Inspection findings
Item Description of check Remarks
Satisfactory Unsatisfactory
Check and ensure the excavation carried out to the required dimension
1 and bottom of foundation is compacted to required degree of
compaction
Check survey report and compaction test report. Check and ensure the
2 blinding concrete curing period is complete and ensure protective
coating on top surface is complete and is acceptable (if applicable)
Ensure concrete strength test result are satisfactory prior to start
3
installing precast Units
Check and installed coordinates in plan and elevation for the anchor
8
bolts and top of concrete of installed precast members
Check all anchor bolts exposed threaded portion is covered with a film
9
of degree to avoid corrosion
Check and ensure back filling around installed foundation is carried out
10 in layers as per project specification and compacted to required
degree of compaction (verify compaction test report
Remarks:
Reference:
Signature
Date
PROJECT: CPF PHASE 1 AT BADRA OIL
FIELDPermanent Camp Phase-II Project ITR No : C-021084 XA
INSPECTION & TEST RECORD-CIVIL
Proj.ITR No:
AREA CIVIL WORK COMPLETION
GB088GB150-2013IE02-
CERTIFICATCONCRETE PRECAST UNITS
0200-QA-IT-20104
INSTALLATION CHECK SHEETE
Rev. : B0
(Space reserved for barcode) Project No: JI-2013IE02
Record No:
TAG RFI No:
SUB-SYSTEM No:
Description:
Drawing No: Rev:
Location:
Specification No: Rev:
Quality Control Procedure No: Rev:
Signature
Date