCS-AI130 Setpoint in SVC (local) next day hour 7 MMscft 32-bit float 258 03 R
131 DCS-AI131 Setpoint in SVC (local) next day hour 8 MMscft 32-bit float 260 03 R
132 DCS-AI132 Setpoint in SVC (local) next day hour 9 MMscft 32-bit float 262 03 R
133 DCS-AI133 Setpoint in SVC (local) next day hour 10 MMscft 32-bit float 264 03 R
134 DCS-AI134 Setpoint in SVC (local) next day hour 11 MMscft 32-bit float 266 03 R
135 DCS-AI135 Setpoint in SVC (local) next day hour 12 MMscft 32-bit float 268 03 R
136 DCS-AI136 Setpoint in SVC (local) next day hour 13 MMscft 32-bit float 270 03 R
137 DCS-AI137 Setpoint in SVC (local) next day hour 14 MMscft 32-bit float 272 03 R
138 DCS-AI138 Setpoint in SVC (local) next day hour 15 MMscft 32-bit float 274 03 R
139 DCS-AI139 Setpoint in SVC (local) next day hour 16 MMscft 32-bit float 276 03 R
140 DCS-AI140 Setpoint in SVC (local) next day hour 17 MMscft 32-bit float 278 03 R
141 DCS-AI141 Setpoint in SVC (local) next day hour 18 MMscft 32-bit float 280 03 R
142 DCS-AI142 Setpoint in SVC (local) next day hour 19 MMscft 32-bit float 282 03 R
143 DCS-AI143 Setpoint in SVC (local) next day hour 20 MMscft 32-bit float 284 03 R
144 DCS-AI144 Setpoint in SVC (local) next day hour 21 MMscft 32-bit float 286 03 R
145 DCS-AI145 Setpoint in SVC (local) next day hour 22 MMscft 32-bit float 288 03 R
146 DCS-AI146 Setpoint in SVC (local) next day hour 23 MMscft 32-bit float 290 03 R
147 DCS-AI147 Setpoint in SVC (local) next day hour 24 MMscft 32-bit float 292 03 R
148 DCS-AI148 In Use setpoint FCV current day hour 1 MMscft 32-bit float 294 03 R
149 DCS-AI149 In Use setpoint FCV current day hour 2 MMscft 32-bit float 296 03 R
150 DCS-AI150 In Use setpoint FCV current day hour 3 MMscft 32-bit float 298 03 R
151 DCS-AI151 In Use setpoint FCV current day hour 4 MMscft 32-bit float 300 03 R
152 DCS-AI152 In Use setpoint FCV current day hour 5 MMscft 32-bit float 302 03 R
153 DCS-AI153 In Use setpoint FCV current day hour 6 MMscft 32-bit float 304 03 R
154 DCS-AI154 In Use setpoint FCV current day hour 7 MMscft 32-bit float 306 03 R
155 DCS-AI155 In Use setpoint FCV current day hour 8 MMscft 32-bit float 308 03 R
156 DCS-AI156 In Use setpoint FCV current day hour 9 MMscft 32-bit float 310 03 R
157 DCS-AI157 In Use setpoint FCV current day hour 10 MMscft 32-bit float 312 03 R
158 DCS-AI158 In Use setpoint FCV current day hour 11 MMscft 32-bit float 314 03 R
159 DCS-AI159 In Use setpoint FCV current day hour 12 MMscft 32-bit float 316 03 R
160 DCS-AI160 In Use setpoint FCV current day hour 13 MMscft 32-bit float 318 03 R
161 DCS-AI161 In Use setpoint FCV current day hour 14 MMscft 32-bit float 320 03 R
162 DCS-AI162 In Use setpoint FCV current day hour 15 MMscft 32-bit float 322 03 R
163 DCS-AI163 In Use setpoint FCV current day hour 16 MMscft 32-bit float 324 03 R
164 DCS-AI164 In Use setpoint FCV current day hour 17 MMscft 32-bit float 326 03 R
165 DCS-AI165 In Use setpoint FCV current day hour 18 MMscft 32-bit float 328 03 R
166 DCS-AI166 In Use setpoint FCV current day hour 19 MMscft 32-bit float 330 03 R
167 DCS-AI167 In Use setpoint FCV current day hour 20 MMscft 32-bit float 332 03 R
168 DCS-AI168 In Use setpoint FCV current day hour 21 MMscft 32-bit float 334 03 R
169 DCS-AI169 In Use setpoint FCV current day hour 22 MMscft 32-bit float 336 03 R
170 DCS-AI170 In Use setpoint FCV current day hour 23 MMscft 32-bit float 338 03 R
171 DCS-AI171 In Use setpoint FCV current day hour 24 MMscft 32-bit float 340 03 R
PROJECT IPP3 & IPP4 POWER STATION NATURLA FEEDING PROJECTS
CLIENT JORDANIAN EGYPTION COMPANY
VENDOR DOCUMENT NO. 2819-650-IPP3-4-213
Communication Tag List - SCADA
VENDOR Elster-Instromet Sdn. Bhd.
REV. 04
PAGE 20 of 24
No. TAG Description Units Min Max Type Address Function R/W Rev
System status
200 DCS-DI001 SVC 1 in duty - 1-bit Coil 450:00 03 R
201 DCS-DI002 SVC 2 in duty - 1-bit Coil 450:01 03 R
Stream 1 alarms
202 DCS-DI003 Stream 1 Maximum flow alarm - 1-bit Coil 450:02 03 R
203 DCS-DI004 Stream 1 Maximum flow alarm (1 minute) - 1-bit Coil 450:03 03 R
204 DCS-DI005 Stream 1 Default pressure in use - 1-bit Coil 450:04 03 R
205 DCS-DI006 Stream 1 Default temperature in use - 1-bit Coil 450:05 03 R
206 DCS-DI007 Stream 1 Measured VOS deviates from calculated VOS - 1-bit Coil 450:06 03 R
207 DCS-DI008 Stream 1 Communication alarm - 1-bit Coil 450:07 03 R
PROJECT IPP3 & IPP4 POWER STATION NATURLA FEEDING PROJECTS
CLIENT JORDANIAN EGYPTION COMPANY
VENDOR DOCUMENT NO. 2819-650-IPP3-4-213
Communication Tag List - SCADA
VENDOR Elster-Instromet Sdn. Bhd.
REV. 04
PAGE 21 of 24
No. TAG Description Units Min Max Type Address Function R/W Rev
Stream 2 alarms
208 DCS-DI009 Stream 2 Maximum flow alarm - 1-bit Coil 450:08 03 R
209 DCS-DI010 Stream 2 Maximum flow alarm (1 minute) - 1-bit Coil 450:09 03 R
210 DCS-DI011 Stream 2 Default pressure in use - 1-bit Coil 450:10 03 R
211 DCS-DI012 Stream 2 Default temperature in use - 1-bit Coil 450:11 03 R
212 DCS-DI013 Stream 2 Measured VOS deviates from calculated VOS - 1-bit Coil 450:12 03 R
213 DCS-DI014 Stream 2 Communication alarm - 1-bit Coil 450:13 03 R
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
No. TAG Description Units Min Max Type Address Function R/W Rev
332 DCS-AI218 Setpoint FCV from SCADA current day hour 16 MMscft 32-bit float 2 03/16 R/W 04
333 DCS-AI219 Setpoint FCV from SCADA current day hour 17 MMscft 32-bit float 4 03/16 R/W 04
334 DCS-AI220 Setpoint FCV from SCADA current day hour 18 MMscft 32-bit float 6 03/16 R/W 04
335 DCS-AI221 Setpoint FCV from SCADA current day hour 19 MMscft 32-bit float 8 03/16 R/W 04
336 DCS-AI222 Setpoint FCV from SCADA current day hour 20 MMscft 32-bit float 10 03/16 R/W 04
337 DCS-AI223 Setpoint FCV from SCADA current day hour 21 MMscft 32-bit float 12 03/16 R/W 04
338 DCS-AI224 Setpoint FCV from SCADA current day hour 22 MMscft 32-bit float 942 03/16 R/W 04
339 DCS-AI225 Setpoint FCV from SCADA current day hour 23 MMscft 32-bit float 944 03/16 R/W 04
340 DCS-AI226 Setpoint FCV from SCADA current day hour 24 MMscft 32-bit float 946 03/16 R/W 04
341 DCS-AI227 Setpoint FCV from SCADA next day hour 1 MMscft 32-bit float 948 03/16 R/W 04
342 DCS-AI228 Setpoint FCV from SCADA next day hour 2 MMscft 32-bit float 950 03/16 R/W 04
343 DCS-AI229 Setpoint FCV from SCADA next day hour 3 MMscft 32-bit float 952 03/16 R/W 04
344 DCS-AI230 Setpoint FCV from SCADA next day hour 4 MMscft 32-bit float 954 03/16 R/W 04
345 DCS-AI231 Setpoint FCV from SCADA next day hour 5 MMscft 32-bit float 956 03/16 R/W 04
346 DCS-AI232 Setpoint FCV from SCADA next day hour 6 MMscft 32-bit float 958 03/16 R/W 04
347 DCS-AI233 Setpoint FCV from SCADA next day hour 7 MMscft 32-bit float 960 03/16 R/W 04
348 DCS-AI234 Setpoint FCV from SCADA next day hour 8 MMscft 32-bit float 962 03/16 R/W 04
349 DCS-AI235 Setpoint FCV from SCADA next day hour 9 MMscft 32-bit float 964 03/16 R/W 04
350 DCS-AI236 Setpoint FCV from SCADA next day hour 10 MMscft 32-bit float 966 03/16 R/W 04
351 DCS-AI237 Setpoint FCV from SCADA next day hour 11 MMscft 32-bit float 968 03/16 R/W 04
352 DCS-AI238 Setpoint FCV from SCADA next day hour 12 MMscft 32-bit float 970 03/16 R/W 04
353 DCS-AI239 Setpoint FCV from SCADA next day hour 13 MMscft 32-bit float 972 03/16 R/W 04
354 DCS-AI240 Setpoint FCV from SCADA next day hour 14 MMscft 32-bit float 974 03/16 R/W 04
355 DCS-AI241 Setpoint FCV from SCADA next day hour 15 MMscft 32-bit float 976 03/16 R/W 04
356 DCS-AI242 Setpoint FCV from SCADA next day hour 16 MMscft 32-bit float 978 03/16 R/W 04
357 DCS-AI243 Setpoint FCV from SCADA next day hour 17 MMscft 32-bit float 980 03/16 R/W 04
358 DCS-AI244 Setpoint FCV from SCADA next day hour 18 MMscft 32-bit float 982 03/16 R/W 04
359 DCS-AI245 Setpoint FCV from SCADA next day hour 19 MMscft 32-bit float 984 03/16 R/W 04
360 DCS-AI246 Setpoint FCV from SCADA next day hour 20 MMscft 32-bit float 986 03/16 R/W 04
361 DCS-AI247 Setpoint FCV from SCADA next day hour 21 MMscft 32-bit float 988 03/16 R/W 04
362 DCS-AI248 Setpoint FCV from SCADA next day hour 22 MMscft 32-bit float 990 03/16 R/W 04
363 DCS-AI249 Setpoint FCV from SCADA next day hour 23 MMscft 32-bit float 992 03/16 R/W 04
364 DCS-AI250 Setpoint FCV from SCADA next day hour 24 MMscft 32-bit float 994 03/16 R/W 04
365 DCS-AI251 Manual FCV Percentage setpoint from SCADA MMscft 32-bit float 996 03/16 R/W 04
366 DCS-AI252 Pressure Control setpoint from SCADA MMscft 32-bit float 998 03/16 R/W 04
PROJECT : IPP3 & IPP4 METERING STATIONS
CLIENT : PETROJET
END USER : Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co Ltd
NO.OF PAGES : 10
REV : 1
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
COVER SHEET
SHT. NO. SHEET TITLE REVISION ISSUE DATE
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
TABLE OF CONTENTS
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
BILL OF MATERIAL
SIDE VIEW FRONT VIEW
AIR AIR
FLOW FLOW
LAMP
TOP VIEW
40X40 DUCT
60X80 DUCT
PLC
PRI
REAR
PS CPU ETY-1 ETY-2 DIM 1
40X40 DUCT
XDC -24+:01
TO
XDC -24+:20
XDC -24+
60X80 DUCT
PLC
SEC
40X40 DUCT PS CPU ETY-1 ETY-2 DIM 2
XDC-24-:01
TO
XDC-24-:20
XDC-24-
40X40 DUCT
40X40 DUCT
80X80 DUCT
80X80 DUCT
40X40 DUCT
MAIN CB FANS CB LIGHT CB PLC PRI PLC SEC
CB 1 CB 2 CB 3 PS CB PS CB
CB 4 CB 5
80X80 DUCT
PLC PLC
SWITCH A SWITCH B
40X40 DUCT
PS1 CB PS2 CB SOCKET CB SPARE CB
CB 6 CB 7 CB 8 CB 9
POWR
SOCKET
T.B DI
XAC
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
220 VAC
1N 2N 3N 4N 5N 6N 7N 8N 9N
4 2 4 2 4 2 4 2 4 2 4 2 2 2
4 4
CB08-4 \ SOCKET-N
CB08-2 \ SOCKET-L
CB06-4 \ P.S1-N
CB07-4 \ P.S2-N
CB06-2 \ P.S1-L
CB07-2 \ P.S2-L
N L N L N L N L N L N L N L N L
PANEL PANEL PLC PRI PLC SEC 24 V DC 24 V DC
DOOR POWER SUPPLY 1 POWER SUPPLY 2
POWER SPARE
FANS PS PS SOCKET
LIGHT -V +V -V +V
-V +V -V +V
IN 1 IN 2
REDUND. MODULE
-V +V
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
AC POWER DISTRIBUTION
24 VDC
0 VDC
+24 VDC
XDC1-
XDC1+
1
XDC-24- -01 \ PLC-SW1- -
0
1A
PLC
XDC-24+ -01 \ PLC-SW1- +
+
1
SWITCH A
2
XDC-24- -02 \ PLC-SW2- -
0
1A
PLC
XDC-24+ -02 \ PLC-SW2- +
SWITCH B
2
DI
1A
MODULE 1
3
0
XDC-24+ -04 \ TB-DI02-2+
DI
1A
MODULE 2
4
5
1A
5
6
1A
6
7
1A
7
8
0.5A
8
we integrate
GIZA
SYSTEMS
DC POWER DISTRIBUTION
GIZA SYSTEMS
DIM 1
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
SDH SDH
SWITCH A SWITCH B
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
NETWORK CONNECTIONS
PROJECT : IPP3 & IPP4 METERING STATIONS
CLIENT : PETROJET
END USER : Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co Ltd
NO.OF PAGES : 10
REV : 1
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
COVER SHEET
SHT. NO. SHEET TITLE REVISION ISSUE DATE
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
TABLE OF CONTENTS
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
BILL OF MATERIAL
SIDE VIEW FRONT VIEW
AIR AIR
FLOW FLOW
LAMP
TOP VIEW
40X40 DUCT
60X80 DUCT
PLC
PRI
REAR
PS CPU ETY-1 ETY-2 DIM 1
40X40 DUCT
XDC -24+:01
TO
XDC -24+:20
XDC -24+
60X80 DUCT
PLC
SEC
40X40 DUCT PS CPU ETY-1 ETY-2 DIM 2
XDC-24-:01
TO
XDC-24-:20
XDC-24-
40X40 DUCT
40X40 DUCT
80X80 DUCT
80X80 DUCT
40X40 DUCT
MAIN CB FANS CB LIGHT CB PLC PRI PLC SEC
CB 1 CB 2 CB 3 PS CB PS CB
CB 4 CB 5
80X80 DUCT
PLC PLC
SWITCH A SWITCH B
40X40 DUCT
PS1 CB PS2 CB SOCKET CB SPARE CB
CB 6 CB 7 CB 8 CB 9
POWR
SOCKET
T.B DI
XAC
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
220 VAC
1N 2N 3N 4N 5N 6N 7N 8N 9N
4 2 4 2 4 2 4 2 4 2 4 2 2 2
4 4
CB08-4 \ SOCKET-N
CB08-2 \ SOCKET-L
CB06-4 \ P.S1-N
CB07-4 \ P.S2-N
CB06-2 \ P.S1-L
CB07-2 \ P.S2-L
N L N L N L N L N L N L N L N L
PANEL PANEL PLC PRI PLC SEC 24 V DC 24 V DC
DOOR POWER SUPPLY 1 POWER SUPPLY 2
POWER SPARE
FANS PS PS SOCKET
LIGHT -V +V -V +V
-V +V -V +V
IN 1 IN 2
REDUND. MODULE
-V +V
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
AC POWER DISTRIBUTION
24 VDC
0 VDC
+24 VDC
XDC1-
XDC1+
1
XDC-24- -01 \ PLC-SW1- -
0
1A
PLC
XDC-24+ -01 \ PLC-SW1- +
+
1
SWITCH A
2
XDC-24- -02 \ PLC-SW2- -
0
1A
PLC
XDC-24+ -02 \ PLC-SW2- +
SWITCH B
2
DI
1A
MODULE 1
3
0
XDC-24+ -04 \ TB-DI02-2+
DI
1A
MODULE 2
4
5
1A
5
6
1A
6
7
1A
7
8
0.5A
8
we integrate
GIZA
SYSTEMS
DC POWER DISTRIBUTION
GIZA SYSTEMS
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
SDH SDH
SWITCH A SWITCH B
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
NETWORK CONNECTIONS
PROJECT : IPP3 & IPP4 METERING STATIONS
CLIENT : PETROJET
END USER : Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co Ltd
NO.OF PAGES : 9
REV : 1
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
COVER SHEET
SHT. NO. SHEET TITLE REVISION ISSUE DATE
01
02
03
04
05
06
07
08
09
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
TABLE OF CONTENTS
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
BILL OF MATERIAL
SIDE VIEW SIDE VIEW
LAMP
SCADA Pack ES
REAR
60X80 DUCT
80X80 DUCT
80X80 DUCT
60X80 DUCT
60X80 DUCT
XDC-24-
XDC -24+
40X80 DUCT
XAC
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
0 VDC
+24 VDC
XDC1-
XDC1+
1
XDC-24- -01 \ SCADA PACK- -
0
1A
