ITB 2.4 The bidder should have a minimum current net worth of US $ 5
million, certified by Chartered accountant.
ITB 3.2 Origin: India covering atleast 85 % of the supply and the balance
from any other country.
ITB 6.1 For Clarification of bid purposes only, the Employers address is:
Time: 09:00 h
PREPARATION OF BIDS
ITB 9.3 (c) & (e) Qualification requirements for bidders, including members of
joint ventures, subcontractors or vendors.
2005
2004
2003
2002
2001
a) Item of equipment
b) Description, make, and age (years)
c) Condition (new, good, poor) and number available
d) Owned, leased (from whom?), or to be purchased (from
whom?)
a) Position
b) Name
c) Qualifications
d) Type of experience in similar functions
e) Years of experience (general)
f) Years of experience in proposed position
b) Value of Subcontract
c) Subcontractor name, address and contact person.
d) Type of experience in similar work (incl. Details and value
of work done in last five years as per 1.3 above)
e) Years of experience (general)
1.8 Audited accounts for the last three years; bank references; etc.
[Furnish details below and attach copies.]
2.1 The information listed in 1.1 - 1.12 above shall be provided for
each partner of the joint venture.
2.2 The information in 1.13 above shall be provided for the joint
venture.
2.4 Attach the Agreement among all partners of the joint venture
(and which is legally binding on all partners), which shows that
(a) all partners shall be jointly and severally liable for the
execution of the Contract in accordance with the Contract
terms;
J P MUKHERJI & ASSOCIATES PVT LTD
ITB 11.3 Separate numbered Schedules shall be used for each of the following
elements. The total amount from each Schedule (1 to 6) shall be
summarized in a Grand Summary (Schedule 7) giving the total bid
price(s) to be entered in the Bid Form.
Bidders shall note that the plant and equipment included in Schedule
Nos. 1 and 2 above exclude materials used for civil, building and
other construction works. All materials required for installation and
other purposes shall be included and priced under Schedule No. 6,
Installation Services.
ITB 11.4 (a) i) Plant and equipment to be supplied from abroad shall be quoted
on basis of DDU Tendaho Sugar Factory Project site.
Employer assumes import custom clearances and payment
of custom duties and taxes.
ITB 11.4 (b) i) Prices shall be quoted DDU Tendaho Sugar Factory Project
ITB 12.1 (c) The choice of currencies in ITB Sub-Clause 12.1 (c) shall be as
under.
ITB 13.1 Bid shall include a Bid Security (issued by bank or surety) included in
Section VII Bidding Forms;
ITB 13.2 Bid Security shall be in the form of Bank Guarantee from a reputable
banking institution. If the institution issuing the bid security is located
outside Ethiopia, it shall have a correspondent financial institution
located in Ethiopia to make it enforceable.
ITB 14.1 Bid validity period 120 days from the date of bid opening.
ITB 15.1 & 19.2 The number of copies of the Bid to be completed and returned shall
be ONE original plus FOUR copies plus ONE electronic copy on a
Data Compact Disk (CD) in Microsoft Word format for text and
Microsoft Excel format for quantitative information. (Only Technical
and commercial bid excluding price bid shall be included on CD)
ITB 16.1 Bidders shall not have the option of submitting their bids only
electronically but with hard copies as indicated under BDS 15.1.
ITB 17.1 For bid submission purposes, the Employers address is:
Email: tsfp@ethionet.et
gebreasrat@yahoo.com
BID EVALUATION
Table- 1
ITB 24.1 The Employer will adopt marking system for technical evaluation. A
total of 100 marks have been kept for technical and Financial /
Commercial Evaluation. Merit points shall be allotted for Technical
and Financial evaluation as given below:
Technical Evaluation
3) Training
ITB 25.1 The comparison shall be DDU named place of destination price for
all.
Ii) For those figures, which were not filled by the bidders, the
corresponding maximum value of other bidder shall be filled for
evaluation purpose.
Evaluated Price
The 1st successful and qualified bidder shall be invited for AWARD
OF CONTRACT.
ITB 25.3 (c) Operating and maintenance costs factors for calculation of the life
cycle
iii) maintenance costs, including the cost of spare parts for the
initial period of operation, [to be specified by the Bidder for the
J P MUKHERJI & ASSOCIATES PVT LTD
life cycle]
ITB 25.3 (d) (ii) The following adjustment factors will be used for the BLANCE OF
Adjustment factor PLANT ELECTRICAL.
used in bid
evaluation a) Addition of US $ 10000 for every 2 % excess losses when
compared to the bid received with lowest losses for converter
transformer.
CONTRACT AWARD