SPEC. NO.

COASTAL GUJARAT POWER LIMITED


SECTION : F 3
4000 MW UMPP AT MUNDRA
TITLE
TCE 5146A-H-510-02 SHEET 1 OF 3
STEAM GENERATOR AND AUXILIARIES CONTRACT
DOCUMENT

SCHEDULE OF PERFORMANCE GUARANTEE

The CONTRACTOR shall furnish performance guarantee for Steam Generator and
Auxiliaries in respect of all items listed below: The guarantees below are based on
design coal and design ambient conditions. Contractor recommends that all tests
shall be performed with coal from one single source and not blended with analysis as
close to design coal as possible.

1. Boiler steam generation at Turbine VWO 693.7 kg/s


condition - Under Penalty
2. Boiler steam generation at BMCR - 701.6 kg/s
Demonstration
3. Deleted

4. Boiler efficiency at 100% TGMCR - Under 89.24 %


Penalty
5. Superheat temperature over the control range of 568.5
50% TG MCR to 100% TGMCR - Under
Correction
Reheater steam temperature over the control 595.6
range of 60% TG MCR to 100% TGMCR -
Under Correction
6. Desuperheating spray water quantity for Normal 30 kg/s at steady
superheat steam temperature control at condition. However certain
the 100% TG MCR conditions for design coal operating condition could
and normally fouled steam generator - result in spray water quantity
Under Correction upto 70 kg/s.

7. Desuperheating spray water quantity for reheat 0 kg/s at steady condition


steam temperature control at the 100% TG
MCR conditions for normally fouled steam
generator Under Penalty

8. Total auxiliary power consumption at 100% TG 16,413 kW


MCR - Under Penalty
9. Pressure drop on steam and water side across 45.0 kg/cm2
terminal including static head at 100% TG MCR - From economizer inlet TP to
Under Penalty superheater outlet TP
10. Maximum unburnt carbon ratio in bottom ash at 6%
100% TG MCR Under Correction
11. Maximum unburnt carbon ratio in fly ash at 100% 3%
TG MCR Under Correction
12. Pressure drop on steam side across terminal 2.3 kg/cm2
points for reheater at 100% TG MCR - Under
Penalty
13. Deleted

14. Deleted

ISSUE
R1
SPEC. NO. COASTAL GUJARAT POWER LIMITED
SECTION : F 3
4000 MW UMPP AT MUNDRA
TITLE
TCE 5146A-H-510-02 SHEET 2 OF 3
STEAM GENERATOR AND AUXILIARIES CONTRACT
DOCUMENT

15. Air heater leakage at the specified excess air 10 % of Air heater inlet gas
and air inlet temperature at 100% TG MCR flow
conditions - Under Correction

16. NOx emission rate between 60% TG MCR to 365 ppmv, dry and 6% O2 at
100% SG MCR rating - Under Correction Boiler outlet
17. Dust concentration at ESP outlet, mg/Nm3 with 50 mg/Nm3
all fields in service Under Correction
18. Near field noise level - Under Correction Refer to the Annexure 7.1
Refer to the Annexure 7.1 BOILER ISLAND BOILER ISLAND NOISE
NOISE PROTECTION PROTECTION

19. Coal mill capacity at fineness of 70% through 17.3 kg/s


200 mesh with HGI 40 and total moisture 15% -
Under Correction

Note :

1. If TG heat balance data at 100% TGMCR is different from the original consortium
data, all above data will be reviewed and revised if necessary.

2. Contractor shall submit the relevant correction curves for Owners approval

3. With one field out of service, the expected dust concentration at ESP outlet is
70 mg/Nm3

< Minimum Acceptable Criteria for Boiler Performance >

o Deficiency in Boiler efficiency at 100% TGMCR : -3%

o Deficiency in Boiler steam generation at Turbine VWO condition : -2%

o Increase in Desuperheating spray water quantity for reheat steam


temperature control at the 100% TG MCR conditions for normally
fouled steam generator : +25 T/H

o Increase in Total auxiliary power consumption at 100% TG MCR :+


5%

o Increase in Pressure drop on steam and water side across terminal


including static head at 100% TG MCR : +5%

o Increase in Pressure drop on steam side across terminal points for


reheater at 100% TG MCR : +10%

ISSUE
R1
SPEC. NO. COASTAL GUJARAT POWER LIMITED
SECTION : F 3
4000 MW UMPP AT MUNDRA
TITLE
TCE 5146A-H-510-02 SHEET 3 OF 3
STEAM GENERATOR AND AUXILIARIES CONTRACT
DOCUMENT

LD Condition

20. Shortfall in Boiler steam generation at Turbine 73,500 USD / (1Ton/hr)


VWO condition - Under Penalty
21. Shortfall in Boiler efficiency at 100% TGMCR - 14.5 Mil.USD / 1%
Under Penalty
22. Increase in Desuperheating spray water quantity 0.25 Mil.USD / (1Ton/hr)
for reheat steam temperature control at
the 100% TG MCR conditions for normally fouled
steam generator Under Penalty

23. Increase in Total auxiliary power consumption at 2,000USD/KW


100% TG MCR - Under Penalty
24. Increase in Pressure drop on steam and water 0.32Mil.USD / 1bar
side across terminal including static head at
100% TG MCR - Under Penalty
25. Increase in Pressure drop on steam side across 16,000USD / 0.1bar
terminal points for reheater at 100% TG MCR -
Under Penalty

SIGNATURE ______________

DESIGNATION ______________

COMPANY ______________
COMPANY SEAL
DATE ______________