Sunteți pe pagina 1din 4

Daily Report

www.GQIS.co.uk

Project: Hinkley Jetty Design


Customer: Egden Murray
Finalisation
Sub-Vendor: Zhejiang Chankong Steel
Vendor: ESC Group
Pipe CO.,LTD
Sub-Vendor Address: Tianning, Jiashan,
Vendor Address: Putuo, Shanghai,China
Zhejiang
Vendor Reference: Sub-Vendor Reference:

GQIS Assignment No: Customer Reference:

Purchase Order No: 3568 Report No: 006

8PM 28th,August-8AM
Date of Visit:
29th,August,2016
MATERIAL INSPECTED THIS VISIT
Item No. Quantity Description Tag No., Batch No., Serial No., Cast,
Heat No.

SUMMARY / AREAS OF CONCERN

GUI-036-00 (Revision 0) Flash Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

1. SMMARY / AREAS OF CONCERN:


1.1 Review cutting record & roiling inspection record
GQIS inspector review factory original data of cutting record & roiling inspection record, confirm the
inspection record is real and valuable, the inspection content meet the basic requirement and updated timely.

1.2 Witness UT
As per ITP, GQIS inspector witness ultrasonic testing for weld seam of pipe 3568-C12-050-C, before testing,
GQIS inspector reviewed the certificates for UT persons, checked the period of validity of UT equipment,
verification the curve graph accuracy by standard block, and satisfactory; also verification the test condition,
procedure, test process, and satisfactory. No indication was detected during testing and acceptable..

1.3 Inspection cutting, dimension, surface quality and rolling for pipe No.3568-C12-047-B2
GQIS inspector performed visual inspection for pipe No.3568-C12-047-B2 about cutting, dimension, surface
quality and rolling, confirm all the inspection content satisfactory the drawing and specification, also compare
with original data and verified they are correspond.

1.4 Inspection fit-up between pipe 3568-C12-051-B1 with 3568-C12-049-A


As per ITP, GQIS inspector checked the fit-up between pipe 3568-C12-051-B1 with 3568-C12-049-A,
checked the gap about 2mm, alignment about 1mm, and roundness about 1.5mm, polished the weld area of
two side welding seam about 20mm confirm that meet WPS, the result satisfactory.

Picture 5

Review cutting record & roiling inspection record

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Witness UT

Inspection cutting, dimension, surface quality and rolling

Inspection cutting, dimension, surface quality and rolling

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016


Daily Report
www.GQIS.com
Customer: Egden Murray Purchase Order 3568
No.:

Inspection fit-up between pipe 3568-C12-051-B1 with 3568-C12-049-A

Inspection fit-up between pipe 3568-C12-051-B1 with 3568-C12-049-A

Accepted Yes Non-Compliant Yes / No

Technical Specialist: Su Jinlong Operations Coordinator:

Date: 8PM 28th,August-8AM 29th,August,2016 Date:

GUI-035-00 (Revision 0) Inspection Report Dated: 22nd March 2016