Sunteți pe pagina 1din 18

Distributed Inverter Elevator

Distributed by

SIGMA constantly endeavors to improve products so that information in this catalog is subject to change without notice.
Future Oriented, Creating More Comfortable And Pleasant Space
Sigma is creating look of building more beautifully and more effectively.
Our designs are in line with current advances in modern buildings such as luxurious department stores, shopping
centers, office buildings and resort facilities etc.

Sigma’s observation elevator


provides you with an opportunity to enjoy the charming view of the city, and the natural beauty of outdoors.
whenever you go up or down.
In addition, Sgima’s observation
elevator not only has been designed and produced putting customers safety first, but also offers you a sense of
pleasantness in riding an elevator and comfort that truly wakes our customers satisfied.

combines the latest materials of high quality, state of the art technology and elegant design.
Important part of a building...... 50% Energy Saving,
Elevators are a part of the working space. with improved comfort and safety!
User-friendly engineering with an integration of classic and modern design, perfection in Low Noise!
operation controls, safety first, Elevators of Sigma Elevator Company will enhance your Comfortable Ride!
building in functionality and aesthetics. Reliable!
Di(Distributed Inverter) Control?
Safe!
From central control system, Distributed Control drastically improves reliability and perfomance of elevators by implementing And 50% power facility savings
distributed serial communication network structure. Comfortable ride by applying VVVF control with vector control and PWM control.
Control panel size reduced by 46% with distributed network structure. Easy maintenance with LCD Announciator applying sub-divided trouble codes.
Serial communication application reduces wiring and installation time but increases reliability. At site modifications to meet customer¡fl
s specific needs possible.
Motor noise reduced with IGBT. Reliable with self-expert diagnosis system, remote monitoring, group network, and universal
Inverter door provides smooth operation with low noise. communication channels.
Distributed Inverter Elevator 7 | 8

With major changes in life styles, various urban


structures are being developed, and elevators
play a leading role in guiding people to comfortable and
safe urban life styles

EXTERIOR OF 2 SIDE VIEW


OBSERVATION DESIGN

| V2-01 |

EXTERIOR OF 1SIDE VIEW


OBSERVATION DESIGN

| V1-01 | | V1-02 | | V1-03 | | V1-04 | | V1-05 |


Distributed Inverter Elevator 9 | 10

EXTERIOR OF 3SIDE VIEW OBSERVATION DESIGN BIRDCAGE DESIGN

| VB-01 |

| V3-01 | | V3-02 | | V3-03 | | V3-05 |

OPTION

| VB-02 |

| V3-06 | | V3-07 | | V3-08 |

Elevators, at the same time, have become


an integral part of our modern
urban aesthetics.

| VB-03 |
Distributed Inverter Elevator 11 | 12

EXTERIOR OF NUDE DESIGN

Different types of observation lifts are available ranging from 1 side view to 3 side view with variety of exterior
designs. Sigma will provide quality, safety and the design required with its innovative technology accumulated
over past 30 years, challenging spirit, and customer oriented enthusiasm.

Above picture may differ slightly from actual product.

EXTERIOR OF ROUND DESIGN

| VR-01 | | VR-02 | | VR-03 | | VR-04 | | VR-05 |


Distributed Inverter Elevator 13 | 14

V1-04 VR-01
VIEW TYPE : 1 Side View VIEW TYPE : Round View
EXTERIOR DESIGN EXTERIOR DESIGN
MATERIAL : Painted Steel Sheet MATERIAL : Painted Steel Sheet
LIGHTING : Incandescent Light LIGHTING : Incandescent Light & Milky Acryl

V3-06 VR-05
VIEW TYPE : 3 Side View VIEW TYPE : Round View
EXTERIOR DESIGN EXTERIOR DESIGN
MATERIAL : Milky Acryl + Stainless Steel Mirror + FRP With Painted MATERIAL : F.R.P + Painted Steel Sheet
LIGHTING : Incandescent Light & Milky Acryl LIGHTING : Incandescent Light & Globe

V3-07 VB-03
VIEW TYPE : 3 Side View
VIEW TYPE : Bird Cage View
EXTERIOR DESIGN
EXTERIOR DESIGN
MATERIAL : Stainless Steel Mirror + Painted Steel Sheet
MATERIAL : F.R.P + Painted Steel Sheet
LIGHTING : Incandescent Light
LIGHTING : Incandescent Light & Globe
F.R.P(Fiberglass Reinforced Plastics)
Distributed Inverter Elevator 15 | 16

1 Side View Observation Round View Observation


CAR WALL : Stainless Steel Etching CAR WALL : Stainless With Ion-Gold Painting
GLASS : Tempered Glass GLASS : Laminated Glass
CEILING : Painted Steel Sheet + Acryl Lens (C-MX3) CEILING : Painted Steel Sheet (OP-01)

3 Side View Observation Entrance Design


CAR WALL : Stainless Steel Etching + Stone Panel JAMB : Wide Tapered Jamb With Stainless Steel Hairline
GLASS : Tempered Glass TRANSOM PANEL : Stainless Steel Hairline
CEILING : Stainless Mirror + Pearl Painting(Option) DOOR : Stainless Steel Etching (No. EH1-017)
SILL : Extruded Hard Aluminium
HALL INDICATOR : HID-A122
HALL BUTTON : HBT-R51