XDC-24+ -01 \ SCADA PACK- +
+
1
SCADA PACK
2
XDC-24- -02 \ MEDIA CONV- -
0
1A
MEDIA
+
2
CONVERTER
3
DI
1A
MODULE
3
DO
1A
MODULE
4
AI
1A
MODULE
5
AO
1A
MODULE
6
RELAYS
7
8
1A
8
we integrate
GIZA
SYSTEMS
DC POWER DISTRIBUTION
GIZA SYSTEMS
GIZA
SYSTEMS GIZA SYSTEMS
we integrate
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 8
Doc. No. IPP-SCD0115-CLC-400 Revision 0
PROJECT
Power Consumption
Page | 1
Power Consumption
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 8
Doc. No. IPP-SCD0115-CLC-400 Revision 0
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
0 29/10/2015 Issued For Approval Tamer Farid Mohammed Morsi Amr Fathi
Page | 2
Power Consumption
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 8
Doc. No. IPP-SCD0115-CLC-400 Revision 0
Contents
1. GENERAL ........................................................................................................................ 4
1.1. INTRODUCTION ........................................................................................................... 4
1.2. DEFINITIONS AND ABBREVIATION: ..................................................................... 4
2. POWER CONSUMPTION FOR CONTROL PANEL ................................................... 5
2.1. DC POWER SUPPLY 5 VDC TO PLC RACK MODULES:..................................... 5
2.2. DC POWER SUPPLY UNITS ....................................................................................... 5
2.3. AC POWER SUPPLY UNITS: ...................................................................................... 6
2.4. UPS POWER INPUT ...................................................................................................... 6
A. Appendix A ........................................................................................................................ 7
Page | 3
Power Consumption
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 4 of 8
Doc. No. IPP-SCD0115-CLC-400 Revision 0
1. GENERAL
1.1. INTRODUCTION
The Purpose of this document is to provide the Power Consumption for the different parts of the
control system.
Abbreviation Definition
mA Millie Ampere
mW Millie Watt
V Voltage
W Watts
Page | 4
Power Consumption
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 5 of 8
Doc. No. IPP-SCD0115-CLC-400 Revision 0
Total power of 13 watt need to be supplied from the 24 VDC power supply to maintain proper
functionality for the system which in this case is sufficient (26 watts Power supply).
Total power of 63 watt need to be supplied from the 24 VDC power supply to maintain proper
functionality for the system
A 72 watt DC power supply was selected to cover the needs of the system units.
Page | 5
Power Consumption
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 6 of 8
Doc. No. IPP-SCD0115-CLC-400 Revision 0
Total power of 222 watts need to be supplied from the 220 VAC power source to maintain
proper functionality for the system.
A 1 KVA UPS was selected to cover the needs of the system units.
APC
Smart-
SURT1
1 APC UPS 1 220 AC 3.1818 700 W 220 AC 3.1818 700 W
000XLI
1KVA-
700 Watt
The Uninterrupted Power Supply UPS Rating should be sufficient to cover the power
consumption of all the control system units.
A 700 watt (1KV) UPS was selected to supply system cabinet in addition to 2 (APC Smart-
UPS RT 48V Battery Pack) which can supply the system at full load for about 5.5 hours and at
normal load for 7.5 hours, refer to Appendix A.
Page | 6
Power Consumption
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 7 of 8
Doc. No. IPP-SCD0115-CLC-400 Revision 0
Input Power
ITM Vendor DESCR PRT NO.
Volt Current PWR
Qty Type
(V) cons(A) (W)
100FX Singlemode
Schneider
1 Unmanaged Industrial EKI-3525S 2 24 DC 0.0875 4.2
Electric
Ethernet Switch
Schneider TBUP500-
2 SCADAPACK ES RTU 1 24 DC 0.3875 9.3
Electric 1A00-AE01N
TOTAL POWER REQUIRED 14 W
Total power of 14 watt need to be supplied from the 24 VDC power supply to maintain proper
functionality for the system which in this case is sufficient (120 watts Power supply).
ITM Vendor DESCR PRT NO. Qty Volt Current PWR Vol Current PWR
Type Type
(V) cons(A) (W) (V) cons(A) (W)
Power
Schneider Supply ABL8RP
1 1 220 AC 0.545 120 24 DC 5 120
Electric 1P 24V S24050
5A
Schneider
2 Lamps - 1 220 AC 0.059 13 - - - -
Electric
TOTAL POWER REQUIRED 133 W
Total power of 133 watts need to be supplied from the 220 VAC power source to maintain
proper functionality for the system.
A 300 Watts solar cells system was selected to cover the needs of the system units.
Page | 7
Power Consumption
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 8 of 8
Doc. No. IPP-SCD0115-CLC-400 Revision 0
A. Appendix A
Page | 8
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
PROJECT
Page | 1
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
0 27/10/2015 Issued For Approval M.Morsi A.Metwally A.Fathi
Page | 2
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
AI Analogue Input
AO Analogue Output
CPU Central Processing Unit
DI Digital Input
DO Digital Output
FBD Function Block Diagram
FDS Functional Design Specifications
IEC International Electro-technical Committee
IP Ingress Protection
IP address Internet Protocol address
I/O Input / Output
LD Ladder Diagram Language
LED Light Emitting Diode
NEMA National Electric Manufacturers Association
PC Personal Computer
PLC Programmable Logic Controller
RTU Remote Terminal Unit
SDH Synchronous Digital Hierarchy
TCP Transmission Control Protocol
SCADA Supervision Control and Data Acquisition
UDP User Datagram Protocol
PSTN Public Switched Telephone Network
GSM Global System for Mobile Communications
OPC Open Platform Communications
LAN Local Area Network
SMTP Simple Mail Transfer Protocol
Page | 3
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 4 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Contents
1. Introduction............................................................................................................... 6
1.1. Purpose .............................................................................................................. 7
1.2. Applicable Standards.......................................................................................... 7
2. Basic Design ............................................................................................................ 8
2.1. Scope of Supply ................................................................................................. 8
2.2. Equipment Location ............................................................................................ 8
3. System Architecture ................................................................................................. 9
3.1. General layout .................................................................................................... 9
3.1.1. IPP3 System architecture ............................................................................ 9
3.1.2. IPP3 System architecture ......................................................................... 10
3.1.3. Communication Architecture ...................................................................... 11
3.1.3.1. PLC HSBY Controller Design .............................................................. 13
4. Control System Hardware Description.................................................................... 14
4.1. Premium Hot Standby PLC .............................................................................. 14
4.1.1. Premium PLC Modules .............................................................................. 16
4.1.2. Premium CPU (TSXH5724M) .................................................................... 17
4.1.3. Ethernet Module (TSXETY4103) ............................................................... 21
4.1.4. SCADAPack ES ......................................................................................... 23
4.2. Ethernet Switches............................................................................................. 24
4.2.1. Ethernet TCP/IP ConneXium Managed Switch (TCSESM083F23F0) ....... 24
4.2.2. 10/100T (X) to Single-Mode SC Type Fibre Optic Industrial Media
Converter................................................................................................................ 26
Page | 4
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 5 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Page | 5
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 6 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
1. Introduction
This document calls for the description of all components required for the Computerized Monitoring and
Control System of IPP3 & IPP4 Metering Stations.
The scope of the work covers Design, Engineering, Supply, Testing and Commissioning of the
Computerized Monitoring and Control for the PLC and to modify the existing SCADA at Aqaba, Rehab
and Amman control rooms to link with IPP3 & IPP4 Metering Stations.
To fulfil the requirements of a state-of-the-art centralized control system, the works shall include:
To ensure an up-to-date automation system, The PLC technologies are carefully chosen from world-
leading suppliers, namely:
CONTROL: The Programmable Logic Controllers selected for this plant are the powerful state-of-
the-art Schneider Electrics Premium Hot Standby and SCADAPACK RTU for GOV control and
monitoring.
Page | 6
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 7 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
1.1. Purpose
The purpose of this Functional Design Specifications (FDS) document is to describe the functionality and
detailed specifications of both the hardware and the software of the PLC Hot Standby and SCADAPACK
RTU that will be supplied by Giza Systems to provide a redundant control system to existing SCADA
system according to the requirements of customer.
Modicon Premium Hot Standby PLC and SCADAPACK RTU have been developed conform to the
principal national and International standards concerning electronic equipment for industrial automation
systems:
Merchant navy requirements of the main international bodies (with ABS, BV, DNV, GL, LR, RINA,
RMRS): IACS (International Association of Classification Societies).
Compliance with European Directives:
- Low Voltage: 2006/95/EC,
- Electromagnetic Compatibility: 2004/108/EC.
Electrical qualities and self-extinguishing capacity of insulating materials: UL 746C, UL 94.
Hazardous areas classification: CSA 22.2 No. 213, Class I, Division 2, Groups A, B, C and D.
Page | 7
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 8 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
2. Basic Design
This section defines the basic technical requirements and specifications of the Modicon Premium Hot
Standby PLC and SCADAPACK RTU.
The following subjects are described:
Scope of supply
Equipment location
Giza Systems will supply a fully designed Hardware and Software including assembled, tested, inspected,
and documented system for IPP3 & IPP4 Metering Stations SCADA Integration Project. The system
consists of:
2 (Two) PLC System cabinets including the PLC CPU hardware, all necessary I/O cards,
communication cards and System cabling.
2 (Two) SDH multiplexer network cabinets including the SDH node hardware, all necessary
communication modules and System cabling.
1 (One) RTU System cabinet the RTU CPU hardware, all necessary I/O cards, media converters
and System cabling.
2 (Two) Premium PLC software Unity Pro L.
1 (One) SCADAPACK RTU software SCADAPACK E configurator.
Documentation.
Page | 8
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 9 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
3. System Architecture
3.1. General layout
In the following is the general system layout, showing communication architecture and control system
architecture. The layout contains Ethernet switches distribution throw all the system and its connections to
other system components. The layout shows also the cabinets and what will contain from the control
system.
3.1.1. IPP3 System architecture
Page | 9
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 10 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Page | 10
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 11 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
A communication TCP/IP network will be installed to link between different components of the automation
system. The communication between existing SCADA system and IPP3 & IPP4 Metering Stations control
system will be throw Fibre Optic/Ethernet switches via SDH multiplexers. The communication will be built
upon MODBUS inheriting the benefits from the MODBUS protocol to almost of the intelligent devices
manufacturers and the simplicity and higher speed of TCP/IP networks as well as the ability to use the
facilities offered by the TCP/IP to diagnose the faults in equipment and to make the configuration for any
data node remotely.
