COASTAL GUJARAT POWER LIMITED SECTION: A2

Volume 1
TPC-0001-PIM 4000 MW UMPP AT MUNDRA
PROJECT INFORMATION MEMORANDUM SHEET 1 OF 5

TPC-0001-PIM

VOLUME 1: SECTION A2

THE TATA POWER COMPANY LIMITED


4000 MW MUNDRA UMPP
PROJECT INFORMATION MEMORANDUM
COASTAL GUJARAT POWER LIMITED SECTION: A2
Volume 1
TPC-0001-PIM 4000 MW UMPP AT MUNDRA
PROJECT INFORMATION MEMORANDUM SHEET 2 OF 5

PROJECT INFORMATION:

1. Owner/Purchaser : The Tata Power Company Limited

2. Project Title : 4000 MW Mundra Ultra Mega Power


Project

3. Location : Coastal Site in Mundra Taluk of Kutch


district of Gujarat state

4. Elevation Above Sea Level : 3 m to 8m above Sea level

5. Nearest Railway Station : Gandhidam /Adipur about 90Km

6. Name of Railway : Western Railway division of Indian


Railways
7. Nearest Air Port : Bhuj (75 Km from Mundra)

8. Port Facility : Mundra Port 25 Km from site

9. Land : Identified Land (preliminary) - 1092 Ha


Land belonging to Govt. - 705 Ha
Mundra SEZ 218 Ha
Private Parties 169 Ha
10. Ambient Air Temperatures

a) Maximum dry bulb temperature : 42 deg C and 40%


with corresponding relative humidity

b) Minimum dry bulb temperature : 22 deg C and 65%


with corresponding relative humidity

c) Average dry bulb temperature


with corresponding relative : 32 deg C and 85%
humidity

d) Design temperature for electrical : 50 deg C


equipment /device

11. Relative Humidity

a) Maximum during monsoon : 100%

b) Minimum during December : 25%


to January
COASTAL GUJARAT POWER LIMITED SECTION: A2
Volume 1
TPC-0001-PIM 4000 MW UMPP AT MUNDRA
PROJECT INFORMATION MEMORANDUM SHEET 3 OF 5

12. Air Quality : Rural location without any major


polluting industries around.

13. Rainfall

a) Annual Average : 250 mm

b) Maximum annual : 1000 mm

c) Period : July to September

14. Tropicalisation : Tropical protection shall conform to


BS: CP- 1014

15. Wind

a) Basic Wind Speed : 50 m/sec

b) Wind direction : Predominant wind direction is from


South-West to North-East.

16. Sea Water Temperature

a) Maximum : 33 deg C

b) Minimum : 25 deg C

c) Average : 30 deg C

17. Seismic Data


(As per IS:1893 latest issue)

Zone : Zone V

18. Road Access : State highway SH-6 and national


Highway NH-8A (link road from SH/NH
to project site to be established)

19. Main Plant and Auxiliary:

a) Unit type : Unit with Supercritical Steam parameters


b) Unit Size : 5 X 800 (typical)
COASTAL GUJARAT POWER LIMITED SECTION: A2
Volume 1
TPC-0001-PIM 4000 MW UMPP AT MUNDRA
PROJECT INFORMATION MEMORANDUM SHEET 4 OF 5

c) Steam Condition : At steam turbine inlet to be 247 Kg/cm2(a),


565 0C / 5930C reheat
d) Condenser cooling water system : Either once through or recirculation system
e) Coal transport to plant : MGR or conveyor system
f) Ash disposal : Dry ash collection with dry/wet disposal
facility for fly ash & bottom ash
g) Environmental aspect : Two Stacks (multi-flue) of 275 m height,
ESP to limit particulate emission, No
Rehabilitation / Resettlement,
Environmentally compatible

20. Fuel : Imported coal. GCV of 4900 to 5700


Kcal / Kg
Coal requirement would be
Daily requirement 35,000 T
Monthly requirement 1 Million
tonnes
Annual requirement - 12 Million
tonnes

21. Evacuation of Power : Six 400 kV lines

22. Auxiliary Power Supply

a) For AC motors above 200 kW : 6600 Volts, 3 phase, 50Hz, non-


and up to 2500 KW effectively earthed

b) For AC motors above 2500 KW : 11000 volts, 3 phase, 50 Hz, non-


effectively earthed

c) For AC motors 200 kW and : 415 Volts, 3 phase, 50Hz,


below effectively earthed

d) AC Control and protective : 110V, 1phase, 2 wire, 50Hz


devices AC supply with one lead earthed

e) Construction supply : 415 Volts, 3 phase, 4 wire, 50Hz


AC supply with neutral lead earthed

f) Lighting fixtures, space heaters : 240 Volts, 1 phase, 2 wire, 50Hz


AC supply with neutral lead earthed

g) DC motors, control and


protective devices : 220 V, 2 wire, unearthed
COASTAL GUJARAT POWER LIMITED SECTION: A2
Volume 1
TPC-0001-PIM 4000 MW UMPP AT MUNDRA
PROJECT INFORMATION MEMORANDUM SHEET 5 OF 5

h) For Instrumentation & Control : 24 V DC and 240 V AC ; 220V DC for


trip solenoids

23. Unless otherwise specified all electrical system shall be designed for the following
voltage and frequency variations :

23.1 A C System:

a) Voltage variations : 10 %
b) Frequency Variation : 5%
c) Combined Voltage &
Frequency Variation : 10 %

23.2 DC System: :

a) Voltage variation (220V) : + 10% to -15%


b) Voltage variation : To suit equipment of I & C system
(24V or 48V)

23.3 UPS 240 V AC supply : 10 %

24. Beneficiary states of Power Generated against a firm PPA:

Gujarat
Maharashtra
Punjab
Haryana
Rajsthan
Uttar Pradesh

Disclaimer:
* This document is for preliminary information which reflects various assumptions, which may or
may not be correct. This document does not purport to contain all information each bidder /
bidding consortia may require.

* Neither Tata Power Company Limited nor its employees or its consultants make any
representation or warranty or whatsoever as to the accuracy, reliability or completeness of the
information provided in this document.

* Each bidder / bidding consortia should conduct its own investigations and analysis and should
check the accuracy, reliability and completeness of the information in this document and obtain
independent advice from appropriate source in their own interest.