3 Side View Observation Entrance Design


CAR WALL : Stainless Mirror Etching
JAMB : Wide Tapered Jamb With Stainless Steel Hairline
GLASS : Tempered Glass
TRANSOM PANEL : Stainless Steel Hairline
CEILING : Painted Steel Sheet (C-HX2)
DOOR : Stainless Steel Etching (No. EH1-034)
SILL : Extruded Aluminium
HALL INDICATOR & BUTTON : VID-M332
Distributed Inverter Elevator 17 | 18

ELEVATOR LAYOUTS

1 Side View Observation Elevator Plan 1 SIDE VIEW OBSERVATION

Standard (unit:mm)
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV AL AR A3 AM BM AM BM (kg) (kg)
6 450 800 1400 850 1450 1055 2200 1450 1000 175 175 400 2600 3500 4600 3500 3950 3050
8 550 800 1400 1030 1450 1235 2200 1600 1000 175 175 400 2600 3600 4600 3600 4250 3350
9 600 800 1400 1100 1450 1305 2200 1700 1000 175 175 400 2600 3600 4600 3600 4450 3500
45~105 10 680 800 1400 1250 1450 1455 2200 1850 1000 175 175 400 2600 3800 4600 3800 4650 3700
11 750 800 1400 1350 1450 1555 2200 1950 1000 175 175 400 2600 3900 4600 3900 4950 4000
13 900 900 1600 1350 1650 1555 2400 1950 1200 175 175 400 2800 3900 5000 3900 6300 4350
15 1000 900 1600 1500 1650 1705 2400 2100 1200 175 175 400 2800 4000 5000 4000 6650 4650
17 1150 1000 1800 1500 1890 1720 2800 2100 1300 230 230 450 3200 4000 5800 4000 10050 6000
60~105 20 1350 1000 1800 1700 1890 1920 2800 2300 1300 230 230 450 3200 4200 5800 4200 10700 6500
24 1600 1100 2000 1750 2090 1970 3000 2350 1500 230 230 450 3400 4300 6200 4300 12050 6650

EN Code
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV AL AR A3 AM BM AM BM (kg) (kg)
6 450 800 1400 850 1450 1055 2200 1450 1000 175 175 400 2600 3500 4600 3500 3950 3050
7 525 800 1400 1030 1450 1235 2200 1600 1000 175 175 400 2600 3600 4600 3600 4250 3350
8 600 800 1400 1100 1450 1305 2200 1700 1000 175 175 400 2600 3600 4600 3600 4450 3500
45~105 9 675 800 1400 1250 1450 1455 2200 1850 1000 175 175 400 2600 3800 4600 3800 4650 3700
10 800 800 1400 1350 1450 1555 2200 1950 1000 175 175 400 2600 3900 4600 3900 4950 4000
12 900 900 1600 1350 1650 1555 2400 1950 1200 175 175 400 2800 3900 5000 3900 6300 4350
13 1000 900 1600 1500 1650 1705 2400 2100 1200 175 175 400 2800 4000 5000 4000 6650 4650
HOISTWAY & MACHINE ROOM PLAN (Simplex)
16 1250 1000 1800 1500 1890 1720 2800 2100 1300 230 230 450 3200 4000 5800 4000 10050 6000
60~105 18 1350 1000 1800 1700 1890 1920 2800 2300 1300 230 230 450 3200 4200 5800 4200 10700 6500
21 1600 1100 2000 1750 2090 1970 3000 2350 1500 230 230 450 3400 4300 6200 4300 12050 6650

Singapore & Malaysia


Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV AL AR A3 AM BM AM BM (kg) (kg)
6 410 800 1400 830 1450 1035 2200 1450 1000 175 175 400 2600 3500 4600 3500 3950 3050
8 545 800 1400 1030 1450 1235 2200 1600 1000 175 175 400 2600 3600 4600 3600 4250 3350
9 610 800 1400 1120 1450 1325 2200 1700 1000 175 175 400 2600 3600 4600 3600 4450 3500
45~105 10 680 800 1400 1250 1450 1455 2200 1850 1000 175 175 400 2600 3800 4600 3800 4650 3700
11 750 800 1400 1350 1450 1555 2200 1950 1000 175 175 400 2600 3900 4600 3900 4950 4000
13 885 900 1600 1350 1650 1555 2400 1950 1200 175 175 400 2800 3900 5000 3900 6300 4350
15 1020 900 1600 1520 1650 1725 2400 2100 1200 175 175 400 2800 4000 5000 4000 6650 4650
17 1155 1000 1800 1500 1890 1720 2800 2100 1300 230 230 450 3200 4000 5800 4000 10050 6000
60~105 20 1360 1000 1800 1720 1890 1940 2800 2300 1300 230 230 450 3200 4200 5800 4200 10700 6500
23 1565 1100 2000 1750 2090 1970 3000 2350 1500 230 230 450 3400 4300 6200 4300 12050 6650