The TCP/IP communication system will have two types of communications links:
1- Twisted pair copper link :
This type of link will be used inside the panels because of the small distance and easy to
maintenance and test during troubleshooting.
One of the main advantages of the communication architecture its fully redundant design. The
communication design will provide redundancy as follow:
The communication is based on Fiber Optics ring topology using SDH multiplexers. If a single link
fails the others pick up the slack. The link will not go down completely. SDH multiplexers offers
advanced functions and customized service levels to improve LAN performance and reliability.
Any replacements or maintenance in the SDH multiplexers network items as STM modules or
Ethernet modules will not affect the network, because disconnection will not happen if it failed in a
single link.
The Redundant communication appears in three levels:
1- SCADA Ring
It is responsible for the communication between the existing SCADA and IPP3 & IPP4 SDH
nodes.it is based on two STM modules in each node for right and left connection with
nearby stations. If anyone of STM modules failed the communication between the existing
SCADA and the IPP3 & IPP4 SDH nodes will not be broken.
Page | 11
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 12 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
2- HSBY Ring
It is responsible for the communication between the SDH node and HSBY Ring in both
IPP3 & IPP4.it is based on two Ethernet switches. If any Ethernet switch failed the
communication between the SDH node and the HSBY Ring will continue.
3- I/O SCANNING Ring
It is responsible for providing redundant communication between the two Hot Standby
control units and IPP3 & IPP4 Metering Stations PLCs and Power plant PLCs .it is consist
of two separated Ethernet switches and every node has its Ethernet switch.
So in any communication ring, if one link fails, the communication path will not be
disconnected.
Page | 12
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 13 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
It is based on the Primary/Standby redundancy principle, with complete redundancy of the main
processing and communication functions, the use of shared I/O on the Ethernet Modbus/TCP network, a
Modbus link and/or redundancy of in-rack I/O (single-rack configuration only).
Premium Hot Standby redundant architectures offer an ideal solution for availability requirements when
changeover time is not critical. They are designed for processes which can tolerate a lack of control on
the part of the Premium PLC lasting up to one second (average changeover time from the Primary unit
to the Standby unit and for updating shared I/O on Ethernet).
At the center of the system, there are two Modicon Premium single-rack configurations called the
Primary PLC and the Standby PLC. Their hardware and software configurations are identical. The offer
is comprised of two processor models TSX H57 24M designed specifically for Hot Standby architectures
with Unity Pro software.
This dual processor configuration combines the functions of the CPU and redundant coprocessor in the
same unit.
The Primary PLC:
Executes the application program and manages the I/O, which can take the form of:
- Field devices on an Ethernet network managed by the I/O Scanning service
- Field devices on a Modbus master link
- Sensors and actuators connected to Premium I/O modules on bus X with single-rack
configuration
Manages the transfer of data via the CPU Sync link to the Standby PLC at the start of every
cycle
In the event the Primary PLC becomes inoperative, the standby system changes over automatically,
whereby execution of the application program and control of the I/O is changed over to the Standby PLC
within 1.5 cycles, with an up-to-date data context. An automatic mechanism for the assignment of IP and
IP + 1 addresses changes the addresses of the Ethernet network modules with the 2 Premium
configurations which manage the field devices. The same mechanism is used for n and n + 1 slave
address assignments for Modbus link modules.
Once they have changed over, the Standby PLC becomes the Primary PLC.
Once the inoperative PLC has been repaired and reconnected to the standby system, it takes the role of
the Standby PLC.
Page | 13
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 14 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
3
2
Page | 14
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 15 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
The Modicon Premium Hot Standby redundancy system is compatible with Unity Pro software. It helps to
ensure continuity of operation for an automation system based on the Modicon Premium platform in the
event that one of the following becomes inoperative:
The central processing
communication functions
They can meet availability requirements when the purpose of the RTU is to monitor and control an
installation in continuous operation, signal incidents to a control station, and transmit command
instructions from the supervision manager to various locations on an extensive site.
Example areas of application:
Page | 15
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 16 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Page | 16
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 17 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
The double-format Modicon Premium Hot Standby processors TSX H57 24M display the following
features on the front panel:
1. Display unit consisting of six LEDs:
RUN LED (green):
-- LED permanently on: Processor in Primary mode during operation (program running)
-- Flashing 2.5 s (on)/0.5 s (off): Processor in Standby mode during operation (Execution of
first program section)
-- Flashing 0.5 s (on)/2.5 s (off): Processor not in standby mode
-- Flashing 0.5 s (on)/0.5 s (off): PLC in Stop mode
ERR LED (red):
-- LED permanently on: Detected fault on the processor or its on-board devices (PCMCIA
memory card)
-- Flashing 0.5 s (on)/0.5 s (off): Detected application fault
TER LED (yellow): Activity on the TER/AUX terminal port
Page | 17
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 18 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
I/O (red), permanently on: Detected fault on another module on the PLC station, or detected
configuration fault
STS LED (yellow):
-- Flashing 0.5 s (on)/0.5 s (off): Redundant mode between the Primary and Standby
processors is OK
-- LED permanently on: Standby mode not active or being initialized
-- Off: Processor does not pass self-test
-- ACT LED (yellow): Activity on the CPU Sync link between the Primary and Standby
processors is OK
Diagnostics at redundancy mode level is supported by the 3 LEDs (RUN, ERR and STS) on the TSX
ETY 4103/5103 communication modules managing the shared I/O on Ethernet.
2. Memory Extract button: Not operational on Hot Standby processors.
3. RESET button which initiates a cold restart of the PLC when activated.
4. 8-way female mini-DIN connector marked TER/AUX for connecting a programming, adjustment or
user interface terminal.
5. USB connector marked TER for connecting a programming terminal (requires UNY XCA USB 033
3.3 m connection cable for connection to a compatible PC; to be ordered separately).
7. PCMCIA slot (no. 1) for a memory extension card to store additional data (1).
8. RJ45 connector marked HSBY Link, designed for Hot Standby communication between the
Primary and Standby processors.
Page | 18
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 19 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Item Specification
Number of racks 1
Number of slots 12
Page | 19
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 20 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Page | 20
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 21 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Item Specification
Ethernet TCP/IP RJ45 10/100 Mbit/s 1 twisted pair transparent ready class
Integrated connection type
B30
Bandwidth management
Data Editor (via PC terminal)
FDR server
Communication service Rack Viewer
SNMP network administrator
Global Data
I/O scanning
Modbus TCP messaging
Port Ethernet 10BASE-T/100BASE-TX
Marking CE
Page | 21
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 22 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Item Specification
Product certifications UL 508
Page | 22
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 23 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
4.1.4. SCADAPack ES
Page | 23
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 24 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Item Specification
Management Managed
Transmission support medium Twisted shielded pairs cable CAT 5E for copper cable
Page | 24
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 25 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Marking CE
Page | 25
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 26 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
1. Communications
Standard IEEE 802.3, 802.3u, 802.3x
LAN 10/100Base-T (X), 100Base-FX
Transmission Distance Ethernet: Up to 100 m Fiber: Multi-mode: up to 2 km Fiber: Single-mode:
up to 30 km
Transmission Speed Up to 100 Mbps
Optical Fiber Multi-mode Wavelength: 1310 nm (EKI-3541M) Tx Power: -14/-20 dBm Rx
Sensitivity: -31 dBm Parameters: 50/125 um,62.5/125 um Single-mode Wavelength: 1310 nm
(EKI-3541S) Tx Power: -8/-15 dBm Rx Sensitivity: -34 dBm Parameters: 9/125 um.
2. Interface
Connectors 1 x RJ45 1 x SC type fiber connector 6-pin removable screw terminal (power)
LED Indicators P1, P2, P-Fail LFP, LNK/ACT (FX), FDX/COL (FX)
DIP Switch T(X):Speed and HDX/FDX, LFP Fiber: HDX/FDX, T(X):Auto-Negotiation
3. Power
Power Consumption Max. 2.4 W
Power Input 12 ~ 48 VDC, redundant dual inputs
4. Mechanism
Dimensions (W x H x D) 28.5 x 120 x 85.3 mm (1.02" x 4.73" x 3.35")
Mounting DIN-rail, Wall
Enclosure IP40, plastic and metal shell with solid mounting kits
5. Protection
Power Reverse Present
Overload current Present
Page | 26
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 27 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
6. Environment
Operating Temperature -10 ~ 60C (14 ~ 140F)
Storage Temperature -40 ~ 85C (-40 ~ 185F)
Operating Humidity 5 ~ 95% (non-condensing)
Storage Humidity 0 ~ 95% (non-condensing)
MTBF 597,488 hours (EKI-3541M and EKI-3541S)
7. Certification
Safety UL 60950-1, CAN/CSA-C22.2 No.60950
EMI FCC Part 15 Subpart B Class A, EN 55011/55022 Class A
EMS EN 61000-4-2 (Level 3) EN 61000-4-3 (Level 3) EN 61000-4-4 (Level 4) EN 61000-4-5
(Level 3) EN 61000-4-6
Level 3) EN 61000-4-8 (Level 4)
Shock IEC 60068-2-27
Freefall IEC 60068-2-32
Page | 27
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 28 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
1. Communications
Standard IEEE 802.3, 802.3u, 802.3x, 802.1p, 802.3az
LAN 10/100Base-T(X),100Base-FX
Transmission Distance Ethernet: Up to 100 m Multi-mode Fiber: Up to 2 km (EKI-3525M) Single-mode Fiber: Up to 30
km (EKI-3525S)
Transmission Speed Up to 100 Mbps
Optical Fiber Multi-Mode (EKI-3525M) Wavelength:1310nm Tx Power: -14/-20 dBm Rx Sensitivity: -31 dBm Parameters:
50/125 um, 62.5/125 um Single-Mode (EKI-3525S) Wavelength: 1310 nm Tx Power: -8/-15 dBm Rx Sensitivity: -34 dBm
Parameters: 9/125 um
2. Interface
Connectors 4 x RJ45 ports, 1 x SC type fiber connector 6-pin removable screw terminal (power & relay)
LED Indicators P1, P2, P-Fail, Loop detection 10/100T (X): Link/Activity, Speed
3. Switch Properties
MAC Table Size 2K
Packet Buffer Size 384K bit
Switch Fabric Speed 1.0Gbps
4. Power
Power Consumption Max. 2.1 W
Power Input 12 ~ 48 VDC (8.4 ~ 52.8 VDC) redundant dual inputs
Fault Output 1 Relay Output
Page | 28
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 29 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
5. Mechanism
Dimensions (W x H x D) 28.5 x 120 x 85.3 mm (1.02" x 4.73" x 3.35")
Enclosure IP40, plastic and metal shell with solid mounting kits
Mounting DIN-rail, Wall
6. Protection
Reverse Polarity Present
Overload current Present
7. Environment
Operating Temperature -10 ~ 60C (14 ~ 140F)
Storage Temperature -40 ~ 85C (-40 ~ 185F)
Operating Humidity 5 ~ 95% (non-condensing)
Storage Humidity 0 ~ 95% (non-condensing)
MTBF 833,835 hours
8. Certifications
Safety UL 60950-1, CAN/CSA-C22.2 No.60950
EMI FCC Part 15 Subpart B Class A, EN 55011/ 55022 Class A
EMS EN 61000-4-2 (Level 3) EN 61000-4-3 (Level 3) EN 61000-4-4 (Level 4) EN 61000-4-5 (Level 3) EN 61000-4-6
(Level 3) EN 61000-4-8 (Level 4)
Shock IEC 60068-2-27
Freefall IEC 60068-2-32
Vibration IEC 60068-2-6
Page | 29
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 30 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
This section describes software tools that are used for PLC programming. Unity Pro is used mainly in
programming and configuring Premium and M340 CPUs.
Page | 30
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 31 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Unity Pro is the unique and high performance multitask software offer for the Modicon M340, Premium,
Quantum and Safety family range:
- "All-in-one" software
- IEC61131-3 languages
- Ladder (LD)
For these five languages, you can use the standard set of instructions compliant with IEC standard
61131-3 to create applications which can be transferred from one platform to another. Unity Pro software
also provides extensions to this standard set of instructions. As they are specific to Modicon M340,
Page | 31
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 32 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Atrium/Premium and Quantum PLCs, these extensions support the development of more complex
applications in order to maximize the potential of the specific features of each of these platforms.
5.1.3. DFB user function blocks
Using Unity Pro software, users can create their own function blocks for specific application requirements
on Modicon M340, Atrium, Premium and Quantum platforms.
Once created and saved in the library, these user function blocks can be reused as easily as EFBs
(Elementary Function Blocks).
These user function blocks are used to structure an application. They are used when a program sequence
is repeated several times in the application or for fixing a standard programming routine. They can be
read-only or read/write. They can be exported to all other Unity Pro applications.
Page | 32
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 33 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Page | 33
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 34 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
Page | 34
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 35 of 35
Doc. No. IPP-SCD0115-SPC-100 Revision 0
SCADAPack E Configurator can create and modify configurations on-line with a SCADAPack E RTU or
off-line, saving configurations for loading into the RTUs at a later time. SCADAPack E Configurator
supports a wide variety of communication media access for remote communication with RTUs.
Graphical forms are presented for each aspect of the RTU configuration. Ad-hoc user point enquiries may
also be entered, and saved. Saved user data is associated with the RTU configuration file, so user data
can be individually tailored for each RTU.
ISAGRAF 3 Workbench CASE tools manage the configuration and debugging of SCADAPack E
sequence and control applications using IEC61131-3 languages, and target 3 firmware.
Through on-line interaction with the ISAGRAF 3 Workbench Debugger, SCADAPack E Configurator
provides the ability for user applications to be debugged, remotely across a SCADA communications
network including DNP3 communications links.
