MATERIAL MANEGEMENT
MATERIAL MANEGEMENT
Inspection
Or Stores- In charge
Or Stores- In charge
Or Stores- In charge
Or Stores- In charge
Or Stores- In charge
Accepted Material
The Accepted material shall be transferred to Main store for stacking and
should be identified by proper tag or by other means.
Rejected Material
Computer system for receipt information (Qty. rate, etc.,) stocks shall
be updated simultaneously for quantity as well as value. Where
material is received frees of Cost (spares received along with new
equipments) a nominal rate such as Rs.1/- shall be used since
Computer system does not accept receipts without rate.
Every site should have their computer at stores from the very
beginning of the project.
MRF will be prepared / printed and distributed to accounts department.
After issue of material, following records shall be updated.
Computer system for issue information (qty., rate, activity code etc.,)
Issues shall be valued by weighted average method by computerized
store accounting system.
Issue slips also shall be properly preserved as a record.
Sufficient racks and bins shall be provided in main store for proper stocking &
preservation of materials. All areas and locations shall be suitably marked
and placard should be displayed.
At regular intervals all the stores item should be visually inspected by the
store officer to observe the following:
a. The Cement supplied by client / supplier shall be physically verified for quantities,
brand, grade, batch and Manufacturing date. Visual inspection to be carried out in
consultation with QA / QC.
b. The receipt of cement should be recorded. if it is supplied by client otherwise it should
be maintained in iPMS.
c. Verify the cement bag weight on sample basis.
d. Cement received in bags shall be stored in cement godown only and shall be protected
from moisture. Cement bags shall be stacked on the platform at least 6 high from the
ground level. While stacking care shall be taken to ensure that bags do not touch the
go down walls. Gap of at least 1 feet shall be maintained between go down walls and
bags.
e. Maximum 15 bags shall be placed on a top another. While stacking cement bags in go
down, attention shall be given so that the packaging down not gets damage.
f. Each batch truck load of cement shall be stacked at a particular place and shall be
identified by display board.
g. Samples for testing shall be collected from each batch and shall be informed to Quality
Control Dept for testing.
h. Cement shall be issued only when the same is found conforming to our site quality
requirement. Any non-conforming / rejected cement shall be kept separately and shall
be prevented from any use.
i. Cement is a shelf life item, so First in First out (FIFO) system shall be followed while
issuing the cement from the go down. If the cement is stored, whether in silo or go
down beyond three month from week of manufacture, the Q.C dept. shall be
contacted for ensuring the quality attributes of the same.
j. Cement bags shall be opened carefully from the mouth by cutting the thread. Care
shall be taken to ensure that workers do not cut the bags in the middle which
drastically reduces the resale value of empty bags.
k. In case of Bulk Cement receipt, same shall be stored in SILO. Cement shall be issued to
the works from SILO to Batching plant.
l. The consumption should be recorded in a register by collecting details from the
executed team.
m. Daily cement reconciliation to be done in consultation with Execution department.
n. Cement Bags returned should be maintained in the same register of cement issues
register.
Diesel can be stored at site in Barrels or Underground Storage tanks provided by Oil
Companies. This decision should be taken in consultation with Project In charge. Store
officer should liason with oil co. and administration department for fulfilling statuary
requirements like No Objection Certificate Explosive License Lay out of pumping outlet
etc. Pump as well as metering device shall be periodically calibrated & record shall be
maintained.
Receipt: All Chambers seals of Diesel tankers should be visually checked for any
tempering. Vehicle should be parked at level ground for 20 minutes for settling, before
unloading of HSD. Dip stick reading should be carefully converted to liters by taking
into account Density and temperature.
Issue of Diesel to Bowser/Equipments/Sub-Contractors: Diesel will be issued to
bouser/Equipments/Sub-contractors against proper authorized MRIS. It should Cleary
specify the purpose of use. Issues to S/contractors / Hired Equipment should as per
Work order terms and condition.
Wastage: Leakage from Storage drums / Bouser should always be attended on top
priority. Store in charge to ensure that all safety procedures are followed for storage
and issues of HSD.
Admixtures / Chemicals shall be unloaded by rolling over the plywood or over the used
tyres to eliminate damage. This type of materials also shall be stored in sheds to
prevent direct sunlight.
Use separate barrel gun for Engine oil , Gear oil and Hydraulic oil.
Keep saw dust near to lub store and clean the floor regularly.
1. Issue of Material
The Cement, hardware items like binding wire, nails, grease, plumbing items, spare parts,
petrol and oil should be issued by store keeper only on the receipt of MATERIAL REQUSITION &
ISSUE SLIP (MRIS) signed by authorized person.
If any stock material is found to be defective, issue entry shall be made and material shall be
returned to the vendor against rejection Challan.
Any material to Sub-contractor should be issued only after the presentation of approved MRIS
from Project Manager / authorized section in charge, clearly mentioning Contractors name
with specimen signature of their authorized representative who will draw the material from
stores. Indent should be clear whether on
a. Fixed Rate
b. System Rate + Service charges as mentioned in work order or as decided by Project
Manager/Project Head.
Separate issue register shall be generated from computer for materials issued to contractors.
Sub-contractors shall be asked to certify the materials drawn by them from stores on monthly
basis. This shall be tallied with the issue record and differences, if any shall be settled
forthwith.
a This authorizes employee of the company to use the MRIS book for issuance of Material from
stores.
b It will avoid the unauthorized use of MRIS for issuance of material from stores.
c A record is kept with storekeeper for authorized issuance.
d The Project In charge authorizes engineers / supervisors for allocating MRIS.
c MRIS Book Issue Register would help in controlling the issuance and return of MRIS
Book.
f Old MRIS Book, if any, should be returned before the new MRIS book is issued.
g Pages of old MRIS book, if any should be checked for proper utilization before
Issuance of new MRIS book.