Speed APPLICATION AREA


(m/min) Standard EN Code Malaysia Singapore
OVERHEAD 60 4800 4500 4500 4500
(mm) 90 5000 4600 4600 4600
(PLF.HT. ¡´3200mm) 105 5200 4700 4700 4700
60 2000 2000 2000 2000
PIT DEPTH
90 2100 2100 2100 2100
(mm)
105 2300 2300 2300 2300
HOISTWAY & MACHINE ROOM PLAN (Duplex) HOISTWAY SECTION
MACHINE ROOM HEIGHT Load ¡´1500 2300 2300 2700 2300
(mm) Load ⁄ 1500 2600 2600 2700 2600
Distributed Inverter Elevator 19 | 20

ELEVATOR LAYOUTS

2 Side View Observation Elevator Plan 2 SIDE VIEW OBSERVATION

Standard (unit:mm)
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV BV AL AR A3 AM BM AM BM (kg) (kg)
8 550 800 1400 1030 1450 1235 2250 1600 1100 250 175 230 395 2700 3600 4700 3600 4650 3600
9 600 800 1400 1100 1450 1305 2250 1700 1100 300 175 230 395 2700 3700 4700 3700 4850 3750
10 680 800 1400 1250 1450 1455 2250 1850 1100 350 175 230 395 2700 3900 4700 3900 5100 4000
45~105
11 750 800 1400 1350 1450 1555 2250 1950 1100 400 175 230 395 2700 4000 4700 4000 5350 4250
13 900 900 1500 1450 1550 1655 2400 2050 1200 450 230 230 390 2800 4100 5000 4100 6550 4550
15 1000 900 1500 1600 1550 1805 2400 2200 1200 500 230 230 390 2800 4200 5000 4200 7100 4900
17 1150 1000 1600 1680 1690 1900 2650 2300 1300 500 260 260 440 3000 4300 5500 4300 10150 6050
60~105 20 1350 1000 1700 1800 1790 2020 2750 2400 1400 550 250 250 460 3100 4400 5700 4400 11000 6300
24 1600 1100 1800 1940 1890 2160 2850 2550 1400 600 260 260 440 3200 4500 5900 4500 12150 6700

EN Code
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV BV AL AR A3 AM BM AM BM (kg) (kg)
7 525 800 1400 1030 1450 1235 2250 1600 1100 250 175 230 395 2700 3600 4700 3600 4650 3600
8 600 800 1400 1100 1450 1305 2250 1700 1100 300 175 230 395 2700 3700 4700 3700 4850 3750
9 675 800 1400 1250 1450 1455 2250 1850 1100 350 175 230 395 2700 3900 4700 3900 5100 4000
45~105
10 800 800 1400 1350 1450 1555 2250 1950 1100 400 175 230 395 2700 4000 4700 4000 5350 4250
12 900 900 1500 1450 1550 1655 2400 2050 1200 450 230 230 390 2800 4100 5000 4100 6550 4550
13 1000 900 1500 1600 1550 1805 2400 2200 1200 500 230 230 390 2800 4200 5000 4200 7100 4900
16 1250 1000 1600 1680 1690 1900 2650 2300 1300 500 260 260 440 3000 4300 5500 4300 10150 6050
HOISTWAY & MACHINE ROOM PLAN (Simplex)
60~105 18 1350 1000 1700 1800 1790 2020 2750 2400 1400 550 250 250 460 3100 4400 5700 4400 11000 6300
21 1600 1100 1800 1940 1890 2160 2850 2550 1400 600 260 260 440 3200 4500 5900 4500 12150 6700

Singapore & Malaysia


Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV BV AL AR A3 AM BM AM BM (kg) (kg)
8 545 800 1400 1030 1450 1235 2250 1600 1100 250 175 230 395 2700 3600 4700 3600 4650 3600
9 610 800 1400 1120 1450 1325 2250 1700 1100 300 175 230 395 2700 3700 4700 3700 4850 3750
10 680 800 1400 1250 1450 1455 2250 1850 1100 350 175 230 395 2700 3900 4700 3900 5100 4000
45~105
11 750 800 1400 1350 1450 1555 2250 1950 1100 400 175 230 395 2700 4000 4700 4000 5350 4250
13 885 900 1500 1450 1550 1655 2400 2050 1200 450 230 230 390 2800 4100 5000 4100 6550 4550
15 1020 900 1500 1620 1550 1825 2400 2200 1200 500 230 230 390 2800 4200 5000 4200 7100 4900
17 1155 1000 1600 1700 1690 1920 2650 2300 1300 500 260 260 440 3000 4300 5500 4300 10150 6050
60~105 20 1360 1000 1700 1820 1790 2040 2750 2400 1400 550 250 250 460 3100 4400 5700 4400 11000 6300
23 1565 1100 1800 1940 1890 2160 2850 2550 1400 600 260 260 440 3200 4500 5900 4500 12150 6700