Page | 35
FACTORY ACCEPTANCE TEST
PROCEDUREs
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 3
Doc. No. IPP-SCD0115-PRC-500 Revision 0
PROJECT
Page | 1
FACTORY ACCEPTANCE TEST
PROCEDUREs
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 3
Doc. No. IPP-SCD0115-PRC-500 Revision 0
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yy)
0 10/02/16 For Review and comments M.Morsi A.Metwally A.Fathi
Page | 2
FACTORY ACCEPTANCE TEST
PROCEDUREs
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 3
Doc. No. IPP-SCD0115-PRC-500 Revision 0
Table of Contents
Page | 3
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
PROJECT
Page | 1
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yy)
0 10/02/16 For Review and comments M.Morsi A.Metwally A.Fathi
Attachments:
Page | 2
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
ABBREVIATIONS
Page | 3
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 4 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
Table of Contents
Attachments: ................................................................................................................................................. 2
1 Introduction ............................................................................................................................................ 5
1.1 Purpose ................................................................................................................................. 5
1.2 Reference documents ........................................................................................................... 5
1.3 General test procedure ......................................................................................................... 6
Page | 4
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 5 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
1 Introduction
1.1 Purpose
This document describes the control system FAT Procedure. It is intended to provide the client with all
details of the Factory Acceptance Test (FAT) procedure including the methodology, equipment and
system setup, tested items, expected results, and with report templates, etc.
FAT Procedure defines the inspections and tests to be carried out during the Factory Acceptance Test in
order to certify that the equipment and the system provided comply with the Functional Design
Specification.
A separate FAT reports shall be signed by the representatives from PETROJET, FAJR/GASCO and GIZA
SYSTEMS upon completion of the Factory Acceptance Testing.
Functional inspection of SCADA Systems hardware and software has been carried out in accordance with
GIZA SYSTEMSs Quality Inspection.
Page | 5
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 6 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
1- Control system panel with the two HSBY Premium PLCs base inside the panel.
2- One laptop with Modbus simulator to simulate FAJR SCADA server.
3- One laptop with Modbus slave simulator installed to simulate IPP3 metering stations/power
plant.
Page | 6
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 7 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
Page | 7
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 8 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
OUTLINE: Hardware components for this project are subjected to visual inspection.
OBJECTIVE: The purpose of this test is to verify that the following is in accordance with the FDS and
product datasheets.
1. Model No. of each component
2. Quantity No. of each component.
PROCEDURE: To check the part numbers and the specifications are complying with those required and
mentioned in the Tender Document and System BOM
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 8
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 9 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
OUTLINE: All components, which are supplied by GIZASYSTEMS, are certified free from scratches
and any deformities, which might impair the product quality and appearance.
OBJECTIVE: The purpose of this test is to ensure that all components are free from scratches and
deformities and ensure that panel assembly is congruent with detailed layout drawing.
PROCEDURE: To visually verify that all components are free from scratches and any kind of
deformation.
CRITERIA: There should not be any external defects such as deformities, scratches etc., which
might impair the product quality or appearance.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 9
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 10 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 10
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 11 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
OUTLINE: Each component of the system normally goes to its operating mode after power up.
OBJECTIVE: The purpose of this test is to ensure that all components successfully boot up when
going from stop mode to operating mode.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 11
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 12 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
OBJECTIVE: When one of the two PLC fails, the system will be able to work through the Hot Standby
PLC
PROCEDURE:
1. Power on PLC number one and switch off the PLC number two.
a) Force any digital input from the simulation panel and notice the feedback in
Modbus simulator.
b) Force any digital output value from Modbus simulator and notice the resonance in
the simulator panel.
2. Power on PLC number one and switch off the PLC number two.
a) Force any digital input from the simulation panel and notice the feedback in
Modbus simulator.
b) Force any digital output value from Modbus simulator and notice the resonance in
the simulator panel.
CRITERIA: The Hot Standby function is working properly for both PLCs
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 12
IPP3 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 13 of 13
Doc. No. IPP-SCD0115-PRC-500-IPP3 Revision 0
OBJECTIVE: Make sure of correct wiring for each and every hardware channel.
CRITERIA: Random selected digital inputs statuses are matched with corresponding values
into Modbus simulator.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 13
IP
PP3 FAC
CTORY ACCEPTA
A ANCE TE
EST
PUNS
SH LIST
Prroject Ga
as Feeding Po
ower Station IP
PP3 & IPP4 Metering
M Statio
ons
Customer PE
ETROJET
En
nd User Jo
ordanian Egyp
ptian FAJR for Natural Gas T
Transmission & Supply Co
Prroject No. 31
128/177/15/14
4
POO No.
IPP3 FAT
T PUNCH LIST
L D
Date
Process
s Area Plant No. Te
eam
Descripttion:
Categ
gory Additional
Discrepancy Improvemen
nt
(tick appllicable) Requirement
Notedd by Name Sig
gn
Agreed S
Solution:
Impleme
entation ve
erified and
d accepted:
Siign: Sign:
GS
S PetroJ
Jet/Fajr/Gasc
co
Daate: Date:
Page:
P 1 of 1
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
PROJECT
Page | 1
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yy)
0 10/02/16 For Review and comments M.Morsi A.Metwally A.Fathi
Attachments:
Page | 2
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
ABBREVIATIONS
Page | 3
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 4 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
Table of Contents
Attachments: ................................................................................................................................................. 2
1 Introduction ............................................................................................................................................ 5
1.1 Purpose ................................................................................................................................. 5
1.2 Reference documents ........................................................................................................... 5
1.3 General test procedure ......................................................................................................... 6
Page | 4
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 5 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
1 Introduction
1.1 Purpose
This document describes the control system FAT Procedure. It is intended to provide the client with all
details of the Factory Acceptance Test (FAT) procedure including the methodology, equipment and
system setup, tested items, expected results, and with report templates, etc.
FAT Procedure defines the inspections and tests to be carried out during the Factory Acceptance Test in
order to certify that the equipment and the system provided comply with the Functional Design
Specification.
A separate FAT reports shall be signed by the representatives from PETROJET, FAJR/GASCO and GIZA
SYSTEMS upon completion of the Factory Acceptance Testing.
Functional inspection of SCADA Systems hardware and software has been carried out in accordance with
GIZA SYSTEMSs Quality Inspection.
Page | 5
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 6 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
1- Control system panel with the two HSBY Premium PLCs base inside the panel.
2- One laptop with Modbus simulator to simulate FAJR SCADA server.
3- One laptop with Modbus slave simulator installed to simulate IPP4 metering stations/power
plant.
Page | 6
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 7 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
Page | 7
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 8 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
OUTLINE: Hardware components for this project are subjected to visual inspection.
OBJECTIVE: The purpose of this test is to verify that the following is in accordance with the FDS and
product datasheets.
1. Model No. of each component
2. Quantity No. of each component.
PROCEDURE: To check the part numbers and the specifications are complying with those required and
mentioned in the Tender Document and System BOM
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 8
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 9 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
OUTLINE: All components, which are supplied by GIZASYSTEMS, are certified free from scratches
and any deformities, which might impair the product quality and appearance.
OBJECTIVE: The purpose of this test is to ensure that all components are free from scratches and
deformities and ensure that panel assembly is congruent with detailed layout drawing.
PROCEDURE: To visually verify that all components are free from scratches and any kind of
deformation.
CRITERIA: There should not be any external defects such as deformities, scratches etc., which
might impair the product quality or appearance.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 9
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 10 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 10
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 11 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
OUTLINE: Each component of the system normally goes to its operating mode after power up.
OBJECTIVE: The purpose of this test is to ensure that all components successfully boot up when
going from stop mode to operating mode.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 11
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 12 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
OBJECTIVE: When one of the two PLC fails, the system will be able to work through the Hot Standby
PLC
PROCEDURE:
1. Power on PLC number one and switch off the PLC number two.
a) Force any digital input from the simulation panel and notice the feedback in
Modbus simulator.
b) Force any digital output value from Modbus simulator and notice the resonance in
the simulator panel.
2. Power on PLC number one and switch off the PLC number two.
a) Force any digital input from the simulation panel and notice the feedback in
Modbus simulator.
b) Force any digital output value from Modbus simulator and notice the resonance in
the simulator panel.
CRITERIA: The Hot Standby function is working properly for both PLCs
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 12
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 13 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
OBJECTIVE: Make sure of correct wiring for each and every hardware channel.
CRITERIA: Random selected digital inputs statuses are matched with corresponding values
into Modbus simulator.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 13
IPP4 FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 14 of 14
Doc. No. IPP-SCD0115-PRC-500-IPP4 Revision 1
OUTLINE: Checking that IPP4 PLCs are acting as Client (Master) and Power Plant PLC acting
as a Server (Slave) while communicating via Modbus TCP.
OBJECTIVE: Make sure of successful data requesting by IPP4 PLC (as a Master) and proper
data retrieving from Power Plant PLC (as a slave).
CRITERIA: Using Modbus simulator tool on laptop, configure simulator to act as a slave and
try to get values of 1 coil and 1 holding register on IPP4 PLC via Modbus TCP.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 14
IP
PP4 FAC
CTORY ACCEPTA
A ANCE TE
EST
PUNS
SH LIST
Prroject Ga
as Feeding Po
ower Station IP
PP3 & IPP4 Metering
M Statio
ons
Customer PE
ETROJET
En
nd User Jo
ordanian Egyp
ptian FAJR for Natural Gas T
Transmission & Supply Co
Prroject No. 31
128/177/15/14
4
POO No.
IPP4 FAT
T PUNCH LIST
L D
Date
Process
s Area Plant No. Te
eam
Descripttion:
Categ
gory Additional
Discrepancy Improvemen
nt
(tick appllicable) Requirement
Notedd by Name Sig
gn
Agreed S
Solution:
Impleme
entation ve
erified and
d accepted:
Siign: Sign:
GS
S PetroJ
Jet/Fajr/Gasc
co
Daate: Date:
Page:
P 1 of 1
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
PROJECT
Page | 1
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yy)
0 10/02/16 For Review and comments M.Morsi A.Metwally A.Fathi
Attachments:
Page | 2
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
ABBREVIATIONS
Page | 3
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 4 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
Table of Contents
Attachments: ................................................................................................................................................. 2
1 Introduction ............................................................................................................................................ 5
1.1 Purpose ................................................................................................................................. 5
1.2 Reference documents ........................................................................................................... 5
1.3 General test procedure ......................................................................................................... 6
Page | 4
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 5 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
1 Introduction
1.1 Purpose
This document describes the control system FAT Procedure. It is intended to provide the client with all
details of the Factory Acceptance Test (FAT) procedure including the methodology, equipment and
system setup, tested items, expected results, and with report templates, etc.
FAT Procedure defines the inspections and tests to be carried out during the Factory Acceptance Test in
order to certify that the equipment and the system provided comply with the Functional Design
Specification.
A separate FAT reports shall be signed by the representatives from PETROJET, FAJR/GASCO and GIZA
SYSTEMS upon completion of the Factory Acceptance Testing.
Functional inspection of SCADA Systems hardware and software has been carried out in accordance with
GIZA SYSTEMSs Quality Inspection.
Page | 5
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 6 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
Page | 6
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 7 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
Page | 7
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 8 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
OUTLINE: Hardware components for this project are subjected to visual inspection.
OBJECTIVE: The purpose of this test is to verify that the following is in accordance with the FDS and
product datasheets.
1. Model No. of each component
2. Quantity No. of each component.
PROCEDURE: To check the part numbers and the specifications are complying with those required and
mentioned in the Tender Document and System BOM
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 8
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 9 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
OUTLINE: All components, which are supplied by GIZASYSTEMS, are certified free from scratches
and any deformities, which might impair the product quality and appearance.
OBJECTIVE: The purpose of this test is to ensure that all components are free from scratches and
deformities and ensure that panel assembly is congruent with detailed layout drawing.
PROCEDURE: To visually verify that all components are free from scratches and any kind of
deformation.
CRITERIA: There should not be any external defects such as deformities, scratches etc., which
might impair the product quality or appearance.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 9
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 10 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 10
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 11 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
OUTLINE: Each component of the system normally goes to its operating mode after power up.
OBJECTIVE: The purpose of this test is to ensure that all components successfully boot up when
going from stop mode to operating mode.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 11
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 12 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
OBJECTIVE: When one of the two RTU TCP ports fails the system will be able to work through the
redundant RTU TCP port.
PROCEDURE:
1. Plug Ethernet cable in RTU TCP port number one and leave RTU TCP port number
two unplugged.
a) Force any digital input from the field and notice the feedback in SCADA displays
b) Force any digital output value from SCADA graphics and notice the resonance in
the field.
2. Plug Ethernet cable in RTU TCP port number two and unplug the cable from RTU TCP
port number one.
a) Force any digital input from the field and notice the feedback in SCADA displays
b) Force any digital output value from SCADA graphics and notice the resonance in
the field.
CRITERIA: The RTU TCP ports redundancy is working properly for both inputs and outputs
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 12
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 13 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
OBJECTIVE: Make sure of correct wiring for each and every hardware channel.
CRITERIA: Random selected IOs signals values are matched with corresponding values into
Modbus simulator.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 13
GOV FACTORY ACCEPTANCE TEST
PROCEDURE
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 14 of 14
Doc. No. IPP-SCD0115-PRC-500-GOV Revision 1
OUTLINE: Checking proper operation for GOV with SCADA graphical interface.
OBJECTIVE: Make sure that GOV statuses and values are updating properly in GOV display on
SCADA client.
CRITERIA: Using Modbus simulator on laptop, give Open/Close commands to GOV and test
digital output by multi-meter, and give Open feedback and Close feedback via
jumper on digital input terminal blocks and see that Open/Close commands are
turns-off.
COMMENTS:
Customer : PETROJET
Name : Signature :
: Signature :
Giza Systems
Name : Signature :
: Signature :
Page | 14
G
GOV FAC
CTORY ACCEPTA
A ANCE TE
EST
PUNS
SH LIST
Prroject Ga
as Feeding Po
ower Station IP
PP3 & IPP4 Metering
M Statio
ons
Customer PE
ETROJET
En
nd User Jo
ordanian Egyp
ptian FAJR for Natural Gas T
Transmission & Supply Co
Prroject No. 31
128/177/15/14
4
POO No.
GOV FAT
T PUNCH LIST
L D
Date
Process
s Area Plant No. Te
eam
Descripttion:
Categ
gory Additional
Discrepancy Improvemen
nt
(tick appllicable) Requirement
Notedd by Name Sig
gn
Agreed S
Solution:
Impleme
entation ve
erified and
d accepted:
Siign: Sign:
GS
S PetroJ
Jet/Fajr/Gasc
co
Daate: Date:
Page:
P 1 of 1
FACTORY ACCEPTANCE TEST
REPORT
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14
Doc. No. IPP-SCD0115-RPT-600
PROJECT TITLE : Gas Feeding Power Station IPP3 & IPP4 Metering Stations
CUSTOMER : PETROJET
Jordanian Egyptian FAJR for Natural Gas Transmission & Supply
END-USER : Co Ltd
This is to certify that the Control System for Gas Feeding Power Station IPP3 & IPP4
Metering Stations and GOV Remote Site (as per the above mentioned P.O. No.) has been
inspected and tested during the Factory Acceptance Test.
