Project Subject
Settlement Calculation
Description
Settlement Calculation
Project Subject
Settlement Calculation
Description
L6 13.85 13.85 0 21
L7 13.85 13.85 0 21
L8 13.85 13.85 0 21
L9 13.85 13.85 0 21
L10 13.85 13.85 0 21
L11 13.85 13.85 0 21
L12 13.85 13.85 0 21
ORIGINATOR/DEPT.
FICHTNER India
Project Subject
Settlement Calculation
Description
P = P X L X B/((L+H) (B+H))
H = depth of the layer under consideration from founding level at its centre
Si = {P x B x (1- 2) x I}/E
Total Settlement St = Se + Si
FICHTNER India
Project Subject
Settlement Calculation
Description
ORIGINATOR/DEPT.
FICHTNER India
n References / Remarks
INPUTS
Cr = 0.1 x Cc
1.0 m
1.7 t/m3
width of Settlement
pressure increment log value =
influence zone at
at middle of layer log((Po+P)/
middle of layer
(P) (t/m2) Po)
considered (m)
n References / Remarks
21 0.9795918 0.0296794245 0
21 0.9795918 0.0296794245 0
21 0.9795918 0.0296794245 0
21 0.9795918 0.0296794245 0
21 0.9795918 0.0296794245 0
21 0.9795918 0.0296794245 0
21 0.9795918 0.0296794245 0
Soed 49.05531929
Oedometer correction factor 1 (Ref. IS 8009-1976 part I)
Se = Soed* 49.05531929 mm
FORM T9-P REV-A
DEPT. Date__/__/___
FICHTNER India
n References / Remarks
(Ref. Fig. 11 of
IS 8009-1976 part I)
FICHTNER India
n References / Remarks