Speed APPLICATION AREA


(m/min) Standard EN Code Malaysia Singapore
OVERHEAD 60 4800 4500 4500 4500
(mm) 90 5000 4600 4600 4600
(PLF.HT. ¡´3200mm) 105 5200 4700 4700 4700
60 2000 2000 2000 2000
PIT DEPTH
90 2100 2100 2100 2100
(mm)
105 2300 2300 2300 2300
HOISTWAY & MACHINE ROOM PLAN (Duplex) HOISTWAY SECTION MACHINE ROOM HEIGHT Load ¡´1500 2300 2300 2700 2300
(mm) Load ⁄ 1500 2600 2600 2700 2600
Distributed Inverter Elevator 21 | 22

ELEVATOR LAYOUTS

3 Side View Observation Elevator Plan 3 SIDE VIEW OBSERVATION

Standard (unit:mm)
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV AL AR A3 B3 AM BM AM BM (kg) (kg)
10 680 800 1400 1290 1450 1495 2350 1900 1050 230 230 440 1100 2800 3900 4900 3900 5750 3900
11 750 800 1400 1400 1450 1605 2350 2000 1000 230 230 440 1150 2800 4000 4900 4000 6700 4500
45~105
13 900 900 1500 1480 1550 1685 2400 2050 1100 230 230 390 1250 2800 4100 5000 4100 7250 4650
15 1000 900 1500 1670 1550 1875 2400 2250 1000 230 230 390 1300 2800 4300 5000 4300 7600 4950
17 1150 1000 1600 1770 1690 1990 2650 2400 1050 250 250 460 1400 3100 4300 5500 4300 10200 6400
60~105 20 1350 1000 1700 1890 1790 2110 2750 2500 1100 250 250 460 1450 3200 4400 5700 4400 11050 6650
24 1600 1000 1700 2160 1790 2380 2850 2750 1050 300 300 460 1700 3200 4700 5900 4700 12200 7050

EN Code
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV AL AR A3 B3 AM BM AM BM (kg) (kg)
9 675 800 1400 1290 1450 1495 2350 1900 1050 230 230 440 1100 2800 3900 4900 3900 5750 3900
10 800 800 1400 1400 1450 1605 2350 2000 1000 230 230 440 1150 2800 4000 4900 4000 6700 4500
45~105
12 900 900 1500 1480 1550 1685 2400 2050 1100 230 230 390 1250 2800 4100 5000 4100 7250 4650
13 1000 900 1500 1670 1550 1875 2400 2250 1000 230 230 390 1300 2800 4300 5000 4300 7600 4950
16 1250 1000 1600 1770 1690 1990 2650 2400 1050 250 250 460 1400 3100 4300 5500 4300 10200 6400
HOISTWAY & MACHINE ROOM PLAN (Simplex) 60~105 18 1350 1000 1700 1890 1790 2110 2750 2500 1100 250 250 460 1450 3200 4400 5700 4400 11050 6650
21 1600 1000 1700 2160 1790 2380 2850 2750 1050 300 300 460 1700 3200 4700 5900 4700 12200 7050

Singapore & Malaysia


Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AV AL AR A3 B3 AM BM AM BM (kg) (kg)
10 680 800 1400 1290 1450 1495 2350 1900 1050 230 230 440 1100 2800 3900 4900 3900 5750 3900
11 750 800 1400 1400 1450 1605 2350 2000 1000 230 230 440 1150 2800 4000 4900 4000 6700 4500
45~105
13 885 900 1500 1480 1550 1685 2400 2050 1100 230 230 390 1250 2800 4100 5000 4100 7250 4650
15 1020 900 1500 1700 1550 1905 2400 2250 1000 230 230 390 1300 2800 4300 5000 4300 7600 4950
17 1155 1000 1600 1770 1690 1990 2650 2400 1050 250 250 460 1400 3100 4300 5500 4300 10200 6400
60~105 20 1360 1000 1700 1910 1790 2130 2750 2500 1100 250 250 460 1450 3200 4400 5700 4400 11050 6650
23 1565 1000 1700 2160 1790 2380 2850 2750 1050 300 300 460 1700 3200 4700 5900 4700 12200 7050

Speed APPLICATION AREA


(m/min) Standard EN Code Malaysia Singapore
OVERHEAD 60 4800 4500 4500 4500
(mm) 90 5000 4600 4600 4600
(PLF.HT. ¡´3600mm) 105 5200 4700 4700 4700
60 2000 2000 2000 2000
PIT DEPTH
90 2100 2100 2100 2100
(mm)
105 2300 2300 2300 2300
HOISTWAY & MACHINE ROOM PLAN (Duplex) HOISTWAY SECTION MACHINE ROOM HEIGHT Load ¡´1500 2300 2300 2700 2300
(mm) Load ⁄ 1500 2600 2600 2700 2600
Distributed Inverter Elevator 23 | 24