The System is found to function as per the project specifications and requirements and is
accepted as deliverable material requirements.
[COMMENTS]
1. Refer to IPP3 FAT PROCEDURE record and its Appendices.
2. Refer to IPP4 FAT PROCEDURE record and its Appendices.
3. Refer to GOV FAT PROCEDURE record and its Appendices.
4. Refer to attached IPP3 FAT Punch List.
5. Refer to attached IPP4 FAT Punch List.
6. Refer to attached GOV FAT Punch List.
SIGNED BY:
Name
Signature
Date
Page | 1
MASTER
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 16
Doc. No. IPP-SDH0115-PRC-500 Revision 03
PROJECT
GAS FEEDING POWER STATION IPP3 & IPP4 METERING STATIONS
SDH SYSTEM
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 16
Doc. No. IPP-SDH0115-PRC-500 Revision 03
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
01 25/01/2016 Issued For Review
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
SDH SYSTEM
Author: pp CLB
John Mills Optilan UK Limited
Project Engineer
Approved CLB
Chris Lee-Brown Optilan UK Limited
Project Manager
Approved LD
QA Optilan UK Limited
Approved Name
On behalf of
Petrojet Signature
Position
This is an unpublished work the copyright of which vests in Optilan UK Limited. All rights reserved. The
information contained herein is the property of Optilan UK Limited. No part of which may be reproduced or
used except as authorised by contracts or other written permission. The copyright and the foregoing restriction
on reproduction and use extend to all media in which the information may be embodied.
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 4 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 5 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
0.2 Contents
0.1 ISSUE CONTROL OF DOCUMENT ............................................................................................ 4
0.2 CONTENTS ........................................................................................................................... 5
0.3 REFERENCED DRAWINGS AND DOCUMENTS ........................................................................... 6
1 INTRODUCTION ........................................................................................................................ 7
1.1 SCOPE ................................................................................................................................. 7
1.2 PURPOSE ............................................................................................................................. 7
1.3 SYSTEM DESCRIPTION .......................................................................................................... 7
2 TEST EQUIPMENT .................................................................................................................... 8
2.1 MULTIMETER ........................................................................................................................ 8
2.2 OPTICAL POWER METER ....................................................................................................... 8
2.3 VARIABLE OPTICAL ATTENUATOR .......................................................................................... 8
3 TEST FUNCTIONALITY ............................................................................................................. 9
3.1 TEST SET-UP ....................................................................................................................... 9
4 TEST PROCEDURES AND RESULTS .................................................................................... 11
4.1 INITIAL SET UP AND VOLTAGE CHECKS ................................................................................ 11
4.2 OPTICAL POWER OUTPUT ................................................................................................... 12
4.3 VISTANET FEATURES AND ALARM TESTS ............................................................................ 13
4.4 ETHERNET UNITS 10BASET ................................................................................................ 14
5 PUNCH LIST............................................................................................................................. 15
6 FACTORY ACCEPTANCE TEST CERTIFICATE ................................................................... 16
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 6 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
Optilan Doc
Project Document Title
No
AQQU-AAC-01 BILL OF MATERIALS (BOM) - SDH SYSTEM
AQQU-AAD-01 BLOCK DIAGRAM IPP3 - SDH SYSTEM
AQQU-AAV-01 BLOCK DIAGRAM IPP4 - SDH SYSTEM
AQQU-AAG-01 FUNCTIONAL DESIGN SPECIFICATION - SDH SYSTEM
AQQU-AAH-01 GENERAL ARRANGEMENT IPP3 EQUIPMENT CABINET - SDH SYSTEM
AQQU-AAQ-01 GENERAL ARRANGEMENT IPP4 EQUIPMENT CABINET - SDH SYSTEM
AQQU-AAF-01 SCHEMATIC DIAGRAM - SDH SYSTEM
AQQU-AAI-01 WIRING & POWER DIAGRAM IPP3 EQUIPMENT CABINET - SDH SYSTEM
AQQU-AAR-01 WIRING & POWER DIAGRAM IPP4 EQUIPMENT CABINET - SDH SYSTEM
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 7 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
1 INTRODUCTION
1.1 Scope
The scope of this document will extend to cover the activities and equipment for the
additional nodes provided by Optilan UK Limited for the use on the Gas Feeding Power
Station IPP3 & IPP4 Metering Stations Project
Optilan have not been advised of any site specific configurations required for the system,
so only basic equipment functionality will be tested.
1.2 Purpose
It is intended that this document be used during the factory acceptance tests of the
additional nodes of TN1U SDH multiplex, Ethernet equipment, and the commissioning
spares , and if required detail any punch list items prior to delivery of the equipment and
cabinets to site. It details the test configuration, test equipment used, methods and the
test results achieved
Prior to the FAT all the equipment will be, as far as possible, installed in cabinets with all
required paddleboards, interface cards, interconnecting cables and interface panels
connected.
The nominal power supply to the equipment cabinets to be used for these tests is
230VAC.
The test equipment and loop-backs will be connected to the interface panels as required.
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 8 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
2 TEST EQUIPMENT
The test equipment to be used for functionality testing is detailed below. The make, model
and serial number of each piece of test equipment shall be recorded in the appropriate
sections below. This will form part of the test results.
The test equipment manufacturers and model numbers will be annotated in this section at
the FAT.
2.1 Multimeter
Equipment manufacturer and Serial Number Calibration Date
model number.
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 9 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
3 TEST FUNCTIONALITY
The following sections describe the tests required to prove the functionality of the
equipment that is required to operate on the FAJR Gas Pipeline Project.
Comments regarding the test results should be added to each test sheet. Where further
action is required this will be addressed either immediately by the project engineer or as
soon as possible after the remaining tests are complete.
All outstanding issues should be recorded in the punch list at the end of this document.
A Pass would be recorded when all equipment passes all tests to the satisfaction of all
present with no outstanding issues.
Minor issues that would not fail the FAT but require further action could be dents or
scratches which need rectifying prior to commissioning, a faulty circuit card which
necessitates utilising a spare card, these would be recorded as a PASS with comments,
and recorded on the punch list.
Issues that would fail the FAT might be a complete node not working, or a specific test not
being completed to the satisfaction of those present. At this point the decision must be
made as to whether the rest of the FAT is completed or if the FAT should be stopped. In
either case a remedial action plan would then be agreed, giving proposed dates for the
retest.
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 10 of 16 Figure 1 Test Set-Up
Doc. No. IPP-SDH0115-ENG-200 Revision 03
WEST
WEST
FOPP
FOPP
FOPP
FOPP
EAST
EAST
ETH10
ETH10
ETH10
ETH10
Service
Service
Blanks
Blanks
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 11 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
1. Before connecting the power plug to any TN-1U Verify the input voltage of 24Vdc
on the Power Connectors of all B86431-41 Power Units (Paddleboards
connectors). Input Voltage should be between 21V and 28V.
2. Connect power to all power units. Ensure that there are no LEDs lit on the power
cards.
3. Check the configuration of each card. This should be as per the Node Assignment
Drawing.
4. Observe the voltage readings and note the results in the test results table below.
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 12 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
1. Power up the TN-1U, with the unit being stand alone and with no fibres connected,
there will be several alarms.
2. Using a VistaNET enabled laptop plugged into the CI port on the front of the STM-1
Units, record the Laser Current readings of both of the STM-1 units. The nominal
readings should be between 10mA to 30mA.
3. Connect a fibre patch cord between the STM-1 transmit port and an optical power
meter. Verify the output power for both of the STM-1 Units. Record results in the table
provided. The nominal readings for 1310nm wavelengths are between-5dBm to 0dBm
4. Connect the two STM1 aggregate cards (TX to RX) together with a fibre patch cord
with a 10dB fixed attenuator, and a variable attenuator set at minimum attenuation.
5. Adjust the optical attenuator to increase the optical attenuation between the STM-1
units. Increase the attenuation further until Vistanet indicates a VC4 fail alarm.
6. Disconnect the receive fibre patch cord and measure with the optical power meter the
received power level. The measured value, i.e. the receive sensitivity should be lower
than -33dBM.
7. Re-insert the fibre patch cord to the STM-1 unit, reset the attenuator to minimum and
clear all alarms.
8. Repeat steps 4 to 8 for the other unit and record all results in the tables provided.
9. Replace the STM1 cards in the TN1U shelf with the commissioning spares and repeat
steps 2 to 8 until all cards have been tested.
2
3
4
5
6
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 13 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
2
3
4
5
6
All results should be recorded in the test record sheet at the end of this section.
1. Plug the VistaNET enabled laptop into the CI port on the front of the service unit.
2. Remove a fibre from the system and observe the change of LED on the STM-1
units and the change in the Ring View, then by drilling down to the Node View to
see the detail of the fault. Replace the fibre and clear all alarms.
3. Remove a fuse from a power card on the system and observe the change of LED
on the STM-1 units and the change of condition in the Ring View, then by drilling
down to Node View to see the detail of the fault. Replace the fuse and clear all
alarms.
4. Remove an Ethernet card from the system and observe the change of condition in
the Ring View, then by drilling down to Node View to see the detail of the fault.
SDH Equipment
Location Alarm Reporting Alarm Reporting Pass/Fail Comments
IPP3
IPP4
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 14 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
1. Using the CI interface and the node assignment drawing, ensure that both Ethernet
units are configured for the correct slot position, TU assignment and priority.
2. Remove the pair of Ethernet cards and replace with the commissioning spares.
Using the CI interface and the node assignment drawing, ensure that both Ethernet
units are configured for the correct slot position, TU assignment and priority.
Two laptops will be used to ping each other over the test link to prove connectivity and
operation.
FACTORY ACCEPTANCE TEST
PROCEDURE
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 15 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
5 PUNCH LIST
Failure/Requirement Agreed Action
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAJ-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 16 of 16
Doc. No. IPP-SDH0115-ENG-200 Revision 03
END OF DOCUMENT
RTU HW FUNC
CTIONALL DESIGN
N
SPECIFICATION
NS
PROJE
ECT
IPP3 & IP
PP4 Pow
wer station
n Naturall Gas Fee
eding
FACTO
ORY ACC
CEPTAN
NCE TEST REPOR
RT
Docum
ment Revis
sion Histo
ory
D
Date
Rev
R Desc
cription Prep
pared by Verified
d by Approved
A by
y
(dd/m
mm/yyyy)
0 11/0
02/2016 Issued Fo
or Approval C.Picca S.colom
mbo F.Ceriani
Page | 1
RTU HW FUNC
CTIONALL DESIGN
N
SPECIFICATION
NS
Page | 2
SIITE ACCE
EPTANC
CE TEST
PRO
OCEDUREEs
ECT
PROJE
Gas Feeding
F Power Sttation IPP
P3 & IPP4
4 Meterin
ng Station
ns
S
SITE AC
CCEPTA
ANCE TEST PR
ROCEDU
URES
Page | 1
SIITE ACCE
EPTANC
CE TEST
PRO
OCEDUREEs
Docum
ment Revision History
y
Date
Rev D
Description P
Prepared by Verified
d by Ap
pproved by
(dd/mm/yy))
0 10/02/16 For Reviiew and com
mments M.Morsi A.Metw
wally A.SAThi
Page | 2
SIITE ACCE
EPTANC
CE TEST
PRO
OCEDUREEs
Tablle of Co
ontents
s
1. IPP3SA
ATProce
edure.
2. IPP4SA
ATProce
edure.
3. GOVSAATProce
edure.
4. SCADASATReport
5. OMNISSHELTERRSATPrrocedurre&Rep
port.
Page | 3
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
ECT
PROJE
Gas Feeding
F Power Sttation IPP
P3 & IPP4
4 Meterin
ng Station
ns
IPP
P3 SITE
E ACCEP
PTANCE TEST
T PROCE
EDURE
Page | 1
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
Docum
ment Revision History
y
Date
Rev D
Description P
Prepared by Verified
d by Ap
pproved by
(dd/mm/yy))
0 10/02/16 For Reviiew and com
mments M.Morsi A.Metw
wally A.Fathi
Attac
chments:
Page | 2
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
ABBREV
VIATIONS
Page | 3
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
Table
e of Conte
ents
ments: .................................................................................................................................................... 2
Attachm
1 Intrroduction ............................................................................................................................................... 5
1.1 Purp
pose ................................................................................................................................... 5
1.2 Refe
erence documents .............................................................................................................. 5
Page | 4
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
1 Intrroduction
1.1 Pu
urpose
Thepurrposeofthis documentisstodescribe etheorganizzationandto odefinethetestsandco ontrolscarrieed
outduriingtheSATpphaseandFu unctionalinsspectionofSCADASystem mandsoftwaare.
SAT Pro
ocedure defiines the insp pections andd tests to bee carried ou
ut during thee Site Accep
ptance Test in
ordertoocertifythatttheequipm mentareopeerativeand thecommun nicationinteerfaceswith otherdevicees
ofthesaamesiteoriintersitesth
hroughtheteelecommuniccationsystem marerunnin ng.
A separrate SAT rep
ports shall be signed by the represeentatives fro om PETROJET, FAJR\GASSCO and GIZZA
SYSTEMMSuponcompletionofth heSiteAccepptanceTestin ng.
1.2 Re
eference do
ocuments
Docume entNumber DocumentTTitle
D0115DWG300
IPPSCD SystemArch hitecture
IPPSCD
D0115SPC10
00 FunctionDeesignDocumeents(FDS)
IPPSCD
D0115ENG2200 BillofMaterrial(RTU/SDH)
IPPSCD
D0115DWG310 Detailedlayoutdrawing(GA/IA)
IPPSCD0115EN
NG270Comm
municationttaglist*
* Docum
ment provided
d by Elster.
Page | 5
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
2 Sys
stem Test Outline
2.1 Sy
ystem Hard
dware Insp
pection
AlltheeequipmentaandhardwarefortheSysstemshouldbeinaccord
dancewiththerequiredspecification
ns
andthefollowingiteemswillbecchecked:
Systtemhardwarreinspection nprocedure//Report
Appearanceand dconstructioon
2.2 Sy
ystem Testt
Thefollo
owingContrrolSystemfu
unctionsarecchecked:
SysttemStartUpFunction.