ELEVATOR LAYOUTS

3 Side Rectangular Observation Elevator Plan 3 SIDE RECTANGULAR OBSERVATION

Standard (unit:mm)
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH BV AL AR A3 A4 A5 B3 AM BM AM BM (kg) (kg)
13 900 900 1500 1450 1550 1655 2650 2050 400 650 450 500 300 425 1100 3100 4100 5500 4100 7050 5150
45~105
15 1000 900 1500 1600 1550 1805 2650 2200 500 650 450 500 300 425 1200 3100 4200 5500 4200 7600 5250
17 1150 1000 1600 1680 1690 1900 2900 2300 500 760 450 660 350 510 1250 3200 4300 6000 4300 10200 6750
60~105 20 1350 1000 1700 1800 1790 2020 2950 2400 550 710 450 610 350 500 1300 3300 4400 6100 4400 11250 6750
24 1600 1100 1800 1940 1890 2160 3100 2550 600 760 450 660 350 500 1400 3400 4500 6400 4500 12450 6850

EN Code
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH BV AL AR A3 A4 A5 B3 AM BM AM BM (kg) (kg)
12 900 900 1500 1450 1550 1655 2650 2050 400 650 450 500 300 425 1100 3100 4100 5500 4100 7050 5150
45~105
13 1000 900 1500 1600 1550 1805 2650 2200 500 650 450 500 300 425 1200 3100 4200 5500 4200 7600 5250
16 1250 1000 1600 1680 1690 1900 2900 2300 500 760 450 660 350 510 1250 3200 4300 6000 4300 10200 6750
60~105 18 1350 1000 1700 1800 1790 2020 2950 2400 550 710 450 610 350 500 1300 3300 4400 6100 4400 11250 6750
21 1600 1100 1800 1940 1890 2160 3100 2550 600 760 450 660 350 500 1400 3400 4500 6400 4500 12450 6850

HOISTWAY & MACHINE ROOM PLAN (Simplex)

Singapore & Malaysia


Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH BV AL AR A3 A4 A5 B3 AM BM AM BM (kg) (kg)
12 885 900 1500 1450 1550 1655 2650 2050 400 650 450 500 300 425 1100 3100 4100 5500 4100 7050 5150
45~105
15 1020 900 1500 1650 1550 1855 2650 2200 500 650 450 500 300 425 1200 3100 4200 5500 4200 7600 5250
17 1155 1000 1600 1700 1690 1920 2900 2300 500 760 450 660 350 510 1250 3200 4300 6000 4300 10200 6750
60~105 20 1360 1000 1700 1850 1790 2070 2950 2400 550 710 450 610 350 500 1300 3300 4400 6100 4400 11250 6750
23 1565 1100 1800 1940 1890 2160 3100 2550 600 760 450 660 350 500 1400 3400 4500 6400 4500 12450 6850

Speed APPLICATION AREA


(m/min) Standard EN Code Malaysia Singapore
OVERHEAD 60 4800 4500 4500 4500
(mm) 90 5000 4800 4800 4800
(PLF.HT. ¡´3200mm) 105 5200 5000 5000 5000
60 2000 2000 2000 2000
PIT DEPTH
90 2100 2100 2100 2100
(mm)
105 2300 2300 2300 2300
MACHINE ROOM HEIGHT Load ¡´1500 2300 2300 2700 2300
(mm) Load ⁄ 1500 2600 2600 2700 2600

HOISTWAY & MACHINE ROOM PLAN(Duplex) HOISTWAY SECTION


Distributed Inverter Elevator 25 | 26

ELEVATOR LAYOUTS

Round Observation Elevator Plan ROUND OBSERVATION

Standard (unit:mm)
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH R AL AR A3 B3 AM BM AM BM (kg) (kg)
11 750 800 1300 1600 1350 1805 2250 2200 650 250 250 400 1100 2700 4200 4700 4200 6050 4400
45~105 13 900 800 1300 1800 1350 2005 2250 2400 650 250 250 400 1220 2700 4400 4700 4400 7050 5150
15 1000 900 1400 1860 1450 2065 2400 2450 700 275 275 400 1220 2800 4500 5000 4500 7600 5250
17 1150 900 1500 1960 1590 2180 2500 2550 750 250 250 410 1270 3100 4600 5200 4600 10200 6750
60~105 20 1350 1000 1600 2080 1690 2300 2650 2700 800 250 250 460 1350 3200 4600 5500 4600 11250 6750
24 1600 1000 1700 2240 1790 2460 2850 2850 850 300 300 460 1450 3300 4900 5900 4900 12450 6850

EN Code
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH R AL AR A3 B3 AM BM AM BM (kg) (kg)
10 800 800 1300 1600 1350 1805 2250 2200 650 250 250 400 1100 2700 4200 4700 4200 6050 4400
45~105 12 900 800 1300 1800 1350 2005 2250 2400 650 250 250 400 1220 2700 4400 4700 4400 7050 5150
13 1000 900 1400 1860 1450 2065 2400 2450 700 275 275 400 1220 2800 4500 5000 4500 7600 5250
16 1250 900 1500 1960 1590 2180 2500 2550 750 250 250 410 1270 3100 4600 5200 4600 10200 6750
60~105 18 1350 1000 1600 2080 1690 2300 2650 2700 800 250 250 460 1350 3200 4600 5500 4600 11250 6750
HOISTWAY & MACHINE ROOM PLAN (Simplex) 21 1600 1000 1700 2240 1790 2460 2850 2850 850 300 300 460 1450 3300 4900 5900 4900 12450 6850

Singapore & Malaysia


Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH R AL AR A3 B3 AM BM AM BM (kg) (kg)
11 750 800 1300 1600 1350 1805 2250 2200 650 250 250 400 1100 2700 4200 4700 4200 6050 4400
45~105 13 885 800 1300 1800 1350 2005 2250 2400 650 250 250 400 1220 2700 4400 4700 4400 7050 5150
15 1020 900 1400 1890 1450 2095 2400 2450 700 275 275 400 1220 2800 4500 5000 4500 7600 5250
17 1155 900 1500 1960 1590 2180 2500 2550 750 250 250 410 1270 3100 4600 5200 4600 10200 6750
60~105 20 1360 1000 1600 2100 1690 2320 2650 2700 800 250 250 460 1350 3200 4600 5500 4600 11250 6750
23 1565 1000 1700 2240 1790 2460 2850 2850 850 300 300 460 1450 3300 4900 5900 4900 12450 6850

Speed APPLICATION AREA


(m/min) Standard EN Code Malaysia Singapore
OVERHEAD 60 4800 4500 4500 4500
(mm) 90 5000 4600 4600 4600
(PLF.HT. ¡´3200mm) 105 5200 4700 4700 4700
60 2000 2000 2000 2000
PIT DEPTH
90 2100 2100 2100 2100
(mm)
105 2300 2300 2300 2300
MACHINE ROOM HEIGHT Load ¡´1500 2300 2300 2700 2300
HOISTWAY & MACHINE ROOM PLAN(Duplex) HOISTWAY SECTION (mm) Load ⁄ 1500 2600 2600 2700 2600
Distributed Inverter Elevator 27 | 28

ELEVATOR LAYOUTS

Birdcage Observation Elevator Plan BIRDCAGE OBSERVATION

Standard (unit:mm)
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH R A3 B3 AM BM AM BM (kg) (kg)
15 1000 800 1100 2060 1190 2297 2550 2700 720 1650 1150 3000 4700 5300 4700 11600 8700

60~105 17 1150 800 1150 2170 1240 2407 2600 2850 780 1700 1150 3000 4800 5400 4800 12400 9250

20 1350 900 1250 2280 1340 2517 2700 2950 840 1800 1150 3100 4900 5600 4900 13500 10400

EN Code
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH R A3 B3 AM BM AM BM (kg) (kg)
13 1000 800 1100 2060 1190 2297 2550 2700 720 1650 1150 3000 4700 5300 4700 11600 8700

60~105 16 1250 800 1150 2170 1240 2407 2600 2850 780 1700 1150 3000 4800 5400 4800 12400 9250

18 1350 900 1250 2280 1340 2517 2700 2950 840 1800 1150 3100 4900 5600 4900 13500 10400

HOISTWAY & MACHINE ROOM PLAN (Simplex)

Singapore & Malaysia


Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH R A3 B3 AM BM AM BM (kg) (kg)
15 1020 800 1100 2100 1190 2337 2550 2700 720 1650 1150 3000 4700 5300 4700 11600 8700

60~105 17 1155 800 1150 2170 1240 2407 2600 2850 780 1700 1150 3000 4800 5400 4800 12400 9250

20 1360 900 1250 2300 1340 2537 2700 2950 840 1800 1150 3100 4900 5600 4900 13500 10400

Speed APPLICATION AREA


(m/min) Standard EN Code Malaysia Singapore
OVERHEAD 60 5600 5600 5600 5600
(mm) 90 5700 5700 5700 5700
(PLF.HT. ¡´3600mm) 105 5800 5800 5800 5800
60 2300 2300 2300 2300
PIT DEPTH
90 2300 2300 2300 2300
(mm)
105 2500 2500 2500 2500
60
MACHINE ROOM HEIGHT
90 2700 2700 2700 2700
(mm)
105

HOISTWAY & MACHINE ROOM PLAN(Duplex) HOISTWAY SECTION


Distributed Inverter Elevator 29 | 30

ELEVATOR LAYOUTS

Octagonal Observation Elevator Plan OCTAGONAL OBSERVATION

Standard (unit:mm)
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AA AS BS AH BH A3 B3 AM BM AM BM (kg) (kg)
15 1000 800 1100 2040 1400 1190 2277 2550 2700 1650 1150 3000 4700 5300 4700 11600 8700

60~105 17 1150 800 1150 2140 1520 1240 2377 2600 2800 1700 1150 3000 4800 5400 4800 12400 9250

20 1350 1000 1300 2160 1600 1390 2397 2750 2850 1850 1150 3100 4900 5700 4900 13500 10400

EN Code
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AA AS BS AH BH A3 B3 AM BM AM BM (kg) (kg)
13 1000 800 1100 2040 1400 1190 2277 2550 2700 1650 1150 3000 4700 5300 4700 11600 8700

60~105 16 1250 800 1150 2140 1520 1240 2377 2600 2800 1700 1150 3000 4800 5400 4800 12400 9250

18 1350 1000 1300 2160 1600 1390 2397 2750 2850 1850 1150 3100 4900 5700 4900 13500 10400

HOISTWAY & MACHINE ROOM PLAN (Simplex)