BilloofMaterials..
RedundantPowerSupplyTeest.
I/OC ChannelsTest(LoopTestt)forallsign
nalsofeachttype.
LogicFunctionTTestwithESDDscenarios,iifapplicable..
Grap phicaldisplayTest.
Page | 6
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
3 Sys
stem Test Procedurre Details
3.1 Sy
ystem Hardware Inspe
ection Proc
cedure
3.1.1 Overall Sy
ystem Conffiguration
NE:
OUTLIN Hardwarecom
mponentsforthisprojectaresubjecteedtovisualin
nspection.
TIVE:
OBJECT ThepurposeoffthistestisttoverifythatttheModelNo.ofeachcomponentisin
acccordancewitththeHardw wareSpecificcations.
REFERE
ENCE: mBOM(IPPSSCD0115ENG200).
ControlSystem
PROCEDURE: Tocheckthepartnumberssandthespeecificationsaarecomplyingwiththoseerequiredan
nd
meentionedinttheTenderD
DocumentanndSystemBO OM
CRITER
RIA: Eacchcomponeentshouldco
onformtotheerequiredhardwareSpeecification.
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
Custome
er : PETR
ROJET
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 7
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
3.1.2 Appearanc
ce and Con
nstruction
OUTLIN
NE: Allcomponents,whicharesuppliedbyGIZASYSTEM MS,arecertiffiedfreefrom
mscratches
mities,which
andanydeform hmightimpaairtheprodu
uctqualityan
ndappearancce.
TIVE:
OBJECT Thepurposeoffthistestisttoensurethatallcompo
onentsarefreeefromscraatchesand
deformities.
REFERE
ENCE: PaanelDrawinggsGA\IA(IPP
PSCD0115D
DWG310).
CRITER
RIA: notbeanyexxternaldefecctssuchasdeformities,sscratchesetcc.,which
Thereshouldn
mightimpairth
heproductq
qualityorapppearance.
COMME
ENTS:
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
Custome
er : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 8
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
3.2 Sy
ystem Inspe
ection Proc
cedure
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 9
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: Eacchcomponeentofthesysstemnormallygoestoitssoperatingm
modeafterp
powerup.
OBJECT
TIVE: Thepurposeoffthistestisttoensurethatallcompo
onentssuccesssfullybootupwhen
goingfromsto
opmodetooperatingm mode.
PROCE
EDURE: 1.Poweeroffcomponnentsindivid
dually.
2.Poweeroneachco
omponentind dividually.
CRITER
RIA: Eacchcomponeenttobootupsuccessfully.
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : PETR
ROJET
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 10
1
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: CheckingHotSStandbyofPLLCs.
OBJECT
TIVE: Whhenoneofth
hetwoPLCffails,thesysttemwillbeaabletoworkthroughtheeHotStandbyy
PLC
C
PROCEDURE:
1 PoweronPLCn
numberoneandswitcho offthePLCn
numbertwo..
a) Forceanyd
digitalinputfromthefieldandnoticeethefeedbaackinSCADAAdisplays
b) Forceanyd
digitaloutpu
utvaluefrommSCADAgrap phicsandnooticethereso
onanceinthee
field.
2 PoweronPLCn
numberoneandswitcho offthePLCn
numbertwo..
a) Forceanyd
digitalinputfromthefieldandnoticeethefeedbaackinSCADAAdisplays
b) Forceanyd
digitaloutpu
utvaluefrommSCADAgrap phicsandnooticethereso
onanceinthee
field.
CRITER
RIA: TheHotStandb
byfunctionisworkingprroperlyforbothPLCs
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : R/GASCO
FAJR
Name : nature
Sign :
: Sign
nature :
er
Custome : PETR
ROJET
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 11
1
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: erationforeachhardwarresignal.
Checkingproperope
OBJECT
TIVE: Makesu
ureofcorrecctwiringforeeachandeve
eryhardwareeinstrumentt.
ENCE:
REFERE HardwareI/OList.
CRITER
RIA: Alldigitaalinputsstaatusarematcchedwithco
orrespondinggvaluesintoSCADA
graphicss.
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
End Use
er : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 12
1
IPP3 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
3.3 SC
CADA Grap
phics Test
OUTLIN
NE: CheckingmatchingoftheggraphicspageesasperFAJJR/GASCOre
equirements.
TIVE:
OBJECT DatacollectedbySCADAco
orrectly
PROCEDURE:
1. CheckIPP3
3P&IDSCADAdrawings((GSdidntreceivedityett).
2. Checkdataafrom/toPowerStationss(IPPSCD01
115ENG270 0)
RIA:
CRITER Graphicspagessdisplayingaalldataprop
perlyandasp
perFAJR/GA
ASCOrequirements.
COMME
ENTS:
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 13
1
IPP3 SITE
S ACC
CEPTANC CE TEST
T
PUNS
SH LIST
Prroject Ga
as Feeding Po
ower Station IP
PP3 & IPP4 Metering
M Statio
ons
Customer PE
ETROJET
En
nd User Jo
ordanian Egyp
ptian FAJR for Natural Gas T
Transmission & Supply Co
Prroject No. 31
128/177/15/14
4
POO No.
IPP3 SAT
T PUNCH LIST
L D
Date
Process
s Area Plant No. Te
eam
Descripttion:
Categ
gory Additional
Discrepancy Improvemen
nt
(tick appllicable) Requirement
Notedd by Name Sig
gn
Agreed S
Solution:
Impleme
entation ve
erified and
d accepted:
Siign: Sign:
GS
S PetroJ
Jet/Fajr/Gasc
co
Daate: Date:
Page:
P 1 of 1
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
ECT
PROJE
Gas Feeding
F Power Sttation IPP
P3 & IPP4
4 Meterin
ng Station
ns
IPP
P4 SITE
E ACCEP
PTANCE TEST
T PROCE
EDURE
Page | 1
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
Docum
ment Revision History
y
Date
Rev D
Description P
Prepared by Verified
d by Ap
pproved by
(dd/mm/yy))
0 10/02/16 For Reviiew and com
mments M.Morsi A.Metw
wally A.Fathi
Attac
chments:
Page | 2
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
ABBREV
VIATIONS
Page | 3
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
Table
e of Conte
ents
ments: .................................................................................................................................................... 2
Attachm
1 Intrroduction ............................................................................................................................................... 5
1.1 Purp
pose ................................................................................................................................... 5
1.2 Refe
erence documents .............................................................................................................. 5
Page | 4
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
1 Intrroduction
1.1 Pu
urpose
Thepurrposeofthis documentisstodescribe etheorganizzationandto odefinethetestsandco ontrolscarrieed
outduriingtheSATpphaseandFu unctionalinsspectionofSCADASystem mandsoftwaare.
SAT Pro
ocedure defiines the insp pections andd tests to bee carried ou
ut during thee Site Accep
ptance Test in
ordertoocertifythatttheequipm mentareopeerativeand thecommun nicationinteerfaceswith otherdevicees
ofthesaamesiteoriintersitesth
hroughtheteelecommuniccationsystem marerunnin ng.
A separrate SAT rep
ports shall be signed by the represeentatives fro om PETROJET, FAJR\GASSCO and GIZZA
SYSTEMMSuponcompletionofth heSiteAccepptanceTestin ng.
1.2 Re
eference do
ocuments
Docume entNumber DocumentTTitle
D0115DWG300
IPPSCD SystemArch hitecture
IPPSCD
D0115SPC10
00 FunctionDeesignDocumeents(FDS)
IPPSCD
D0115ENG2200 BillofMaterrial(RTU/SDH)
IPPSCD
D0115DWG310 Detailedlayoutdrawing(GA/IA)
IPPSCD0115EN
NG270Comm
municationttaglist*
* Docum
ment provided
d by Elster.
Page | 5
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
2 Sys
stem Test Outline
2.1 Sy
ystem Hard
dware Insp
pection
AlltheeequipmentaandhardwarefortheSysstemshouldbeinaccord
dancewiththerequiredspecification
ns
andthefollowingiteemswillbecchecked:
Systtemhardwarreinspection nprocedure//Report
Appearanceand dconstructioon
2.2 Sy
ystem Testt
Thefollo
owingContrrolSystemfu
unctionsarecchecked:
SysttemStartUpFunction.
BilloofMaterials..
RedundantPowerSupplyTeest.
I/OC ChannelsTest(LoopTestt)forallsign
nalsofeachttype.
LogicFunctionTTestwithESDDscenarios,iifapplicable..
Grap phicaldisplayTest.
Page | 6
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
3 Sys
stem Test Procedurre Details
3.1 Sy
ystem Hardware Inspe
ection Proc
cedure
3.1.1 Overall Sy
ystem Conffiguration
NE:
OUTLIN Hardwarecom
mponentsforthisprojectaresubjecteedtovisualin
nspection.
TIVE:
OBJECT ThepurposeoffthistestisttoverifythatttheModelNo.ofeachcomponentisin
acccordancewitththeHardw wareSpecificcations.
REFERE
ENCE: mBOM(IPPSSCD0115ENG200).
ControlSystem
PROCEDURE: Tocheckthepartnumberssandthespeecificationsaarecomplyingwiththoseerequiredan
nd
meentionedinttheTenderD
DocumentanndSystemBO OM
CRITER
RIA: Eacchcomponeentshouldco
onformtotheerequiredhardwareSpeecification.
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
Custome
er : PETR
ROJET
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 7
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
3.1.2 Appearanc
ce and Con
nstruction
OUTLIN
NE: Allcomponents,whicharesuppliedbyGIZASYSTEM MS,arecertiffiedfreefrom
mscratches
mities,which
andanydeform hmightimpaairtheprodu
uctqualityan
ndappearancce.
TIVE:
OBJECT Thepurposeoffthistestisttoensurethatallcompo
onentsarefreeefromscraatchesand
deformities.
REFERE
ENCE: PaanelDrawinggsGA\IA(IPP
PSCD0115D
DWG310).
CRITER
RIA: notbeanyexxternaldefecctssuchasdeformities,sscratchesetcc.,which
Thereshouldn
mightimpairth
heproductq
qualityorapppearance.
COMME
ENTS:
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
Custome
er : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 8
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
3.2 Sy
ystem Inspe
ection Proc
cedure
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 9
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: Eacchcomponeentofthesysstemnormallygoestoitssoperatingm
modeafterp
powerup.
OBJECT
TIVE: Thepurposeoffthistestisttoensurethatallcompo
onentssuccesssfullybootupwhen
goingfromsto
opmodetooperatingm mode.
PROCE
EDURE: 1.Poweeroffcomponnentsindivid
dually.
2.Poweeroneachco
omponentind dividually.
CRITER
RIA: Eacchcomponeenttobootupsuccessfully.
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : PETR
ROJET
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 10
1
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: CheckingHotSStandbyofPLLCs.
OBJECT
TIVE: Whhenoneofth
hetwoPLCffails,thesysttemwillbeaabletoworkthroughtheeHotStandbyy
PLC
C
PROCEDURE:
1 PoweronPLCn
numberoneandswitcho offthePLCn
numbertwo..
a) Forceanyd
digitalinputfromthefieldandnoticeethefeedbaackinSCADAAdisplays
b) Forceanyd
digitaloutpu
utvaluefrommSCADAgrap phicsandnooticethereso
onanceinthee
field.
2 PoweronPLCn
numberoneandswitcho offthePLCn
numbertwo..
a) Forceanyd
digitalinputfromthefieldandnoticeethefeedbaackinSCADAAdisplays
b) Forceanyd
digitaloutpu
utvaluefrommSCADAgrap phicsandnooticethereso
onanceinthee
field.
CRITER
RIA: TheHotStandb
byfunctionisworkingprroperlyforbothPLCs
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : R/GASCO
FAJR
Name : nature
Sign :
: Sign
nature :
er
Custome : PETR
ROJET
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 11
1
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: erationforeachhardwarresignal.
Checkingproperope
OBJECT
TIVE: Makesu
ureofcorrecctwiringforeeachandeve
eryhardwareeinstrumentt.
ENCE:
REFERE HardwareI/OList.
CRITER
RIA: Alldigitaalinputsstaatusarematcchedwithco
orrespondinggvaluesintoSCADA
graphicss.
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
End Use
er : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 12
1
IPP4 SITE AC
CCEPTAN
NCE TES
ST
PROOCEDUR
RE
3.3 SC
CADA Grap
phics Test
OUTLIN
NE: CheckingmatchingoftheggraphicspageesasperFAJJR/GASCOre
equirements.
TIVE:
OBJECT DatacollectedbySCADAco
orrectly
PROCEDURE:
1. CheckIPP4
4P&IDSCADAdrawings((GSdidntreceivedityett).
2. Checkdataafrom/toPowerStationss(IPPSCD01
115ENG270 0)
RIA:
CRITER Graphicspagessdisplayingaalldataprop
perlyandasp
perFAJR/GA
ASCOrequirements.
COMME
ENTS:
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 13
1
IPP4 SITE
S ACC
CEPTANC CE TEST
T
PUNS
SH LIST
Prroject Ga
as Feeding Po
ower Station IP
PP3 & IPP4 Metering
M Statio
ons
Customer PE
ETROJET
En
nd User Jo
ordanian Egyp
ptian FAJR for Natural Gas T
Transmission & Supply Co
Prroject No. 31
128/177/15/14
4
POO No.
IPP4 SAT
T PUNCH LIST
L D
Date
Process
s Area Plant No. Te
eam
Descripttion:
Categ
gory Additional
Discrepancy Improvemen
nt
(tick appllicable) Requirement
Notedd by Name Sig
gn
Agreed S
Solution:
Impleme
entation ve
erified and
d accepted:
Siign: Sign:
GS
S PetroJ
Jet/Fajr/Gasc
co
Daate: Date:
Page:
P 1 of 1
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
ECT
PROJE
Gas Feeding
F Power Sttation IPP
P3 & IPP4
4 Meterin
ng Station
ns
GO
OV SITE
E ACCEP
PTANCE TEST
T PROCE
EDURE
Page | 1
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
Docum
ment Revision History
y
Date
Rev D
Description P
Prepared by Verified
d by Ap
pproved by
(dd/mm/yy))
0 10/02/16 For Reviiew and com
mments M.Morsi A.Metw
wally A.Fathi
Attac
chments:
Page | 2
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
ABBREV
VIATIONS
Page | 3
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
Table
e of Conte
ents
ments: .................................................................................................................................................... 2
Attachm
1 Intrroduction ............................................................................................................................................... 5
1.1 Purp
pose ................................................................................................................................... 5
1.2 Refe
erence documents .............................................................................................................. 5
Page | 4
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
1 Intrroduction
1.1 Pu
urpose
Thepurrposeofthis documentisstodescribe etheorganizzationandto odefinethetestsandco ontrolscarrieed
outduriingtheSATpphaseandFu unctionalinsspectionofSCADASystem mandsoftwaare.