Singapore & Malaysia


Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AA AS BS AH BH A3 B3 AM BM AM BM (kg) (kg)
15 1020 800 1100 2100 1400 1190 2337 2550 2700 1650 1150 3000 4700 5300 4700 11600 8700

60~105 17 1150 800 1150 2140 1520 1240 2377 2600 2800 1700 1150 3000 4800 5400 4800 12400 9250

20 1360 1000 1300 2230 1600 1390 2467 2750 2850 1850 1150 3100 4900 5700 4900 13500 10400

Speed APPLICATION AREA


(m/min) Standard EN Code Malaysia Singapore
OVERHEAD 60 5600 5600 5600 5600
(mm) 90 5700 5700 5700 5700
(PLF.HT. ¡´3200mm) 105 5800 5800 5800 5800
60 2300 2300 2300 2300
PIT DEPTH
90 2300 2300 2300 2300
(mm)
105 2500 2500 2500 2500
60
MACHINE ROOM HEIGHT
90 2700 2700 2700 2700
(mm)
105

HOISTWAY & MACHINE ROOM PLAN(Duplex) HOISTWAY SECTION


Distributed Inverter Elevator 31 | 32

ELEVATOR LAYOUTS

Pentagonal Observation Elevator Plan PENTAGONAL OBSERVATION

Standard (unit:mm)
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AL AR A3 B3 AM BM AM BM (kg) (kg)
11 750 800 1400 1550 1450 1755 2250 2150 200 200 400 1340 2700 4200 5600 4200 6700 4500
45~105 13 900 900 1500 1680 1550 1885 2400 2250 230 230 390 1340 2800 4300 5600 4300 7250 4650
15 1000 900 1500 1800 1550 2005 2400 2400 230 230 390 1450 2800 4400 5600 4400 7600 4950
17 1150 1000 1600 1900 1690 2120 2650 2500 250 250 460 1530 3000 4500 5600 4500 10200 6400
60~105 20 1350 1000 1700 2050 1790 2270 2750 2650 250 250 460 1680 3100 4600 5600 4600 11050 6650
24 1600 1100 1800 2200 1890 2420 2850 2800 250 250 460 1780 3200 4800 5600 4800 12200 7050

EN Code
Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AL AR A3 B3 AM BM AM BM (kg) (kg)
10 800 800 1400 1550 1450 1755 2250 2150 200 200 400 1340 2700 4200 5600 4200 6700 4500
45~105 12 900 900 1500 1680 1550 1885 2400 2250 230 230 390 1340 2800 4300 5600 4300 7250 4650
13 1000 900 1500 1800 1550 2005 2400 2400 230 230 390 1450 2800 4400 5600 4400 7600 4950
16 1250 1000 1600 1900 1690 2120 2650 2500 250 250 460 1530 3000 4500 5600 4500 10200 6400
60~105 18 1350 1000 1700 2050 1790 2270 2750 2650 250 250 460 1680 3100 4600 5600 4600 11050 6650
21 1600 1100 1800 2200 1890 2420 2850 2800 250 250 460 1780 3200 4800 5600 4800 12200 7050

HOISTWAY & MACHINE ROOM PLAN (Simplex)

Singapore & Malaysia


Car Size Machine Room Size Reactions
Speed Load Opening Dimensions in Hoistway
Person Inside Outside Simplex Duplex R1 R2
(m/min) (kg) (EW)
AN BN AS BS AH BH AL AR A3 B3 AM BM AM BM (kg) (kg)
11 750 800 1400 1550 1450 1755 2250 2150 200 200 400 1340 2700 4200 5600 4200 6700 4500
45~105 13 885 900 1500 1680 1550 1885 2400 2250 230 230 390 1340 2800 4300 5600 4300 7250 4650
15 1020 900 1500 1850 1550 2055 2400 2400 230 230 390 1450 2800 4400 5600 4400 7600 4950
17 1155 1000 1600 1950 1690 2170 2650 2500 250 250 460 1530 3000 4500 5600 4500 10200 6400
60~105 20 1360 1000 1700 2080 1790 2300 2750 2650 250 250 460 1680 3100 4600 5600 4600 11050 6650
23 1565 1100 1800 2200 1890 2420 2850 2800 250 250 460 1780 3200 4800 5600 4800 12200 7050

Speed APPLICATION AREA


(m/min) Standard EN Code Malaysia Singapore
OVERHEAD 60 4800 4500 4500 4500
(mm) 90 5000 4600 4600 4600
(PLF.HT. ¡´3200mm) 105 5200 4700 4700 4700
60 2000 2000 2000 2000
PIT DEPTH
90 2100 2100 2100 2100
(mm)
105 2300 2300 2300 2300
Load ¡´1500 2300 2300 2700 2300
MACHINE ROOM HEIGHT
(mm) Load ⁄ 1500 2600 2600 2700 2600