SAT Pro
ocedure defiines the insp pections andd tests to bee carried ou
ut during thee Site Accep
ptance Test in
ordertoocertifythatttheequipm mentareopeerativeand thecommun nicationinteerfaceswith otherdevicees
ofthesaamesiteoriintersitesth
hroughtheteelecommuniccationsystem marerunnin ng.
A separrate SAT rep
ports shall be signed by the represeentatives fro om PETROJET, FAJR\GASSCO and GIZZA
SYSTEMMSuponcompletionofth heSiteAccepptanceTestin ng.
1.2 Re
eference do
ocuments
Docume entNumber DocumentTTitle
D0115DWG300
IPPSCD SystemArch hitecture
IPPSCD
D0115SPC10
00 FunctionDeesignDocumeents(FDS)
IPPSCD
D0115ENG2200 BillofMaterrial(RTU/SDH)
IPPSCD
D0115DWG310 Detailedlayoutdrawing(GA/IA)
IPPSCD0115EN
NG270Comm
municationttaglist*
* Docum
ment provided
d by Elster.
Page | 5
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
2 Sys
stem Test Outline
2.1 Sy
ystem Hard
dware Insp
pection
AlltheeequipmentaandhardwarefortheSysstemshouldbeinaccord
dancewiththerequiredspecification
ns
andthefollowingiteemswillbecchecked:
Systtemhardwarreinspection nprocedure//Report
Appearanceand dconstructioon
2.2 Sy
ystem Testt
Thefollo
owingContrrolSystemfu
unctionsarecchecked:
SysttemStartUpFunction.
BilloofMaterials..
RedundantPowerSupplyTeest.
I/OC ChannelsTest(LoopTestt)forallsign
nalsofeachttype.
LogicFunctionTTestwithESDDscenarios,iifapplicable..
Grap phicaldisplayTest.
Page | 6
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
3 Sys
stem Test Procedurre Details
3.1 Sy
ystem Hardware Inspe
ection Proc
cedure
3.1.1 Overall Sy
ystem Conffiguration
NE:
OUTLIN Hardwarecom
mponentsforthisprojectaresubjecteedtovisualin
nspection.
TIVE:
OBJECT ThepurposeoffthistestisttoverifythatttheModelNo.ofeachcomponentisin
acccordancewitththeHardw wareSpecificcations.
REFERE
ENCE: mBOM(IPPSSCD0115ENG200).
ControlSystem
PROCEDURE: Tocheckthepartnumberssandthespeecificationsaarecomplyingwiththoseerequiredan
nd
meentionedinttheTenderD
DocumentanndSystemBO OM
CRITER
RIA: Eacchcomponeentshouldco
onformtotheerequiredhardwareSpeecification.
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
Custome
er : PETR
ROJET
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 7
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
3.1.2 Appearanc
ce and Con
nstruction
OUTLIN
NE: Allcomponents,whicharesuppliedbyGIZASYSTEM MS,arecertiffiedfreefrom
mscratches
mities,which
andanydeform hmightimpaairtheprodu
uctqualityan
ndappearancce.
TIVE:
OBJECT Thepurposeoffthistestisttoensurethatallcompo
onentsarefreeefromscraatchesand
deformities.
REFERE
ENCE: PaanelDrawinggsGA\IA(IPP
PSCD0115D
DWG310).
CRITER
RIA: notbeanyexxternaldefecctssuchasdeformities,sscratchesetcc.,which
Thereshouldn
mightimpairth
heproductq
qualityorapppearance.
COMME
ENTS:
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
Custome
er : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 8
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
3.2 Sy
ystem Inspe
ection Proc
cedure
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 9
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: Eacchcomponeentofthesysstemnormallygoestoitssoperatingm
modeafterp
powerup.
OBJECT
TIVE: Thepurposeoffthistestisttoensurethatallcompo
onentssuccesssfullybootupwhen
goingfromsto
opmodetooperatingm mode.
PROCE
EDURE: 1.Poweeroffcomponnentsindivid
dually.
2.Poweeroneachco
omponentind dividually.
CRITER
RIA: Eacchcomponeenttobootupsuccessfully.
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 10
1
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: Che
ecking RTU TCP
T ports Re
edundancy
TIVE:
OBJECT Wheen one of the
e two RTU TCCP ports fail the system will
w be able to
t work throu
ugh the
redu
undant RTU TCP
T port.
PROCEDURE:
1. P
Plug Ethernet cable in RTTU TCP port number one e and leave RTU
R TCP porrt number twwo
u
unplugged.
a Force any digital inpu
a) ut from the fie
eld and noticce the feedba
ack in SCADA displays
b Force any digital outp
b) put value fromm SCADA grraphics and notice
n the ressonance in
the field.
2. Plug
P Ethernet cable in RT
TU TCP port number two and unplug the cable fro om RTU TCP P
p number one.
port o
a Force any digital inpu
a) ut from the fie
eld and noticce the feedba
ack in SCADA displays
b Force any digital outp
b) put value fromm SCADA grraphics and notice
n the ressonance in
the field.
RIA:
CRITER The RTU TCP ports redund dancy is workking properlyy for both inp
puts and outpputs
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
End Use
er : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 11
1
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: erationforeachhardwarresignal.
Checkingproperope
OBJECT
TIVE: Makesu
ureofcorrecctwiringforeeachandeve
eryhardwareeinstrumentt.
ENCE:
REFERE HardwareI/OList.
CRITER
RIA: Alldigitaalinputsstaatusarematcchedwithco
orrespondinggvaluesintoSCADA
graphicss.
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
End Use
er : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 12
1
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
OUTLIN
NE: Ch
hecking GOV
V PLC progra
amming functtionality.
TIVE:
OBJECT the
e valve open command/cclose comma
and and fail to
o open/fail to
o close feedb
back are
woorking well
PROCEDURE:
A send close command th
1. by SCADA hen wait for 60
6 second then fail to closse feedback
appear
2. by SCADA
A send open command
c then wait for 60
6 second the
en fail to ope
en feedback
appear
RIA:
CRITER Valve functiona
ality working well
ENTS:
COMME
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
er
End Use : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
Sign
nature :
Page | 13
1
GOV
V SITE AC
CCEPTA
ANCE TES
ST
PROOCEDUR
RE
3.3 SC
CADA Grap
phics Test
OUTLIN
NE: CheckingmatchingoftheggraphicspageesasperFAJJR/GASCOre
equirements.
TIVE:
OBJECT DatacollectedbySCADAco
orrectly
PROCEDURE:
CheckGOVP&IDSCADAdrrawings(GSd
didntreceivvedityet).
RIA:
CRITER Graphicspagessdisplayingaalldataprop
perlyandasp
perFAJR/GA
ASCOrequirements.
COMME
ENTS:
RESULT
TEST R : PAASS / PASSS WITH CO
OMMENTS / FAIL
DATE :
End Use
er : FAJR
R/GASCO
Name : nature
Sign :
: Sign
nature :
er
Custome : ROJET
PETR
Name : Sign
nature :
: Sign
nature :
Giza Sysstems
Name : Sign
nature :
: Sign
nature :
Page | 14
1
GOV SITE
S ACC
CEPTANC CE TEST
T
PUNS
SH LIST
Prroject Ga
as Feeding Po
ower Station IP
PP3 & IPP4 Metering
M Statio
ons
Customer PE
ETROJET
En
nd User Jo
ordanian Egyp
ptian FAJR for Natural Gas T
Transmission & Supply Co
Prroject No. 31
128/177/15/14
4
POO No.
GOV SAT
T PUNCH LIST
L D
Date
Process
s Area Plant No. Te
eam
Descripttion:
Categ
gory Additional
Discrepancy Improvemen
nt
(tick appllicable) Requirement
Notedd by Name Sig
gn
Agreed S
Solution:
Impleme
entation ve
erified and
d accepted:
Siign: Sign:
GS
S PetroJ
Jet/Fajr/Gasc
co
Daate: Date:
Page:
P 1 of 1
SITE ACCEPTANCE TEST REPORT
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14
Doc. No. IPP-SCD0115-RPT-610
PROJECT TITLE : Gas Feeding Power Station IPP3 & IPP4 Metering Stations
CUSTOMER : PETROJET
Jordanian Egyptian FAJR for Natural Gas Transmission & Supply
END-USER : Co Ltd
This is to certify that the Control System for Gas Feeding Power Station IPP3 & IPP4
Metering Stations and GOV Remote Site (as per the above mentioned P.O. No.) has been
inspected and tested during the Site Acceptance Test.
The System is found to function as per the project specifications and requirements and is
accepted as deliverable material requirements.
[COMMENTS]
SIGNED BY:
Name
Signature
Date
Page | 1
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
PROJECT
Page | 1
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
0 11/02/2016 Issued For Approval C.Picca S.colombo F.Ceriani
Page | 2
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
1. FOREWORD
The present document describes the site acceptance test procedure for the Active and
Active Cooling Shelter.
The procedure defines the inspections and tests to be done on site after shelter
installation and prior of commissioning of the whole system including the equipment
(RTU, Telecom, etc,) to verify that all the shelter sub-systems are properly installed and
ready to work.
The procedure is drawn is tabular way to permit a record of the test results.
The SAT must be performed after the complement of all the activities described on the
User manual of the shelter
Page | 3
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Page | 4
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Page | 5
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Page | 6
INSPECTION TEST PLAN
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 3
Doc. No. IPP-SCD0115-PLN-020 Revision 0
PROJECT
Page | 1
INSPECTION TEST PLAN
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian FAJR for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 3
Doc. No. IPP-SCD0115-PLN-020 Revision 0
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yy)
0 10/02/16 For Review and comments M.Morsi A.Metwally A.Fathi
Page | 2
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
PROJECT
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
0 11/02/2016 Issued For Approval C.Picca S.colombo F.Ceriani
Page | 1
RTU HW FUNCTIONAL DESIGN
SPECIFICATIONS
Action point
Omnishelter
Customer
Item
P.O. Acknowledgement
Purchase Order
1 R NA NA Customer PO Conforming to the offer copy signed for acceptance
Rewiew
by Omnishelter
Issuing documents Customer written
2 H AR R IPP-SHL0115-SPC-100 Approved documents
for approval Approval
Verify the main internal
Workmanship:
and external Manufacturing control
3 components, main H R R IPP-SHL0115-DWG-310 During production test
dimensions (tollerance report (3.1 - EN 10204)
dimensions
10 mm)
Conforming to the
Workmanship: spec.: No damages or Manufacturing control
4 H R R IPP-SHL0115-SPC-100 During production test
External Painting defects thickness >50 report (3.1 - EN 10204)
micron
Visual control of the
correct installation of
Workmanship:
IPP-SHL0115-DWG-350 the electrical ancillary Manufacturing control
5 Electrical system H R R During production test
IPP-SHL0115-DWG-330 systems components report (3.1 - EN 10204)
installation
including earthing
system
Workmanship: Verify that all the
IPP-SHL0115-DWG-330 Manufacturing control
6 Accessory H R R accessories required During production test
IPP-SHL0115-SPC-100 report (3.1 - EN 10204)
installation are correctly installed
Verification of Presence Inspection Inspection certificates (2.1,
7 H R R EN 10204
material certificates certificate for: aluminiun 2.2 or 3.1 - EN 10204)
Factory acceptance FAT report (3.1 - EN
8 H W R IPP-SHL0115-RPT-600 Compliant test result
test 10204)
Action point:
H Hold Point
W Witness Point
AR Approval required
R Review Point
NA No Action
Page | 2
MASTER
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
PROJECT
GAS FEEDING POWER STATION IPP3 & IPP4 METERING STATIONS
SDH SYSTEM
INSPECTION AND TEST PLAN
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
01 29/01/2016 Issued For Review
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 3 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
SDH SYSTEM
Author: AC
Armando Caldarello Optilan UK Limited
SQE Engineer
Approved CLB
Chris Lee-Brown Optilan UK Limited
Project Manager
Approved PB
QA Optilan UK Limited
Approved Name
On behalf of
Petrojet Signature
Position
This is an unpublished work the copyright of which vests in Optilan UK Limited. All rights reserved. The
information contained herein is the property of Optilan UK Limited. No part of which may be reproduced or
used except as authorised by contracts or other written permission. The copyright and the foregoing restriction
on reproduction and use extend to all media in which the information may be embodied.
INSPECTION AND TEST PLAN
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 4 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 5 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
0.2 Contents
0.1 ISSUE CONTROL OF DOCUMENT ............................................................................................ 4
0.2 CONTENTS ........................................................................................................................... 5
0.3 GLOSSARY ........................................................................................................................... 6
0.4 REFERENCED DRAWINGS AND DOCUMENTS ........................................................................... 6
1 INTRODUCTION ........................................................................................................................ 7
1.1 SCOPE ................................................................................................................................. 7
1.2 PURPOSE ............................................................................................................................. 7
1.3 ITP COMPLETION GUIDANCE ................................................................................................. 7
1.3.1 ITP LEGEND .................................................................................................................... 7
2 INSPECTION PLAN ................................................................................................................... 8
2.1 OPTILAN (UK) LTD HEAD OFFICE ACTIVITIES ......................................................................... 8
3 APPENDICES ........................................................................................................................... 10
3.1 ZZC-AAM-01-20_OPTILAN DOCUMENTATION PROCEDURES .................................. 11
3.2 ZZC-AAS-01-12_OPTILAN PROCUREMENT PROCEDURES ...................................... 12
3.3 ZZC-AAX-01-21_OPTILAN STORES PROCEDURES .................................................... 13
3.4 ZZC-AAZ-01-12_OPTILAN TRAINING PROCEDURE .................................................... 14
3.5 ZZC-ABA-01-14_OPTILAN WORKSHOP PROCEDURE ................................................ 15
3.6 ZZC-AHI-01-04_OPTILAN SHIPPING & LOGISTICS PROCEDURE .............................. 16
3.7 ZZC-AMK-01-05_OPTILAN SAFETY, QUALITY & ENVIRONMENTAL PROCEDURE .. 17
3.8 ZZC-AMV-01-01_OPTILAN SITE IMPLEMENTATION PROCEDURE ............................ 18
3.9 ZZC-AMW-01-04_OPTILAN PROJECT CONTROL PROCEDURE ................................ 19
3.10 ZZC-AMX-01-02_OPTILAN DESIGN AND DEVELOPMENT PROCEDURES ................ 20
INSPECTION AND TEST PLAN
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 6 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
0.3 Glossary
App Approved
CIF Cost, Insurance and Freight
Dwg(s) Drawing(s)
FAT Factory Acceptance Test
IFAT Integrated Factory acceptance Test
ITP Inspection and Test Plan
Orig Original
PO Purchase Order
Pre-FAT Pre Factory Acceptance Test (Optilan in house test)
SAT Site Acceptance Test
SQE Safety, Quality & Environment
Tech Technical
WM Workshop Manager
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 7 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
1 INTRODUCTION
1.1 Scope
The scope of this document will extend to cover the activities and equipment for the
additional nodes provided by Optilan UK Limited for the use on the Gas Feeding Power
Station IPP3 & IPP4 Metering Stations Project. This Inspection and Test Plan covers
activities up to CIF Aqaba Port, Jordan.
1.2 Purpose
The purpose of this document is to detail the key inspection and test points on the project.
This document will be a live document and will be annotated through the project as and
when a stage is complete.
It is the responsibility of the Optilan Project Manager to sign off the HOLD points in the
Optilan column once he has satisfied himself that all the activities relevant to the individual
stage have been completed satisfactorily. He is also responsible for ensuring the clients
representative is presented with this document to sign off their HOLD points.
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 8 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
2 INSPECTION PLAN
2.1 Optilan (UK) Ltd Head Office Activities
Item Activity Verifying Acceptance Procedure Optilan Sign / Client Sign / Comments
No Doc Criteria Date Date
2.1.1 Contract Review Job Card NA ZZC-AMW-01 R -
Production of General Compliant with
2.1.2 App Dwgs ZZC-AMX-01 RA RA
Arrangement Dwgs client spec*
Compliant with
2.1.3 Production of Block Dwgs App Dwgs ZZC-AMX-01 RA RA
client spec*
Production of Schematic cable Compliant with
2.1.4 App Dwgs ZZC-AMX-01 RA RA
drawings client spec*
Compliant with
2.1.5 Production of Wiring Diagrams App Dwgs ZZC-AMX-01 RA RA
client spec*
AQQU- Compliant with
2.1.6 Functional Design Specification ZZC-AMX-01 RA RA
AAG client spec*
App FAT Compliant with
2.1.8 Production of FAT procedures ZZC-AMX-01 RA RA
Procedures client spec*
Compliant with
2.1.9 Procurement App PO ZZC-AAS-01 RA -
client spec*
Original Delivery note / Job
2.1.10 Goods Inwards Inspection ZZC-AAX-01 R -
PO card
Inspection of all goods not covered Original Compliant with ZZC-AAX-01
2.1.11 OH W
by FAT process PO / Bill of client spec* and ZZC-AMX-01
INSPECTION AND TEST PLAN
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 9 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
Item Activity Verifying Acceptance Procedure Optilan Sign / Client Sign / Comments
No Doc Criteria Date Date
Materials original PO
Production / Issue of Workshop App Route Receipt &
2.1.12 ZZC-AMX-01 RA -
Documentation (Route Cards) Card acceptance by WM
Copy of Compliant with
2.1.13 Pre-FAT ZZC-AMX-01 OH R
FAT doc approved FAT
FAT Compliant with
2.1.18 FAT ZZC-AMX-01 OH W
Report approved FAT
Appropriate for
2.1.24 Delivery Paperwork NA ZZC-AHI-01 RA R/S
Shipment type
Packaging for Shipment & Compliant with
2.1.25 NA ZZC-AHI-01 R W
Dispatch Dossier Review Spec*
Client
Completion and
Inspection
2.1.26 Final Inspection Release Acceptance of FAT - RA H
release
reports
note
INSPECTION AND TEST PLAN
SDH SYSTEM
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET Vendor Doc AQQU-AAU-01-03
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 10 of 20
Doc. No. IPP-SDH0115-PLN-020 Revision 03
3 APPENDICES
Refer to the attached appendices for the Optilan standards used.
SOLAR SYSTEMs ARCHITECTURE
& LAYOUT
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 3
Doc. No. IPP-SOL0115-DWG-300 Revision 0
PROJECT
Page | 1
SOLAR SYSTEMs ARCHITECTURE
& LAYOUT
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 3
Doc. No. IPP-SOL0115-DWG-300 Revision 0
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
0 16/12/2015 Issued For Approval Mohammed Morsi Ayman Metwally Amr Fathi
Page | 2
SOLAR SYSTEM INTERNAL WIRING
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 3
Doc. No. IPP-SOL0115-DWG-310 Revision 0
PROJECT
Page | 1
SOLAR SYSTEM INTERNAL WIRING
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 3
Doc. No. IPP-SOL0115-DWG-310 Revision 0
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
0 27/2/2016 Issued For Approval Mohammed Morsi Ayman Metwally Amr Fathi
Page | 2
SOLAR SYSTEM DATASHEETS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 1 of 3
Doc. No. IPP-SOL0115-MSC-800 Revision 0
PROJECT
Page | 1
SOLAR SYSTEM DATASHEETS
Project Gas Feeding Power Station IPP3 & IPP4 Metering Stations
Customer PETROJET
End User Jordanian Egyptian Fajr for Natural Gas Transmission & Supply Co
Project No. 3128/177/15/14 Sheet 2 of 3
Doc. No. IPP-SOL0115-MSC-800 Revision 0
Date
Rev Description Prepared by Verified by Approved by
(dd/mm/yyyy)
0 27/2/2016 Issued For Approval Mohammed Morsi Ayman Metwally Amr Fathi
Page | 2
Industrial Batteries Network Power
Sonnenschein Solar
Safe storage capacity for renewable energy.
Specifications
The compact alternative
for smaller solar applications.
2
Solar series
Type Part number Nominal Nominal Discharge Length Width Height Height Weight Terminal Ter-
voltage capacity current (l) (b/w) up to top incl. con- minal
C100 l100 of cover nectors posi-
1.8 V/C max. max. (h1) (h2) approx. tion
V Ah A mm mm max. mm max. mm kg
S12/6.6 S NGSO1206D6HS0SA 12 6.6 0.066 151.7 65.5 94.5 98.4 2.6 S-4.8 3
S12/17 G5 NGSO120017HS0BA 12 17.0 0.170 181.0 76.0 167.0 6.1 G-M5 1
S12/27 G5 NGSO120027HS0BA 12 27.0 0.270 167.0 176.0 126.0 9.7 G-M5 1
S12/32 G6 NGSO120032HS0BA 12 32.0 0.320 197.0 132.0 160.0 184.0 11.2 G-M6 2
S12/41 A NGSO120041HS0CA 12 41.0 0.410 210.0 175.0 175.0 14.8 A-Terminal 1
S12/60 A NGSO120060HS0CA 12 60.0 0.600 261.0 136.0 208.0 230.0 19.0 A-Terminal 1
S12/85 A * NGSO120085HS0CA 12 85.0 0.850 353.0 175.0 190.0 27.3 A-Terminal 1
S12/90 A NGSO120090HS0CA 12 90.0 0.900 330.0 171.0 213.0 236.0 31.3 A-Terminal 2
S12/130 A NGSO120130HS0CA 12 130.0 1.300 286.0 269.0 208.0 230.0 39.8 A-Terminal 4
S12/230 A NGSO120230HS0CA 12 230.0 2.300 518.0 274.0 216.0 238.0 70.0 A-Terminal 3
Fig.1
Capacities C1 C100 (20C)
Type C1 C5 C10 C20 C100
1.70 V/C 1.70 V/C 1.70 V/C 1.75 V/C 1.80 V/C
S12/6.6 S 2.9 4.6 5.1 5.7 6.6
S12/17 G5 9.3 12.6 14.3 15.0 17.0
S12/27 G5 15.0 22.1 23.5 24.0 27.0
S12/32 G6 16.9 24.4 27.0 28.0 32.0
S12/41 A 21.0 30.6 34.0 38.0 41.0
S12/60 A 30.0 42.5 47.5 50.0 60.0
Charge mode (to Fig.1): S12/85 A 55.0 68.5 74.0 76.0 85.0
1.) with switch regulator (two-step controller) S12/90 A 50.5 72.0 78.0 84.0 90.0
- charge on curve B (max.charge voltage) for max.2 hrs/day S12/130 A 66.0 93.5 104.5 110.0 130.0
then switch over to continous charge - curve C
S12/230 A 120.0 170.0 190.0 200.0 230.0
2.) Standard charge (without switching) - curve A
3.) Boost charge (Equalizing charge with external generator)
- charge on curve B for max. 5 hrs/month, then switch
Drawings with terminal position, terminal and torque
over to curve C
1 2 3 4
Fig. 2
(to Fig. 2)
5 Nm 6 Nm 8 Nm
Endurance in cycles according to IEC 896-2
* S12/85 A = 400 cycles Not to scale!
3
Safe power supply for medium
performance.
4
Solar Block series
Type Part number Nominal Nominal Discharge Length Width Height Height Weight Terminal Ter-
voltage capacity current (l) (b/w) up to top incl. con- minal
C100 l100 of cover nectors posi-
1.8 V/C max. max. (h1) (h2) approx. tion
V Ah A mm mm max. mm max.mm kg
SB12/60 A NGSB120060HS0CA 12 60 0.60 278 175 190 20 A-Terminal 1
SB12/75 A NGSB120075HS0CA 12 75 0.75 330 171 214 236 28 A-Terminal 2
SB12/100 A NGSB120100HS0CA 12 100 1.00 513 189 195 223 39 A-Terminal 3
SB12/130 A NGSB120130HS0CA 12 130 1.30 513 223 195 223 48 A-Terminal 3
SB12/185 A NGSB120185HS0CA 12 185 1.85 518 274 216 238 65 A-Terminal 3
SB6/200 A NGSB060200HS0CA 6 200 2.00 190 244 254 275 31 A-Terminal 4
SB6/330 A NGSB060330HS0CA 6 330 3.30 312 182 337 359 48 A-Terminal 4
Fig.1
Capacities C1 C100 (20C)
Type C1 C5 C10 C20 C100
1.70 V/C 1.70 V/C 1.70 V/C 1.75 V/C 1.80 V/C
SB12/60 A 34 45 52 56 60
SB12/75 A 48 60 66 70 75
SB12/100 A 57 84 89 90 100
SB12/130 A 78 101 105 116 130
SB12/185 A 103 150 155 165 185
SB6/200 A 104 153 162 180 200
Charge mode (to Fig.1): SB6/330 A 150 235 260 280 330
1.) with switch regulator (two-step controller)
- charge on curve B (max.charge voltage) for max.2 hrs/day
then switch over to continous charge - curve C
2.) Standard charge (without switching) - curve A
3.) Boost charge (Equalizing charge with external generator)
- charge on curve B for max. 5 hrs/month, then switch
Drawings with terminal position, terminal and torque
over to curve C
1 2 3 4
Fig. 2
8 Nm
(to Fig. 2)
Endurance in cycles according to IEC 896-2 Not to scale!
5
Power for high capacity requirements.
6
A600 Solar series
20 Nm
(to Fig. 2)
Endurance in cycles according to IEC 896-2 Not to scale!
7
Exide Technologies Network Power
The Industry Leader.
NXSSOPE50000502 The company reserves the right to change the specification. Colours may differ from those shown.
Exide Technologies Network Power Based on over 100 years of tech-
Division is the global leader in stored nological innovation the Network
electrical energy solutions for all major Power Division leads the industry
critical reserve power applications and with the most recognized global
needs. Network power applications brands such as Absolyte, Sonnen-
include communication/data networks, schein, Marathon, Sprinter, and
UPS systems for computers and Flooded Classic. They have come
control systems, electrical power to symbolize quality, reliability,
generation and distribution systems, performance and excellence in all the
as well as a wide range of other markets served.
industrial standby power applications.
With a strong manufacturing base in Exide Technologies takes pride in its
both North America and Europe and a commitment to a better environment.
truly global reach (operations in more Its Total Battery Management program,
than 80 countries) in sales and ser- an integrated approach to manufac-
vice, Exide Technologies Network turing, distributing and recycling of
Power Division is best positioned to lead acid batteries, has been develo-
satisfy your back up power needs ped to ensure a safe and responsible
locally as well as all over the world. life cycle for all of its products.
www.elektrotec-berlin.de info@elektrotec-berlin.de
SUNSAVER
S O L A R Controller
Solar CONTROLLER
TM
Morningstar is pleased to introduce our third generation SunSaver. Since its first market introduction in 1996, over
1 million SunSaver controllers have been installed in over 73 countries for numerous solar power systems including
oil/gas, telecom and instrumentation, marine and boating, and remote homes. We have retained much of our legacy
design including the same ratings, footprint and simple user interface, and have added several new and advanced
high value features:
SUNSAVER
Full electronic protectionsTM
4 stage battery charging
S O L A RSelf-diagnostics
C O N T R OtoL Ldetect
critical faults
ER
3 LEDs for battery state
of charge
Dead battery recovery
Telecom mode for sensitive
Maximum charge limiting
for sensitive loads
Cover to protect wire
terminals
Multi-color status LED loads Additional certifications
SunSaver Versions
Solar Load System
Current Current Voltage LVD
SS-6-12V 6A 6A 12V No
SS-6L-12V 6A 6A 12V Yes
SS-10-12V 10A 10A 12V No
SS-10L-12V 10A 10A 12V Yes
SS-10L-24V 10A 10A 24V Yes
SS-20L-12V 20A 20A 12V Yes + -
SS-20L-24V 20A 20A 24V Yes SunSaver shown with
wire terminal cover.
T E C H N I C A L S P E C I F I C AT I ON S
8 Pheasant Run
Newtown, PA 18940 USA
Tel: +1 215-321-4457fax: +1 215-321-4458
e-mail: info@morningstarcorp.com