HOISTWAY & MACHINE ROOM PLAN(Duplex) HOISTWAY SECTION


Distributed Inverter Elevator 33 | 34

WORK BY OTHERS

The works below are not included in the elevator installation work and should be carried out by
building contractors in accordance with our drawings, relevant international or local codes and
regulations.
Installation of lead - in wire and earth wire between building main power board and machine room incoming distribution board.
Hoistways However, machine room lighting source supply shall be separately installed.
Provision of steel bars to fix jamb around the hoistway entrance of each floor.
Waterproof work inside pit,(including drainage, if necessary) and finishing work after the buffers installed. Should operation of the elevators be required on emergency standby power, other are to provide an emergency power unit and
Provision of entrance or ladder(gangway) for pit access(where necessary for deep pit). means for starting it, and deliver to the elevator main switch(MCCB) at the controller in the machine room, sufficient power
Supply and installation of fall - prevention plate at the hoistway entrances. to operate one or more elevators at a time at full rated speed.
Installation of emergency exits and electric wiring in blind sections of hoistway(where required). Provide necessary transfer switch(es) to switch from normal power supply to emergency power supply,
A properly framed and enclosed legal hoistway, including venting as required by the governing code or authority, in the event of normal power supply failure. Provide normally closed contact(s)
ready for uninterrupted use by the Elevator Contractor at an agreed upon date. and wiring from transfer switch(es) to one(1) elevator controller within each group.
Adequate guide rail bracket supports and spacing as required by governing code,
from pit floor to underside of an overhead slab, separator beams where required. Suitable light fixture and convenience outlets in machine room with light switches.
Dry pit of proper depth shall be provided and reinforced to sustain normal and impact vertical forces from rails and impact loads The receptacles shall have ground fault circuit interrupter protection.
from buffer.
Plumb-line tolerance over the whole hoistway height must not exceed ¡ 30mm. Provision of fire extinguishers(per governing codes).
Hoistway walls are to be designed and constructed according to the required fire rating including where penetrated
by elevator fixture boxes and to include adequate fastening to hoistway entrance assemblies. One front entrance wall,
at the main landing, is not to be constructed until after all elevator materials are located in the hoistway. Remaining front entrance walls
shall not be constructed until after door frames and sills are in place. If front walls are poured concrete bearing wall, rough openings are to
be provided to accept entrance frames and filled in after frames are set. Rough openings shall be sized to suit the Elevator Contractor.
All cutting, including cutouts to accommodate hall signal fixtures, patching, painting of walls, floors, or partitions, Miscellaneous
together with finish painting of entrance doors and frames, if required. For the fire emergency operation, the smoke detectors located where required are to be wiring connected to the elevator controllers.
Suitable light fixture and convenience outlet in the pit with a light switch adjacent to the access door or ladder.
The receptacles shall have ground fault circuit interrupter protection. Wiring and piping works between monitoring systems (if monitoring systems are used), elevator machine room,
The surface of the pit floor beneath the rails and buffers stand to be flat and level within 1/8¡¨(3.2mm) of the full width of the pit. alarm panels and inter - communication systems, etc, outside of hoistway.
Where access to the pit is by means of the lowest hoistway entrance, a vertical iron ladder extending 42¡¨ (1067mm) minimum above
the sill of the access door. The elevator machine rooms and hoistways shall be free of dust or harmful gas.

A secured area for storage of elevator equipment and materials during elevator installation shall be provided.

Hoistway and machine room shall contain no piping or wiring not related directly to elevator operation.
Machine Rooms
Provision of phone wiring from phone sevice and / or remote locations to elevator controllers. All electric power for light, tools, hoists, welding, etc, during erection.

Lifting beam must be installed on the ceiling for hoisting and transfer of heavy equipment. All single phase receptacles installed in machine rooms, pits and machinery spaces shall have ground fault circuit interrupter protection.
Noise insulation should be installed between the machine room and adjacent residential areas.
Guarding and protecting the hoistway during construction; the protection of the hoistway shall include removable solid panels surrounding
Patching and plastering of all cutouts made necessary by elevator work. each hoistway opening at each floor, a minimum of 120cm high.
A suitable machine room with legal access, ventilation and concrete floor. Hoistway guards to be erected, maintained and removed by others.
The temperature in the machine room should be maintained between 5¡ and 40¡ .
Relative humidity should not exceed 90%(monthly) and 95%(daily) non - condensing. TEMPORARY USE OF ELEVATORS : Should any elevator be required for use before final completion, others shall provide without
Ventilation shall suit the Elevator Contractor’s heat release requirements. expense to the Elevator Contractor, if required, temporary car enclosures, requisite guards or other protection for elevator hoistway
openings, main line switch with wiring, necessary power, signaling devices, lights in car and elevator operators together with
Machine room entrance size shall be 900mm(W) ¡¿2000mm(H) and cannot be used as passageway leading to any other place. any other special labor or equipment needed to permit this temporary usage.
Forced locking system(automatic - closing) shall be furnished.
The Elevator Contractor shall be reimbursed for any labor and material which is not part of the permanent elevator installation and
Main line power supply shall not exceed ¡ 5% variance.
which is required to provide temporary elevator service. In addition, the Elevator Contractors temporary acceptance(permission) form shall
A three(3) phase, four(4) wire electrical feeder system with an equipment grounding conductor terminating in the machine room. be executed before any elevator is placed in temporary service, and the cost power and operation, maintenance of